PRE-INSTALLATION GUIDE

Similar documents
PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE for MODELS

PRE-INSTALLATION GUIDE for MODELS

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE

DENTAL VACUUM SYSTEM Part Numbers: VS2O, VS40, VS50, VS50H, VS80 and VS80H RECOMMEND DAILY USE OF MONARCH CLEANSTREAM USER S MANUAL

Installation & Operation

DENTAL AIR SYSTEM. AS12, AS22, AS50 AS70, AS12C, AS22C & AS50C International. Installation and Operation Manual

Va c S t a r V a c S t a r N e o. More Performance. Less Water. Less Energy.

Equipment Alert. P-Trap Must Be Installed to Exhaust or Warranty will be Voided. Refer to this Manual for installation Instructions

Dansereau Dental. P r e - C o n s t r u c t i o n G u i d e

Read Only Document Not For Distribution

Utility Room Accessories. Take your equipment s performance to the next level.

Special Requirements For Health Care Facilities

WineZone Ceiling Mount Ductless Split 15

Vacuum Plumbing Layout Recommendations

A m e r i c a s D e n t a l E q u i p m e n t C o m p a n y. Rev 2/15. D a n s e r e a u

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

User s and Installation Manual

Installation. 324 Series Built-In Dishwashers U L. Viking Range, LLC 111 Front Street Greenwood, Mississippi USA (662)

INSTALLATION MANUAL. Manufactured by AQUA-AIR MANUFACTURING. (801) or (800) FAX (801)

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS

PowerVac G Single to Twin Conversion Kit [ ]

Installation Guide. 15 W. Undercounter/Freestanding Nugget Ice Machine U L. Viking Range, LLC. 111 Front Street

USER MANUAL/Installation Instructions LRV-4

Sundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A

Viking Installation Guide

VetPro Solo Installation

AirStar Clinical Air Compressor AS60, AS90 and AS120. Installation & Operating Instructions

IMPORTANT INSTRUCTIONS READ & SAVE

Installation GUIDE VDWU524SS VDWU524WSSS FDWU524WS FDWU524 VDWU324SS FDWU324

IMPORTANT INSTRUCTIONS READ & SAVE

VENTILATION FAN / LED LIGHT

Installation. 15 W. Undercounter/Freestanding Ice Machine FGIM515 / CFGIM515 FPIM515 / CFPIM515

INSTALLATION MANUAL GEO-BOOST GROUND LOOP HEAT EXCHANGER

Installation Instructions Remote Blowers

Ergoline Affinity 500

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

Questions on Installation? Call: GECARES (US) or Visit our Web site at: (US) 4" DUCT CLAMPS (2) OR 4" SPRING CLAMPS (2)

28 1/2"* 72.4 cm. (*28 1/2 " to include hinges.) 41 3/4" 106 cm. 27" 68.6 cm. 28 1/2"* 72.4 cm. (includes hinges.) 28 1/2"* 41 3/4" 106 cm

HUMIDITY SENSING BATH FAN

Installation instructions for vented tumble dryer DOMESTIC. Dear Customer,

PLAN REVIEW SUBMITTAL GUIDE

VENTILATION FAN / LED LIGHT / LED NIGHT LIGHT

IMPORTANT INSTRUCTIONS READ & SAVE

CENTRAL AIR CONDITIONER SPLIT SYSTEM

Ergoline Open Sun 1050

HEATER. Fan Forced IMPORTANT INSTRUCTIONS READ & SAVE OWNER S MANUAL. Model No.: DR W 120V 60Hz DR W 240V 60Hz

INSTALLATION MANUAL GEO-BOOST GROUND LOOP HEAT EXCHANGER

VENTILATION FAN READ AND SAVE THESE INSTRUCTIONS MODEL 50F / 70F / 70HS TABLE OF CONTENTS. Package Contents 2. General Safety Information 3

RVAC-100 VACUUM CLEANER MANUAL. For Household Use Only

INSTALLATION INSTRUCTIONS TD75. Vented tumble dryer DOMESTIC. Carefully read the instructions for use before using the dryer.

