CEA 4102 Sprinkler Systems. Requirements and test methods for Foam Proportioners for Sprinkler Systems according to CEA 4001

Similar documents
Extended Coverage Sidewall Sprinklers

Tail-end valve stations

Wet alarm valve stations

Spark Extinguishing Systems

Procedure for the Approval of New Fire Detection and Alarm Technologies

Control and Indicating Equipment

IAS Surveillance Measures for Safes & Strongrooms

COMITÉ EUROPÉEN DES ASSURANCES

ISO INTERNATIONAL STANDARD. Fire-fighting hoses Rubber and plastics suction hoses and hose assemblies

Contents. EN :2012 (E) Issue 5 ( ) Page

ISO INTERNATIONAL STANDARD. Footwear Test methods for whole shoe Washability in a domestic washing machine

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Footwear Test methods for outsoles Tensile strength and elongation

ISO 1806 INTERNATIONAL STANDARD. Fishing nets Determination of mesh breaking force of netting

COPYRIGHT Danish Standards. NOT FOR COMMERCIAL USE OR REPRODUCTION. DS/EN :1999

LOAD RESTRAINT ASSEMBLIES ON ROAD VEHICLES - SAFETY - PART 2: WEB LASHING MADE FROM MAN-MADE FIBRES IRISH STANDARD I.S. EN :

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

INTERNATIONAL STANDARD

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD. Rotary positive displacement pumps Technical requirements

Portable fire extinguishers - Part 7: Characteristics, performance requirements and test methods KONSOLIDEERITUD TEKST

INTERNATIONAL STANDARD

COPYRIGHT Danish Standards. NOT FOR COMMERCIAL USE OR REPRODUCTION. DS/EN :1999

ISO INTERNATIONAL STANDARD. Non-destructive testing Penetrant testing Part 2: Testing of penetrant materials

ISO INTERNATIONAL STANDARD. Footwear Test methods for uppers and lining Water vapour permeability and absorption

This document is a preview generated by EVS

This document is a preview generated by EVS

This document is a preview generated by EVS

PAPER - DETERMINATION OF BURSTING STRENGTH (ISO 2758:2001) IRISH STANDARD I.S. EN ISO 2758:2003. Price Code

ISO INTERNATIONAL STANDARD. Footwear Test methods for outsoles Abrasion resistance

ISO INTERNATIONAL STANDARD. Plastics piping systems for hot and cold water installations Crosslinked polyethylene (PE-X) Part 1: General

This document is a preview generated by EVS

ILNAS-EN 50304:2001. Electric ovens for household use - Methods for measuring the energy consumption

LIGHTING APPLICATIONS - TUNNEL LIGHTING IRISH STANDARD I.S. CR 14380: Price Code. Údarás um Chaighdeáin Náisiúnta na héireann

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

This document is a preview generated by EVS

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

ILNAS-EN 61882:2016. Hazard and operability studies (HAZOP studies) - Application guide

This document is a preview generated by EVS

Fire-fighting hoses - Non-percolating layflat hoses for fixed systems KONSOLIDEERITUD TEKST

ISO INTERNATIONAL STANDARD. Packaging Tactile warnings of danger Requirements. Emballages Indications tactiles de danger Exigences

This document is a preview generated by EVS

INTERNATIONAL STANDARD

This document is a preview generated by EVS

Loss Prevention Standard

This document is a preview generated by EVS

This document is a preview generated by EVS

INTERNATIONAL STANDARD NORME INTERNATIONALE

INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Non-destructive testing Magnetic particle testing Part 2: Detection media

INTERNATIONAL STANDARD

This document is a preview generated by EVS

INTERNATIONAL STANDARD

This document is a preview generated by EVS

INTERNATIONAL STANDARD

CONVENTIONS CONCERNING ELECTRIC AND MAGNETIC CIRCUITS (IEC 60375:2003) IRISH STANDARD I.S. EN 60375:2003. Price Code

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

ILNAS-EN 1845:2007. Footwear manufacturing machines - Footwear moulding machines - Safety requirements

Gas meters - Conversion devices - Part 1: Volume conversion

This document is a preview generated by EVS

CROSS RECESSED RAISED COUNTERSUNK HEAD DRILLING SCREWS WITH TAPPING SCREW THREAD (ISO 15483:1999) IRISH STANDARD I.S. EN ISO 15483:2000.

