PRELIMINARY INSTALLATION. Operation & Service Manual. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #1/56

Similar documents
INSTALLATION AND COMMISSIONING MANUAL. Neos 100S Integra 20X, 30S, 35X, 40X, 50X

INSTALLATION MODULE XARIOS RANGE. UTC Climate, Controls & Security PROPRIETARY Rev B 29th mai 2013

an ISO 9001:2008 Registered Company GOLL ST. - SAN ANTONIO, TX ph fax MINI SPACE SAVER HEAT /COOL

Heavy Duty Heater / Air Conditioner Model R-8545

an ISO 9001:2008 Registered Company ShortPac HEAT/COOL (05000-QUX-A/05000-VUX-A)

an ISO 9001:2008 Registered Company MINI SPACE SAVER HEAT /COOL/DEFROST QUZ-A VUZ-A

MINI SLIMLINE COOL VUY-A VUY-A

Installation Manual Mopar Engine Compartment Upgrade Kit

Heater with Air Conditioning. E-Series Ford Aeromaster

an ISO 9001:2015 Registered Company

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST PLYMOUTH BELVEDERE

Camaro A/C Install Instructions

1956 FORD F-100 TRUCK

HEATING AND AIR CONDITIONING

TOYOTA FJ-40 DIRECTIONS

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1968 CHEVROLET IMPALA

Installation Manual. Truck Edition V-500 Series. TK IM (Rev. 3, 01/05) Copyright 2004 Thermo King Corp., Minneapolis, MN, U.S.A.

Installation Manual. NAD Truck Edition V-200 and V-300 Series. TK IM (Rev. 7, 02/12)

HEAT/ COOL/ DEFROST FORD THUNDERBIRD

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST FORD PICKUP

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST CHEVROLET CHEVELLE/ EL CAMINO NOTE: INSTRUCTIONS DEPICT CHEVELLE

Installation Manual. Truck Edition V-520 RT Series Model 10, 20, 30 and 50 Single Temperature Systems. TK IM (Rev.

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Outdoor Unit UQB09JJWC UQB12JJWC. Indoor Unit AQB09JJWC AQB12JJWC

SERVICE MANUAL FOR MODEL RM-10

Truck Edition V-220 / V-320 Series Single Temperature Systems TK IM (Rev. 0, 06/17)

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST EARLY 1955 CHEVROLET PICKUP

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Indoor Unit AQB18J6WC AQB24J2WC. Outdoor Unit UQB18J6WC UQB24J2WC

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST CHEVROLET NOVA

BlueHeat AirTop 2000 Heater

Truck Edition V-520 RT Series Models 10, 20, 30 and 50 Single Temperature Systems TK IM (Rev. 8, 1/16)

DIRECT DRAW BEER COOLERS Installation, Operation and Maintenance Instructions

BC BRONCOS AIR CONDITIONING UNIT

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic hi l PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST FORD TRUCK

Truck Edition V-520 Series Single Temperature and SPECTRUM Multi-Temperature Systems TK IM (Rev. 4, 01/12)

A HEATER KIT With Diesel Engine Connection Fittings

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

CABINET PARTS For Model: KBLC36FTS06 (Stainless Steel)

MITSUBISHI AIR-CON SPARES TD43C/TD43D/TD60

INSTALLATION INSTRUCTIONS PT-A HEAT/AC STANDARD KIT FORD E-SERIES VANS

Installation Manual. Truck Edition UT-1280 Undermount Systems. TK IM (Rev 0, 01/17)

A/C SYSTEM GENERAL SERVICING

SERVICE MANUAL FOR MODEL RM-26

CABINET PARTS. For Models: KBLC36FMS00 (Stainless Steel) 9 05 Litho In U.S.A. (kdj) Part No " BOTTOM MOUNT BUILT IN REFRIGERATOR

CABINET PARTS For Model: KBLC36FMS02 (Stainless Steel)

INSTALLATION MANUAL COMFORT...BUILT TO LAST. 9,000, 12,000 and 18,000 BTU SINGLE-ZONE DUCTLESS MINI-SPLIT SYSTEM Heat Pump

INSTALLATION INSTRUCTIONS John Deere One Series; 1023E, 1025R and 1026R Models A HEATER KIT. Figure 1 (General Layout and Parts I.D.

