C Electrical Connection Kit

Similar documents
JBM-100-LBTV2 Power Connection, Powered Splice, Dual Power Connection, or Splice with Junction Box

C A Heating Cable Gland Kit

HEATING CABLE RATINGS APPROVALS* Drexan Energy Systems, Inc. Kelowna, BC, Canada, V4V 1S5

HS-TSPLICE - HEATSHRINK TEE / SPLICE. Installation Instructions

HWT-P HWAT POWER CONNECTION KIT WITH END SEAL INSTALLATION INSTRUCTIONS

RayClic Connection System

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

JB-RTD-STAND RTD PIPE STAND FOR COMBINATION POWER CONNECTION BOX AND ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS INSTALLATION

Retro-DWS Other Methods Internal Heating Cable System for Sewer Pipe and Waste Drain Applications

FTC-HST WARNING: CAUTION:

NELSON HEAT TRACING SYSTEMS ALT-BC STANDARD POWER CONNECTION KIT

NELSON HEAT TRACING SYSTEMS

KE-Series Constant-Wattage Heating Cable

Consignes d installation

DESTU. Direct Entry Sealed Termination Unit. Installation Instructions. Suitable for use in either safe or hazardous areas.

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

Raychem Heating System

Side Entry Bushing (SEB) High Temperature Cable Clamp Bushing Installation Instructions

SEALING FIBER SEALING COMPOUND

SERGE BARIL GTKB GUT TRACE KIT BAG

NELSON HEAT TRACING SYSTEMS

The DEF-System by BRUGG. The Best Way to defeat the problem of DEF heat Installation Instructions

Retro-DWS Internal Heating Cable System for Non-Pressurized Sewer and Waste Drain Pipes

Data Sheet. Self regulating heating tapes. RS stock numbers

TTSIM-1A. TraceTek Sensor Interface Module with Relay. Installation/Operation Instructions. Installation Items (not supplied) Tools Required.

H908 WinterGard Plug-in Power Connection Kit with End Seal

Data Sheet. Self regulating process heating tapes RS stock numbers ,

QAA 142 Termination instructions Self-regulating trace heaters type ELSR-NA and -HA in Div1 with heater entry kit EL-HAZELECT Kit part No: 09CA051

SERGE BARIL HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS

Gardian W51. Approvals

Toll Free:

1SC-SSC Splice Connection Kit Installation Instructions

JBS-100-ECP-A COMBINATION POWER CONNECTION BOX AND DIGITAL ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

DISHWASHER. Models DW2432 and DW2432SS. Installation Manual. Write Serial Number (on inner door of unit) here:

XAGA 550/550-L. Aerial Splice Closure. 1. General Description. 2. Warnings. 3. Cautions

Toll Free:

INSTALLATION INSTRUCTIONS

HVS S 15kV Class

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

Small Box for Cable Termination. 3.1 Preparation of box 3.3 Mounting of the box on the wall

Commercial and Residential Self-Regulating Heating Products

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

HVS S Splice Series

3MAVR60XX Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3MAVR60XX

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

DSF xx15.xx xhv Ex-Atex Ex-Atex Certified Two wire Hall Effect Speed Sensor

Self-regulating Roof Heat and Gutter Trace Cable

Installation Instructions

SAVE THESE INSTRUCTIONS

Frost Heave Protection System Installation and Operation Manual

Heat Exchanger Block Replacement Instructions

Dishwasher. Installation manual DW60M9990AP

3MAVR60XXD Series Fan. Owner s Guide and Installation Manual. CUL Model NO. : 3MAVR60XXD

OCH-SS series Direct Wired Units Indoor * and Outdoor Comfort Heaters

LED Flex Tube Assembly Guide

Self-regulating Roof Heat Cable

Installation Instructions

PLSRR Heat Trace Cable Data Sheet

Toll Free:

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

Instructions Apply For Model PHTT-6P-KFC. Panel Shelf Is Removed to install warming drawers

Installation Instructions

I<enmore Elite. instructions dlnstallation. Installation Guide Instrucciones de Instalaci6n. English / Espafiol/Frangais

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHER PLASTIC TUB INSTRUCCIONES DE INSTALACIÓN LAVAVAJILLAS EMPOTRADA CON TINA PLÁSTICA

FIST-EDSA-D4. 3 Feeder cable/ducts (max 16 mm) 4 Drop cable (DB cable or guiding tubes 5-8 mm) 5 Adding drop cable. 6 Gel part replacement

