Trans-Texas Corridor Chip Seals for Higher Volume Roads

Similar documents
foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

Effect of Aggregate Embedment On Chip Seal Retention Performance

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

Research Road Map. 4. Quiet Pavements

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

University Park Subdivision Street Assessment Report

VDOT Tunnel Facilities Action Plan

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Historic Bridge Adoption Information Packet

Southern Gateway Project and Public Green

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

ITS Smart Work Zones. THE Conference Feb. 24, District 8 Engineer of Construction

TxDOT Experience with Long-Term Private Maintenance Agreements

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

HEATEC PRODUCTS AND SERVICES THAT EXCEED YOUR EXPECTATIONS

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

2013 Paving Program. Erik T. Deyoe, P.E. Commissioner of Public Works & Interim Superintendent of Highways. 26 June 2013

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Local Municipal Forecast. OPAC Partners in Quality Road Tour Ottawa April 19, 2018

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

Local Municipal Forecast. OPAC Partners in Quality Road Tour Sudbury April 17, 2018

FDOT/FTBA Construction Conference Work Plan

FDOT D4 Complete Streets

Aggregates Table 1 No. Title Options

Presented by. PURE ONE Environmental, Inc.

Farmersville Parkway Phase III

Highway 15 Project - Hutchinson

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

PARK MAINTENANCE STANDARDS & OPERATIONS. By Jeff Mann, Parks Manager, September 25, J.1.b

Constructing PCCP Under High Traffic Volume

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON, DISTRICT DEPUTY DIRECTOR

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Maintenance and Restoration of Porous Pavement Surfaces. Elgin Sweeper Company Mark D. Kinter, Technical Consultant

Full Product Line. Products for concrete, asphalt &, energy. CEI Enterprises

Victoria Bridge Municipal Class EA Civic Works Committee

SMSHE Southeastern Michigan Society for Healthcare Engineering

Cottage Grove Road Reconstruction. City of Madison Engineering

BRIDGE REHABILITATION ANALYSIS AND FEASIBILITY REPORT

Technical Bullet Series on Clay Brick Pavers

Location. Served. Category. Units Start Year. Previous Appropriations

5 May 9, 2012 Public Hearing APPLICANT: MICHAEL H. NORMENT

IMPLEMENTATION EFFORTS PERTAINING TO A STATEWIDE TRAFFIC MONITORING EQUIPMENT EVALUATION AND DEMONSTRATION FACILITY

Library enews KENTUCKY TRANSPORTATION CENTER. Kentucky Transportation Center, Technology Transfer Program - Library E-News, Summer 2009

Green Streets and Porous Pavement: Lessons for Sustainability, Success and Savings

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

Moving The Metro. A special construction update for the metro Omaha area.

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

PRESS RELEASE. Number 28

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

CENTERTON ROAD BRIDGE REPLACEMENT

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

SAFETY ZONE SHEET & TILE MAINTENANCE

Permeable Paver Streets Are Not Parking Lots Successes and Challenges With Permeable Paver Streets in the Midwest

2993-ARM: North-South Road Corridor Investment Program - Tranche November 2015, 15:00 (Yerevan time)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

UNIVERSITY OF NORTHERN IOWA

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

COUNTY OF SAN DIEGO BOARD OF SUPERVISORS 1600 PACIFIC HIGHWAY, ROOM 335, SAN DIEGO, CALIFORNIA AGENDA ITEM

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

2017 Canadian Consulting Engineering Awards

FY 2005 TRANSPORTATION CAPITAL PROGRAM

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

TRINITY COUNTY Board Item Request Form

North Commuter Parkway and Traffic Bridge Project Market Sounding

VILLAGE OF MOUNT PROSPECT 2016 STREET RESURFACING PROGRAM Frequently Asked Questions (FAQ s)

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Memorandum CITY OF DALLAS

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

D3 January 14, 2015 Public Hearing

I-710 Corridor Advisory Committee. Gary Hamrick, Iteris

Engineering Department

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

Transport Planning And Design Manual Volume 2 Chapter 3

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

4 September 14, 2011 Public Hearing APPLICANT:

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

1.0 Circulation Element

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

The Project. In 2013, construction was completed between 100 Street and 102 Street.

