The SEC Armadillo CDM Information

Similar documents
THE DIGITAL HUB COMPANIES, HEALTH & SAFETY HANDBOOK

SHREWSBURY COLLEGE EMERGENCY PROCEDURES. Firearm and Weapon Attacks

INDUCTION MANUAL CONTRACTORS & SERVICE PROVIDERS. Convention Square, 1 Lower Long Street, Cape Town 8001, South Africa

If you have any questions, please feel free to call us on Emergency procedures 01/17

EMERGENCY PROCEDURES

Emergency Preparedness General Response

INDUCTION PACK. for Supply Workers, Contractors, Consultants and Volunteers. at Woodcroft Primary School. Keeping Children Safe In Education

LESSEE EMERGENCY RESPONSE PLAN AFAS Live

CONTRACTOR GUIDELINES

Fire and Bomb. Evacuation Policy

Texas Woman s University

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

Fire Risk Assessment. A safety guide for users of the hall

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

Event Safety Check List

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

Charlotte Building, 17 Gresse Street, London W1T 1QL

Emergency Procedures. The international exhibition and conference centre

FINLEY HALL EMERGENCY EVACUATION PLAN

(Fire) Emergency Evacuation Plan

CORPORATE SERVICES HEALTH AND SAFETY

NEWBATTLE ABBEY COLLEGE. Fire Safety and Emergency Evacuation Policy and Procedure

Bishopstone Village Hall Health and Safety and Fire Evacuation Policy

CHELMSFORD QUAKER MEETING ROOM BOOKING PACK 2018

Fire Safety, Procedures and Risk Assessment Policy

Date Issued: December 14, 2017 Revision: 2.1

Floor Warden Training. Thursday, May 27, 2015

West Virginia University Health Sciences Center Campus Emergency Preparedness Instructions for

Arbour House. Fire Policy and Procedures

EXAMPLES ONLY EVENTS SAFETY MANAGEMENT PLAN (RISK ASSESSMENT) (APPENDIX C)

Venue Emergency Response Plan (VERP)

5 Key Stages to Risk Assessment

Fire Risk Assessment for Old School and Fuller Room

FIRE EMERGENCY PLAN AND FIRE RISK (PREVENTATION) POLICY

Hythe Marina Association (HMA) Ltd

Emergency Procedures. Emergency Phone Numbers. Unisafe (Security) (07) or extension 4444 Police, Fire Service or Ambulance 1-111

SCALES NW EMERGENCY ACTION PLAN

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

EMERGENCY RESPONSE GUIDELINES

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

FIRE PROCEDURES 1. APPOINTMENTS

LYON COLLEGE CRISIS PLAN PROCEDURES

Museum Towers EVACUATION PROCEDURE IN CASE OF FIRE

SECC Guide to Emergency Procedures. September 2010

Fire Evacuation Plan Bressler Research Building. UMB POLICE or

Fire Evacuation Plan Health Sciences & Human Services Library. UMB POLICE or

The Bridgewater Hall

Purpose of Emergency Response Program Emergency Response Team / Leader Evacuation Procedures Building Life Safety System Virtual Evacuation Building

PHOENIX CONVENTION CENTER. EMERGENCY PROCEDURES MANUAL for SHOW MANAGERS

FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

ACTIONS IN THE EVENT OF A FIRE ALARM

Mulch fires, trash can fires, or other fire outside a building should be reported by the following methods:

HAZARD HAZARD DETAILS RISK GROUP ACTIONS PLANNED RISK LEVEL ADDITIONAL ACTIONS PROPOSED.

Emergency Procedures Protocol

HORNCASTLE ARENA 55 JACK HINTON DRIVE CHRISTCHURCH

Fire Procedures. April 2016

EAST DEAN & FRISTON VILLAGE HALL FIRE RISK ASSESSMENT

2012 SunTrust Center ERT Annual Review. 919 East Main St. Richmond, VA

Highland City Library Disaster and Emergency Plan

Fire Safety Procedures & Risk Assessment Policy

EMERGENCY RESPONSE GUIDEBOOK South Hamilton Campus February 2016 Reviewed and Updated

Emergency Procedures Quick Reference Guide

BUILDING EMERGENCY ACTION PLAN

Evaluating Your Property and Work for Safety Hazards

Emergency Action Plan

DEF Fire Evacuation and Emergency Planning Criteria

The Basement Risk Assessment Form

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

Fire and Emergency Evacuation Procedures

Emergency Preparedness Guide

Visitor information pack

CLYST ST. MARY VILLAGE HALL

Health and Safety Policy

Health & Safety Policy

Emergency Response Guide

Support Staff. Updated / /20. Emergency Contacts 1. Evacuation 2. Lockdown 3. Exterior Lockdown 4. Clear the Halls 5. Reverse Evacuation 6