ITEM # , , PAWTUCKET CEILING FAN MODEL #40958, 40959, 40047

8TNR56XXXD-V1 Series Fan. Owner s Guide and Installation Manual. ETL Model NO. : 8TNR56XXXD-V1

Roanoke 48 in Ceiling Fan Owner s Manual. Roanoke Ventilador de Techo de 1,22 m Manual del Propietario

ST. KITTS CEILING FAN

Hawkins 44 in Ceiling Fan Owner s Manual. Hawkins Ventilador de Techo de 1,12 m Manual del Propietario

Lifetime Limited Warranty

Irene-H READ AND SAVE THESE INSTRUCTIONS

SPRINGHILL 44 CEILING FAN

Installation Instructions

GelCap SL. GelCap SL splice cover kits quickly and con-veniently insulate, seal, and protect stub splice connections up to 1000 volts.

TE Connectivity's AMP NETCONNECT Cable Management

HEATRACE. Young Chang Silicone Ltd, Co. SELF-REGULATING PIPE TRACING HEATER CABLE. Installation, Operation & Maintenance Manual

DATE OF PURCHASE: RETAILER NAME: MODEL NUMBER: RETAILER ADDRESS:

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

TILGHMAN CEILING FAN. LISTED For Damp Location E ITEM # MODEL #WCK52LMW5N WCK52NWZ5N. Español p. 20 ATTACH YOUR RECEIPT HERE

ELSTON 52 CEILING FAN

AquiTron. AT-LDM Liquid Detection Module INSTALLATION INSTRUCTIONS

OCH-SSE series Direct Wired Units Indoor * and Outdoor Comfort Heaters

AMERICA AMERICA 52 CEILING FAN INSTALLATION AND OPERATION MANUAL

FMP-ULS UNIVERSAL LIQUID SENSOR INSTALLATION GUIDE

NISSAN FRONTIER INSTALLATION INSTRUCTIONS

Installation GUIDE VDWU524SS VDWU524WSSS FDWU524WS FDWU524 VDWU324SS FDWU324

TECK-40 Series 1000V Class Splice for 4/C Armored Teck Power Cables

DPM-G DPM-CR DPM-W DPM-B INDOOR DOME PENDANT MOUNT INSTALLATION MANUAL

3MNLR72XXD Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3MNLR72

AquiTron. AT-WM Water Monitor DATA SHEET

Some models are supplied with a protective film on steel and aluminium parts. This film must be removed before installing/using the appliance.

Dishwasher Installation Instructions DW 24XT/DW 24XV

ITEM # SAIL STREAM CEILING FAN MODEL #40048

Transcription:

1548-4010C Electrical Connection Kit For Use With Dekoron 2700 and 2300 Family of Heating Cables Installation Instructions Kit Description The Dekoron 1548-4010C electrical connection and end seal kit distributed by Heat-Line contains components needed to make one power input connection and one end termination in Ordinary or Division 2 locations; or one power input connection in Division 1 locations; or one end termination in Division 1 locations. Splices and power input splices can be made by using 2 kits. Tools Required Flat-head screwdriver Wire cutters Diagonal cutting pliers Needle-nose pliers Utility knife or razor blade Crimp tool Phillips screwdriver Approvals Non-Hazardous Locations / Hazardous Locations Class I, Div 1*/2, Groups A, B, C, D Class II, Div 1*/2, Groups E, F, G Class III, Div 1* and 2 *Contact Heat-Line representative for information on Division 1 hazardous location systems. Additional Materials Required (but not provided) Weather Tight Junction Box (3/4 in. NPT Hubs)* Sealing Fitting (Division 1)* Pipe Strap (for pipe sizes other than 2 in. to 6 in. O.D.) Additional Fiberglass Tape * The hazardous location designation of the complete cable set is governed by the lowest hazardous location rating of the sealing fitting and outlet box. Power Connection Kit Parts Item Qty Description A 1 Connector Cap 2 Connector Gland Washers 1 Connector Body B 1 Grommet C 1 Locknut D 1 Termination Block E 1 Termination Boot F 1 Silicone Sealant G 1 Strain Relief Grip H 1 Standoff Bracket I 1 Roll of Fiberglass Tape J 1 Ring Tongue Terminal K 1 Pipe Strap (for 2" to 6" O.D. Pipes) L 1 End Seal Kit A G B H C D E I J K F Silicone L The Canadian Electrical Code and National Electric Code requires ground fault protection of equipment for each branch circuit supplying electrical heating cables or devices. If the heating cable has a stainless steel ground braid, the following caution applies: The metal covering shall not be used as the bonding-to-ground means. Alternative means of protection shall be provided per CE Code part I. For cable installed in outdoor or wet indoor locations, use a suitable weather proofing cover (such as aluminum jacketing) to protect the thermal insulation. After installation of thermal insulation is complete, the insulation resistance of the system should not be less than 10 Mohms when measured at 500 Vdc between each circuit and ground with set de-energized and all circuit neutrals isolated from ground. Ground metal structures used for support or on which the cable is installed in accordance with CE Code part 1, Section 10. Install cable at 22 F ( 30 C) or above. Do not install heater closer than 1/2 inch to any exposed combustible surface, unless the cable has a metal shield or sheath and is provided with a positive temperature control which will limit the surface temperature to a value not exceeding 162 F (72 C). Minimum bending radius for heating cable is 1/4 inch.

