Attachment 1 - Projected metering points The following tables are the good faith attempt to indentify all metering points for base bid. However, due to the complexity of the project and anticipation of unforeseen circumstances MSU expects to be able to work cooperatively with the vendor to either add or delete metering points during the system design process at an approximately equal cost per point as represented by the base bid. Evaluation of cost with be based on the total of all zones and will be awarded as a single contract however we are asking for the cost for each zone provided separately due to funding divisions. Academic Building Zone Building Whole or Sub-meter Metered Utility Location 13,800 volt at plant or piggy back All Campus Utility Service Val Imm Electric Generator Building Existing All Campus Utility Service Warren Street Electric Generator Building Existing reading from standby generator gear Alt 2 13,800 volt at plant or piggy back reading from standby generator gear Alt 2 All Campus sub meter Gen 1 Electric Generator Building Existing From standby system Alt 2 All Campus sub meter Gen 2 Electric Generator Building Existing From standby system Alt 2 All Campus sub meter Gen 3 Electric Generator Building Existing From standby system Alt 2 Alumni Foundation Bldg whole building Electric Mech room 112 New Meter Armstrong Hall whole building 480V Electrical Mech room M1 Existing Nelson Addition is fed from Armstrong Hall and would have to be subtracted from the AH reading Armstrong Hall whole building 208V Electrical Mech room M1 Existing Armstrong Hall whole building Steam condensate Mech room M1 Existing Armstrong Hall whole building Domestic water 14B Existing Blakeslee Stadium whole facility Electric Elect room 111 Existing Ford Hall whole building Electric?? New meter New building - requires new meter Ford Hall whole building Steam condensate?? New meter New building - requires new meter Generator Building whole building Electric New meter New building - requires new meter Highland Center whole building 480V Electrical Electrical room 1034 Existing Highland Center whole building Steam condensate Mechanical B0104 Existing Highland Center whole building Domestic Water Mechanical B0104 Existing from the city's water meters Alt1 or
Highland North whole building 480V Electrical Elect room B05 Existing Pennington fed from HN and need to be metered and subtracted from Highland meter or Highland North whole building Steam condensate Mech room B06 Existing Highland North whole building Domestic water Mech room B06 Existing Memorial Library whole building 277/480 Electrical Elect room 0099 Existing whole building electric including chillers Memorial Library sub meter Chiller Electric Mech room 0074 Existing ML Chiller 1 electric Memorial Library sub meter Chiller Electric Mech room 0074 Existing ML Chiller 2 electric Memorial Library sub meter Chiller BTU Mech room 0074 New BTU meter Total chilled water production (GPM & delta temp) Memorial Library whole building Cooling Tower fill Mech room 0070 Existing Memorial Library whole building Steam condensate Mech room 0075 Existing Memorial Library whole building Domestic water Mech room 0070 Existing Morris Addition whole building 480V Electrical Electrical room B02 Existing Morris Addition whole building Steam condensate Mechanical B02 Existing Morris Hall whole building 208V Electrical Electrical room B07 Existing Morris Hall whole building Steam condensate Mechanical B07 Existing Morris Hall whole building Domestic Water Mechanical B07 Existing Myers Field House whole building 480V Electrical Elect room 114B Existing Off link to Taylor Center Myers Field House whole building Steam condensate Mech room 114A Existing Myers Field House whole building Domestic Water Mech room 114A Existing Nelson Hall whole building Electric Mech room 07 Existing Nelson Hall whole building Steam condensate Mech room 07 Existing Nelson Hall whole building Domestic Water Mech room 07 Existing Nelson Hall Addition whole building Electric AH Mech room M1 Existing Nelson Addition electric is fed from Armstrong Hall
or Nelson Hall Addition whole building Steam condensate Mech room 155 Existing Paint Shop whole building Electric New meter Fed from Utility Plant - Requires new meter Pennington partial building heating Highland C. Mech 104 New meter Unsure if both steam and hot water or just hot water. Would be a sub-meter of Highland Center Pennington partial building Electric Highland N. Mech 224 New meter Unsure if currently being metered. This would be a sub meter of the Highland North building service, (excludes racquetball courts) Performing Arts whole building 208V Electrical Elect room 174 Existing Performing Arts whole building 480V Electrical Elect room 174A Existing Performing Arts whole building Steam condensate Mech room 174 Existing Performing Arts whole building Domestic Water Mech room 174 Existing Taylor Center whole building 480V Electrical Elect room 071 Existing Taylor Center whole building Steam condensate Mech room 039 Existing Taylor Center whole building Domestic Water Mech room 039 Existing Trafton East whole building Electric Mech room TE 003 Existing Trafton East whole building Steam condensate Mech room TE 004 Existing Trafton East whole building Domestic Water Mech room TE 004 Existing Trafton Science Center north sub meter Steam condensate Mech room TR C003 Existing Building total equals total of north and south meters Trafton Science Center south sub meter Steam condensate Mech room TR C003 Existing Building total equals total of north and south meters Trafton Science Center whole building 480V Electrical Mech room TR C004 Existing Trafton Science Center whole building 208V Electrical Mech room TR C004 Existing Trafton Science Center whole building Domestic Water Mech room TR C003 Existing Utility Plant Campus Steam condensate Boiler room Existing Utility Plant Boiler #1 Fuel oil meter Boiler room Existing