BUILDING EMERGENCY ACTION PLAN. for Your Building Name

UNITY TEMPLE EMERGENCY RESPONSE PLAN Fire and Emergency Services 911

Peninsula Dental Social Enterprise (PDSE)

Newcastle University. Estate Support Service. Contractor Induction Booklet

Walker Children s Club Health and Safety Policy

Fire Risk Assessment

MONRO PAVILION RISK ASSESSMENT FORM. Date(s) Monday 1 Wednesday 3 July. External Contact & Nos Sarah Taylor - Venue Information

University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,

Fire Evacuation Procedure

Wellsprings Primary School. Fire Emergency Evacuation Plan

FIRE SAFETY FOR PRE-SCHOOLS AND CHILDCARE FACILITIES GENERAL GUIDANCE COUNTY COMMITTEE LIMERICK CHILDCARE

Emergency Response Team (ERT) Areas of Accountability

FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY

Sir Christopher Hatton Academy A Member of Hatton Academies Trust

Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x

This contractor induction represents UNSW Policy, and all contractors are required to follow the procedures described.

Fire & Life Safety Seattle Municipal Tower

TABLE OF CONTENTS. Medical & First Aid Procedure 11, 12. Hazardous Material Emergency Response 17. Civil Disturbances and Demonstrations 21

LINDENWOOD UNIVERSITY BASIC EMERGENCY ACTION PLANS

BUILDING EMERGENCY ACTION PLAN

Property Name & Address [ Property Name ] - [ Property Address ]

Be Safe and Be Prepared! EMERGENCY PREPAREDNESS QUICK-REFERENCE GUIDE. YOUR CURRENT LOCATION Building/Address: Room Number:

Transcription:

The SEC Armadillo CDM Information Appendix 2 to CDM Guide The SEC Armadillo CDM Information V1.1 1

Contents 1.0 Contents 2 2.0 SEC Armadillo Site Plan 3 3.0 Campus Traffic Management 4 4.0 Important Telephone Contacts 5 5.0 Site Safety Rules 5 6.0 Construction Area 7 7.0 Medical Incidents 8 8.0 Near Miss and Non-Medical Incidents 8 9.0 Emergency Procedures 9 9.1 Fire 9 10.0 Terrorist Activity 12 10.1 Bomb Threat 12 10.2 Weapons Attack ~ Radio Code Silver 12 11.0 SEC Armadillo ~ Technical Information 14 12.0 SEC Armadillo ~ Technical Layout Sheet 16 The SEC Armadillo CDM Information V1.1 2

2.0 SEC Armadillo Site Plan North Gatehouse SEC West SEC East The SEC Armadillo CDM Information V1.1 3

3.0 Campus Traffic Management Vehicle access via the North Gatehouse located on Stobcross Road. Emergency Vehicle Access to; o North Boom. o South Boom. Campus Speed Limits; o Campus ~ 15mph. o Stage and back door area ~ 5 mph. Vehicle passes, where supplied must be displayed at all times during build up and break down periods. All loading and unloading may be carried out in the service yards adjacent to Armadillo. FLT Hazard light to be used when operating at all times. Seatbelts to be worn at all times. Sound horns on entry into or egress from the stage and back door areas. High visibility vests must be worn when working adjacent to or near moving vehicles. Armadillo Vehicle door heights o Acoustic Doors North ~ 4.5 metres o Acoustic Doors South ~ 3.4 metres It is important that no undue obstruction is caused to fire evacuation routes of the free flow of traffic. Vehicles must be removed to your designated car park immediately after loading or unloading. The SEC Armadillo CDM Information V1.1 4

4.0 Important Telephone Contacts Control Room ~ Ext 290 (Ext 888 Emergency use only). Medical Centre ~ Ext 333. 5.0 Site Safety Rules Contractors shall ensure the following: Access, egress and fire routes must be maintained free at all times. Avoid work practices that create slips, trips or falls. Entry/ exit to the SEC Armadillo is via designated doors only. Cables must not traverse walkways, they must be flown over internal routes. Cable ramps may be used externally with venue agreement. Contractor badges to be displayed at all times. Consumption of alcohol or non-prescriptive drugs during working hours is strictly prohibited. Do not remove or obstruct firefighting equipment. Electrical equipment must be serviceable and subject to Portable Appliance Testing. Good conduct of the contract staff during the occupancy of the site. Hard hats must be worn if work in locations where head injuries may occur or there is overhead working. Hot work permit to work system is operated from SEC Control Room. Incidents and near misses must be reported to the SEC Medical Centre or Event Manager/ G4S Safety Officer. Industrial type ladders only shall be accepted for use on the SEC. No swearing or use of offensive or racist language on site. Sign in on arrival to the premises and sign out when leaving the premises. The SEC Armadillo CDM Information V1.1 5

