ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Similar documents
Electronic Safety and Security

Community Development Department Commercial Permit Application

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Toronto Community Housing Corporation and Tridel Inc. Request for Proposals. For

PROCEDURE: FURNITURE, ART, & DÉCOR STANDARDS & REQUESTS

Grandview area secondary school FAQ

LMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Arlington Public Schools Purchasing Office

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

TO: CITY COUNCIL DATE: MARCH 23,2009

2012 Exhibition of School Planning and Architecture. North Toronto Collegiate Institute Redevelopment (NTCI)

MULTI-LEVEL & COVERED BOOTH CONDITIONS

PHASE I BUDGET FOR THE GREATER DES MOINES BOTANICAL GARDEN IMPROVEMENTS

CHARLES COUNTY GOVERNMENT RFP NO PORT TOBACCO COURTHOUSE GREEN PRELIMINARY DESIGN

CCDC EXPANSION PROJECT

CENTER FOR GREAT LAKES ECOLOGY 3

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

Community Character and Design Guidelines Questionnaire

Capital Improvement Program Monthly Status Report

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

FRAMEWORK OF DESIGN REVIEW:

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

SUBMITTAL REQUIREMENTS

2014 Michael G. Meyers Design Competition

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Master Project List Report

A. Project Description

Solana Ranch Elementary School

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois Business Instructional Facility

Common Building Code Misinterpretations

PSR-BENEFICIAL OCCUPANCY- T&I TRAINING. Testing & Inspection (T & I) Directive

City of La Palma Agenda Item No. 5

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

PLATTEVILLE MIDDLE SCHOOL

ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

September 25, Re: Solicitation # Interpretive Exhibit Fabrication and Installation for the Pinelands Visitor Center.

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

REQUEST FOR PROPOSAL RFP NO. PS CONSULTANT FOR JOHN HENDRY PARK MASTER PLAN QUESTIONS AND ANSWERS NO. 1

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

PLANNING STAFF REVIEW

Design Review of Facility Improvement Projects

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

REPORT CARD TO THE COMMUNITY MAY 15, 2018

RENO-TAHOE INTERNATIONAL AIRPORT RENO-TAHOE AIRPORT AUTHORITY PURCHASING AND MATERIALS MANAGEMENT

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

bold/italic items are revisions to the previous program notes

Cherokee Nation

2009 International Fire Code Errata. SECOND PRINTING (Posted April 6, 2010)

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Emergency Evacuation Procedures

RFP # FIRE STATION ALERTING SYSTEM FOR THE CITY OF BLOOMINGTON FIRE DEPARTMENT

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

Design, education and collaboration intersect to create innovative learning environment

Marketing to Architects and Designers

Beaufort County Community College. Maintenance and House Keeping Plan

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

Carthage College. Fire Incidents by Building for 2016

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

Legacy Community Health. Project Profile

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Florida Department of Transportation

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

MATHEMATICAL SCIENCES BUILDING

Occupancy Packet & Business License Application

implementation r expression in landscape

4.0 Future Land Use Element

Phasing and Implementation

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT

PLAN REVIEW SUBMITTAL GUIDE

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

Capital Improvement Program Monthly Status Report

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

Subject: Addendum #3 IFB No CNG Gas Detection Repair and Maintenance

Thursday, February 28, :15 a.m. - 11:15 a.m. Sacramento Convention Center Room # 306. Workshop #47. DSA Academy Update

Tillamook High School Bond Projects

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Newark Liberty International Airport Terminal A Redevelopment Program

City of La Puente REQUEST FOR PROPOSAL ADDENDUM NO. 1

Welcome to Marina Park. A vibrant & re-energized campus with new creative spaces and amenities designed to promote a more communal way to work, relax

ZERVAS SCHOOL BUILDING COMMITTEE and DESIGN REVIEW COMMITTEE - UPDATE Zervas Elementary School Newton, MA June 4th, 2014

City of Placentia ADMINISTRATION DEPARTMENT

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

Transcription:

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR RFP No. 2030 Professional Design Services for CCC Le-Jao Student Resource Center COAST COMMUNITY COLLEGE DISTRICT COSTA MESA, CALIFORNIA COUNTY OF ORANGE COAST COMMUNITY COLLEGE DISTRICT 1370 Adams Avenue Costa Mesa, CA 92626

