Exercise 2-4. Heat Exchangers (Optional Exercise) EXERCISE OBJECTIVE DISCUSSION OUTLINE. Description of a brazed plate heat exchanger DISCUSSION

Similar documents
Familiarization with the Training System

Shell-and-Tube Heat Exchanger (Four Passes) - Optional

Heat Exchangers and Advanced Temperature Measurement Temperature

Lab 1b Cooling Tower Performance and Sensors for Thermal-Fluid Systems

Jetstream Series HPLC - PELTIER COLUMN-THERMOSTATS 1. GENERALITIES

User Manual. Dryer Controller M720

Dryer Controller M720

armfield COMPUTER CONTROLLED HEAT EXCHANGER SERVICE MODULE HT30XC series issue 2

Autoclave Operations Manual

INSTRUCTION MANUAL and DETAILED PRODUCT SPECIFICATION TRIPLEX PUMP CONTROL SYSTEM MODEL NUMBER CPC-3. M336 Rev F. November 21, 2000.

AMERITROL, INC. INSTALLATION OPERATION MANUAL AND WIRING DIAGRAM LX SERIES LIQUID LEVEL SWITCH WITH ADDITIONAL TEMPERATURE TRANSMITTER

The Refrigeration Cycle

Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.com HCT HCT-1000 User Guide

Rev B, 9/2/2009. Kodiak Chiller Overview

Information Job Sheet 4. Closed-Loop Drainback Systems. Drainback tanks

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

2. HEAT EXCHANGERS MESA

FR-1012B Operation and Maintenance Manual

User Manual. Digi-Sense TC9500 Advanced Multiparameter Temperature Controller with Thermocouple, Thermistor, and RTD Inputs

TWO-PHASE MICRO-CHANNEL HEAT SINK FOR SPACE CRAFT THERMAL CONTROL

HOMEADVANTAGE II IMPORTANT SAFETY INFORMATION

United Electric Controls One Series Safety Transmitter Safety Manual

Dynamic Simulation of Double Pipe Heat Exchanger using MATLAB simulink

AUTOMATED PRODUCTION SYSTEMS, INC Pine Road Huntingdon Va l l ey PA P h o n e : (215) FA X : (215)

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00

Digi-Sense TC9000 Advanced PID and On/Off Temperature Controller with Thermocouple Input

The Refrigeration Cycle

Stratomaster Smart Single

PREDICTION OF THE PRESSURE DROP OF CO 2 IN AN EVAPORATOR USED FOR AIR COOLING ABSTRACT 1. INTRODUCTION 2. EXPERIMENTAL SET-UP AND PROCEDURE

AutomationDirect PM24. Microprocessor - Based Process/Temperature Limit Controller. Operator s Manual. Technical Support.

Figure 1-1 Furnace Front Elevation

WeatherLink for Alarm Output Addendum

DC200 Digital Dispenser Operating Manual

Dew Point Mirror 373. High Precision. Fast Response. Wide Measuring Range. Laboratory Reference. Touch Screen. Full Color High Resolution LCD

Geothermal Training System

Temperature controllers TW, TO and TP, Speedy Therm

Stratomaster Smart Single

Dryer Master DM510 Commissioning Guide

Job Sheet 1. Geothermal Energy OBJECTIVES. Familiarization with the training system components PROCEDURE

Introduction... 3 Setup & Suggestions... 4 Basic Use... 4 Setting Time... 4 Setting Temperature... 5 Setting Height / Pressure...

Transmission Cooling System J Operation Manual. TRANSFLOW Transmission Cooling System Service Tool J

Carbon Monoxide Transmitter

EXPERT TRI-STAR. Temperature controller. User s Manual

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers.

Warner Instruments, Inc Dixwell Avenue, Hamden, CT (800) / (203) (203) fax

Instruction Manual Model A

Introduction Portable Meters Transmitter Probes RELATIVE HUMIDITY

IMR 5000 IMR 400. CEMS Operating Manual IMR USA S/N: Sample IMR Sensors Inside IMR 400. Gas Dryer Inside. IMR Environmental Equipment Inc.