CABINET PARTS For Model: EF48DBSS (Stainless Steel)

This site is based on a but applies to all 1971-on Saab 99 and Saab 900.

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST MUSTANG

Heating and ventilation system,

SERVICE MANUAL FOR MODEL RM-49

Chevrolet Impala Condenser Kit with Drier (021062)

CABINET PARTS For Model: KSSC42QVS03 (Stainless Steel)

COMPAC GEN II HEAT/COOL VUX-A. an ISO 9001:2008 Registered Company #10 SUCTION HOSE COMPRESSOR #8 DISCHARGE HOSE EVAPORATOR DRIER CONDENSER

Orbis Battery Scrubber OBS38130

Chevrolet Pickup Evaporator Kit (754563)

SERIES: A REVISION ECN# DESCRIPTION OF CHANGE MOD. BY DATE 3 N/A DRAIN HOSE UPDATED 31/08/2016. Drawing Ref. No. Kit No. Part Description Qty

SUPER GEN II HEAT/COOL VUX-A. an ISO 9001:2008 Registered Company EVAPORATOR #10 SUCTION HOSE COMPRESSOR #8 DISCHARGE HOSE DRIER CONDENSER

DISTRIBUTION > HOUSING, HVAC > INSTALLATION > AIR INLET HOUSING

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

CABINET PARTS For Model: KSSC42QTS02 (Stainless Steel)

KSSS42QDW05, KSSS42QDX05

CABINET PARTS For Model: JS42CXFXDB00 (Etched Aluminum)

CABINET PARTS For Model: KSSC48QVS02 (Stainless Steel)

CABINET PARTS For Model: KSSS48QJX00 (Stainless Steel)

V-220 / V-320 Heater Kits Installation Instructions TK IM (Rev. 0, 06/17)

CABINET PARTS For Model: KBFC42FTS03 (Stainless Steel)

CABINET PARTS For Model: KBLC36FTS04 (Stainless Steel)

2002 Dodge Caravan SE

Chevrolet Pickup Condenser Kit with Drier with Condenser Mounted Forward From Stock Position (021553)

Installation Instructions

CABINET PARTS For Model: EF42DBSS02 (Stainless Steel)

For our present, For their future. Version 11.04

SAAB 99 Series H Type Engine. Installation Guide Silicone Cooling System Hoses. Classic Silicone Hoses

Truck Edition V-520 Series Single Temperature and SPECTRUM Multi-Temperature Systems TK IM (Rev. 11, 03/18)

Installation Manual BCS2000/3000

SEA FROST BAITFREEZER 110-VOLT AIR-WATER Twin Valve

Air Heater. Air Top 3500 Diesel. Supplemental Installation Instructions for: Van Body Vehicles

TOOLS REQUIRED: Crimping tool A/C Recovery Unit Wrench set up to 1 ¼ 4 Hole saw

Toyota FJ40 Evaporator Upgrade Add-On Kit (751202)

R-2000 HEADLINER Air Conditioner Unit

Model Series. PumpAgents.com - buy pumps and parts online QUIET - FLUSH ELECTRIC TOILET. Model Series FEATURES SPECIFICATIONS INSTALLATION

Trailer Edition Precedent S-600M, C-600M and S-600DE with S-2 and S-3 Remote Evaporator Systems TK IM (Rev. 4, 12/15)

BASIC 700 OPERATOR MANUAL

Chevrolet Corvette Auxiliary Electric Condenser Fan Kit with Trinary Switch ( CCA)

INSTALLATION INSTRUCTIONS

A/C-HEATER SYSTEM - MANUAL

Product Support Bulletin

SECTION 50 - CAB CLIMATE CONTROL

TOP MOUNT REFRIGERATOR MODELS: WRT106TFDW01 (White) WRT106TFDB01 (Black) WRT106TFDT01 (Biscuit)

HEATING AND VENTILATION

CME1856W Service Parts

CABINET PARTS For Models: KSBS20QEWH2, KSBS20QEBL2 (White) (Black)

SEA FROST SHORE ASSIST SA-1 R-12 THIS MANUAL IS SUPPLEMENTAL TO THE SEA FROST R-12 ENGINE DRIVE MANUAL INSTALLATION INSTRUCTIONS

