4KV Switchgear Susceptibility to Main Steam Line Break. By: Akbar Moarefy Kyle Millenaar PE

Similar documents
Union County Vocational - Technical Schools Scotch Plains, New Jersey

City of Duluth Festival Center 04/25

Flexible and efficient: Close Climate Control for IT equipment

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

Air Distribution Fan and Outside Air Damper Recycling Control

SECTION TESTING, ADJUSTING AND BALANCING

SECTION AIR DUCT ACCESSORIES

Tunnel Fire Dynamics and Evacuation Simulations

CxA to Answer this Section

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS

Company Directive STANDARD TECHNIQUE : SP1N

Job Name Control Systems Description Date

August 15, 2013 Page 1 of 19

Fire, Smoke and Control Dampers

Development of standards for MV Switchgear for Arc Flash protection. ABB Group May 20, 2013 Slide 1

Control of temperature and humidity surrounding the stone chamber of Takamatsuzuka tumulus during its dismantlement

FEATURES AND BENEFITS

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

RAMAPO COLLEGE OF NEW JERSEY CCA0803 PHASE II HOUSING REHABILITATION 2012

PALO VERDE NUCLEAR GENERATING STATION

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

COMcheck Software Version Review Mechanical Compliance Certificate

Heating and Cooling Coils

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

INSTALLATION INSTRUCTIONS AH12 WALL MOUNT HOOD

LOW-NOX BURNER RETROFIT CHALLENGE

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

Soot Mitigation Strategies

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Instrumentation for Nuclear Applications

Steam Trap Inspection Methods And Steam Cost Analysis

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

March 2014 AHRI Presents Research Findings at Low-GWP AREP Conference

RESNET HERS Rater Sample Test Questions 2

Technical Presentation on

YARWAY NON-REPAIRABLE DRIP AND TRACER STEAM TRAPS SERIES PB, 29, 129Y AND 29S

Steam Trap Presentation for IDEA Distribution Workshop. Presenter: Joe Radle

White Paper. The Victaulic Vortex Fire Suppression System Fire Suppression for Electrical and Electronic Applications

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

CHAPTER 3 BASIC STEAM CYCLE

INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

Screw Compressors AS SERIES. Capacities from: 59 to 124 cfm Pressures from: 80 to 217 psig

INTRODUCTION. JAU /JCC/JVC Series Jet Fans - for car park ventilation

AIRPORT OFFICE BUILDING. Smoke Control System. Testing Procedures Manual. September 10, 2016

Tunnel Axial Flow Fan

Indirect Gas-Fired Make-Up Air

Installation Guide IM 1248

TESTING STEAM TRAPS TO KEEP YOUR SYSTEM OPERATING EFFECTIVELY AND EFFICIENTLY

SPECIFIC APPLIANCES, FIREPLACES AND SOLID FUEL-BURNING EQUIPMENT

Worried aboutthe air quality in your schools?

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

EL-TSTAT-8820 Safety & Installation Instructions

Put the V back in HVAC

SIMPLICITY FULL MODULARITY?

Effects of Kitchen Ventilation on Residential Dwellings

DOCUMENT TABLE OF CONTENTS

Model: 400E-5M. Bermad Hydraulically Controlled Anti-Columning Deluge Valve, with Easylock Manual Reset. Installation Operation Maintenance

Energy Saver 101: Home Energy Audits

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

Rapid transfer port technology

TMB Baking TSV Gas Oven TAG Series. Contractor s Utility Requirements

Basic Input Data Needed to Develop a High Performance Fan/Blower with Low Noise, Energy Saving and High Efficiency

DEMAND CONTROLLED VENTILATION WITHOUT WIRES

HVAC OUTDOOR AIR VENTILATION STANDARD. ASHRAE Standard ASHRAE Standard

SECTION AIR COILS

Modular Supply Make-Up Air Unit

Innovative Boiler & Heat Exchanger Concepts

Museum Archive Dehumidification in Hot & Humid Climates

An Overview to Designing Smoke-Control Systems

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL /

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Infrared Business Tips & Insight

NOx REDUCTION EXPERIENCE ON NATURAL GAS FIRED TURBO FURNACES

Gas-Fired Indoor and Outdoor Duct Furnaces

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

How to ensure Thermal Comfort in buildings with CFD

VALIDATION OF FINITE ELEMENT MODELS OF INJURY RISK IN VEHICLE-ROADSIDE BARRIER CRASHES

Economical and simplified solutions that offer quality and optimum steam trap service.

Installation Instructions

Fire Engineering in High Rise 15 November 2013

CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS

Executive Summary

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering

CONTENTS. B. System Design and Performance Requirements

Study of Hot-air Recirculation around Off-road Tier-4 Diesel Engine Unit Using CFD Abbreviations Keywords Abstract Introduction and Background

Start today and start saving!