OPTISENS TUR 2000 Technical Datasheet

Experiment 12 Shell and Tube Heat Exchanger. Aim of this Experiment

Model gffoz Process Ozone Sensor (In-Line)

Modeling and Simulation of Axial Fan Using CFD Hemant Kumawat

573 Dew Point Mirror. Industrial Chilled Mirror Hygrometer. Typical applications:

P550W Series Air Dryers

Figure 1-1 Furnace Front Elevation

CAUTION. Installation Manual

EL-USB-2-LCD+ High Accuracy Humidity, Temperature and Dew Point Data Logger with LCD

BASIC HEAT PUMP THEORY By: Lloyd A. Mullen By: Lloyd G. Williams Service Department, York Division, Borg-Warner Corporation

Geothermal Training System (46126-A0)

MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL

DL424/425 DirectLine Sensor Module for Dissolved Oxygen Probes Series DL5000 Specifications

Altanium Temperature Controllers

User Manual. Digi-Sense TC9600 Advanced Multiparameter Temperature Controller with Thermocouple, Thermistor, and RTD Inputs

1. Quick start-up guide

International Reactor Bulletin 1100 Corporation. Standard and Custom Reactors for the Chemical Process Industries

Allcan TM Installation Manual

OPERATING INSTRUCTIONS FUSION MODEL 610 DIGITAL DISPENSING SYSTEM

PumpLab TM Operator s Manual

Oakton TEMP 9500 Advanced Multiparameter Controller

Owner s Manual. Model AC375C Refrigerant Recovery, Recycle, and Recharge Unit

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE. Master Rack Compressor Sequencer 7/21/2017

INSTALLATION ADJUSTMENT SERVICE

INSTRUCTION MANUAL OF WATER DISPENSER ΜΟDEL: CLWD-19PW

Web Site: Forums: forums.parallax.com Sales: Technical:

Meridian wiredhart. HART Field Device Specification Goldmine Rd. Monroe, NC USA

R11B EN. Operating Manual English. RackCDU (InRackCDU) Operating Manual. History: Date: Notes: Revision: 21-Dec First Release 1.

Endoscope Reprocessor Installation Instructions Endoscope Reprocessing System

Temperature Control for Research and Industry. Model 280 Timer Manual

Specifications Minimum Typical Maximum Unit

- Data Brochure Universal Reset Module 422

Quick start guide for Altrix Precision Temperature Management System

MacDonald Steel Limited

2.2. General view of Microchannel Heat Exchangers

Dear Valued Customer:

ND4000 Manual Marine Hydraulics

Web Site: Forums: forums.parallax.com Sales: Technical:

4-20mA CYBER Cyber Transmitter for flammable, toxic and IR gas detection Cyber Head Increased security in ATEX certified head

- Data Brochure Universal Reset Module 423

Analog Room Pressure Monitor RPC Series

AlfaNova the first fusion-bonded plate heat exchanger. A product brochure for AlfaNova within Industrial Refrigeration

TEMPERATURE CONTROLLERS

portable gas analyser

IQ/OQ Protocol Installation Qualification/ Operation Qualification zz FreeZone Stoppering Tray Dryer & Bulk Tray Dryer Freeze Dry Systems

Table of Contents SECTION PAGE SECTION 1 INTRODUCTION Description Features Models... SECTION 2 RS-232 COMMUNICATIONS...