Service Step by Step Trouble-Shooting Check-List

SERVICE BULLETIN A

Installation Manual BCS 1000/1500

EcoVision II Plus Door Upgrade for D6 Kysor Warren Multi-deck Merchandisers

Heat Exchanger Block Replacement Instructions

INSTALLATION INSTRUCTIONS

Transcription:

INSTALLATION Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #1/56

INSTALLATION Table of content Introduction...4 Preparation before installation...5 Vehicle partition... 6 Box preparation...7 Drilling... 7 Roof top and cut mounting...8 Nosemount...11 Evaporator...12 Harness and hoses hole...14 Drain water hose hole...15 Mushrooms... 16 Preparation...16 Set up...18 Unit installation...19 Skin removal... 19 Skin installation... 21 Evaporator installation...24 Hoses...25 Mounting recommendations... 26 Preparation... 27 Unit connection...29 Refrigeration hoses... 31 Evaporator connection...35 Refrigeration hoses... 35 RAT sensor... 37 Drain pan... 38 Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #2/56

INSTALLATION Table of content Driver cab preparation...39 Cab command harness fitting...40 Compressor connection...42 Injection thermostat... 44 Commissioning...49 Leak checking... 49 Unit vacuum... 50 Refrigerant charge... 51 Settings... 53 CPR adjustment...53 TXV setting...55 Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #3/56

Installation Introduction This document gives the correct rules to follow in order to correctly install the VIENTO 200 / 300 / 350 units. SAFETY FIRST MANDATORY BEFORE ANY ELECTRICAL OPERATION: DISCONNECT THE VEHICLE BATTERY: - First remove the battery ground (-) - then remove the positive battery (+) PERSONAL PROTECTIVE EQUIPMENT Always use adequate personal protective equipment before doing anything on this refrigerant unit. BODYBUILDER RECOMMENDATIONS Drain hose from the evaporator to the outside must have an angle to insure water to be drained out. A descent of 10 cm minimum must be applied between evaporator drain water hoses and the hoses inside the body (picture page 36). Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #4/56

Installation Preparation before installation 1. Unpack the box contents in your warehouse. KEEP THE DOCUMENT DELIVERED WITH THE UNIT! 2. Unpack the box. 3. Check if the box content corresponds to the bill of material on the packaging. Condenser Evaporator Mounting kit Cab command In the event of any abnormality (missing, damaged part or part number etc), fill in the form "Advance Warning, DOA, Claim" Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #5/56

Installation Preparation before installation Vehicle partition Take care not to obstruct the air intakes on the evaporator section and the ventilation ducts. For any mobile partition installation, contact our Technical Department or refer to the following chart: MODELS Evaporator X Y Viento 200 Viento 300 Viento 350 MXS 600 MXS 850 MXS 850 MXL 850 MXS 1100 MXL 1100 500 mm 1000 mm 150 mm Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #6/56

Installation Box preparation Drilling RECOMMENDATIONS Before box preparation and unit installation commences, protect the vehicle roof and the refrigeration box floor (cover, cardboard ). There are 3 possibilities to fit the unit: Roof top Nosemount Roof cut mounting Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #7/56

Installation Box preparation Drilling Roof top and cut mounting 1. Present the drilling template not supplied - (refer to the bodybuilder drawing) 2. Mark out the 4 fixing holes and the electrical harness and hoses hole 3. Drill the fixing holes. drill 10 mm 4. For roof top mounting: drill a hole 80 mm to pass hoses and harnesses. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #8/56

Installation Box preparation Drilling Roof top and cut mounting 5. Install the 4 silent blocks: put silicone to waterproof on the bottom. put silicone to waterproof on the 4 screws before to install the host unit. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #9/56

Installation Box preparation Drilling Roof top and cut mounting 6. To pass harnesses and hoses between condenser and evaporator, drill the electrical harness and hoses hole. Roof cut mounting : on vertical face of the vehicle Roof top mounting: on the roof of the body (refer to bodybuilder drawing) Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #10/56

