GUIDELINES FOR SELECTION/SCRUTINY OF ROADS AND BRIDGES PROJECTS UNDER NABARD SCHEME

Similar documents
Highway Alignment and Route Location Survey

Landscape Act. (Act No. 110 of June 18, 2004)

Study of Geometric Design, hydraulic and hydrology for Highways Using Civil 3D Software- A Case Study

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness

IC Chapter Severe Weather Warning Sirens

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Delhi May 6-7, Paper to be published in Urban Update during South Asian Cities Summit organized by AIILSG and UCLG, New

Classification of soils

Glenborough at Easton Land Use Master Plan

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

2002/ Modernisation Road N 4

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

1.0 Circulation Element

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

CECW-AG 11 June 1998 MEMORANDUM FOR MAJOR SUBORDINATE COMMANDS AND DISTRICT COMMANDS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

GUIDELINES FOR ENVIRONMENTAL SCREENING OF ROAD PROJECTS

AN EVALUATION STUDY OF COMMUNITY FISH PONDS PROGRAMME IN HIMACHAL PRADESH

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

BRIDGES, FLYOVERS AND ELEVATED MRTS STRUCTURES

IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2

DuPage Mayors and Managers Conference June 21, 2013 TRANSPORTATION PROGRAM (STP) WORKSHOP

THE NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom Happiness No. 30/2009/QH12 Hanoi, June 17, 2009

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: HIGHWAY ENGINEERING (COURSE CODE: ) Civil Engineering

INSTITUTE OF TOWN PLANNERS, INDIA TOWN PLANNING EXAMINATION BOARD ASSOCIATESHIP EXAMINATION. ASSIGNMENT: Semester -II Year 2019

KANPUR 5 LAND USE Final Report: Kanpur City Development Plan Under JNNURM

Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey

EXPRESSION OF INTEREST CONSULTANCY SERVICES FOR GIVING FACELIFT TO BHEL GATES & LAND SCAPING OF SOUTH AVENUE AT BHEL-R.C.

Loop Detectors for Motorways

Subject: Hendry County Evaluation and Appraisal Report Letter of Understanding - Identification of Major Issues

14.5 HOPEFIELD: (REFER PLAN 39 AND PLAN 40)

COMMUNITY GARDEN BYLAWS

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

Approval of Ex (Electrical) Equipment for use/installation in Hazardous Areas.

East Corridor Final Environmental Impact Statement

5 th Regional EST Forum in Asia A new decade in sustainable transport

COMMISSION DELEGATED REGULATION (EU) No /.. of

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

Uttarakhand Rural Water Supply & Sanitation Project ( )

Emery Village Road 2A Municipal Class Environmental Assessment Study

Procedures for Environmental Impact Assessment in Cambodia

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

DGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness No. 19/2008/TT-BXD Hanoi, November 20, 2008 CIRCULAR

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

On Electromagnetic Compatibility

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Creating Complete Roadway Corridors:

VILLAGER SQUARE URBAN RENEWAL PLAN

Joint Meeting City Council and the Plan Commission. September 1st, 2015

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

Chapter 11. Implementation Plan

Post - Construction Hydromodification Development Requirements

SECTION 5 - SCENIC HIGHWAYS

CHAPTER 12 IMPLEMENTATION

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

CHAPTER 1 Introduction

KTDC HOTELS & RESORTS LIMITED MASCOT SQUARE, TRIVANDRUM - 33

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

SERVICE LEVEL IMPROVEMENT PLAN (SLIP) GREEN SPACE AND PARKS

THE POLICY FRAMEWORK FOR WALKABLE COMMUNITIES. Community Technical Assistance Program Building Active Communities Institute March 2016

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Scope of application and the purpose of the Law

Downtown Lead Revitalization Project Final Recommendations. Three Proposed Options for the Revitalization of Downtown Lead

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Southern Gateway Project and Public Green

Strategies to Connect and Integrate Urban Planning and Environmental Planning Through Focusing On Sustainability : Case Study of Cheongju City, Korea.