R11B EN R11A EN. RackCDU. Operating Manual

Temperature Control for Research and Industry. Apollo Dual Channel Temperature Controller User s Manual

Instruction Sheet THERMOCOUPLE DATA LOGGER WITH LCD DISPLAY AND USB INTERFACE

WL 110 Series. Heat Exchanger with Supply Unit EQUIPMENT FOR ENGINEERING EDUCATION

Desoldering Tool. Instruction Manual

Eastern Mediterranean University Department of Mechanical Engineering Laboratory Handout

Transcription:

Exercise 2-4 Heat Exchangers (Optional Exercise) EXERCISE OBJECTIVE In this exercise, you will become familiar with plate heat exchangers. You will set up a cooling and a heating loop passing through the same brazed plate heat exchanger and record the temperatures at all four ports to investigate the behavior of such a process. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Description of a brazed plate heat exchanger Typical applications Characteristics of the brazed plate heat exchanger Using the brazed plate heat exchanger DISCUSSION Description of a brazed plate heat exchanger A brazed plate heat exchanger is a compact type of exchanger made of a series of thin, usually corrugated plates which, once joined, are designed to create cavities in which the process fluids flow. Each plate has four corner ports (one inlet and one outlet for each of the two fluids). When the plates are assembled, the ports line up to give access to the cavities. For each cavity, a pair of gaskets or restrictions blocks the access to one of the two fluids and lets the other one flow from the inlet to the outlet. By alternating the fluid admitted in each cavity between fluid 1 and fluid 2, one obtains a disposition similar to the one shown in Figure 2-39, where the heat exchanger is in the counterflow configuration. The alternating layers of cold and warm fluids separated by a thin and thermally conductive wall allows for a very good heat transfer between the fluids. Figure 2-39. A brazed plate heat exchanger. Once the stainless steel plates are assembled, they are brazed together to ensure the exchanger is completely sealed. The brazing process is similar to soldering, but the filling metal, usually copper, is melted at higher Festo Didactic 88461-00 85

Ex. 2-4 Heat Exchangers (Optional Exercise) Discussion temperatures (above 450 C [842 F]). Consequently, in this type of heat exchanger, the number of plates and the characteristics are determined during the design phase and remain fixed once built. A plate heat exchanger is typically very efficient but causes important pressure drops to the fluids traveling through it. This can be a limiting factor for some processes. Typical applications Brazed plate heat exchangers are designed for high-temperature and high pressure applications. Since they cannot be opened, they are restricted to applications where fouling is negligible. Characteristics of the brazed plate heat exchanger The brazed plate heat exchanger used in the experiment is shown in a typical counterflow configuration in Figure 2-40. Side A Side B Fluid 2 (cold) Fluid 1 (hot) Figure 2-40. Brazed plate heat exchanger in counterflow mode. 86 Festo Didactic 88461-00

Outline Table 2-14 presents a summary of the main characteristics of the brazed plate heat exchanger: Table 2-14. Brazed plate heat exchanger characteristics. Characteristic Value Nominal surface (A) 0.21 m 2 (2.3 ft 2 ) Number of plates 8 Number of channels (Side A) 4 Number of channels (Side B) 3 Using the brazed plate heat exchanger To ensure an efficient heat transfer, as well as to extend the useful life of the brazed plate heat exchanger, some precautions must be taken. Be sure to: Fasten the heat exchanger properly to the work surface and remember that ports 1 and 2 are linked, as are ports 3 and 4. The heat exchanger should be used in a counterflow configuration as it is more efficient than a parallel-flow configuration. Each side has two hose connectors that are used as the inlet port and outlet port for the hot or cold water. It does not matter which port is chosen for the inlet port or outlet port. The important thing is that the inlet and outlet connections must be made to ensure that the hot water and cold water circulate in a counter-current manner through the plate heat exchanger, as shown in Figure 2-40. If, for example, the hot water enters the exchanger through connector 1 and leaves through connector 2, then the cold water must enter the exchanger through connector 4 and leave through connector 3. Each hose connector of the plate heat exchanger is equipped with a pressure port. The temperature at a pressure port can be measured by connecting a thermocouple probe to the port. PROCEDURE OUTLINE The Procedure is divided into the following sections: Introduction Set up and connections Preliminary setup. Calibration of the temperature transmitters. Purging air from the components downstream of the column. Activating the water loops. Operation of the water heating/cooling system Heat exchanger calculations. Ending the exercise Festo Didactic 88461-00 87