Installation Box preparation Drilling Nosemount 1. Present the drilling template not supplied (refer to the bodybuilder drawing) 2. Mark out fixing and electrical harness and hoses holes. 3. Drill the fixing holes - drill 10 mm 4. Drill the electrical harness and hoses hole. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #11/56

Installation Box preparation Drilling Evaporator NOTE : - The drilling depends on the evaporator you have to install. - Let a minimum space of 150 mm between the box wall and the rear of the evaporator. 1. Mark the fixing holes for the evaporator (refer to the bodybuilder drawing). If needed, use the fixing material adapted to reinforcement done by the bodybuilder. If you don't have reinforcement, you will have to use mushrooms (refer to section "Mushrooms" page 16). Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #12/56

Installation Box preparation Drilling Evaporator If body reinforced, install the insert using the adapted tool (manual or pneumatic). Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #13/56

Installation Box preparation Drilling Harness and hoses hole 2. Drill the electrical harness and hoses hole inside the box. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #14/56

Installation Box preparation Drilling Drain water hose hole 1. If body is not prepared to pass harnesses, refrigerant and water drain hoses, drill the hose inside body. RECOMMENDATIONS A descent of MINIMUM 100 mm must be applied between the drain water hoses pipe and the hoses inside the body to help to drain water out. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #15/56

Installation Box preparation Mushrooms Preparation 1. From box inside, drill 4 holes 5 mm in the roof through and through (drill of minimum size 140mm) 2. Countersink with a drill 12,5 mm the 4 tapping drill holes realized at the previous step. RECOMMENDATIONS Take care not to damage the 5 mm drilling of the box external skin. 3. From box outside, countersink with a circular slitting saw 22 mm. RECOMMENDATIONS Take care not to damage the 12,5 mm drilling of the box internal skin. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #16/56

Installation Box preparation Mushrooms Preparation 4. Measure the roof thickness. 5. Adjust the mushroom length (L) to the roof thickness minus the internal skin thickness (E E') L: mushroom length E: roof thickness E': internal skin thickness Mushroom in place 1. mushroom 2. silicon gasket 3. skin of external box 4. polyurethane foam 5. skin of internal box 6. evaporator upper side 7. washer 8. screw M12 Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #17/56

Installation Box preparation Mushrooms Set up 1. Apply silicon on the internal side of the mushroom head. 2. Put mushrooms in holes previously realized in box roof. 3. With a mallet, slightly crush the silicon gasket. 4. Follow silent block installation. Take care to clean silent block surface for a better sticking/water proof ness. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #18/56

Installation Unit installation Skin removal 1. Remove the grill: remove the 4 fixing nuts remove the front grill Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #19/56

Installation Unit installation 2. Remove the top cover: remove the 5 fixing screws. push the cover and remove it. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #20/56

Installation Unit installation GOOD Skin installation BAD 1. Insert the top cover. RECOMMENDATIONS Make sure that both sides of the top cover are well engaged as described on the pictures. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #21/56

Installation Unit installation Skin installation RECOMMENDATIONS Make sure that the pins of the front grill are well engaged into the bottom and top covers. 2. Put the front grill in place. 3. Tie the 4 nuts of the front grill. Tie the 5 screws of the top cover. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #22/56 4.

Installation Unit installation 5. Roof top and roof cut mounting installation: Drill the 4 fixing holes 10 mm in the bottom cover of the unit. 6. Nosemount installation: Use the 4 fixing holes at the rear of the frame (refer to "Box preparation/drilling/nosemount page11) 7. Using the lifting device (P/N 07-60110-00) put the unit in place on the 4 silent blocks. 8. Roof top and roof cut mounting installation: Fix the unit with the 4 silent blocks and bolts delivered in the packaging. 9. Nosemount installation: Fix the unit with the 4 bolts. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #23/56

Installation Evaporator installation 1. Remove the two side panels. 2. Using the adapted tool, put the evaporator facing the fixing holes previously drilled. 3. Check the minimum distance between the rear of the evaporator and the box is correct (refer to the chart p6) 4. Tighten the screws. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #24/56