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD

This document is a preview generated by EVS

This document is a preview generated by EVS

This document is a preview generated by EVS

This document is a preview generated by EVS

Skorstenar Allmänna krav. Chimneys General requirements

This document is a preview generated by EVS

Skyddshandskar för brandmän. Protective gloves for firefighters

This document is a preview generated by EVS

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

This document is a preview generated by EVS

INTERNATIONAL STANDARD

Explosiv atmosfär Tillämpning av kvalitetssystem. Potentially explosive atmospheres Application of quality systems

Electromagnetic compatibility (EMC)

AS/NZS :2016

SVENSK STANDARD SS-EN Stållinor Säkerhet Del 9: Slutna bärlinor för linbaneanläggningar för persontransport

INTERNATIONAL STANDARD

This document is a preview generated by EVS

Waste fittings for sanitary appliances

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

This document is a preview generated by EVS

Foodstuffs - Determination of vitamin C by HPLC

Gas meters - Additional functionalities

Emergency Lighting. This is a free 7 page sample. Access the full version online. Irish Standard I.S. 3217:2008

This document is a preview generated by EVS

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529

ISO INTERNATIONAL STANDARD

This document is a preview generated by EVS

This document is a preview generated by EVS

This document is a preview generated by EVS

Transcription:

CEA 4102 Sprinkler Systems Requirements and test methods for Foam Proportioners for Sprinkler Systems according to CEA 4001 May 2015

Insurance Europe Standard CEA 4102 Sprinkler Systems Requirements and test methods for Foam Proportioners for Sprinkler Systems according to CEA 4001 May 2015 CEA 4102 2015 All rights reserved 3

This non-binding standard has been developed by prevention bodies, under the initiative of the insurers or their representatives grouped at European level in the Insurance Europe Prevention Forum. The prevention bodies are: - ANPI asbl, Belgium - CEPREVEN, Spain - CNPP, France - DBI, Denmark - FPA (Fire Protection Association), United Kingdom - VdS Schadenverhütung GmbH, Germany The technical work has been carried out by the Expert Group 3. The editorial work has been carried out by VdS Schadenverhütung GmbH, on behalf of the other prevention bodies. The copyright of the non-binding standards is shared by the Consortium of prevention bodies: This the fi rst edition of this non-binding standard. designated body for publication: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln, Germany Phone: +49 221 77 66 0 Fax: + 49 221 77 66 341 www.vds.de www.vds-shop.de

This standard is a non-binding standard. Insurers are free to accept for insurance, on whatever terms and conditions they wish, security systems, devices or installation services which do not comply with this standard. Use of the words: specifications, guidelines or rules throughout the text are used to improve the readability and do not detract from the non-binding nature of the document. CONTENTS Foreword...6 1 Scope...6 2 References...6 3 Definitions...6 4 Requirements and test methods...7 4.1 Manufacturer Specifications...7 4.2 Technical documentation...7 4.3 Marking...7 4.4 Requirements and test methods of EN 13565-1...7 4.5 Function...8 4.6 Water hammer...9 4.7 Overload 110%...9 4.8 Overload 150%...10 4.9 Suction-side dry run (operation without foam concentrate supply)...10 4.10 Other tests...10 CEA 4102 2015 All rights reserved 5

CEA 4102 Sprinkler Systems Requirements and test methods for Foam Proportioners FOREWORD It has been assumed in the preparation of these CEA Specifications that the execution of its provisions is entrusted to appropriately qualified and experienced organisations. NOTE: All pressure data in these CEA Specifications are given as gauge pressures in bar 1). 1) bar = 10 5 Pa 1 SCOPE These CEA Specifications specify requirements and test methods for Foam Proportioners used in automatic sprinkler systems (wet pipe systems and dry pipe systems) conforming to the CEA Rules for Sprinkler Systems Planning and Installation (CEA 4001) or foam enhanced systems to EN 12845. These CEA-Specifications specify requirements and test methods for these foam proportioners by reference to the European Standard for Foam Systems (EN 13565-1) or detailed description of additional requirements and test methods in these CEA-Specifications. NOTE: The requirements and test methods ensure that the foam proportioner is reliable and provides a stable function (proportion rate). The requirements and test methods do not ensure that the foam proportioner is compatible with a specific foam concentrate chosen for a specific sprinkler system and that the foam proportioner in each case provides the intended proportion rate. According to CEA 4001, the compatibility has to be ensured by the installer and the proportion rate has to be tested and verified in each installed system. 2 REFERENCES and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to these CEA-Specifications only when incorporated in them by amendment or revision. For undated references the latest edition of the publication referred to applies. CEA 4001 Sprinkler Systems Planning and Installation EN 13565-1 Foam systems Part 1: Requirements and test methods for components NT Fire 042 : 1989-09 Nordtest method, Foam Concentrates, Proportioner: Performance test 3 DEFINITIONS For the purpose of these CEA-Specifications the definitions of EN 13565-1 and the following definitions apply. Flow rate Q1: Flow rate of extinguishing water into and through the proportioner, in l/min. Flow rate Q2: Flow rate of foam concentrate induced into the extinguishing water by the proportioner, in l/min. Flow rate Q3: Total flow rate at the outlet of the proportioner (Q1 + Q2), in l/min. Proportion rate: Volume-% foam concentrate in the total flow = (Q2/Q3) x 100, in %. These CEA-Specifications incorporate by dated or undated references, provisions from other publications. These normative references are cited at the appropriate places in the text 6 CEA 4102 2015 All rights reserved