PROCEDURE Introduction In certain situations, the temperature of a fluid must be kept at a given temperature. For example, a process may require a precise temperature in order for a chemical reaction to take place. This experiment simulates the case in which a fluid in a column produces heat via an exothermic reaction. This fluid needs to be kept at an optimal temperature using a heat exchanger in which a cooling fluid circulates. Set up and connections Preliminary setup 1. Connect the system as shown in Figure 2-41, Figure 2-42, Figure 2-43, and Figure 2-44. Do not perform the connections shown in blue in Figure 2-44 yet; this would compromise the calibration procedure performed later. To ensure that the flows of the hot and cool water loops operate in counterflow mode in the heat exchanger, connect the outlet of the heating unit to connector 1 of the heat exchanger, and connector 2 to the top of the column, as shown in Figure 2-43. Also, connect the outlet of the cooling unit to connector 4 of the heat exchanger, and connector 3 to the pump of the cooling loop. The controllers FC1 and FC2 will regulate the drive of the pumping units remotely. If you prefer, you can also control the pumps locally with the drive keypads. The heating unit and cooling unit will be controlled manually. Because of this, no temperature controller (TC) appears next to these units in Figure 2-43. Connect the thermocouple probes of transmitters TT1, TT2, TT3, and TT4 to the pressure ports on connectors 1, 2, 3, and 4 of the heat exchanger, respectively. 88 Festo Didactic 88461-00

Back view Pump 2 Pump 1 Figure 2-41. Heat exchanger setup Heating loop highlighted. 1 - Column 5 - Heat exchanger 2 - Heating unit 6 - Cooling unit 3 - Power supply 7 - Thermocouple temperature transmitter module 4 - Rotameters Festo Didactic 88461-00 89

Back view Pump 2 Pump 1 Figure 2-42. Heat exchanger setup Cooling loop highlighted. 1 - Column 5 - Heat exchanger 2 - Heating unit 6 - Cooling unit 3 - Power supply 7 - Thermocouple temperature transmitter module 4 - Rotameters 90 Festo Didactic 88461-00

Pump 1 Pump 2 Hot side Cold side Figure 2-43. Flow diagram - Heat exchanger setup. Festo Didactic 88461-00 91

LVProSim Figure 2-44. Wiring diagram - Heat exchanger setup. Figure 2-44 shows how to connect the computer running LVProSim to the pumps and thermocouple temperature transmitter module via the I/O interface. With this setup the two pumps are controlled using the software. To control the pumps speed using LVProSim, connect each of the variable-speed drives to an output of the I/O interface. With this configuration, you can modify the speed of a pump by changing the output signal manually in the appropriate PID controller section of LVProSim. 92 Festo Didactic 88461-00

2. Adjust the equipment to the settings shown in Table 2-15. Table 2-15. Equipment settings. Equipment Knob or switch Setting Heating unit S1 2 Manual control knob Fully counterclockwise S1 2 Cooling unit All four thermocouple temperature transmitters Manual control knob S2 INPUT CALIBRATION ZERO SPAN Fully counterclockwise CAL. SOURCE VARIABLE MAX. MAX. 3. If you control the pumps remotely, make sure controllers FC1 and FC2 are in the manual mode. Set the output of these controllers to 0% (4 ma). 4. Turn on the power supply. This powers up the I/O interface, the cooling unit, and the thermocouple temperature transmitter module. Leave both pumping units and the heating unit turned off. Never power up the heating unit in the absence of water flow through this unit. Failure to do so might cause the heating unit to wear out prematurely. Calibration of the temperature transmitters 5. Calibrate the output of each of the four thermocouple temperature transmitters so that the output signal goes from 0% to 100% (4 ma to 20 ma) when the probe temperature simulated by the calibration source is increased from 25 C to 55 C (77 F to 131 F). a Use the method outlined in steps 8 through 12 of Ex. 2-1 for the calibration of the outputs of the transmitters using the calibration source. 6. Once the four thermocouple temperature transmitters are calibrated, set the INPUT switch of each transmitter to THERMOCOUPLE. Connect the 4-20 ma output of transmitters TT1, TT2, TT3, and TT4 to inputs 1, 2, 3 and 4, respectively, of the I/O interface (blue connections in Figure 2-44). Festo Didactic 88461-00 93