Installation Hoses Stocking recommendations RECOMMENDATIONS For a good functioning of refrigeration circuit, refrigeration hoses must be clean and dry. Hoses must be stocked in a dry area, with less variation in temperature as possible and sheltered from moisture. The two ends MUST ABSOLUTELY been blocked with tight caps to avoid any internal damages or condensation until their connection into the circuit. To fit hoses and electrical harnesses, use as much as possible RSGU clamps. To protect hoses and electrical harnesses, use adequate rubber funnels to avoid cutting with metallic corners. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #25/56

Installation Unit hoses Right installation Wrong installation Mounting recommendations Do not twist or curve the hose. Keep enough length to avoid length variation when the pipes are under pressure. Pipes length can vary between -2% to +4%. Using elbows and fittings make easier installations, assist accessibility and increase hoses/pipes life. Always insure that minimum radius is respected. Provide a radius as big as possible to avoid constriction. Module 6 Module 8 Module 10 Module 12 Minimum curve radius 80 mm 95 mm 110 mm 130 mm Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #26/56

Installation Unit hoses Preparation Tools requested 1. Cut the hose at the right length with appropriate tool. 2. Put POE oil on the connector on fitting. 3. Widen hose clearance with adapted tool before to insert double-clic clamp. 4. Insert double-clic clamp on the hose. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #27/56

Installation Unit hoses Preparation 5. Lubricate the fitting. 6. Don't forget to remove the hose cap. 7. Insert connector in the hose. 8. Crimp the double-click clamp with appropriate crimping tool. Example of a good preparation The clamp gauge (arrow) is set between the hose and the fitting stop. The clamp bands are perpendicular with the fitting and hose. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #28/56

Installation Unit connection 1. Run the electrical harnesses and ignition cable inside the vehicle body. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #29/56

Installation Unit connection 2. Run refrigeration hoses inside the vehicle body. 3. Run the drain water hose inside the vehicle body. RECOMMENDATIONS Always mark off the hot gas line (both sides of the hose) in order to avoid the confusion with the liquid line hose. Remove caps from the hoses JUST before connecting in order to avoid too much moisture in the circuit. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #30/56

Installation Unit connection Refrigeration hoses RECOMMENDATIONS Always check that O-ring is still in place. If O- ring is missing, put a new one in place. 4 hoses have to be connected on the unit: Oil return line High pressure line Liquid line Hot gas line Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #31/56

Installation Unit connection Refrigeration hoses 4. Connect the OIL RETURN HOSE to the oil separator (lower fitting) to the compressor. 5. Connect the HIGH PRESSURE LINE to the oil separator (upper fitting) to the compressor. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #32/56

Installation Unit connection Refrigeration hoses 6. Remove the Hot Gas valve (HGV) solenoid to connect the HOT GAS LINE hose easily. 7. Connect the HOT GAS LINE fitting to the Hot Gas valve. 8. Re-install the Hot Gas valve solenoid. 9. Connect the LIQUID LINE HOSE to the filter drier. RECOMMENDATIONS 45 fitting recommended if lateral outlet needed. GENERALY, use the appropriate fitting depending on the installation. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #33/56

Installation Unit connection Refrigeration hoses 10. Attach regularly all hoses, harnesses with plastic tiewraps. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #34/56

Installation Evaporator connection Refrigeration hoses 3 hoses have to be connected to the evaporator : - Suction pressure hose: from the CRP valve outlet ( 16 module 12) to the compressor. - Liquid line hose: from the expansion valve through the heat exchanger ( 8 module 6) to the host unit. - Hot gas line: from the defrost element inlet ( 8 module 6) to the host unit. 1. Run hoses and harness through the hole. - Suction line - Liquid line - Hot gas line - Fan motor wires - RAT cable - Injection valve if so equipped 2. Prepare hoses as described in section "Unit hoses / Preparation - p27". Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #35/56

Installation Evaporator connection Refrigeration hoses 3. Install fitting and connect the SUCTION PRESSURE LINE hose ( 16 module 12) to outlet of the CPR valve. 4. Install fitting and connect the HOT GAS LINE hose -with red label ( 8 module 6) to the drain pan serpentin inlet. 5. Install fitting and connect the LIQUID LINE ( 8 module 6) to the Thermostatic Expansion Valve inlet (through the heat exchanger). 6. Attach all hoses with plastic tie-wraps. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #36/56

Installation Evaporator connection RAT sensor 7. With the 6 clamp, install the RAT sensor. 8. Connect together evaporator fan connectors. 9. Put the bottom skin in place. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #37/56