5.0 IMPLEMENTATION STRATEGIES

SMART CITIES IN INDIA 2018

Rezoning Transportation Analysis Petition Number: General Location Identifier:

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Vietnam Scaling up Urban Upgrading Project (SUUP)

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

USF System Campus Master Plan Updates Goals, Objectives and Policies

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Final Master Plan and Development Control Regulations

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Executive Information Memorandu m. October 2011

WELCOME TO OPEN HOUSE TWO November 28, 2018

City of Richmond. Engineering Design Specifications

Integration of Trees into Roads Policy - the road to success -

Beautification Advisory Committee Mission Statement and Goals & Objectives

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

Transcription:

GUIDELINES FOR SELECTION/SCRUTINY OF ROADS AND BRIDGES PROJECTS UNDER NABARD SCHEME 1. RURAL ROADS & BRIDGES Rural ruads are those roads which connect rural areas with the urban marketing, central highways, rail head, road heads, etc., or a link between the two rural locations. would also include Other District Roads (ODRs) and roads connecting villages to groth centres. Similarly, Rural Bridges are to be taken as those which connect rural areas the main roads leading to urban marketing centres. Ongoing Road and Bridge projects have to be defined as one in which some physical has started and not merely on the basis of administrative approval granted to a project. 2. TYPE OF PROJECTS The project should conform to the standards prescribed by Indian Roads Congress.. The proposed scope should be only of Black Top type. For on going projects it is possible that the Government had adopted local standards which may not conform to the IRC. Proposals for such roads will however, be considered as new road project. The States have already conducted surveys and prepared Master Plan with priority index for roads. To the extent possible thease plans shall be made use of for making a selection of new road scheme. However, the broad policy parameters, such as connecting rural areas with urban areas centers shall be kept in mind. 3. PRIORITIES For selecting the projects the following priorities may generally be followed: a) Completion of Ongoing Bridge project; b) New Bridge projects as per IRC specifications giving connectivity to growth centres etc; c) Strengthening of the Roads/Ongoing Road projects; and d) New Road projects. 4. POINTS FOR SCRUTINY While scrutining the projects for financing under RIDF, the following points are generally examined. a) In the case of ongoing projects, the reason for non-completion shall be observed whether the schemes are incomplete due to arbitration/litigation of conctractors/ land acquisition etc., the same should not be selected. b) Priority should be given to those projects in which large number of ecconomic activities are supposed to be generated. c) Organising capabilities of the implementing agency may be considered as major deciding factor

d) It may be examined whether staff redeployment in the Satate Government department will be necessary to complete the project as per schedule. e) It is suggested that CPM method may be preferred over other methods. for all the roads/bridges projects shall be insisted upon. f) Bridge projects/bridges as part of a road project involving outlay of over Rs. 1.0 crore shall be referred to SPD/HO for "in-principle" approval before the project appraised by the appraisal team. 5. MAINTENANCE OF ROADS Maintenance of Road and Bridges in the State should be carefully examined. It shall be ensured that State Governemnt has adequate arrangements for maintenance of roads. This aspect should be disscussd with the State Government at the time of wrapup metter the conclusion appraisal. It should be borne in mind that no project shall be sanctioned unless the State Government has assured to have adequate arrangements of maintenance of roads.by doing so we will save sizeable social capital. A mention in this regard be made in the appraisal report and also in the sanction memorandum. 6. MONITERING National Bank to check the quality of work through its staff/consultant/outside expertsfrom time to time. The appraisal report shall discuss in detail the monitoring mechanics to be adopted in proper implementation of the projects. PART I : TECHNICAL GUIDELINES FOR FINANCING RURAL ROADS AND BRIDGES Specific criteria for planning design and construction and socio-economic impact of the project are to be established for Rural Roads and Bridges to be financed under the Rural Infrastructure Development Fund. Therefore, Rural Roads & Bridges, would have to be designed, constructed and completed in accordance with the following criteria: The Road and Bridge works which are eligible for assistance from NABARD under RIDF are categorized below : These should be primarily in the category of Public Roads possessed by Mandal/Block, the State Government., Zilla Parishad, Panchayat Raj Department or Revenue Department, for such assistance. (i)while selecting road project it shall be assured that the Connectivity with pucca roads (Black topped ) is observed at both the ends of Road under consideration (ii) It shall be ensured that the Project sanctioned under R.I.D.F. scheme result in all weather Pucca Road