Purging air from the components downstream of the column 7. On the column, make sure the cap is tightened firmly and the plugs are in place. 8. Make sure the reservoir of each pumping unit is filled with about 12 liters (3.2 gal) of water. Make sure the baffle plate is properly installed at the bottom of each reservoir. a You must add algaecide and rust inhibitor to the water when you fill the reservoirs. Refer to step 19 of Ex. 2-1 for precise quantities. 9. On pumping unit 1, adjust valves HV1 through HV3 using Table 2-16. Table 2-16. Valves settings. Valve HV1 HV2 Position Open Closed HV3 Fully clockwise 15 10. Turn on pumping unit 1. Adjust the parameters of the drive to either local or remote mode depending on the way you want to control the speed of the drive. Leave pumping unit 2 and the heating unit turned off. 11. Press the Run button on the drive keypad of pumping unit 1 to start the pump. 12. Set the variable-speed drive of pumping unit 1 to maximum speed. 13. Allow the level of the water to rise in the pressurized column until it stabilizes at some intermediate level. This forces air out of the components downstream of the column. Activating the water loops 14. On pumping unit 1, close valve HV1. Then set valve HV3 for directing the full return flow to the pump inlet (turn handle fully counterclockwise). 15. Open valve HV2 in order to decrease the water level in the column to 7.5 cm (3 in), then close this valve. 15 To direct the full reservoir flow to the pump inlet 94 Festo Didactic 88461-00

16. Remove the cap to depressurize the column. 17. Adjust the variable-speed drive of pumping unit 1 until you have a flow rate of about 3 L/min (0.75 gal/min). The first loop (with the heating unit turned off for now) is in operation. You will now activate the second loop (with the cooling unit). 18. On pumping unit 2, adjust valves HV1 through HV3 (identified as HV4 through HV6, respectively, in Figure 2-43) using Table 2-17. Table 2-17. Valves settings. Valve HV1 HV2 HV3 Position Open Closed Fully clockwise 19. Turn on pumping unit 2. Adjust the parameters of the drive to either local or remote mode depending on the way you want to control the speed of the drive. 20. Press the Run button on the drive keypad of pumping unit 2 to start the pump. 21. Set the variable-speed drive of the pumping unit for maximum speed. Wait 30 seconds. 22. On pumping unit 2, close valve HV1. Then set valve HV3 for directing the full return flow to the pump inlet (turn handle fully counterclockwise). 23. Adjust the variable-speed drive of pumping unit 2 until you have a flow rate of about 3 L/min (0.75 gal/min). Both loops are now in operation. Festo Didactic 88461-00 95

Operation of the water heating/cooling system 24. Plot the output signal of each thermocouple temperature transmitter (TT1 through TT4) on the trend recorder. See below for detailed instructions. LVProSim Figure 2-44 shows how to connect the computer running LVProSim to the pumps and temperature transmitter. Follow the steps below to plot the four transmitter output signals in the software. Configure each thermocouple to read a temperature between 25 C and 55 C (77 F and 131 F). For each channel, press the Set Channels icon in the LVProSim menu bar and, in the Set Channels window, configure the four channels as detailed below. Enter the name you want to give to the channel in the Label section. Select Temperature as the type of measured variable. Select Celsius (or Fahrenheit) as the measurement unit. Enter 25 C (77 F) in the Minimum value field and 55 C (131 F) in the Maximum value field. These values correspond to 4 ma and 20 ma signals respectively. From the Settings menu, change the sampling interval to 1000 ms. Add all four channels to the curves list and press the play button in the menu bar to start recording data. 25. On the cooling unit, turn the manual control knob fully clockwise to make the fans rotate at maximum speed. 26. Turn on the heating unit. Turn the manual control knob fully clockwise to apply the maximum electrical power to the heating element. 27. Allow the signals from the four temperature transmitters, TT1 through TT4, to increase and stabilize, which may require around 40 minutes. 28. Save the data to plot the results after the experiment. 29. When the signals from temperature transmitters TT1 through TT4 are stable on the trend recorder, the process is in a state of thermal equilibrium. Record the temperatures measured by the thermocouples at equilibrium in the table below. 96 Festo Didactic 88461-00