Study and Design Considerations of HRSG Evaporators in Fast Start Combined Cycle Plants. Govind Rengarajan, P.E.CEM, Dan Taylor

ISLAND MOUNT RANGE HOOD. This manual is made with 100 % recycled paper. Electronic version of this manual is available at:

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Transcription:

4KV Switchgear Susceptibility to Main Steam Line Break By: Akbar Moarefy Kyle Millenaar PE

OE Discovery of New Harsh Environment Conditions 10/19/09 Monticello issued LER 2009-005-00 due to the failure of a HELB door fusible link with potential result of losing 4kV SWGR in case of HELB. 04/18/10 Prairie Island entered LCO 3.0.3 after discovering U1 turbine building truck Aisle rollup door security fence was closed. This fence was required to remain open to drain flood water resulting from HELB in the turbine building. 9/16/11 Callaway issued LER 2010-009-01 due to failure in implementation of HELB defense (HELB doors) challenging equipment operability in areas of the plant that were intended to be mild. 2/10/12 Cooper (Green NCV): Failure to translate design requirements associated with turbine building HELB into design information to demonstrate protection of safety related 4160V switchgear and EDG 2/10/12 Braidwood (Green NCV): Failure to report non-conservative assumption in actuation time for fusible links that protect ESF switchgear room from HELB. 05/08/12 Braidwood (Green NCV): EQ failed to consider temp/humidity changes in EDG, ESG and MEER rooms during a turbine building HELB 06/07/12 Millstone entered TS action statement when they determined that the practice of opening the switchgear room doors as compensatory measure when ventilation was OOS could allow steam from HELB enter the SWGR.

DCPP Discovery of New Harsh Environment Conditions In August 2014, Diablo Canyon Power Plant entered Technical Specifications 3.0.3 due to non-conservative assumptions in a legacy calculation resulting in the Design Class 1E emergency power supply switchgear (4kV switchgear) being exposed to a high-temperature, high-humidity environment during a main steam line break (MSLB). Corrective action was implemented by closing the fire dampers isolating 4kV SWGR from turbine deck atmosphere. Issue became past operability assessment (29 years)

Background Unit 1: 5-7-85 Start up date Unit 2: 3-13-86 Start up date Legacy calculation dated 1983 (before plant startup) assumed dead volume of air in the 4kV SWGR preventing the entry of steam following HELB. It also made wrong assumptions about fusible links closing the fire dampers, isolating SWGR from HELB environment. Reexamination of calculation of record proved the assumption to be wrong. Following a HELB in turbine building steam can enter the 4kV SWGR when the thermostat controlled HVAC fans are not running causing humidity reach 100%RH. 4kV SWGR components were not qualified for a 100%RH environment.

False Assumptions Room HVAC supply fans provide a positive pressure of 0.018 psi. Model shows steam pressure to be approximately 10x greater than supply fan

Background Turbine building ceiling curved First stage high pressure turbine

Background 4kV Exhaust duct on Turbine Deck

Background 4kV switchgear panel top vent 4kV switchgear panel bottom vent

Is it possible to retract entry into 3.0.0? DCPP EQ Group recommended testing all the 4kV SWGR components under the newly discovered adverse condition. Other groups including AREVA suggested to pursue parallel success paths to prove past operability.

Is it possible to retract entry into 3.0.0? AREVA was contracted to lead the project. Nutherm was subcontracted to perform qualification tests. Initial proposal was received by AREVA on 8/12 The Test Spec was drafted by DCPP on 9/2/14 Testing was completed on 9/12/14 Final report was issued on 9/19 (5 weeks)

Paths to Prove Past Operability ALPHA Path: Elimination of 0.9 sq-ft longitudinal split break Double Ended guillotine break results in a rapid isolation of the steam line and does not create adverse environment in the 4kV SWGR. a 0.9 sq-ft longitudinal split break which is not sufficient in size to isolate the steam line but does expose the vented cabinets in the switchgear room to a 100% humidity environment. STATUS: This success path failed

Paths to Prove Past Operability BRAVO Path: Remove conservatism from GOTHIC model using NRC Operability determination guidelines such as IM-9900. goal was to prove the environment in the 4kV SWGR would remain mild following a HELB on the turbine deck. STATUS: This success path failed

Paths to Prove Past Operability CHARLIE Path: Using Computational Fluid Dynamics (CFD) Analysis for the 4kV SWGR. Use CFD models of the switchgear rooms to simulate the temperature, flow fields and humidity distribution inside the switchgear rooms. These simplified models included the air flow within the switchgear room from the floor to the exhaust duct/turbine building interface. Goal of the model was to demonstrate that the hot humid air entering the room would flow out the normal air inlet without approaching the vented cabinet vent locations. Thus concluding that the SWGR components would not have been subjected to an adverse environment. STATUS: This success path failed

Paths to Prove Past Operability DELTA Path: Computational Fluid Dynamics Analysis of Vented Cabinets. The simplified CFD models created in the CHARLIE path were used to extend to model the air flow and humidity distribution within the vented cabinets. Goal of this success path was to demonstrate that the even with 100% humidity in the 4kV SWGR, the components within the cabinets will not be exposed to condensing environment. STATUS: This success path failed

Paths to Prove Past Operability ECHO Path: Vented Cabinet Components Already Qualified for 100% humidity conditions. Compare DCPP s component list and HELB qualification requirements to existing industry qualification reports to eliminate or reduce the need to test components in humid environment. STATUS: Only one component was eliminated

Paths to Prove Past Operability FOXTROT Path Conduct Qualification Testing on the 4kV SWGR components. STATUS: 35 components representing 756 components used in the 4kV SWGR cabinets were successfully tested. Leakage current on a terminal block with broken barrier wall in a 100%RH condensing environment was measured to be minimal with no adverse impact. Potential for arc flash was eliminated by test on high voltage components.

TEST CABINET TEST CHAMBER

Questions?