DRAFT INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

WKS 2200 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

Quest Power Electric Heat EHS 31 Pro

RP, GP, XP Pro Series Installation Instructions

Dear Concessionaire,

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

Quest 105, Dry155, and 205 Dual

Quest Power Electric Heat EHS 62 Pro

Installation Instructions

Installation Instructions

S AGE E NGINEERING A SSOCIATES, LLP

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

RDT Refrigeration Book

Installation Instructions

PTAC/PTHP. Packaged Terminal Air Conditioners and Heat Pumps. Residential & Light Commercial HVAC. Features: Performance:

i200, Gen II i250, Gen II Submittal Data

ELECTRIC DRYER INSTALLATION INSTRUCTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

VENTILATION FAN. MFG Model : VFB80HLED2/VFB080C4L2 /VFB080C4LED2/ VFB100HLED2/VFB100C4LED1 READ AND SAVE THESE INSTRUCTIONS

Quest Dry 105, 155, and 205 Dual

ELECTRIC DRYER INSTALLATION INSTRUCTIONS

VF/VG700 Jumbo. Construction Heater. Installation and Maintenance Manual

FT1000S BASE FLIGHT-TYPE DISHWASHER

Electric Heat Accessory Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS ELECTRIC HEAT ACCESSORY

STERI-VAC CENTRAL SUCTION SYSTEM

Installation plan PG 8581 PG 8582 PG en - US

MODELS B1PA024, 030 AND 036

INSTALLATION AND OPERATION INSTRUCTIONS 303, 304, 305, CRH, CRQ, CFA SERIES 2250 WATT MODELS

Safety and Installation Instructions Model 1700

RF EMI PORTABLE ENCLOSURE OPTIONS. Vestibule / Foyer - internal or external. RMEC0004 Canvas Carry Bag for enclosures 40 x 20 x 20

Electrical Installation Instructions

Maestro Plus Ice Machine with RIDE Technology Installation Instructions for Vision

Owner s Manual for. PennStoker

IMPORTANT INSTRUCTIONS READ & SAVE

Owner s Manual Phoenix FireBird

Dishwasher Installation Manual

MHNCCW (4-Pipe) Chilled/Hot Water Ceiling Concealed 208/230V 4-Pipe Heating & Cooling Fan Coil 12,000 BTUH

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS

Installation Instructions

VENTILATION FAN WITH LED LIGHT AND HEATER MODEL RAD110LED

IMPORTANT INFORMATION. Revised Dishwasher Installation Instructions

DRYER INSTALLATION INSTRUCTIONS

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

347002K/177002K/34900

Transcription:

DENTAL VACUUM SYSTEMS PRE-INSTALLATION GUIDE for MODELS VS20 & VS40 Check VacStar Model Being Installed: VS20 VS40 Model VS20 Model VS40 Doctor: Address: Phone#: Dealer: Dealer Address: PRODUCT SPECIFICATIONS Electrical Model VS20 Model VS40 Voltage Rating *120/220 220 Voltage Min./Max. *108/132 or 198/242 198/242 Full Load Amps 16/8 13.4 Frequency 60 50/60 *VacStar 20 may be converted from 220 Volts to 115 Volts at installation site. Water Inlet Water Pressure (PSI) 20-100 20-100 Typical Flow Rate (gal/min) per Pump w/ HydroMiser 0.12 0.18 Flow Rate (gal/min) per Pump w/o HydroMiser 0.50 0.75 Inlet Water Temperature ( F) 40-75 40-75 Power and Heat (@ 100% duty cycle) Watts per Hour 750 1,230 BTU per Hour 2,560 4,197 Vacuum Level Preset at Factory (in Hg) 10 10 All installations must conform to local codes.

PHYSICAL CHARACTERISTICS Model VS20 Model VS40 Height 14 inches (36 cm) Height 17 inches (43 cm) Width 11 inches (28 cm) Width 11 inches (28 cm) Depth 11 inches (28 cm) Depth 11 inches (28 cm) 14.00 17.00 Shipping Weight Shipping Weight 68 lbs. (31 kg) 85 lbs. (39 kg) ELECTRICAL CONNECTIONS All VS20 VacStars are wired directly via an electrical box that complies with local electrical codes to the VacStar s Electrical Connection Box. See Figure 1. All VS40 VacStars are wired with a supplied hospital grade NEMA 6-15P line cord and requires a hospital grade 6-15R receptacle. Handy Box Connection Green Black White Internal Dual Voltage Jumpers * 220 V, factory set Jumper Tabs position shown below 1 2-3 4 5-6 7 * For 120 V, place Jumper Tabs in position shown If voltage falls below the minimum or maximum during operation, a Buck/Boost Transformer must be installed. See Product Specifications. 24V CONNECTIONS Connection to 24 V Switch Only Vacuum Pump Interconnect Cable Remote Switch Yellow 2 2 Connection without 24 V Switch Figure 1 - VS20 Connections 1-2 3-4 5 6-7 Brown 4 Orange 3 for Future Use Use 18 Gauge, 4 Conductor, Interconnect Cable Between VacStar Pump and Remote Switch 4 3 2 Yel 3 Org 4 Brn Interior Electrical Box Connections CLASSIFIED MEDICAL ELECTRICAL EQUIPMENT WITH RESPECT TO ELECTRICAL SHOCK, FIRE, MECHANICAL AND OTHER SPECIFIED HAZARDS ONLY IN ACCORDANCE WITH UL-60601-1, CAN/CSA C22.2 NO.601.1 66CA Page 2

