National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Cultural Resources

Similar documents
Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

TECHNICAL COMMITTEE ON FIRE CODE

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

M E M O R A N D U M. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action.

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda*

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Tampa, FL Fire Cause Classification Task Group Tue, 14 April 2011

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

Vacant Building Loss Prevention Best Practices

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Committee on NFPA 232

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

Committee on NFPA 51A

NFPA Technical Committee on Fire Tests

FIRE PROTECTION PROGRAM

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

12/21/2015 National Fire Protection Association Report

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 3-NFPA [ Section No. 2.3 ]

5 Key Stages to Risk Assessment

Report on First Revisions with Statement June 2014 NFPA 101

NFPA Talking Points on NFPA 1 Fire Code update to the 2015 Edition:

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

Report on First Revisions with Statement June 2014 NFPA 101

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

"Spray area" is the term that is used throughout the document. This change is for consistency.

Agency for Health Care Administration

A.C.E. Security Consultants House of Worship Checklist

Chapter 2: Definitions

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Agency for Health Care Administration

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

NFPA 72 Code Changes vs 2013

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

TECHNICAL COMMITTEE ON FIRE CODE

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Committee on NFPA 85

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

1.3.4 The application of the security requirements of this code is based on the risk considerations determined in Chapter 9 6.

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Questions/Comments for Richard Roux from Webinar on 7/11/13

FIRE SAFETY AND PREVENTION POLICY

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

Renovation Program. Renovation Program GENERAL

Clark County Department of Building & Fire Prevention 4701 West Russell Road, Las Vegas, NV (702) FAX (702)

UNIVERSITY OF TOLEDO

Agency for Health Care Administration

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

Changes in NFPA

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

MNEC NFPA 72 WHITE PAPER

APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES

SCALES NW EMERGENCY ACTION PLAN

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Fire Prevention Plan

Fire Safety Strategy

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

The Technical Committee on Commissioning and Integrated Testing

1. Revise , from what was done by Second Revision SR-95 (Annual 2014 revision cycle NFPA 101 Second Draft), to read as follows:

Fire Cause Determination

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

2009 International Fire Code Errata. SECOND PRINTING (Posted April 6, 2010)

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

FIRE SERVICE FEATURES

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

New Facilities. Minimum Requirements

Procedure DESCRIPTION/OVERVIEW

Professional Security Officer Program(PSOP)

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

Transcription:

National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Cultural Resources Gregory Harrington, Staff Liaison DATE: August 11, 2011 SUBJECT: NFPA 909 ROP TC FINAL Ballot Results (F2012) The Final Results of the NFPA 909 ROP Letter Ballot are as follows: 28 Members Eligible to Vote 1 Not Returned (J. Chartier) 24 Affirmative on All (1 with comment R. Fleming on one or more proposals as noted in the attached report) 3 Negatives (S. Carter, S. Rocklin and J. Watts on one or more proposals as noted in the attached report) 0 Abstentions There are two criteria necessary to pass ballot [(1) affirmative 2 / 3 vote and (2) simple majority]. (1) The number of affirmative votes needed for the proposal/comment to pass is 18. (28 eligible to vote - 1 not returned - 0 abstentions = 27 0.66 = 17.82) (2) In all cases, an affirmative vote of at least a simple majority of the total membership eligible to vote is required. This is the calculation for simple majority: [28 eligible 2 = 14 + 1 = (15)] Reasons for negative votes, etc. from alternate members are not included unless the ballot from the principal member was not received. According to the final ballot results, all ballot items received the necessary 2 / 3 required affirmative votes to pass ballot.

909-1 Log #CP1 Technical Committee on Cultural Resources, Review entire document to: 1) Update any extracted material by preparing separate proposals to do so, and 2) review and update references to other organizations documents, by preparing proposal(s) as required. To conform to the NFPA Regulations Governing Committee Projects. See the actions on Proposals 909-26 (Log #CP2), 909-13 (Log #CP3), and 909-5 (Log #CP4). The committee actions on the noted proposals update extracted provisions and referenced standards to current editions. 909-2 Log #CP10 Technical Committee on Cultural Resources, A prescriptive-based design shall be in accordance with Chapter 1 through Chapter 8, Sections 9.1 through 9.12, and Section 9.14, and Chapters 10 through 15 of this code. A performance-based design shall be in accordance with Chapter 1 through Chapter 8, Sections 9.1 through 9.11, and Section 9.13, and Chapters 10 through 15 of this code. The proposal corrects an inadvertent omission from the 2009 edition of NFPA 909. The requirements of Chapters 10 through 15 need to be included in both prescriptive- and performance-based design options as was specified in the 2005 edition. 909-3 Log #29 John F. Bender, Underwriters Laboratories Inc. Add new section and text as follows: 2.2.3 UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096. ANSI/UL 723 Standard for Test for Surface Burning Characteristics of Building Materials, 2008, Revised 2010. Add new Section 2.2.3 to reference mandatory use of ANSI/UL 723 as currently referenced in Section 9.12.19.1. ROCKLIN, S.: Editorial- should this be 2.3.3? 1

909-4 Log #61 Marcelo M. Hirschler, GBH International ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E 84, 2010b ASTM E 1591, 2007 2000. G.1.2.2 ASTM Publications. American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM E 1355,, 2011 2004. ASTM E 1472,, 2007 2003. G.2.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM E 84,, 2010b 1991. [ROC-1] ASTM E 136,, 2011 1995. Standards update. Also ASTM E84 is referenced in section 9.12.19.1 and needs to be added to section 2 and it is important to use a much more recent edition than 1991. Affirmative: 26 Negative: 1 ROCKLIN, S.: The definition of alteration in NFPA 5000 includes modification, replacement or another physical change, and the 2009 edition continues the use of the term renovation, as well as modification. This change does not clarify the intent of the code. 909-5 Log #CP4 Technical Committee on Cultural Resources, ASTM International, 100 Barr Harbor Drive, P.O. Box C700,West Conshohocken, PA 19428-2959. ASTM E 1591, Standard Guide for Obtaining Data for Deterministic Fire Models, 20002007. The proposal updates the referenced standard to the current edition. 2