or Utility Plant Boiler #2 Fuel oil meter Boiler room Existing Utility Plant Boiler #3 Fuel oil meter Boiler room Existing Utility Plant Boiler #4 Fuel oil meter Boiler room Existing Utility Plant MCC-1 feed Electric Chiller Plant Existing Select chiller equipment Utility Plant MCC-2 feed Electric Chiller Plant Existing Select chiller equipment Measures GPM and delta T to calculate Utility Plant Campus Chilled Water Chiller Plant New BTU meter Total BTU Utility Plant Boiler plant Electric Electrical L4 Existing Utility Plant Boiler plant Cooling Tower fill Boiler room Existing Utility Plant Boiler plant Domestic Water Boiler room Existing Wiecking Center sub meter 208V Electrical Mech room B001 Existing East wing loads Wiecking Center sub meter 208V Electrical Mech room B002 Existing Serves west wing and shop building Wiecking Center whole building Steam condensate Mech room B004 Existing Wiecking Center whole building Domestic water Room 228 Existing Wigley Admin whole building Electric Mech room B01 Existing Wigley Admin whole building Steam condensate Mech room B02 Existing Wigley Admin whole building Domestic water CSU mech room Existing Wissink Hall whole building 480V Electrical Elect room B0001 Existing Near tunnel entrance Wissink Hall whole building Steam condensate Elect room B0001 Existing Near tunnel entrance Wissink Hall whole building Domestic water Room 113 Existing
Residential Life Zone Building Whole or Sub-meter Metered Utility Location or Carkoski Commons whole building 208V Electrical Elect room 77 Existing Carkoski Commons whole building Steam condensate Mech room 75 Existing Carkoski Commons whole building Chilled Water Mech room 75 Existing Carkoski Commons Kitchen Sub-meter Water Mech room 75 New meter This is a new location and new meter Carkoski Commons Kitchen Sub-meter Steam condensate Mech room 75 New meter This is a new location and new meter Carkoski Commons Kitchen Sub-meter Electric Mech room 81 Existing Crawford Complex Sub meter A,B,C 208V Electrical Elect room 100A Existing Crawford Complex Sub meter A only 208V Electrical TBD New meter Crawford Complex Sub meter B only 208V Electrical TBD New meter Crawford Complex Sub meter C only 208V Electrical TBD New meter Electric meter installed but not connected to existing metering system Note Add alt 1 - split each hall A, B, and C to meter separately deletes the requirement for the A, B, C deletes the requirement for the A, B, C deletes the requirement for the A, B, C Crawford Complex Sub meter D 208V Electrical Elect room D3 Existing Crawford Complex Sub meter D AC Units 208V Electrical New meter Meter a separate electrical distribution panel that feeds all the window AC units. Crawford Complex Sub meter D Steam condensate Mech room D4 Existing Gage whole building Steam condensate A-Tower mech 13 Existing Gage B-Tower 208V Electrical Electrical room 24 Existing Gage A-Tower 208V Electrical Electrical room 31 Existing Gage Commons 208V Electrical Electrical room 54 Existing Gage whole building Domestic water A-Tower mech 13 Existing RL2 McElroy Complex Sub meter E,F,G 208V Electrical Elect room 100B Existing Add Alt to meter each wing separately
McElroy Complex Sub meter E only 208V Electrical TBD New meter McElroy Complex Sub meter F only 208V Electrical TBD New meter McElroy Complex Sub meter G only 208V Electrical TBD New meter deletes the requirement for the E, F, G deletes the requirement for the E, F, G deletes the requirement for the E, F, G McElroy Complex Sub meter E,F,G Steam condensate Mech room G-2 Existing McElroy Complex Sub meter H,I 208V Electrical Elect room T0005 Existing McElroy Complex Sub meter H only 208V Electrical Elect room T0005 New meter deletes the requirement for the H, I McElroy Complex Sub meter I only 208V Electrical Elect room T0005 New meter deletes the requirement for the H, I McElroy Complex Sub meter H,I Steam condensate Mech room H-4 Add Alt to meter each wing separately Sears Hall whole building Electric Mech Room Basement New meter New Building Sears Hall whole building Steam condensate Mech Room Basement New meter New Building Sears Hall whole building Chilled Water Mech Room Basement New BTU meter New Building - Meter GPM, delta T, BTU consumption Sears Hall whole building Domestic water Mech Room Basement New Meter Add Alt to collect data from city's water meter or
Centennial Student Union Zone Building Whole or Sub-meter Metered Utility Location or Student Union whole building Electric Elect room 35 Existing Student Union east sub meter Steam condensate Mech room B19 Existing Student Union west sub meter Steam condensate Mech room B37 Existing Student Union whole building Chilled Water Mech room B37 New BTU meter Student Union whole building Domestic Water Mech room B37 Existing Add alt S1 to collect data from city's water meter S1 Student Union Kitchen Sub-meter Steam condensate TBD New meter Add alt to meter Kitchen steam use S1 Student Union Kitchen Sub-meter Electric TBD New meter Add alt to meter Kitchen electric use S1 *Meter Note: For reference "new meter" or "new BTU meter" indicates responsibility by the vendor for each meter type: Electric Meter includes the meter and PT's or CT's and all wiring devices to make it operational Steam Condensate meters will be provided and installed by MSU in consultation with the successful vendor Chilled water BTU meter includes all devices and equipment to measure flows and temperatures for calculation of BTU Attachment 1 - Page of 7