4. Requirements and test methods 4 REQUIREMENTS AND TEST METHODS 4.1 Manufacturer Specifications The manufacturer shall specify: the maximum working pressure PS: at least 10 bar and not exceeding 16 bar; and the permitted maximum water flow rate Q1 max wet for use in wet pipe systems; and the permitted maximum water flow rate Q1 max dry for use in dry pipe systems: either 70% or 100% of Q1 max wet ; and Note: The manufacturer may, by specification, limit the use in dry pipe systems to systems requiring not more than 70% of the specified maximum flow rate Q1 for wet pipe systems. the nominal proportion rate(s); and the pressure drop; and the required/permissible conditions at the foam concentrate inlet (including permissible dry run time, if clause 4.9 is applicable). 4.2 Technical documentation The following documentation shall be submitted: a) Manufacturing documents: Assembly drawing and parts list; and Drawings of all individual parts; and Data sheets of all purchased parts. The marking according to 4.3 shall be documented in the drawings. If the marking is applied in coded form the meaning of the codes must be documented in the drawings. b) User documentation: Data sheet; and Mounting/installation instructions. c) List of documents: A list (with the manufacturer s designations, drawing No., revision s state, date) containing all above mentioned documents (providing designation, drawing No., revision s state and date). 4.3 Marking The foam proportioner must be marked with the following information: Manufacturer s/supplier s name or trade mark; and Type designation; and Maximum working pressure; and Direction of flow (water flow) ; and Nominal proportion rate; and Maximum water flow rate Q1 max wet ; and some mark(s) or code(s) (e.g. serial number or batch number), by which at least the date or batch and the place of manufacture (if several places of manufacture) can be identified by the manufacturer. This marking shall be non-detachable, permanent, non-combustible, and well legible in installed position of the foam proportioner. 4.4 Requirements and test methods of EN 13565-1 4.4.1 Foam proportioners shall fulfil the applicable requirements for foam proportioners of EN 13565-1, except when otherwise stated in these CEA-Specifications. 4.4.2 Foam proportioners shall be tested in accordance with the applicable test methods for foam proportioners of EN 13565-1, except when otherwise stated in these CEA- Specifications. 4.4.3 The test pressure in the hydrostatic pressure test (see EN 13565-1, clause 4.3.2 and Annex A) shall be 4 times the specified maximum working pressure instead of 3 times the specified maximum working pressure and CEA 4102 2015 All rights reserved 7

CEA 4102 Sprinkler Systems Requirements and test methods for Foam Proportioners in a subsequent verificational function test according to 4.5.2 the requirements of 4.5.1 shall be met. 4.4.4 The requirements of EN 13565-1 regarding accuracy of proportioning and flow/pressure loss characteristics (see EN 13565-1, clause 7) are covered by the function requirements and test method specified in 4.5. 4.4.6 Additional requirements and test methods (in addition to EN 13565-1) are specified in 4.6 to 4.9. 4.5 Function NOTE: This clause covers the requirements of EN 13565-1, clause 7. In addition, requirements for high water flow rates (upto 150% of specified Q1 max wet ) and requirements for small water flow rates (below flow rates used in foam systems) are specified. 4.5.1 Requirements The requirements for the accuracy of proportioning as shown in figure 1 shall be met when tested in accordance with 4.5.2. The pressure drop figures specified by the manufacturer shall be within ± 10 % of the value(s) determined in accordance with 4.5.2. 4.5.2 Test method The test shall generally be done as described in section 2 of Nordtest Method NT Fire 042. Water should be used as test media instead of foam concentrate for Q2. Water flow Q1 through the proportioner is established as shown in table 1. At increasing and decreasing pressure the following is measured: Q1; Q2; pressure upstream the proportioner; pressure downstream the proportioner; the required/permissible conditions at the foam concentrate inlet, as applicable. The proportion rate is calculated. Figure 1 Requirements on accuracy of proportioning depending on flow rate Q1. 8 CEA 4102 2015 All rights reserved