909-6 Log #CP14 Technical Committee on Cultural Resources, 1. Add definition to read as follows: The reconfiguration of any space; the addition or elimination of any door or window; the addition or elimination of load-bearing elements; the reconfiguration or extension of any system; or the installation of any additional equipment. [, 2012] 2. Revise the following paragraphs: The requirements of this code shall apply when any of the following occur: (1)*Changes in the construction classification, occupancy of a space, or the way a space is used (2) Alterations, or renovations or modifications that affect the performance of existing fire protection features and systems, including fixed fire protection, detection and suppression, compartmentation,electronic premises security systems, and physical security devices (Balance of 1.3.2.2 unchanged.) The fire safety manager shall review and approve plans for new displays or exhibits, new construction, renovation, modification, restoration, or reconfiguration of space. A vulnerability assessment that includes evaluation of conditions that increase the threat of arson shall be completed prior to commencement of construction, alteration, or renovation, or modification projects. New construction, additions, alterations, and renovations, and modifications, hereafter referred to as the project, shall comply with the applicable building code and the requirements of this chapter. Design proposals shall include documentation that provides anyone involved in ownership or management of the building with notification of the following: (1) The building was approved as a performance-based design with certain specified design criteria and assumptions. (2) Any remodeling, modification, renovation, modification, change in use, or change in the established assumptions shall require reevaluation and reapproval. (3) All special events shall be reviewed and approved based upon the designs developed under this chapter. All construction, alteration, or renovation, and modification contracts shall specify methods and responsibility for controlling fire hazards. Prior to beginning any renovations, modifications, or alterations, workers shall be instructed on emergency communications procedures. Smoking shall be prohibited inside any building or building space or area under construction, renovation, modification, or repair. Prior to construction, the electrical equipment and circuits that might be impacted by the alteration, addition, or renovation, or modification work shall be identified, relocated, and made safe by a qualified person. New construction, addition, alteration, and renovation, and modification projects shall comply with the requirements of Chapter 9. Portable space heaters shall not be permitted except where the building contents have been removed and the building turned over to the contractor for a construction, or renovation, or modification project. New construction, addition, alteration, and renovation, and modification projects shall comply with the requirements of Chapter 9.... Conditions in the cultural resource property change over time, and these changes can increase or decrease the vulnerability of the facility and/or the collection to potential threats. Construction projects, new exhibits, a traveling exhibit, or a new item in the collection can have a significant impact on the vulnerability assessment, so it is important for the governing body to review the vulnerability assessment regularly, and when planning construction, renovation, modifications, alternations, special events, or changes in exhibits. (Balance of A.5.2.2.1 unchanged.) Examples of the roles and responsibilities of the response and recovery team include, but are not limited to, the following: (1) Report on the status of building occupants, including employees and other occupants (2) Report on known conditions in the building, i.e., location of fire or other emergency, status of extinguishing systems, location and status of hazardous materials, location and status of high-value contents, status and location of hazardous or unusual conditions such as on-going ongoing construction/, renovation, or modification 3

(Balance of A.6.1.3 unchanged.) An ad hoc project team that should be interdisciplinary in nature, representing security, safety, and preservation concerns should be appointed to oversee application of this code to designs for alterations, additions, or renovations, or modifications to the cultural resource property... (Balance of A.9.3 unchanged.)... In new libraries, or in major renovations or modifications of existing structures, this type of book stack should be avoided. Floor assemblies should be of conventional building construction with appropriate fire-resistive ratings and the book stack ranges supported by the floor assembly upon which they are placed. Examples of such scenarios are a fire involving ignition of gasoline as an accelerant in a means of egress or renovation or modification materials or other fuel configurations that can cause an ultra-fast fire... (Balance of A.9.13.16.3 unchanged.) The cultural resource property is most vulnerable during periods of renovation, modification, alteration, and new construction... (Balance of A.9.14 unchanged.) Obstructions encountered during alterations, additions, and renovations, and modifications include portable sanitation facilities, construction and demolition debris, building materials, landscaping materials, shrubbery, snow, temporary construction, vehicles, and so forth. 3. Revise FIGURE A.5.2.2.1 Vulnerability Assessment Survey as follows: e. Is the building under construction/, renovation or modification? (Balance of Figure A.5.2.2.1 unchanged.) The proposal extracts the definition of the term 'modification' from NFPA 5000, and adds the term throughout the Code wherever the term 'renovation' is used. The Code previously intended to include reconfiguration of spaces under the scope of 'renovations,' however such reconfiguration is specifically excluded by the definition. 909-7 Log #CP5 Technical Committee on Cultural Resources, Revise definition to read as follows: A continuous vertical or horizontal assembly, such as a wall or floor, that is designed and constructed with a specified fire resistance rating to limit the spread of fire and that also will restrict the movement of smoke. Such barriers might have protected openings. A continuous membrane or a membrane with discontinuities created by protected openings with a specified fire protection rating, where such membrane is designed and constructed with a specified fire resistance rating to limit the spread of fire, that also restricts the movement of smoke. [, 2012] The proposal replaces the secondary definition of 'fire barrier' with the preferred definition from NFPA 101, Life Safety Code. 4