2 HTP 1548-4010C Power Connection Installation Instructions Technical Information 2305 / 2310 / 2315 Self-Regulating Heating Cables Specifications Part Number Thermal Rating @ 50 F (10 C) (Watts/ft.) Service Voltage (Volts) Maximum Circuit Length (ft.) 2305-1 5 120 240 16 2305-2 5 240 480 16 2310-1 10 120 180 16 2310-2 10 240 280 16 2315-1 15 120 135 16 2315-2 15 240 200 16 Bus Wire Size (AWG) Exposure Temperature 366 F (185 C) 150 PSIG Saturated Steam Maintenance Temperature 250 F (120 C) 120 Volt Circuit Breaker Sizing vs. Max Circuit Length (ft.) 240 Volt Circuit Breaker Sizing vs. Max Circuit Length (ft.) Max. Circuit Length (ft.) 15A 20A 30A Max. Circuit Length (ft.) 15A 20A 30A 2305-1 if started at: 50 F (10 C) 150 200 240 2305-2 if started at: 50 F (10 C) 250 330 480 0 F ( 20 C) 150 200 240 0 F ( 20 C) 230 305 440 40 F ( 40 C) 130 170 210 40 F ( 40 C) 220 295 420 2310-1 if started at: 50 F (10 C) 90 120 180 2310-2 if started at: 50 F (10 C) 140 190 280 0 F ( 20 C) 85 110 165 0 F ( 20 C) 130 175 260 40 F ( 40 C) 80 105 160 40 F ( 40 C) 125 170 250 2315-1 if started at: 50 F (10 C) 70 90 135 2315-2 if started at: 50 F (10 C) 100 135 200 0 F ( 20 C) 65 85 125 0 F ( 20 C) 95 125 185 40 F ( 40 C 60 80 120 40 F ( 40 C) 90 120 180 Technical Information 2703 / 2705 / 2708 / 2710 Self-Regulating Heating Cables Specifications Part Number Thermal Rating @ 50 F (10 C) (Watts/ft.) Service Voltage (Volts) Maximum Circuit Length (ft.) Bus Wire Size (AWG) Exposure Temperature F ( C) 2703-1 3 120 330 16 150 (66) 185 (85) 2703-2 3 240 660 16 150 (66) 185 (85) 2705-1 5 120 270 16 150 (66) 185 (85) 2705-2 5 240 540 16 150 (66) 185 (85) 2708-1 8 120 210 16 150 (66) 185 (85) 2708-2 8 240 420 16 150 (66) 185 (85) 2710-1 10 120 180 16 150 (66) 185 (85) 2710-2 10 240 360 16 150 (66) 185 (85) Maintenance Temperature F ( C) 120 Volt Circuit Breaker Sizing vs. Max Circuit Length (ft.) 240 Volt Circuit Breaker Sizing vs. Max Circuit Length (ft.) Max. Circuit Length (ft.) 15A 20A 30A 40A Max. Circuit Length (ft.) 15A 20A 30A 40A 2703-1 if started at: 50 F (10 C) 300 2703-2 if started at: 50 F (10 C) 660 0 F ( 20 C) 200 270 330 0 F ( 20 C) 410 560 660 20 F ( 29 C) 180 230 330 20 F ( 29 C) 360 480 660 2705-1 if started at: 50 F (10 C) 230 270 2705-2 if started at: 50 F (10 C) 460 540 0 F ( 20 C) 150 200 270 0 F ( 20 C) 300 400 540 20 F ( 29 C) 130 175 260 270 20 F ( 29 C) 260 345 520 540 2708-1 if started at: 50 F (10 C) 150 200 210 2708-2 if started at: 50 F (10 C) 295 390 420 0 F ( 20 C) 95 125 190 210 0 F ( 20 C) 195 250 375 420 20 F ( 29 C) 85 100 170 210 20 F ( 29 C) 170 225 340 420 2710-1 if started at: 50 F (10 C) 115 150 180 2710-2 if started at: 50 F (10 C) 230 305 360 0 F ( 20 C) 70 95 145 180 0 F ( 20 C) 150 200 300 360 20 F ( 29 C) 60 85 120 165 20 F ( 29 C) 130 175 260 360 Recommended circuit breakers to minimize effect of transit startup currents. Westinghouse: Types SA, EB, EHB, FB, HFB General Electric: E100 Type TEB, E150 Types TED, THEO Square D: Types EH, FA, IF