Smoking within the SEC is prohibited by law. Smoking in enclosed spaces such as toilets is liable to activate the fire alarm system. Within SEC the Smoke Free Policy includes a ban on the use of electronic cigarettes (e-cigarettes). Smoke in designated areas only. Young Persons ~ The SEC policy is that no one under the age of 16 years of age will be allowed into the construction area. Waste ~ it is the responsibility of each contractor to remove all large items of waste- bricks, wood, display boards, landscaping material from the venue. Waste residual materials must not be flushed down sinks, surface water drains or toilets. Surface water drains discharge direct into the River Clyde. Welfare Facilities: o o o o o Contractor s attire and hands/face are clean if accessing food outlets. Drinking Water ~ designated by Event Organiser. Retail Food outlets ~ designated by Event Organiser. Seated Area ~ designated by Event Organiser. Toilets ~ designated by Event Manager. Working area must be left in a tidy manner and good condition. Working at height shall require that appropriate PPE and Safe Systems of Work are in place and adhered to; a working at Height permit is required for any contractor access to the Lighting Gantry. Work equipment must be fit for purpose and maintained. Work carried out should be in compliance with your own Risk Assessments Crew Catering Facility Liquefied Petroleum Gas (LPG) Cylinders use is not permitted in the SEC Armadillo. The SEC Armadillo CDM Information V1.1 6

6.0 Construction Area The SEC Armadillo CDM Information V1.1 7

7.0 Medical Incidents The Medical Centre is located in the SEC Centre East Concourse, adjacent to the Information Desk. If medical assistance is required, the Nurse/ First Aider should be contacted immediately at extension 333 or via any staff member in the vicinity. 8.0 Near Miss and Non-Medical Incidents Any non-medical incidents must be reported, staff are also required to report and record close calls as this is seen as an opportunity to prevent future accidents that have not yet occurred. Recognising and reporting near miss incidents can make a major difference to the safety of staff and visitors. The SEC Armadillo CDM Information V1.1 8

9.0 Emergency Procedures 9.1 Fire The SEC Armadillo has a comprehensive fire detection system which is complemented by sprinkler protection. A safety curtain and associated sprinkler system is located above the front edge of the stage. This area must be kept clear to allow emergency operation of the safety curtain. Alarm points are located at or near fire exits and vehicle doors. Fire System Testing Weekly Fire Alarm Testing ~ every Wednesday morning between 0500hrs to 0600hrs. Six monthly ~ Full system functioning test, when building is not in use. If you discover a fire: Break the glass on the nearest manual call point. Advise other persons in the vicinity of the emergency. Telephone the Control Room (extension 888), giving the location of the fire, or inform a member of SEC staff in the SEC Armadillo. Do not attempt to extinguish the fire unless it is safe to do so and you are competent to use a fire extinguisher. The automatic alarm may also be activated if the smoke or heat detectors come into operation. The fire alarm takes the form of a pre-recorded announcement over the Public Address System as follows; The SEC Armadillo CDM Information V1.1 9

Fire Extinguishers Attention please, Attention please. An emergency situation has arisen within the building. Please remain calm and follow stewards instructions; they will direct you to the nearest emergency exit, do not use the lifts Fire extinguishers are positioned throughout the premises and should not be used except in an emergency to aid escape from the building. Under No Circumstances are they to be moved or used to block open doors. The SEC Armadillo CDM Information V1.1 10

Fire Evacuation Routes Production Assembly Area SEC East The SEC Armadillo CDM Information V1.1 11