SITE REQUIREMENTS Electrical VS20 VS40 Minimum Circuit Breaker Rating 30A@ 120V or 20A@ 220V 20A Minimum Wire Gauge Size 10 AWG @ 120V or 12 AWG @ 220V 12 AWG 115-Volt Buck/Boost Transformer #67500 (2.0 KVA, VS20 Only) Not Used 230-Volt Buck/Boost Transformer #67002 (3.4 KVA) #67002 (3.4 KVA) Plumbing Note: Suction piping must slope at least a ¼ for each 10 feet of run towards the pump. Use PVC Schedule 40 or Copper Type M. Minimum CFM @ 0" Hg 15 20 Air Exhaust with Hydromiser or Air/Water Separator 2" schedule 40 pipe 2" schedule 40 pipe Overhead Plumbing Main Line Diameter (Min./Max. ID in inches) 1 to 1½" 1¼ to 2" End Fitting 3 /4 FNPT 3 /4 FNPT Overhead Main Line ½" ID ½" ID Floor Plumbing Main Line Diameter (Min./Max. ID in inches) 1 to 1½" 1¼ to 2" End Fitting 3 /4 FNPT 3 /4 FNPT Branch Line Diameter (Min./Max. ID in inches) 3 /4 to 1½ 1 to 1½ Environmental Ambient Temperature (See ventilation requirements below.) 40 to 104 F (5 to 40 C) VENTILATION REQUIREMENTS 40 to 104 F (5 to 40 C) Equipment Room Temperature The VacStar equipment must be used in a controlled temperature environment. Maintain equipment room temperature between 40 and 105 degrees Fahrenheit. Adequate forced ventilation must be provided across the unit by placing an appropriate exhaust fan opposite an equivalent air intake vent. The fan should be higher than the associated intake vent. Exhaust Vent Protection. If the exhaust piping is venting to the outside of the building, precautions must be taken to protect the equipment room from weather elements and animal intrusion. This can be accomplished by using one of the three methods shown below. Shroud & Screen Screen Shroud & Screen Roof-Mounted Outside Vent Protection Wall-Mounted Outside Vent Protection Make sure to use the required pipe type for associated system Page 3

PLUMBING INSTALLATION SUB FLOOR INSTALLATION - The sub-floor plumbing layout shown below is the recommended layout for VacStar system installations and should be used whenever possible. Interior Wall Ceiling Junction Box Floor Sink See Note 1 1/2-Inch Diameter Riser Minumum Slope: 1/4 inch per 10 Feet Riser - See Note 2 45 Elbow Main Line From Dental Unit 1/2 Inch Riser 45 Y To Pump RISER to MAIN LINE DETAIL MAIN LINE See Plumbing Requirements for Main Line Diameters needed for specific units. See Notes 3, through 6. Notes: 1. See Optional Drain Connections shown below. 2. 8-Foot Maximum Height from Main Line to pump. 3. Consult Dental Unit Manufacturer's Guidelines for correct reduced size and height of termination of vacuum line inside junction box. 4. Limit branches. Orient main line under junction box or cabinet. 5. When main line is 1-1/2" I.D. or larger, use 45 Y's and elbows only. 6. Long radius 90 elbows can be used as alternates to 45 elbows. 7. A total of 8 feet of 3/4 inch hose is supplied with VacStar units. This hose must be shared between inlet and drain. All installations must conform to local codes. Page 4