909-8 Log #CP18 Technical Committee on Cultural Resources, Revise definition to read as follows: A continuous assembly membrane, or an assembly membrane with discontinuities created by protected openings, where such an assembly membrane is designed and constructed to restrict the movement of smoke. [, 2012] The proposal replaces the secondary definition of 'smoke barrier' with the preferred definition from NFPA 5000, Building Construction and Safety Code. 909-9 Log #CP19 Technical Committee on Cultural Resources, Revise definition to read as follows: A Building building characteristics and other conditions that are under the control of the design team. [, 2012] The proposal replaces the secondary definition of 'design specification' with the preferred definition from NFPA 5000, Building Construction and Safety Code. Affirmative: 26 Negative: 1 WATTS, JR., J.: 1. The term in the current (2010) edition of 909 should be plural as printed in the 2005 edition. 2. NFPA 909 predominantly uses the plural term. 3. The term in the plural reflects a concept consistent with other terms in NFPA 909 such as collections and occupant characteristics. 4. The singular term definition from NFPA 5000 does not make sense since it uses the plural phrase conditions that are. 5

909-10 Log #CP6 Technical Committee on Cultural Resources, 1. Delete definition of 'fire resistive' as follows: Property or design to resist the effects of any fire to which a material or structure can be expected to be subjected. 2. Revise the following paragraphs: Where packing materials cannot be protected using metal containers with self-closing covers, dedicated crating and packing areas shall be enclosed in by fire barriers having a fire-resistance rating of not less than 1-hour fire-resistive construction or shall be equipped with sprinklers.... The term compartmentation in fire protection is used to mean subdivision of a building into relatively small areas so that water, fire, or smoke can be confined in the room or section in which it originates. Compartmentation also provides the opportunity to provide varying levels of protection for culturally significant objects, to reduce the concentration of values in any single space, and to delay access by a would-be thief. This principle can be applied to libraries and museums without restricting the flexibility of arrangement of library collections or the flow of visitors. Compartmentation requires intrusion and/or fire-resistive resistance rated wall and floor construction, with openings provided with self-closing or automatic fire doors having fire-resistive protection ratings and locking assemblies in accordance with the fire resistance and/or intrusion resistance ratings of the wall or ceiling/floor assemblies they are to protect... (Balance of A.9.1 unchanged.)... In new libraries or in major renovations of existing structures, this type of book stack should be avoided. Floor assemblies should be of conventional building construction with appropriate fire- resistive resistance ratings and the book stack ranges supported by the floor assembly upon which they are placed. 3. Revise Figure A.5.2.2.1 as follows: Fire-resistive resistance rated enclosures protecting stairways and other vertical openings... The definition of 'fire resistive' is inconsistent with that in other NFPA codes and standards and serves no purpose in the Code. The proposal further replaces the term with correct terminology where it is misused throughout the Code. 909-11 Log #CP7 Technical Committee on Cultural Resources, Revise definition to read as follows: The assignment of a person or persons to an area for the express purpose of notifying the fire department, the building occupants, or both, of an emergency,; preventing a fire from occurring,; extinguishing small fires,; or protecting the public from fire or life safety dangers. [, 2012] The proposal replaces the secondary definition of 'fire watch' with the preferred definition from NFPA 1, Fire Code. 6

909-12 Log #62 Marcelo M. Hirschler, GBH International New text to read as follows: Not capable of supporting combustion. 3.3.xx Noncombustible material. See 4.5.1. 3.3.xx Limited combustible material. See 4.5.2. NFPA 909 uses the terms noncombustible material and limited combustible material repeatedly without properly defining them. NFPA 101 and NFPA 5000 have revised the definitions of noncombustible material and limited combustible material so that the definitions don t contain requirements or multiple sentences. The requirements are now contained in the body of the code or standard. This is also a way of dealing with uniformity of references within the NFPA system. For international users of the document I want to point out that ASTM E2652 is identical to ISO 1182. Neither ASTM E2652 nor ISO 1182 contain pass/fail criteria. The proposal does not add any requirements. 7

1. Revise definitions as follows: Not capable of supporting combustion. See 9.12.7.1. See 9.12.7.2. 2. Add a new 9.12.7 and renumber subsequent paragraphs accordingly as follows: A material that complies with any of the following shall be considered a noncombustible material: (1)* A material that, in the form in which it is used and under the conditions anticipated, will not ignite, burn, support combustion, or release flammable vapors, when subjected to fire or heat (2) A material that is reported as passing ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C (3) A material that is reported as complying with the pass/ fail criteria of ASTM E 136 when tested in accordance with the test method and procedure in ASTM E 2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 Degrees C. [ :7.1.4.1.1] The provisions of 9.12.7.1.1 do not require inherently noncombustible materials to be tested in order to be classified as noncombustible materials. [ :A.7.1.4.1] Examples of such materials include steel, concrete, masonry and glass. [ :A.7.1.4.1.1(1)] Where the term limited-combustible is used in this Code, it shall also include the term noncombustible. [ :7.1.4.1.2] A material shall be considered a limited combustible material where all the conditions of 9.12.7.2.1 and 9.12.7.2.2, and the conditions of either 9.12.7.2.3 or 9.12.7.2.4 are met. [ :7.1.4.2] The material shall not comply with the requirements for a noncombustible material, in accordance with 9.12.7.1. [ :7.1.4.2.1] The material, in the form in which it is used, shall exhibit a potential heat value not exceeding 3500 Btu/lb (8141 kj/kg), when tested in accordance with NFPA 259, Standard Test Method for Potential Heat of Building Materials. [ :7.1.4.2.2] The material shall have the structural base of a noncombustible material with a surfacing not exceeding a thickness of 1/8 in. (3.2 mm) where the surfacing exhibits a flame spread index not greater than 50 when tested in accordance with ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials or ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials. [ :7.1.4.2.3] The material shall be composed of materials that, in the form and thickness used, neither exhibit a flame spread index greater than 25 nor evidence of continued progressive combustion when tested in accordance with ASTM E 84 or ANSI/UL 723, and are of such composition that all surfaces that would be exposed by cutting through the material on any plane would neither exhibit a flame spread index greater than 25 nor exhibit evidence of continued progressive combustion when tested in accordance with ASTM E 84 or ANSI/UL 723. [ :7.1.4.2.4] Where the term limited-combustible is used in this Code, it shall also include the term noncombustible. [ :7.1.4.2.5] ***** 3. Add the following references to Chapter 2: NFPA 259, Standard Test Method for Potential Heat of Building Materials, 2013 edition. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C, 2009b. ASTM E 2652, Standard Test Method for Behavior of Materials in a Tube Furnace with a Cone-shaped Airflow Stabilizer, at 750 Degrees C, 2009a. ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, 2008, Revised 2010. The committee action relocates the proposed text to Chapter 9, New Construction, Addition, Alteration, and Renovation Projects, which is more appropriate than Chapter 4, Goals and Objectives. The action further editorially revises the proposal for consistency with the source document (NFPA 5000). ROCKLIN, S.: The technical aspects as approved by the committee are acceptable; however, chapter 9 prescribes processes and requirements. It would be appropriate to locate this material in chapter 3. 8