HTP 1548-4010C Power Connection Installation Instructions 3 Heating Cable Configuration Heater with Ground Braid and Outer Jacket Conductive core Bus wires Inner jacket Ground braid Outer jacket 1 Slide compression ring, grommet ring, and grommet onto the heating cable. 2 Lightly score outer jacket 8 inches from the end of the heating cable and remove as shown. 8" Connector cap Washer Grommet Do Not Cut or Damage Ground Braid or Inner Jacket 3 Make an opening in the ground braid, bend the heater, and pull the inner jacket and core through the opening in the ground braid. 4 Strip inner jacket as shown by lightly scoring 6-1/2 inches along its center. Leave 1-1/2 inches inner jacket covering core. Twist the ground braid into a pigtail. Trim pigtail to remove tapered end. 6-1/2"

4 HTP 1548-4010C Power Connection Installation Instructions 5 Notch the center core between the conductors and pull the bus wires away from the core for 6-1/2 inches. 6 Remove the center core material and any core material on the bus wires. Re-twist bus wires. 1/2" Do Not Cut or Damage Bus Wires 7 Start sliding the bus wires into the termination boot. Before the boot is completely on, fill the boot end with silicone sealant. Continue sliding the heater into the boot until fully Termination boot inserted. Make sure the wires do not touch or cross. Trim the ends of the bus wires to 3/8 of an inch. Silicone sealant Silicone 3/8" 8A Ordinary and Division 2 Applications 8B Division 1 Applications Slide the grommet up to the outer jacket cut back. Guide the cold leads, ground braid and heater through the connector body (inside bevel end toward grommet), insert the grommet into the body and tighten the connector cap. Connector body Grommet Gland washer Pull enough heater through the grommet so that the cold leads and heater can be guided through the connector body (inside bevel end toward grommet) and an approved sealing fitting such that the heating portion of the heater will end just prior to entering an approved connection box and the cold leads will be in the box. Score and remove enough additional outer jacket so that the outer jacket cut back will be centered in the sealing fitting. Remove outer jacket Connector cap Do Not Cut or Damage Ground Braid or Inner Jacket Connector cap

HTP 1548-4010C Power Connection Installation Instructions 5 9A Ordinary and Division 2 Applications Insert the connector body through the standoff bracket and thread a junction box onto the connector. (Use a thread sealant for a water-tight seal.) (Use locknut if needed to make up any gap between bracket and box.) Attach the rounded portion of the strain relief grip to the connector cap aligning the flat surface of the grip with the heater surface. Attach the grip to the heater. Attach the standoff bracket to the pipe using the pipe strap. Connect the cold lead wires to power supply and ground braid pigtail to ground wire. Install box cover. Secure the heater to the pipe with fiberglass tape or cable ties every 12 inches. Box (not included with kit) Standoff bracket Strain relief grip 9B Division 1 Applications Insert the connector body through the standoff bracket and attach an approved sealing fitting to the connector. Attach an approved box to the sealing fitting. Guide the cold leads, ground braid and heater through the connector body and sealing fitting into the box. Insert the grommet into the body and tighten the connector cap. Attach the rounded portion of the strain relief grip to the connector cap aligning the flat surface of the grip with the heater surface. Attach the grip to the heater. Attach the standoff bracket to the pipe using the pipe strap. Connect the cold lead wires to power supply and ground braid pigtail to ground using the ring tongue terminal provided. Install the box cover. Complete the sealing fitting installation by filling with sealing compound per manufacturer's directions. Secure the heater to the pipe with fiberglass tape or cable ties every 12 inches. Box (not included with kit) Sealing fitting (not included with kit) Standoff bracket Strain relief grip Input Power Splice (for power connection to two lengths of heater additional kits required) To make a power connection to two lengths of heater use a box with an additional hub to accommodate the second heater. Follow the above power connection procedure for the first heater. For the second heater, install the connector fitting components in the additional hub in the box. Prepare the heater following the above procedure; then guide the cold leads and heater through for connection to power inside the box. Splice (for splicing two lengths of heater additional kits required) To splice one length of heater to another length, use a box with appropriately located hubs. Follow the above power connection procedure for the first heater. For the second heater, install the connector fitting components in the additional hub in the box; then guide the cold leads and heater through. Attach leads from one heater to leads from the other heater.