10.0 Terrorist Activity 10.1 Bomb Threat The Public Address System may broadcast the message: ATTENTION PLEASE STAFF CALL 100, to signify that a bomb threat has been received. Persons responsible for their construction area must carry out a thorough search to ascertain whether there are any suspicious packages. Should any suspicious item(s) be found, move away from the location and notify a SEC staff member immediately. Otherwise await further instructions and information. If the threat appraisal concludes that an element of danger exists an announcement shall be made providing evacuation instructions and assembly point locations, this shall be followed by the pre-recorded announcement over the Public Address System, (Para 9.1 Page 10). This message will continue to be broadcast until the building has been evacuated. All persons must follow the directions from Stewards. When the emergency has passed and normal working conditions can be resumed the following message will be broadcast. ATTENTION PLEASE CANCEL STAFF CALL 100 10.2 Weapons Attack Radio Code Silver Personal Actions ~ Stay Safe o Under immediate GUN FIRE take cover initially, but leave the area as soon as possible if safe to do so. o Nearby GUN FIRE Leave the area immediately, if possible and it is safe to do so. Leave your belongings behind. Do not congregate at evacuation points. IF YOU CAN T ESCAPE o Consider locking yourself in a room or cupboard. The SEC Armadillo CDM Information V1.1 12

Act o Barricade the door then stay away from it. o If possible, choose a room where escape or further movement is possible. o Silence any sources of noise, such as mobile phones, that may give away your presence. o Secure your immediate environment and other vulnerable areas. o Keep people out of public areas, such as corridors and foyers. o Move away from the door and remain quiet until told otherwise by appropriate authorities or if you need to move for safety reasons, such as a building fire. The SEC Armadillo CDM Information V1.1 13

11.0 SEC Armadillo Technical Information Grid Photograph The SEC Armadillo CDM Information V1.1 14

The SEC Armadillo CDM Information V1.1 15

12.0 SEC Armadillo Technical Layout Sheet Arena Floor Dimensions Clyde Stage useable area Approximately 60ft x 40ft (18.28m x 12.19m Approx. 223m2) Beam Spreads Cherry picker Electrics Head Rigger Contact: IT Information Main Beams at 9ft 10 in (3m) centres Venue can provide cherry picker and operator for hire Event Package 1 x house electrician on standby from load in to load out complete. Any requirements that exceed the standard package will charged accordingly Buses 2 x16 amp single phase available if the buses are parked in the bays to the south of the Armadillo 2 x 32 amp three phase are only available if the buses are parked in spare halls Dining area 1 x 32 amp three phase Lighting up to 400 amp three phase Rigging up to 63 amp three phase Sound up to 300 amp three phase Spot tower up to 2 x 32 amp single phase Video up to 125 amp three phase All rigging plots must be submitted to SEC management for approval Paul Duffy ~ Technical Services Consultant email paul.duffy@sec.co.uk Network Information ~ HP LAN Speed ~ 10Gb core, 1Gb to outlets. Bandwidth ~ 1Gbit/sec primary connection with a 10Mbit/sec backup (shared by everyone). Outlet Availability ~ Plenty of CAT6 Outlets in all areas. WI FI criteria ~ Xirrus High Density Wi-Fi. VPN s ~ Support most VPN Software (subject to actual approval request). The SEC Armadillo CDM Information V1.1 16

Mixer Overall Roof Capacity Rigging Labour Provider Contact Roof Steel Height Spot range Stage Storage Trim Height The mixer area is located on the 1st floor balcony, 14ft x 14ft (4.3m x 4.3m) The cable route to the mixer is approx 164ft (50m) long SEC Armadillo forestage grid total max load 8 tonnes Uniformly Distributed Load (UDL) SEC Armadillo Stage are grid total max load 24 tonnes UDL 'Highly strung rigging' are preferred rigging provider for production rigging points Touring productions contract local rigging services directly Joe McCabe email joe@highlystrungrigging.com (Mobile: 07899 802936) SEC Armadillo forestage grid - approximately. 45ft (13.62m) to underside of rigging grid SEC Armadillo Stage area grid - approximately 69ft (21m) to underside of rigging grid 2 x Robert Juliat super Korrigan follow spots are available to hire, contact Technical Manager for daily rates Level 4 Follow spot location is 150ft (45.72m) Stage Area - 60ft x 40ft (18.28m x 12.19m) Stage Left wing 36ft x 21ft 4 in x 25ft 5in h (11m x 6.5m at 7.75m h) Stage right wing 39ft 4in x 19ft x 25ft 5in h (12m x 5.8m SR at 7.75m h) Touring stages will require a section 89 application via Glasgow City local enforcement authority. This application requires detailed stage drawings and calculations to be submitted to the Building Control and there are monetary charges for this application. Please notify SECC immediately if tour staging will be supplied There is limited storage in the Vehicle Entry, so all other kit back onto trucks Approximately 32ft 9in (10m) The SEC Armadillo CDM Information V1.1 17