909-13 Log #CP3 Technical Committee on Cultural Resources, Revise definition to read as follows: The replacement in kind or strengthening of load-bearing elements; or the refinishing, replacement, bracing, strengthening or upgrading of existing materials, elements, equipment or fixtures, or both, without reconfiguration of spaces. The replacement in kind, strengthening or upgrading of building elements, materials, equipment or fixtures that does not result in a reconfiguration of the building or spaces within. [, 20092012] The proposed revision updates the extracted definition to that in the current edition of NFPA 5000, Building Construction and Safety Code, in accordance with the NFPA extract policy. 909-14 Log #CP9 Technical Committee on Cultural Resources, Add definition of 'secondary storage' as follows: Storage separate from the main collections, usually of low use library collections. The proposal adds a definition for the term 'secondary storage' as used in 9.12.23.10 to clarify its application. 9

909-15 Log #2 Michael D. DeVore, State Farm Insurance Company The governing body of the cultural resource property shall adopt Pprotection goals or and objectives shall be adopted that reflect the acceptable level of loss of for: (1) iitems of cultural significance. and (2) iinterruption of service to the client communitythat is acceptable to the governing body of the cultural resource property. Paragraph reorganized for grammar and clarity. The governing body of the cultural resource property shall adopt Pprotection goals or and objectives shall be adopted that reflect the acceptable level of loss of for both of the following: (1) iitems of cultural significance. and (2) iinterruption of service to the client communitythat is acceptable to the governing body of the cultural resource property. The addition of 'both of the following' clarifies that the acceptable level of loss for both Items 1 and 2 must be determined. The committee action should meet the submitter's intent. 909-16 Log #3 Michael D. DeVore, State Farm Insurance Company Protection features, systems, and programs shall be designed, approved, implemented, and maintained to protect and preserve the original qualities of the collection. Structural integrity shall be maintained to protect items in the collections that are not intimate with the initiating event for the time needed to evacuate, relocate, or defend them in place. Ingress and egress systems shall be designed, implemented, and maintained to provide aaccess to areas that are not intimate with the initiating event for emergency responders shall be provided for the time needed to specified in 4.3.1.1 to evacuate, relocate, or defend collection objects in place. The object of paragraph 4.3.1.2 is to provide access to collections for first responders. The systems necessary to achieve this would be included in the charging paragraph, 4.3.1, and doesn t need to be repeated here. 10

909-17 Log #4 Michael D. DeVore, State Farm Insurance Company Delete text as follows: Protection features, systems, and operations necessary to achieve the goals of this code shall be effective, maintained, and operational for the life of the cultural resource property. Paragraph 4.4 is not necessary as it restates what has already been said in 4.3.1, 4.3.2.1, and 4.3.3, and inspection, test, and maintenance are covered in Chapter 10. A protection feature cannot be mandated to always be effective. For example, a security system may deter theft but cannot prevent it in all cases. For every protection feature there is a method of subverting its effectiveness. 11

909-18 Log #5 Michael D. DeVore, State Farm Insurance Company This chapter provides tthe governing body of a cultural resource property with a framework to develop shall adopt a protection plan that shall cover addresses operations during for conditions or physical situations of any originwith the potential to cause damage or losssuch conditions or physical situations shall includeincluding, but shall not be limited to the following: (1) Fires (2) Deliberate acts of third parties, staff, or visitors (3) Other disruptive or potentially adverse events including, but not limited to, the following: (a) Severe weather (b) Earthquake (c) Loss of communications (d) Failure of critical building systems (e) Flood (f) Loss of utilities (gas, electricity, water, etc.) This chapter provides the governing body of a cultural resource property with a framework to develop a protection plan. The protection plan shall include, but shall not be limited to, components covering operations developed in compliance with Chapter 6, fire safety management developed in compliance with Chapter 7, and security developed in compliance with Chapter 8. The governing body shall provideabout the cultural resource property s stewardship to care for and to protect the items of cultural significance entrusted to it. The governing body shall confer with the authority having jurisdiction or the planning team The governing body shall be responsible for the conduct a of the vulnerability assessment to be made of the cultural resource property to identify, measure, mitigate, and manage risks from recognized potential threats. The governing body shall define the scope of the vulnerability assessment and establish loss tolerability thresholds for the cultural resource property based on the goals and objectives developed in compliance with Sections 4.2 and 4.3. The governing body shall establish the loss tolerability thresholds for the cultural resource property. The governing body shall evaluate the results of the vulnerability assessment against the established risk loss tolerability thresholds and develop protection strategies to mitigate the risks that could prevent achieving the goals and objectives. protect items of cultural significance (e.g., collections, buildings) and vital operations during routine operations and during emergencies. The governing body shall oversee the development of a protection plan to eliminate, manage, or control risks identified as exceeding the tolerability thresholds established in compliance with 5.3.8.2 to achieve the protection goals and objectives developed in compliance with Sections 4.2 and 4.3. The governing body shall appoint a protection plan manager who is responsible for implementation of the protection plan. The protection plan manager shall have duties including, but not be limited to, oversight of the following: (1) Emergency operations (2) Fire safety (3) Security (4) Emergency planning during additions, alterations, or renovation (5) Maintenance of the protection plan (6) Management operational systems (7) Post-incident review (8) Submit appropriate plan changes to planning team. 12