Installation Evaporator connection Drain pan 10. Put the drain water pipe in place. RECOMMENDATIONS A descent of MINIMUM 100 mm must be applied between the drain water hoses pipe and the hoses inside the body to help to drain water out. 11. Connect the drain water hoses between drain water pipes and evaporator water tubes. 12. Fix tie-wrap sockets to maintain drain tubes in the right position. 13. Insulate the two holes with silicone. 14. Install the two evaporator sides. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #38/56

Installation Driver cab preparation RECOMMENDATIONS Before drilling the floor, check the location of fuel tank, harness and/or tubes. 1. Drill a hole in the cab floor (behind driver or passenger seat depends on battery location). RECOMMENDATIONS Protect the hole (ex: armoured hose) to avoid harness and hoses damage. 2. Run water drain hose through the floor. 3. Run battery cable through the floor. 4. Run the refrigeration hose. 5. Run the cab command and ignition cable to the dashboard. Install a capping (not supplied) to cover the hoses and harness. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #39/56

Installation Cab command harness fitting NOTE: For cab command harness fitting, refer to the vehicle mounting kit instructions. 1. Route the cab command harness to the vehicle dashboard. RECOMMENDATIONS Protect or move the harness away from metallic corners of the chassis. Avoid connecting the harness to/or in contact with heating source. Avoid connecting the harness to parts that may cause vibrations. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #40/56

Installation Cab command harness fitting 2. Fit the cab command (in specified location). RECOMMENDATIONS Take care not to pierce any harness or hoses within the dashboard. If the cab command is built into the dashboard, fit it as far as possible from the heating ducts. Maximum temperature of exposure: 70 C (158 F) The cab command MUST NOT be located behind the screen (T too high and obstruction of windscreen). Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #41/56

Installation Compressor connection MANDATORY BEFORE ANY ELECTRICAL OPERATION. DISCONNECT THE VEHICLE BATTERY: Remove the battery ground (-), the positive battery (+) and lock-out. 1. Move along hoses and battery harness to the compressor and vehicle battery. 2. Attach regularly the harness with plastic tie-wraps and base tie-wraps onto the chassis. 3. Insulate the hole with silicon. RECOMMENDATIONS Protect or move the harness away from metallic corners of the chassis. Avoid connecting the harness to/or in contact with heating source. Avoid connecting the harness to parts that may cause vibrations. Do not secure the unit harness to the vehicle harness or piping Avoid drilling the vehicle frame. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #42/56

Installation Compressor connection 4. Connect the HIGH PRESSURE HOSE. 5. Connect the SUCTION PRESSURE HOSE. 6. Connect the OIL RETURN HOSE if available (under the compressor). Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #43/56

Installation Compressor connection Injection thermostat 7. Install injection thermostat on the compressor High pressure line fitting with the clamp. RECOMMENDATIONS Take care to place correctly the thermostat in order to have a good contact with the fitting. 8. Fit injection thermostat wires and compressor clutch wires in a retractable sleeve. 9. Insert terminals in the injection thermostat. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #44/56

Installation Compressor connection Injection thermostat 10. Protect the wires with sleeve. 11. Maintain all cables with plastic tie-wraps. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #45/56

Installation Battery & ignition key harness fitting 1. Route the ignition cable to the vehicle fuse box. 2. Connect the white wire onto the fuse holder supplied in the mounting kit (1A). 3. Refer to the corresponding mounting kit instruction to connect the +12Vdc ignition live. Install the 80 amps fuse holder as closed as possible from the 12 Vdc battery. Cut the battery harness to the required length. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #46/56

Installation Battery & ignition key harness fitting 4. Connect the fuse. 5. Put grease on the fuse holder connections. 6. Connect the + battery (red). Crimp the terminal with adapted crimping tool. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #47/56

Installation Battery harness fitting 7. Install the 80 amps fuse in the fuse holder. 8. Install protection cap on the fuse. 9. Connect unit ground (-) to the vehicle chassis. 10. Re-connect the ground (-) of the vehicle battery. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #48/56