PLUMBING INSTALLATION OVERHEAD INSTALLATION - The overhead plumbing layout shown below is the alternate layout for VacStar system installations and should be used only when unable to use the sub-floor plumbing layout. MAIN LINE See Plumbing Requirements for Main Line Diameters needed for specific units. 45 Elbow 1" Min Main Line 45 Elbow 1/2 Inch Diameter 45 Y To STS Pump 1/2 Inch Riser Minumum Slope: 1/4 inch per 10 Feet RISER to MAIN LINE DETAIL 1/2-Inch Riser To Main Line Dental Unit Interior Wall 1/2-Inch Diameter Riser 10-Foot Maximum Height from Riser Trap to Main Line Ceiling Junction Box Floor Sink 1/2-Inch RISER TRAP DETAIL (Using 45 Elbows) Note: Consult Dental Unit Manufacturer's Guidelines for correct reduced size and height of termination of vacuum line inside junction box. Note: See Optional Drain Connections CONNECTION DETAILS ALL INSTALLATIONS - 45 Elbow CLEARING AN OBSTRUCTION MAKING TURNS MAIN LINE Use only 45 elbows or sweeping (sanitary) 90 elbows to make turns in main line. If piping is diverted to clear an obstruction, DO NOT MAKE A TRAP. DRAIN OPTIONS Direct connection to vented drain. No traps before vent. OR Indirect connection (Air gap) with a p-trap. 6 1-1/2 Inch P-Trap 45 Elbow CLOSED VENTED DRAIN OPEN DRAIN PIPE Page 5

UTILITY ROOM with Air/Water Separator Typical for both VacStar VS20 and VS40 IMPORTANT Add service disconnect if Power Supply Panel is not located in equipment room. Buck/Boost Transformer (Optional) Building Power Supply Panel (Should be located in equipment room.) 4 inch Handybox (not supplied) hardwired for VS20 units. OR 6-15 R NEMA outlet to connect via the supplied line cord for VS40 units. Intake from Main Line hose. Terminate with 3/4 inch FNPT fitting. Note: Hose is Part of the total of 8 feet hose supplied that must be shared between inlet and drain. 1 / 4 inch Poly Tubing 6 feet supplied Note: All VS20 VacStars are hard-wired directly to the VacStar s electrical box via a 4-inch handy box complying with local electrical codes. Refer to Figure 1 for VS20 connection details. All VS40 VacStars are connected using the supplied Hospital Grade 8-foot line cord. WARNING: Condensation of Water will occur in vent piping. Avoid Accumulation of water in vent. Slope piping toward separator. 18 Inches Maximum Drain hose is part of the total supplied 8 foot hose shared between inlet and drain. Vent vent to outside with 2 schedule 40 pipe Air/Water Separator 32 Inches Maximum. Water Supply 1/2 inch copper tube terminate with 1/2 inch FNPT shut-off valve Floor Sink Note: See Optional Drain Connections View B. VacStar with Wall-Mounted Air/Water Separator Page 6

UTILITY ROOM with Hydromiser Typical for both VacStar VS20 and VS40 IMPORTANT Add service disconnect if Power Supply Panel is not located in equipment room. Buck/Boost Transformer (Optional) Building Power Supply Panel (Should be located in equipment room.) 4 inch Handybox (not supplied) hardwired for VS20 units. OR 6-15 R NEMA outlet to connect via the supplied line cord for VS40 units. Intake from Main Line hose. Terminate with 3/4 inch FNPT fitting. Note: Hose is Part of the total of 8 feet hose supplied that must be shared between inlet and drain. Note: All VS20 VacStars are hard-wired directly to the VacStar s electrical box via a 4-inch handy box complying with local electrical codes. Refer to Figure 1 for VS20 connection details. All VS40 VacStars are connected using the supplied Hospital Grade 8-foot line cord. WARNING: Condensation of Water will occur in vent piping. Avoid Accumulation of water in vent. Slope piping toward separator. Hydromiser 18 Inches Maximum Vent vent to outside with 2 schedule 40 pipe 32 Inches Maximum. Water Supply 1/2 inch copper tube terminate with 1/2 inch FNPT shut-off valve Drain hose is part of the total supplied 8 foot hose shared between inlet and drain. Floor Sink Note: See Optional Drain Connections View A. VacStar with Wall-Mounted HydroMiser All VacStar vacuums comply with NFPA 99C level 3 requirements Page 7

You can obtain more information about Air Techniques products by visiting our web site at www.airtechniques.com Additional installation information is available on our Authorized Air Techniques Dealer web site at http://dealers.airtechniques.com Air Techniques Inc. 1295 Walt Whitman Road, Melville, NY 11747-3062 Website: www.airtechniques.com 1-800-AIR-TECH (1-800-247-8324) VacStar and Hydromiser are trademarks of Air Techniques, Inc. 2008 Air Techniques, Inc. Part No 55341, Rev. P, December 2017