Renumber A.5.2.2.1 to be A.5.2.3 and A.5.2.2.2 to be A.5.2.4. Revised for grammar and to comply with the Manual of Style. There were 3 verbs in 5.1.1 and more than 1 compulsory shall in several paragraphs. Re-organized Section 5.2 to separate the components of a protection plan; essentially the vulnerability assessment, setting loss tolerability thresholds, and defining the goals and standards for the property. Deleted the description of a vulnerability assessment in 5.2.1 because it is covered in the annex material. Deleted 5.2.3 because it didn t say anything that was not already covered in the preceding parts of 5.2. Added protection plan manager because throughout the document reference is made to reviewing plans and managing the plan. Administration of the protection plan is not appropriately a committee activity. Decisions will often need to be made more quickly than is possible for a committee. Reference is made in Chapter 7 to a fire safety manager and a security manager is mentioned in Chapter 10. Depending on the size of the facility, the protection plan manager could do both of these jobs or those responsibilities could be delegated to others under the protection plan manager. Revise text to read as follows and renumber associated Annex notes accordingly: This chapter provides tthe governing body of a cultural resource property with a framework to develop shall adopt a protection plan that shall cover addresses operations during for conditions or physical situations of any originwith the potential to cause damage or losssuch conditions or physical situations shall includeincluding, but shall not be limited to the following: (1) Fires (2) Deliberate acts of third parties, staff, or visitors (3) Other disruptive or potentially adverse events including, but not limited to, the following: (a) Severe weather (b) Earthquake (c) Loss of communications (d) Failure of critical building systems (e) Flood (f) Loss of utilities (gas, electricity, water, etc.) This chapter provides the governing body of a cultural resource property with a framework to develop a protection plan. The protection plan shall include, but shall not be limited to, components covering operations developed in compliance with Chapter 6, fire safety management developed in compliance with Chapter 7, and security developed in compliance with Chapter 8. Authority Having Jurisdiction. The governing body shall confer with the authority having jurisdiction or the planning team (see 5.3.2) about the cultural resource property s provide stewardship to care for and to protect the items of cultural significance entrusted to it. The governing body shall confer with the authority having jurisdiction or the planning team (see 5.3.2). 5.2.2 Vulnerability Assessment. The governing body shall be responsible for the conduct a of the vulnerability assessment to be made of the cultural resource property to identify, measure, mitigate, and manage risks from recognized potential threats. The governing body shall define the scope of the vulnerability assessment and establish loss tolerability thresholds for the cultural resource property based on the goals and objectives developed in compliance with Sections 4.2 and 4.3. The governing body shall establish the loss tolerability thresholds for the cultural resource property. The governing body shall evaluate the results of the vulnerability assessment against the established risk loss tolerability thresholds and develop protection strategies to protect items of cultural significance (e.g., collections, buildings) and vital operations during routine operations and during emergencies mitigate the risks that could prevent achieving the goals and objectives. The governing body shall oversee the development of a protection plan to eliminate, manage, or control risks identified as exceeding the tolerability thresholds established in compliance with 5.3.8.2 to achieve the protection goals and objectives developed in compliance with Sections 4.2 and 4.3. The committee action rejects the proposed deletion of 5.2.3 and the addition of requirements for a protection plan manager. The addition of a protection plan manager, appointed by the governing body to oversee the work of the fire safety manager and the security manager, would confuse the lines of authority and would create an unnecessary complication. 13

909-19 Log #32 Danny L. McDaniel, Colonial Williamsburg Foundation The governing body shall conduct a vulnerability assessment to be made of the cultural resource property to identify measure, mitigate, and manage risks from recognized potential threats. This is an editorial change that removes unnecessary and potentially confusing words from the text. See the action on Proposal 909-18 (Log #5). The action on Proposal 909-18 (Log #5) should meet the submitter's intent. 909-20 Log #33 Danny L. McDaniel, Colonial Williamsburg Foundation Specific emergency response roles and responsibilities shall be assigned to response personnel from within (and/or outside of) the cultural resource property. Roles shall include, but shall not be limited to, the following: (1) Collections stabilization (2) Communication (internal and external) (3) Health and safety (4) Location of recovery effort (on or off site) (5) Securing collections (6) Vendors and consultants The protection plan shall identify locations, on- and off-site, that can serve as temporary storage for evacuated collections and as a triage area for initial collection stabilization during a response. Damage to the building envelope that allows penetration of moisture and debris, or has compromised shelving, or other storage or exhibit furnishings shall be corrected as soon as possible to provide a stable area in which to house, inspect, or recover collections. The collections storage or exhibit environment shall be controlled to prevent other additional damage such as the growth and spread of mold. The protection plan shall include measures for stabilization of at-risk collections. The protection plan shall include steps for recovery from the incident. A written post-incident report shall be completed and shall be scaled to the magnitude of the incident. [NOTE: Renumber Annex A notes to correspond to the renumbered text.] The proposed changes and renumbering more accurately reflects the intent of the section. 14