The following changes, additions, deletions, clarifications, or corrections shall become part of the Bid-Contract Documents for Coast Community College District RFP No. 2030, Professional Design Services for CCC Le-Jao Student Resource Center. All other terms, specifications, and conditions remain the same. Modifications are identified by clouds and the following: Deletions strikethrough Insertions/Substitutions italic-underlined. Item 1: Add the attached responses to questions through May 13, 2014. END OF ADDENDUM Prepared By: John Eriksen Director of Purchasing Official Copy for Bidding 2 of 2 Bid #2030 Addendum No. 1, May 16, 2014

1. Are there any as built documents available for architectural, mechanical, electrical, plumbing, structural, civil, and fire life safety? Yes. These will be made available to the awarded architectural firm. 2. Are there auto cad files available for the disciplines as noted in item #1? Yes, we have these available on disc for the awarded firm. 3. Are there any proposed construction materials or methods required for the new second floor addition? Since the existing building is cmu is there any requirement that the new structure be cmu to match? We would like the new structure to look like it was part of the original design as much as possible. 4. According to the 2020 Master Plan, the first floor area that is presently open area, the scope of work is noted to provide student oriented seating, tables and other amenities in the courtyard -please clarify if this work is to include only freestanding tables, chairs, furniture, etc. or will there be hard construction or built in features and amenities. Have the required amenities been defined? Not to be included in this scope. 5. The 2020 master plan does not further define the second floor area program requirements aside from a description of the desired areas. Is there a more definitive description and requirements for the cyber library, open student lounge and success center in terms of activities that might require additional plumbing, mechanical, structural, fire life safety provisions? Will there be a kitchen or food service/prep area or exhaust hood? This will be a student study space that will have computer work stations and a small reception desk. If the budget allows, it may increase the size of the student lounge below, but this would only increase space and no additional plumbing would be needed. 6. Is the parking as identified in the 2020 master plan to be considered as part of this scope of work? If so please indicate which option should be considered? No. 7. Are there any as-built drawings available for review of the existing facility? See question #1. 8. You are requesting the A/E firm to retain a Fire Protection Engineer under our scope of work. Is this correct? Yes. 9. As new exterior seating, tables and amenities are requested; should we include the services of a Landscape Architect? No. Exterior seating will not be a part of the scope for this project. 10. Does the 20 page limit include the Signature page (Tab 11) or insurance forms? No.

11. Does the existing CCC Le-Jao Student Resource Center meet LEED criteria, and does the District intend to pursue LEED certification or meet LEED criteria for the new addition? The current facility is a LEED Silver and the new addition should be designed to this. 12. Does the District anticipate any code upgrade requirements to the existing building, such as path of travel upgrades, ADA upgrades and elevator additions? We do not anticipate and upgraded code requirements since the building is fairly new, but that will be up to DSA. 13. Does the 2000sf project addition described in the RFP include the square footage of the lounge space located under the existing terrace and stair? It includes if the budget allows, to possibly increase the square footage of the space below. 14. Does the existing campus site acreage have a FAR maximum for campus build-out? If so, what amount of square footage remains as entitled space? The District is unsure of the answer at this time but will work with selected architect for the determination of FAR maximums if any. 15. Does current occupant egress for the second floor spaces (as designed and approved) rely on the exiting capacity of the east stair and bridge? The District will work with selected architect on the appropriate egress. 16. Does current occupant egress for the ground floor courtyard space (as designed and approved) rely on the exit gates that flank the north and south sides of the existing student lounge? See item #15. 17. Will the campus remain open and all the instruction spaces need to be useable during construction? The District is hopeful to do the demo phase during the summer and we can relocate these classes, but as of now we plan on using it for the fall and spring semesters if at all possible. 18. Does the Le-Jao campus property line include the drive aisle to the east that services the neighboring Rose Theatre complex? The back drive (alley) is City Owned. 19. Does the Le-Jao campus rely on the eastern drive aisle for servicing the campus (deliveries, etc.)? Yes. 20. Does the Le-Jao campus property line along the west at All American Way and north along 15 th Street extend to the public sidewalks? If so are there any easements or setbacks that dictated the placement of the existing north classroom wing? Yes. Any easements should be noted in the plans. 21. Will CCCD be considering alternative delivery methods such as Lease-Leasback? No.

22. Does CCCD require the project be documented using BIM? No. 23. Will CCCD be providing electronic CAD documentation of the existing building and site? See questions #1 and #2. 24. Does CCCD require LEED certification for new construction? See question #11. 25. Is the Attachment C considered a District Form and as such not included in the page count? Attachment C is to be included in the 20 page count.