AN ACCEPTANCE TEST FOR CHIP SEAL PROJECTS BASED ON IMAGE ANALYSIS

Berkshire Regional Planning Commission Clearinghouse Review Report

Title 11 Streets and Sidewalks

LOCATION AND DESIGN DIVISION

I-84 HARTFORD PROJECT HARTFORD, CONNECTICUT DRAFT PURPOSE AND NEED STATEMENT

Blake C. Kronkosky, PE, Ph.D.

FHWA INVEST. And the Harbor Bridge Project

City of Bonita Springs Driveway Permit Information Packet

Vinyl Composition Tile with Diamond 10 Technology Coating Commercial Maintenance Tip Sheet

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Chris Gent Landscape Studio

Transcription:

Chip Seals for Higher Volume Roads Zane L. Webb, P. E. Director, Maintenance Division Texas Department of Transportation

TxDOT Statistics Maintains 79,500 centerline miles 190,000 lane miles 460 million daily vehicle miles. Maintain and Inspect 49,000 bridges

TxDOT Statistics Fiscal Year 2007 Budgets: Routine Maintenance = $492 mil Contracted Maintenance = $434 mil Preventive Maintenance = $265 mil Rehabilitation = $898 mil

TxDOT Statistics 15,000 employees 322 thousand road condition hot line calls 448 thousand overweight truck permits 19.1 million vehicles $22 million in transportation research

Seal Coat Statistics In FY 2006 TxDOT Seal Coated 16,517 LM Assuming each lane averages 12 wide, that is 116,279,680 SY At.45 gallons per SY, that is 52,325,856 gallons of asphalt or emulsion At 1 CY per 100 SY, that is 1,162,797 CY of aggregate

Texas Seal Coat Binders AC binders include AC-5, 10, 15 with additives such as polymers, tire rubber, CRS-2, 2H and 2P, HFRS-2P. Emulsions include RS-1P, CRS-2P, RC- 250, 800 and 3000, MC-250, 800, 3000, 2400L.

Seal Coat A seal coat (chip seal) is generally a single, double or triple application of asphaltic material covered with aggregate

Seal Coat (chip seal) Consists spraying asphalt material (asphalt cement or emulsified asphalt) followed immediately by a thin aggregate cover.

Dollars Spent Trans-Texas Corridor FY 2000 - FY 2006 Seal Coat Dollars Spent 240,000,000 220,000,000 200,000,000 180,000,000 160,000,000 140,000,000 120,000,000 100,000,000 2000 2001 2002 2003 2004 2005 2006 Fiscal Year

Texas Seal Coat

Texas Seal Coat

Texas Seal Coat

Seal Coats TxDOT applies seal coat to existing pavement to extend the life of the pavement and to protect the base material from water intrusion.

Seal Coats service life varies depending on traffic volumes, weather, etc.

Seal Coats do not: Strengthen the existing pavement Increase the load-bearing capacity Smooth out rough pavement Bridge major cracks (wider than 1/8 inch) Eliminate the need for maintenance or reconstruction

In some areas seal coats have been limited to low traffic volume roads. Why? The standard answers to that question are: 1) vehicle damage, especially broken windshields caused by flying chips; 2) premature failure; and 3) road noise.

Texas Seal Coat

Texas Seal Coat

Embedment Generally, on low volume roads, the aggregate particles should be approximately 40 to 50% embedded.

Embedment Generally, on high volume roads, the aggregate particles should be approximately 30 to 40% embedded.

Evaluating Traffic Conditions Traffic volume or ADT determines amount of binder needed for aggregate embedment Heavy vehicles reduce binder rate ADT is calculated using an adjustment factor for heavy vehicles.

Project Selection Pick the right road at the right time Structurally sound In no need of major repair Minor surface deficiencies such as cracking, raveling, bleeding and lack of skid resistance

Potential Problems on High ADT Roadways: Short term aggregate loss Vehicular damage from loose aggregate Potential flushing Tire noise Prolonged traffic control

Causes of short term aggregate loss Aggregate not applied quickly enough Inadequate binder quantity Inadequate aggregate embedment Dirty aggregate

Texas Seal Coat

Texas Seal Coat

Texas Seal Coat

New Zealand

New Zealand

New Zealand

International Seals

Montana

Trans-Texas Montana Corridor

Montana

Montana

Best Practices for High Volume Roads: Decrease aggregate size Reduce excess aggregate Use light-weight aggregate Use pre-coated aggregate for improved adhesion Use polymer modifiers for improved adhesion

Questions? Trans-Texas Corridor Questions?