909-21 Log #CP16 Technical Committee on Cultural Resources, Transpose Sections 7.1 and 7.2 as follows: 7.12* Fire Safety Management. 7.12.1* General. The governing body of the cultural resource property shall establish a written fire safety management component of the protection plan that complies with this section for systematic achievement of the fire safety goals and objectives developed in compliance with Sections 4.2 and 4.3. 7.12.2 The fire safety management component of the protection plan shall comply with this section and shall provide for systematic achievement of fire safety goals and objectives developed in compliance with Sections 4.2 and 4.3. 7.12.3 The fire safety management component of the protection plan shall include provisions for an annual comprehensive facility inspection and procedures to document and correct problems and potential threats identified during the inspection. (See Annexes J and K for additional information.) 7.12.4 The fire safety management component of the protection plan shall be updated annually or when any addition, alteration, modification, or change in the occupancy occurs. 7.21 Vulnerability Assessment. 7.21.1* A vulnerability assessment, conducted in accordance with 5.2.2.1 and Section 5.4, shall be used to develop the fire safety management component of the protection plan, and a copy of the assessment shall be attached to the protection plan. (See Figure 5.3.1, Planning Flow Chart.) 7.21.2 The vulnerability assessment shall include a survey to identify existing and potential fire hazards. The proposal reverses the order of Sections 7.1 and 7.2 to follow the order of how the protection plan is developed, and is consistent with Chapter 8. 15

909-22 Log #6 Michael D. DeVore, State Farm Insurance Company The governing body protection plan manager shall serve as the fire safety manager or appoint a fire safety manager who is responsible for implementation of the fire safety management component of the protection plan. The fire safety manager s shall have duties shall includinge, but shall not be limited to, oversight of the following: (1) Egress systems (2) Fire prevention (3) Fire inspections (4) Periodic property surveys (5) Operation, maintenance, and testing of fire protection equipment, such as fire detection and fire suppression equipment (6) Management operational systems The fire safety manager shall monitor controls developed for fire hazards inherent to the cultural resource property. The fire safety manager shall review and approve plans for new displays or exhibits, new construction, renovation, restoration, or reconfiguration of space. After any incident the fire safety manager shall review lessons learned from the incident with the planning team. The planning team shall make changes as appropriate to the fire safety management component of the protection plan and retrain staff on the changes as necessary. Revise first paragraph to include protection plan manager or the designee for fire safety. Revise 7.3.2 to eliminate a possessive and the duplicate shall for compliance with the Manual of Style. Delete 7.3.4 and 7.3.5 because this material is already addressed elsewhere in this document. Reject proposed revisions to 7.3.1, 7.3.4, and 7.3.5. Revise 7.3.2 as follows: The fire safety manager s duties shall include, but shall not be limited to, responsible for oversight of all of the following: (1) Egress systems (2) Fire prevention (3) Fire inspections (4) Periodic property surveys (5) Operation, maintenance, and testing of fire protection equipment, such as fire detection and fire suppression equipment (6) Management operational systems The proposed revisions to 7.3.1, 7.3.4, and 7.3.5 are not needed based on the action on Proposal 909-18 (Log #5). The revisions to 7.3.2 are editorial and should meet the submitter's intent. 16

909-23 Log #7 Michael D. DeVore, State Farm Insurance Company A vulnerability assessment shall be conducted in compliance with 5.2.2.1 and Section 5.4 that examines: (1) ppotential threats from the cultural resource property s vulnerability to foreseeable crimes.; (2) llosses through the deliberate actions of third parties, staff, or visitors.; (3) bbreaches in security caused by natural disasters.; or (4) oother conditions or physical situations with the potential to cause damage or loss. The vulnerability assessment required in 5.2.2.1 and Section 5.4 shall include, but not be limited to: (1) Threats from an evaluation of the conditions that increase the risk of arson. A vulnerability assessment that includes evaluation of conditions that increase the t (2) Threats posed by of arson shall be completed prior to commencement of construction, alteration, or renovation projects. The vulnerability assessment shall include an evaluation of the t (3)* Threat potential of terrorist activity. that has the potential to directly or indirectly affect the cultural resource property. Renumber A.8.1.2.2 to A.8.1.2. Renumber A.8.1.3 to A.8.1.2(3). Based upon the outcome of the vulnerability assessment described in Section 8.1 a security component of the protection plan shall be prepared and put into place. A security component of the protection plan shall be prepared and adopted. The security component shall be based on the results of an analysis of: (1) The potential threats identified in the vulnerability assessment (2) The loss tolerability threshold adopted by the governing board (3) The goals and objectives set for the cultural property. Arson prevention shall be addressed in the protection plan included in the cultural resource property s protection goals and objectives developed in compliance with Sections 4.2 and 4.3. Security practices, procedures, operations, and systems to reduce the threat of arson shall be integrated into the cultural resource property s protection plan. The security component of the protection plan shall include screening all personnel, including part-time and volunteers, against records of known fire setters. Book returns shall comply with one of the following: (1) bbe constructed to prevent the spread of fire and smoke from the return into the rest of the library. (2), or the book return shall be l Located in an outside receiving bin away from the exterior walls of the library building. The nature of libraries their access by the public, with many areas obscured from view of attendants results in their being an opportune target for arsonists as well as others bent on other forms of malicious damage. The most common fire setters are juvenile fire starters, vandals, disgruntled patrons, and employees. They can break in at night or gain legitimate access during normal operating hours. A frequent method of external attack has been to place burning materials into the book return. The security component of the protection plan shall include protective measures for potential each threat conditions outlined in the Department of Homeland Security s Security Advisory System. The security component of the protection plan shall include procedures for: (1)* rresponding to unattended objects, containers, or packages. The security component of the protection plan shall include procedures for (2) rresponding to bomb threats. The security component of the protection plan shall include procedures for h (3) Handling suspicious parcels and letters. 17