4. Requirements and test methods Each function test (Input and verificational) Input function test only Q1 [l/min] 200, 500, 20% of Q1 max wet, 50% of Q1 max wet, Q1 max wet 150% of Q1 max wet 5, 10, 12,5 (*), 16 Upstream (but not exceeding the specified maximum working pressure PS) pressure [bar] (*) is done in case the proportioning does not meet the PS requirements at 16 bar Duration At each point: for a time period sufficient to reach stable flow conditions Q1 and Q2 to get proper measurements for the calculation of the proportion rate (as a rule 2 to 5 min) max. 30 s Table T 1: Function test parameters 4.6 Water hammer The proportioner (parts and accessories exposed to extinguishing water pressure) is filled with water and shock-pressurised (test medium water) as follows: Number of water hammer cycles: 3000 Test pressure: (maximum working pressure + 25) bar Before each water hammer cycle the pressure in the proportioner shall not exceed 3,5 bar. During and after the test the proportioner shall show no signs of damage or deterioration. In a subsequent verificational function test according to 4.5.2 the requirements of 4.5.1 shall be met. 4.7 Overload 110% 4.7.1 Applicability These requirements (clause 4.7.2) do not apply to proportioners which by design ensure that overload can by no means modify the characteristics and operational safety of the proportioner temporarily or permanently; and that an obstruction of the extinguishing water flow Q1 as a result of overload conditioning is not possible. These conditions may be met when no parts of the proportioner are located in the extinguishing water flow Q1 and no parts of the proportioner can extend into it and no movable parts inside the proportioner are exposed to the flow. 4.7.2 Requirements and test method Water flow 110% of Q1 max wet through the proportioner is established for 60 min at an upstream pressure of (5,5 ± 0,5) bar. The following is measured: Q1; Q2; pressure upstream the proportioner; pressure downstream the proportioner; the required/permissible conditions at the foam concentrate inlet, as applicable. The proportion rate is calculated. During the test the requirements of 4.5.1 shall be met. NOTE: Maximum allowed proportion rate at 110% of Q1 max wet : 1,3 times the nominal proportion rate (subject to a maximum of nominal proportion rate +1%). Minimum allowed proportion rate at 110% of Q1 max wet : 0,95 times nominal proportion rate. During and after the test the proportioner shall show no signs of damage or deterioration. In a subsequent verificational function test according to 4.5.2 the requirements of 4.5.1 shall be met. CEA 4102 2015 All rights reserved 9

CEA 4102 Sprinkler Systems Requirements and test methods for Foam Proportioners 4.8 Overload 150% 4.8.1 Applicability 4.8.1.1 These requirements (clause 4.8.2) do not apply if the permitted maximum water flow rate Q1 max dry for use in dry pipe systems is limited to 70% of Q1 max wet (see clause 4.1). 4.8.1.2 These requirements do not apply to proportioners which by design ensure that overload can by no means modify the characteristics and operational safety of the proportioner temporarily or permanently; and that an obstruction of the extinguishing water flow Q1 as a result of overload conditioning is not possible. These conditions may be met when no parts of the proportioner are located in the extinguishing water flow Q1 and no parts of the proportioner can extend into it and no movable parts inside the proportioner are exposed to the flow. 4.8.2 Requirements and test method According to 4.7.2 with the following changes: Water flow: 150% of Q1 max wet instead of 110% of Q1 max wet. Duration of flow: 4 min instead of 60 min. 4.9 Suction-side dry run (operation without foam concentrate supply) 4.9.1 Applicability 4.9.1.1 These requirements (clauses 4.9.2 and 4.9.3) do not apply to proportioners which by design ensure that a dry run of the proportioner (operation without foam supply) can by no means modify the characteristics and operational safety of the proportioner temporarily or permanently; and that an obstruction of the extinguishing water flow Q1 as a result of dry run is not possible. 4.9.1.2 Clause 4.9.2. needs to be applied to 1 proportioner of a design series only (i.e. 1 size of a series of proportioners with several sizes of similar design). 4.9.2 Requirements and test method for long test Water flow Q1 max wet through the proportioner is established for 90 min at an upstream pressure corresponding to the maximum working pressure PS. During these 90 min the foam concentrate inlet is open to atmosphere. Subsequently (with the water flow Q1 continuously in place), the foam concentrate inlet is quickly connected to the foam supply (containing test medium water), thus starting Q2. The proportioner is operated for a further short time period to allow for cooling by Q2. During and after the test there shall be no effect on the extinguishing water flow Q1. 4.9.3 Requirements and test method for short test According to 4.9.2 with the following changes: Duration of dry run: specified permissible dry run time (see 4.1) instead of 90 min. During and after the test the proportioner shall show no signs of damage or deterioration. In a subsequent verificational function test according to 4.5.2 the requirements of 4.5.1 shall be met. 4.10 Other tests Where special designs or new manufacturing methods make it necessary to conduct additional testing, this will be carried out in coordination with the manufacturer. 10 CEA 4102 2015 All rights reserved

Julien Eichinger Fotolia