Table 2-18. Temperatures measured by TT1 through TT4 at equilibrium. Transmitter Temperature TT1 (hot side inlet) TT2 (hot side outlet) TT3 (cold side outlet) TT4 (cold side inlet) 30. On the cooling unit, turn the manual control knob fully counterclockwise. 31. On the heating unit, turn the manual control knob fully counterclockwise. Turn off the heating unit. 32. Set the variable-speed drive of pumping unit 1 and 2 to minimum speed. Turn off the pumping units. Heat exchanger calculations 33. Based on the temperatures recorded in Table 2-18, calculate the temperature decrease between the inlet and outlet of the hot side of the heat exchanger: Temperature decrease = TT1 TT2: 34. Based on the temperatures recorded in Table 2-18, calculate the temperature increase between the inlet and outlet of the cold side of the heat exchanger: Temperature increase = TT3 TT4: 35. In theory, at equilibrium, the thermal energy lost by the water flowing through the hot side of the heat exchanger is all gained by the water flowing through the cold side of the heat exchanger. This implies that the decrease in temperature on the hot side of the heat exchanger (TT1 TT2) should equal the increase in temperature on the cold side of the heat exchanger (TT3 TT4), if the flow rates on both sides are equal. Festo Didactic 88461-00 97

Ex. 2-4 Heat Exchangers (Optional Exercise) Conclusion According to the results you obtained in step 33 and step 34, is the decrease in temperature measured on the hot side of the heat exchanger equal to the increase in temperature measured on the cold side? Why? Ending the exercise 36. On each pumping unit, open valves HV1 and HV2 completely to empty the water loops. 37. Disconnect all leads from the training system. Remove from the work surface the power supply, the temperature transmitter, and any electrical equipment not included in the water loops. 38. Disconnect the hoses. Return all leads, hoses, and components to their storage location. Hot water may remain in the hoses and components. The training system is not equipped with dripless connectors, so be careful not to allow water to enter the electrical components and their terminals upon disconnection of the hoses. 39. Wipe off any water from the floor and the Process Control Training System. CONCLUSION In this exercise, you familiarized yourself with heat exchangers of the plate type. You learned that this type of heat exchanger consists of thin plates that are pressed together and arranged in such a way as to make the hotter and the cooler fluids flow in a counter-current manner through alternating passages. You set up a water heating/cooling system that uses a heating loop and a cooling loop connected through the medium of a brazed-plate heat exchanger. You observed that, in the heat exchanger, part of the thermal energy contained in the heated water is transferred to the water circulated by the cooling loop. In industrial systems, this allows excessive heat from the heating loop to be dumped into the cooling loop and permits achievement of a balanced operating condition. 98 Festo Didactic 88461-00

Ex. 2-4 Heat Exchangers (Optional Exercise) Review Questions REVIEW QUESTIONS 1. Describe a brazed plate heat exchanger. 2. For a heat exchanger, which is more efficient: parallel flow or counterflow? 3. Explain why a temperature gradient (difference) between the two process fluids is important for heat exchangers? 4. What is the main condition (assuming the heat exchange occurs without loss) for the decrease in water temperature measured on the hot side to be equal to the increase in water temperature measured on the cold side of the exchanger? 5. What would be the effect on the measured temperatures of injecting colder water into the reservoir of the second pumping unit into the cooling water loop? Festo Didactic 88461-00 99