The security component of the protection plan shall include procedures for r (4) Responding to an explosion and fire. The security component of the protection plan shall include procedures for r (5) Responding to chemical, biological, and radiological threats. The cultural resource property shall conduct ppre-employment screening for all employees and volunteers is required. Procedures shall be implemented to screen and identify official visitors, contractors, and others who have access to nonpublic areas of the cultural resource property. Procedures shall be implemented to control the flow of property in and out of the cultural resource property. Where the vulnerability assessment indicates the need for an electronic premises security system, the system shall be designed by a qualified person. All eelectronic premises security systems shall be installed in accordance with NFPA 731, Where required by the cultural resource property s When part of the protection plan, physical security devices including but not limited to locks, doors, windows, safes, vaults, and strong rooms, shall be installed and maintained in accordance with the manufacturer s specifications. Renumber paragraph only. The security component of the protection plan usually outlines an organization's security-related measures and procedures, as well as providing information required to implement them. The objective of a security component of the protection plan is to ensure that security measures and personnel respond in an integrated and effective way to mitigate the effects of an adversarial act in a manner that is appropriate for that particular organization or facility. In addition to features of protection, the security component of the protection plan usually includes a concise statement of purpose, identifies the intended users, designates where the master copy is maintained, identifies to whom it has been distributed, and contains clear instructions for its use. Specific items in the security component of the protection plan should be based on the potential threats faced by the organization or facility as determined by the Security Vulnerability Assessment (SVA). Given a potentially broad range of threats, however, priority should be given to items that accomplish the following: (1) Address events that are most likely to occur and have the greatest potential impact on defined critical assets (2) Allocate sufficient time and resources for planning, development, and implementation (3) Identify and collect the information necessary to develop effective procedures (4) Are specific and comprehensive Remainder of A.8.2 to remain unchanged. It is important to control the threat of arson. Precautions can minimize the likelihood of a serious fire. The most common fire setters are juvenile fire starters, vandals, disgruntled patrons, and employees. They might break in at night or gain legitimate access during normal operating hours. Experience indicates that if unsuccessful fire arson has occurred, a repeat attempt is likely unless the fire setter is brought to justice. The cultural resource property then becomes a specific target, and extra precautions are warranted. The following special precautions are suggested as recommendations for high-risk properties: (1) The strongest deterrent to fire setters is good security. Suggested elements of a sound security program are as follows: (a) Reasonable surveillance, including use of premises protection systems, video surveillancecctv, and electronic access control systems, of all areas accessible to the public, with spot checks at regular intervals. All nonpublic areas should have controlled access. (b) A background investigation for stability and character should be conducted, to the extent legal restrictions allow, on potential employees, security personnel, and others having free access to the entire facility. (c) All accessible openings, including doors, windows, vents, and roof access, should be properly secured. Fire exits should be arranged to prevent entry from outside. Doors and windows should be checked to make sure locks are in good repair. (d) Exterior lighting is an effective and often underrated security measure against arsonists and other miscreants. 18

Where not provided by public utilities, lighting should be added at all concealed approaches to the facility. (e) A rigid closing procedure, including supervisory follow-up responsibility, should be established to ensure that all unauthorized people have left the building, that openings are secured, and that fire hazards, including ashtrays and trash receptacles are checked. (f) Many fires have been set in book returns. Book returns should be constructed to prevent the spread of fire and smoke from the return into the rest of the library. A better alternative could be to eliminate the inside book return and provide an outside receiving bin away from the exterior walls of the library building. (gf) CUse crime prevention through environmental design (CPTED) to deter criminals. (2) High-risk locations require a A higher level of precaution may be needed when any of the following conditions exist: (a) Properties in high-crime rate area (b) Cultural resource properties associated with or connected to social or political causes (c) Locations having previously incurred an arson fire or threat (d) Facilities where seriously strained relations between employees and management exist (3) For facilities in high-risk locations, the following precautions should be employed: (a) Provide security/guard service during idle periods or intrusion alarms connected to a reliable, constantly attended location (b) Establish liaison with police and fire departments (c) Provide/install closed-circuit television video surveillance and monitors for remote areas with public access, because the cameras provide a formidable psychological deterrent to arsonists, vandals, and other wrongdoers (d) Supplement outside lighting with a 2 m (7 ft) wire fence in concealed access areas of the building (e) Cutting back bushes, shrubs, and other plant materials that could provide cover for an intruder For additional information on the security advisory system, see www.dhs.gov.cultural resource properties should take the following steps: (1) Develop written policies and procedures for terrorist events, and train all personnel about to them, and test their effectiveness of the plan. (2) Provide a prepared on-site area of refuge for guests and employees should an off-site consequence prevent travel from the facility. Preparations should include provision of nonperishable food and drinking water, battery-powered commercial radio/television, first aid supplies, sanitation supplies, flashlights, and so forth. Remainder of the annex section to remain unchanged. If an unattended, suspicious object, container or package (e.g., purse, briefcase, backpack) is discovered, immediate efforts must be made to identify its owner. The item should not be disturbed and radio/cellular communications should be avoided within the immediate vicinity. Potential witnesses should be interviewed to find out if they saw anyone leave the item or how long it has been there. Consideration should be given to the question of whether the unattended item was found in conjunction with a bomb threat, or if there is a compelling factor that makes the object, container, or package particularly suspicious, or if the location is such that an attempt to hide the object was likely. After all reasonable leads have been exhausted, clear the area within line of sight of the object, container, or package and notify the police immediately. Edited to eliminate redundant language and for grammar, clarity, and compliance with the Manual of Style. Revised 8.2 to be a title and started a new General charging paragraph at 8.2.1, adding a paragraph stating that there is a relationship between the SVA, loss tolerance threshold, and the goals and objectives. Deleted the word all where it is implied anyway. Deleted 8.2.1.2 because it is a redundant statement with the charging general paragraph. In A.8.2.4(1), the word immediately is deleted because it is in conflict with the leading phrase after all reasonable leads have been exhausted. Revise as follows and renumber associated Annex A text accordingly: 8.1 Vulnerability Assessment. 8.1.1* A vulnerability assessment shall be conducted in compliance accordance with 5.2.2.1 and Section 5.4 that examines all of the following: (1) cultural resource property s vulnerability to foreseeable Potential threats from crimes; (2) losses Losses through the deliberate actions of third parties, staff, or visitors; (3) breaches Breaches in security caused by natural disasters (4) other Other conditions or physical situations with the potential to cause damage or loss. 8.1.2 Arson. 8.1.2.1* The vulnerability assessment required in 5.2.2.1 and Section 5.4 shall include, but shall not be limited to, all of the following: (1) an evaluation of the Threats from conditions that increase the risk of arson. 8.1.2.2* A vulnerability assessment that includes evaluation of conditions that increase the threat of arson shall be 19