Installation Commissioning Leak checking REQUIREMENT To check gas leak 1 vacuum pump 1 manifold gauges (4 connections) 1 vacuumeter 1. Install manifold gauges on the compressor side. 2. Connect the vacuum pump to the manifold gauges. 3. Start the vacuum pump and vacuum for 15 mn: to remove the air in the circuit. 4. After 15mn, stop the vacuum pump. 5. Connect the nitrogen to the manifold gauges. 6. Put 15 bar (219 psi) in the circuit. 7. Use bubbles water on all refrigeration fittings 8. No bubbles formation means that the circuit is tight. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #49/56

Installation Commissioning Unit vacuum To vacuum the circuit 1. Remove the nitrogen. 2. Start the vacuum pump. 3. Apply "Triple evacuation" process (refer to refrigeration training module) 4. Stop the vacuum pump. 5. Check if vacuum is complete with vacuumeter. (refer to refrigeration training module) Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #50/56

Installation Commissioning Refrigerant charge REQUIREMENT 1 manifold gauges (4 connections) 1 refrigerant cylinder 1 scale - minimum precision requested: 5% After vacuum, charge the circuit 1. Install the manifold gauges on "Free Schrader" fitting located inside the condenser on the high pressure line. 2. Place refrigerant cylinder on scale and connect charging line from cylinder to manifold. 3. Purge charging line at inlet manifold. 4. Note the weight of refrigerant cylinder. Be sure that the unit is stopped during this operation. 5. Open liquid valve on refrigerant cylinder and allow the liquid refrigerant to flow into the unit until the correct weight of refrigerant has been added as indicated by weight scale. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #51/56

Installation Commissioning Refrigerant charge 6. When refrigerant cylinder weight (scale) indicates that the correct charge has been added, close the manifold valves. Refrigerant charge Viento 200 0.85 Kg ± 5% Viento 300 1 Kg ± 5% Viento 350 1,1 Kg ± 5% Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #52/56

Installation Commissioning Settings CPR adjustment The Compressor Regulation valve is a device designed to regulate the flow of refrigerant returning to the compressor from the evaporator, this ensures correct capacity for the unit. The Compressor Regulation valve also reduces the load on the compressor during start-up & whilst in operation which is why it is important it is correctly set-up on commissioning. Adjustment has to be done: Road operation Heat or defrost mode Compressor speed at 2400 rpm Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #53/56

Installation Commissioning Settings CPR adjustment cap jam nut settting screw 1. Connect manifold to CPR fitting. 2. Start the unit in Heating or Defrost mode. 3. Check compressor speed: 2400 rpm. 4. Remove CPR cap. 5. Adjust CPR to get gauge pressure value with hexagonal socket head wrenches (n 8) : To raise the suction pressure : turn the setting screw clockwise To lower the suction pressure: turn the setting screw counterclockwise. CPR adjustment R134a R404A Viento 200 3 bar 2.7 bar Viento 300 2.2 bar LA HA 1,85 bar 1.25 bar Viento 350 2.8 bar LA HA 3.4 bar 1,8 bar 6. When the setting has been adjusted, tighten the jam nut securely against the setting screw to prevent any movement of the setting screw due to vibrations in the unit. 7. Replace the cap. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #54/56

Installation Commissioning Settings TXV setting The Thermo Expansion valve is a precision device designed to meter the flow of refrigerant into an evaporator in exact proportion to the rate of evaporation of the refrigerant in the evaporator. The Thermo Expansion valve can control the refrigerant gas leaving the evaporator at a pre-determined superheat. The superheat is the temperature difference between T1 (Temperature measured at remote bulb location) and P2 (Evaporation temperature of the last liquid drop). T1 : Temperature at remote bulb location P2 : Evaporator outlet pressure S : Superheat Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #55/56

Installation Commissioning Settings TXV setting 1. Connect manifold to evaporator outlet fitting. 2. Install a sensor on the expansion valve bulb location. 3. Run the unit on COOLING mode. 4. Correct superheat: Turn anti-clockwise to increase flow & decrease superheat Turn clockwise to decrease flow and increase superheat. Viento 200 Viento 300 Viento 350 TXV adjustment 8 C at box temperature 0 C (14.4 F at box T : 32 F) 4 C at box temperature -20 C (7.2 F at box T : -4 F) Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #56/56