Category A : Ongoing Works New formations, black topping the existing Earthern & WBM Roads, River Bridges, Culverts and Causeways widening of Single Lane to Double Lane, etc. All such works which were taken up by the respective agencies but could not be completed for want of funds are eligible for assistance. Category B : New Works These include new formations, strengthening the existing roads including black topping, construction of bridges, culverts and causeways etc. The ongoing works proposed shall satisfy the design in sub clauses below. For the ongoing road works also geometric inprovements satisfying the design criteria shall be proposed by acquiring land, if necessary. The cost estimate of such protions which cannot be taken up immediately, may be indicated as Part II. For Ongoing Bridge Works the hydraulic data, geotechnical details of foundations and design details including drawings shall be furnished. The design of these bridges shall be in accordance with the design crieria of a IRC Bridge Code. Report shall clearly indicate the reasons for stoppage of works. Similar report as noted above shall be furnished about ongoing road works. For part A and B, the estimate should consist of two part Part I : It consists of itmes which do not involve Land Acquisition. Part II: Items like Geometric Improvements etc. which involve Land Acquisition. The following documents should be enclosed. i) Detailed project report convering all aspects, like necessity and nature of work, route selection, condition of existing road, traffic and soil date, design standards, specifications adopted, hydraulic date, materials specification, cost estimate, schedule of construction etc. as routine norms ii) For New Road Works, socio-economic benefits such as connectivity to villages, access to service centres like schools, hospitals, growth centres, market yards industrial centres etc shall be indicated. iii) For New Road Works full details of alignment including geometric, earth work formation, pavement design, pavement materials, cross drainage works etc satisfying the design criteria stipulated in Chapter B of IRC 73 of 1980, shall be indicate. iv) For bridges, design shall be as per IRC standards for two lane carriage way.

OPERATIONAL GUIDELINES FOR NABARD WORKS RIDF - I X - TERMS AND CONDITIONS FOR PROJECTS TO BE IMPLEMENTED BY STATE GOVERNMENTS 1. Phasing (Period of Completion) Maximum phasing period of three years will be allowed for projects sanctioned under the tranche. 2. Quantum of Loan Loans will be available as per the following norms for various sectors covered under RIDF-IX : Sr.No Sector / Activity RIDF loan admissible as percentage of eligible project cost 1 Agriculture and allied activities like 95% Irrigation, watershed, fisheries, Animal husbandry etc.,. 2 Rural Connectivity 80 % 3 Social Sector 85% 3. Type of Projects Priority would be given to ongoing projects. In case of new projects, only short duration projects which could be completed within 3 years would be considered. 4. Cut Off Date Expenditure incurred on or after 01 April of the concerned financial year in which the project is sanctioned, only would be eligible for reimbursement. However, preappraisal expenses such as expenses incurred on project preparation and cost of detailed technical surveys, incurred prior to the cut-off date, may be reimbursed subject to a ceiling of 0.5% of RIDF loan sanctioned, provided such work has been outsourced. 5. Nodal Department Finance Department (FD) of the State Government would continue to be the nodal department for documentation, drawal of fund, etc. Therefore the projects have to be routed through the FD for sanction under RIDF. 6. Mode of Funding NABARD would release the sanctioned amount on reimbursement basis. However, if the State Government desires, NABARD may consider releasing as advance such amount as per the norms applicable from time to time.

7. Rate of interest & Repayment period : Bank Rate +0.5 % ( Presently it is 6.0% + 0.5 % = 6.5 % p a). Rate of interest is payable on quarterly basis. The repayment period is 7 years with 2 years grace period. Nabard Sanctions at a glance Total Projects Sancctioned as on 8/04 = 581 Nos. = 280 Nos. = 301 Nos. Sanctined cost 51371.27 4556.18 55927.45 29187.77 706.74 29888.51 22189.50 3849.44 26038.94 Sanctiones from year 1998 to 2003 RIDF III To VIII Total Projects =292 Nos. = 135 Nos. =157 Nos. Sanctined cost 27812.47 1347.69 29160.16 14601.01 72.61 14673.62 13211.46 1275.08 14486.54 Sanctiones in year 2004 RIDF IX Total Projects =289 Nos. = 145 Nos. =144 Nos. Sanctined cost 23558.80 3208.49 26767.29 14580.76 634.13 15214.89 8978.04 2574.36 11552.40