completed prior to commencement of (2) Threats posed by construction, alteration, or renovation projects. 8.1.3* The vulnerability assessment shall include an evaluation of the threat (3) Threat potential of terrorist activity that has the potential to directly or indirectly affect the cultural resource property. 8.2* Security Component of the Protection Plan. Based upon the outcome of the vulnerability assessment described in Section 8.1 a security component of the protection plan shall be prepared and put into place. 8.2.1 Arson Prevention (Incendiary Fires). A security component of the protection plan shall be prepared and adopted. The security component shall be based on the results of an analysis of all of the following: (1) Potential threats identified in the vulnerability assessment (2) Loss tolerability threshold adopted by the governing body (3) Goals and objectives set for the cultural property 8.2.1.13* Arson prevention shall be included in the cultural resource property s protection goals and objectives developed in compliance with Sections 4.2 and 4.3. 8.2.1.2 Security practices, procedures, operations, and systems to reduce the threat of arson shall be integrated into the cultural resource property s protection plan. 8.2.1.2.14 Personnel Screening. The security component of the protection plan shall include screening all personnel, including part-time and volunteers, against records of known fire setters. 8.2.1.2.25* Book Returns. Book returns shall comply with one of the following: (1) They shall be constructed to prevent the spread of fire and smoke from the return into the rest of the library, or the book return. (2) They shall be located in an outside receiving bin away from the exterior walls of the library building. 8.2.26* Terrorism. The security component of the protection plan shall include protective measures for each threat condition outlined in the Department of Homeland Security s Security Advisory System. 8.2.37* Unattended Suspicious Objects, Containers, or Packages. The security component of the protection plan shall include procedures for all of the following: (1) responding Responding to unattended objects, containers, or packages. 8.2.4 Bomb Threats. The security component of the protection plan shall include procedures for responding (2) Responding to bomb threats. 8.2.5 Suspicious Parcels and Letters. The security component of the protection plan shall include procedures for handling (3) Handling suspicious parcels and letters. 8.2.6 Explosion and Fire. The security component of the protection plan shall include procedures for responding (4) Responding to an explosions and fires. 8.2.7 Chemical, Biological, and Radiological Threats. The security component of the protection plan shall include procedures for responding (5) Responding to chemical, biological, and radiological threats. 8.3 Security Program. 8.3.1* Pre-Employment Screening. The cultural resource property shall conduct pre-employment screening for all All employees and volunteers shall be subjected to pre-employment screening. 8.3.2* Access Control. Procedures shall be implemented to screen and identify official visitors, contractors, and others who have access to nonpublic areas of the cultural resource property. 8.3.3 Parcel Control. Procedures shall be implemented to control the flow of property in and out of the cultural resource property. 8.3.4 Electronic Premises Security Systems. 8.3.4.1* Qualifications for Security System Designers. Where the vulnerability assessment indicates the need for an electronic premises security system, the system shall be designed by a qualified person. 8.3.4.2* Installation. All electronic Electronic premises security systems shall be installed in accordance with NFPA 731, Standard for the Installation of Electronic Premises Security Systems. 8.3.5* Physical Security Devices. 8.3.5.1 Installation and Maintenance. Where required by the cultural resource property s part of the protection plan, physical security devices, including but not limited to locks, doors, windows, safes, vaults, and strong rooms, shall be installed and maintained in accordance with the manufacturer s specifications. 8.3.5.12 Delayed Egress Locking Systems. 8.3.5.12.1 Approved, listed, delayed-egress locking systems shall be permitted... (Balance unchanged.) 8.3.5.12.2 Delayed egress locking devices shall be tested regularly, but not less than quarterly and a written record of the test and the results shall be kept. ***** Accept proposed revisions to A.8.2. Reject proposed revisions to A.8.2.1.1 (renumbered as A.8.2.3). 20