6 HTP 1548-4010C Power Connection Installation Instructions Heating Cable Configuration Conductive core Bus wires Heater with Ground Braid Inner jacket Ground braid 1 Trim the ground braid back 6-1/2 in. Slide the connector cap and two (2) washers over the heater and ground braid. 2 Slide the grommet on the heater, pushing the ground braid back, until 8 in. of heater is through the grommet. Grommet 6-1/2" Connector cap 8" Washers 3 Lightly score the inner jacket and strip as shown. 4 Remove core material from between the bus wires and any core material remaining on the bus wires. Re-twist bus wires. 6-1/2" 1/2" Cut inner core at end as shown. Roll back with pliers and peel bus wires away from core. Do Not Cut or Damage Bus Wires

HTP 1548-4010C Power Connection Installation Instructions 7 5 Start sliding the bus wires into the termination boot. Before the boot is completely on, fill the boot end with silicone sealant. Continue sliding the heater into the boot until fully inserted. Make sure the wires do not touch or cross. Trim the ends of the bus wires to 3/8 of an inch. Termination boot Silicone sealant Silicone 3/8" 6 Spread the ground braid out and slide the first washer (1) up to the grommet trapping the ground braid between the grommet and washer. Fold the ground braid back over the first washer and slide the second washer (2) and cap over the folded ground braid. Guide the cold leads and heater through the connector body (inside bevel toward grommet), insert the grommet into the body and tighten the connector cap. Connector body 7 Ordinary and Division 2 Applications Insert the connector body through the standoff bracket and thread a junction box onto the connector. (Use a thread sealant for a water-tight seal.) (Use locknut if needed to make up any gap between bracket and box.) Attach the rounded portion of the strain relief grip to the connector cap aligning the flat surface of the grip with the heater surface. Attach the grip to the heater. Attach the standoff bracket to the pipe using the pipe strap. Connect the cold lead wires to power supply. Install box cover. Secure the heater to the pipe with fiberglass tape or cable ties every 12 inches. Box (not included with kit) Standoff bracket Strain relief grip Pipe strap Fiberglass tape

8 HTP 1548-4010C Power Connection Installation Instructions Input Power Splice (for power connection to two lengths of heater additional kits required) To make a power connection to two lengths of heater use a box with an additional hub to accommodate the second heater. Follow the above power connection procedure for the first heater. For the second heater, install the connector fitting components in the additional hub in the box. Prepare the heater following the above procedure; then guide the cold leads and heater through for connection to power inside the box. Splice (for splicing two lengths of heater additional kits required) To splice one length of heater to another length, use a box with appropriately located hubs. Follow the above power connection procedure for the first heater. For the second heater, install the connector fitting components in the additional hub in the box; then guide the cold leads and heater through. Attach leads from one heater to leads from the other heater. End Seal Installation for Heating Cable with Ground Braid and Outer Jacket in Division 1 Locations Heating Cable Configuration Heater with Ground Braid and Outer Jacket Conductive core Bus wires Inner jacket Ground braid Outer jacket 1 Slide compression ring, grommet ring, and grommet onto the heating cable. 2 Lightly score outer jacket 8 inches from the end and remove as shown. 8" Connector cap Washer Grommet Do Not Cut or Damage Ground Braid or Inner Jacket

HTP 1548-4010C Power Connection Installation Instructions 9 3 Make an opening in the ground braid, bend the heater, and pull the inner jacket and core through the opening in the ground braid. Twist the ground braid into a pigtail. 4 Pull enough heater through the grommet so that the heater end can be guided through the connector body (inside bevel end toward grommet) and an approved sealing fitting and into a box. Score and remove enough additional outer jacket so that the outer jacket cut back will be centered in the sealing fitting. Insert the connector body through the standoff bracket and attach an approved sealing fitting to the connector. Attach an approved box to the sealing fitting. Remove additional outer jacket Box (not included with kit) Sealing fitting (not included with kit) Do Not Cut or Damage Ground Braid or Inner Jacket Standoff bracket Connector body 5 Guide the heater and ground braid through the connector body and sealing fitting into the box. Insert the grommet into the body and tighten the connector cap. Attach the rounded portion of the strain relief grip to the connector cap aligning the flat surface of the grip with the heater surface. Attach the grip to the heater. Attach the standoff bracket to the pipe using the pipe strap. Pipe strap Fiberglass tape

10 HTP 1548-4010C Power Connection Installation Instructions 6 Trim the end of the heater if needed so that once the end seal cap is on it will be centered in the box. Apply sealant into the end cap and also on the end of the heater. Slide the end cap onto the heater. Slide the clamp over the end cap and position it 1/4 inch from the heater entrance point. (Note: the screw may have to be completely removed in order to get the clamp over the cap, and then reinstalled.) Tighten the clamp until the cap deforms. Clamp 1/4" 7 Connect the ground braid pigtail to ground point in box using the ring tongue terminal provided. Install the box cover. Complete the sealing fitting installation by filling with sealing compound per manufacturer's instructions. Ring tongue terminal

HTP 1548-4010C Power Connection Installation Instructions 11 End Seal Installation for Heating Cable with Ground Braid and Outer Jacket in Ordinary & Division 2 Locations Heating Cable Configuration Heater with Ground Braid and Outer Jacket Conductive core Bus wires Inner jacket Ground braid Outer jacket 1 Trim end of heating cable square. Strip outer jacket back 1/2 inch from the end of the heating cable. 2 Unravel and trim ground braid to within 1/2 inch of the heating cable end, even with outer jacket. 1/2" Do Not Cut or Damage Ground Braid or Inner Jacket 3 4 Apply sealant over 1 inch of the heater end and into the end cap. Slide end cap over the heating cable. Make sure 1-1/4 inches of the heater goes into the end cap, including 3/4 inch of the outer jacket. Slide the clamp over the end cap and position it 1/4 inch from the heater entrance point. (Note: the screw may have to be completely removed in order to get the clamp over the cap, and then reinstalled.) Tighten the clamp until the cap deforms. Clamp 1/4" 1-1/4" 3/4"

12 HTP 1548-4010C Power Connection Installation Instructions End Seal Installation for Heating Cable with Ground Braid Only in Ordinary & Division 2 Locations Conductive core Bus wires Inner jacket Ground braid 1 Peel back approximately 4 inches of ground braid. Cut off 2 inches of the exposed heater. 2 Apply sealant over 1 inch of the heater end and into the end cap. Slide end cap over the heating cable. Make sure 1-1/4 inches of the heater goes into the end cap. 1-1/4" 2" 3 4 Pull ground braid back over end cap. Twist the end of the ground braid, extending past the end cap, into a pigtail. Slide the clamp over the end cap and ground braid and position it 1/4 inch from the heating cable entrance point. (Note: the screw may have to be completely removed in order to get the clamp over the cap, and then reinstalled.) Tighten the clamp until the end cap deforms. Clamp Slide the barrel crimp over the ground braid pigtail and crimp to secure the ground braid to secure the ground braid. Heat-Line is a trademark of Heat-Line Corporation. All other trademarks are the property of their respective owners. 1/4" Barrel crimp 2014 Heat-Line a Division of Christopher MacLean Ltd. 07/14 Heat-Line A Division of Christopher MacLean Ltd. 1095 Green Lake Road Carnarvon, ON Canada K0M 1J0 Tel: (705) 754-4545 (800) 584-4944 Fax: (705) 754-4567 info@heatline.com www.heatline.com Important: All information, including illustrations, is believed to be reliable. Users, however, should independently evaluate the suitability of each product for their particular application. Heat-Line a Division of Christopher MacLean Ltd. makes no warranties as to the accuracy or completeness of the information, and disclaims any liability regarding its use. Heat-Line's only obligations are those in the Heat-Line Standard Terms and Conditions of Sale for this product, and in no case will Heat-Line be liable for any incidental, indirect, or consequential damages arising from the sale, resale, use, or misuse of the product. Specifications are subject to change without notice. Heat-Line reserves the right to make changes without notification to Buyer to processing or materials that do not affect compliance with any applicable specification. All heating cable products and or accessories presented in this document are distributed through Heat-Line a division of Christopher MacLean Limited in accordance with Heat Trace Products, LLC, the manufacturer.