POLICY. Carbon Monoxide (CO) is an odorless, colorless gas that can cause sudden illness and death. 1

Similar documents
POLICY. Code Announcement means an announcement (e.g. page or strobe light, verbal notification) to commence a Fire Drill without an audible alarm.

POLICY. Number: Title: Laser Safety. Authorization

OHIO UNIVERSITY RADIATION SAFETY REVIEW

Fire Safety Policy and Procedures

Procedure DESCRIPTION/OVERVIEW

Request for Lockout. Initiating. Affected Systems and Areas Information

Patrick County Horizons Jeb Stuart Hwy. Stuart, Va

FIRE SAFETY POLICY. 2.0 Under national, provincial and municipal fire regulations, the Board will ensure compliance with:

Fire Drill Procedure

Emergency Action Fire Prevention Plan

Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London

Document Title: Management of Research and Development Freezers

MANUAL OF PROCEDURE. Keys and Access Control (Standard and Electronic)

FIRE PREVENTION PLAN EMERGENCY ACTION

Guide for Implementing the Carbon Monoxide Monitoring and Response Framework in Long-term Care Facilities

Property Health and Safety Compliance at Housing and Education Centres

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

FIRE SAFETY AND PREVENTION POLICY

Travis County Emergency Services District #1 Standard Operating Guidelines

Emergency Action Plan

Electrical Safety Policy and Management System

TABLE OF CONTENTS 8. ANNEX B

ADMINISTRATOR S WEEKLY REPORT # September 12 th through 18 th, 2011

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

B. The Facility Emergency Planners and Alternate Planners will successfully complete the in-house DJJ Fire Prevention course.

Management Practices: Fire Protection Impairments November 2015

Fire Inspection & Prevention Initiative. Fire Safety Plan Documentation Guide. Part 3 (of 3) Format Guide Edition. (December 5, 2014)

Health & Safety Policy

The following departments are responsible for preservation oflife and fire safety at the University of Toledo.

Plant Operations Cleaning and Sanitation Audits.

Town of Cochrane Policy

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 517. July 2015

1.0 Purpose. 2.0 Scope. 3.0 Reference. 4.0 Definitions. University Policy. Keys & Building Access Cards Policy

IIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations

Model Carbon Monoxide (CO) Alarm Response Policy

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

HOLLY HILL FIRE DEPARTMENT

Modbus Point Map. for the. Data Aire DAP-II

Sunday January 30, 2011

YTD. The monthly Safety Committee meeting was held on Monday, July 2 nd at GSA Station 35.

Urban Design Review Panel Terms of Reference

a) Establishment of emergency procedures to be followed at the time of an emergency;

Fire Risk Assessment Borough High Street

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

NEWBATTLE ABBEY COLLEGE. Fire Safety and Emergency Evacuation Policy and Procedure

POSITION VACANCY NOTICE CITY OF KETCHIKAN

MANNED GUARDING. CALL US today for a FREE Quotation on +971 (4) Dubai, UAE

Property Name & Address [ Property Name ] - [ Property Address ]

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Introductions HERS Industry HERS Ratings ACCA Standard 12 Resources

Dear Volunteer Master Gardener Applicant for the Sutter-Yuba Counties, U.C. Master Gardener Program

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

TG FIRE DRILLS. Office of the Fire Marshal and Emergency Management

May 27, Mayor Thomas M. Roach Members of the Common Council City of White Plains 255 Main Street White Plains, New York 10601

APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES

CODE RED (FIRE) Site:

Design Standard DS70-02

Carbon Monoxide Poisoning

OPERATIONS & MAINTENANCE PLAN. 571 Vance Ave Memphis, TN

NOT PROTECTIVELY MARKED. Fire Legislation

Environmental Health & Safety (EHS) and Public Safety s General Requirements for Contractors

Radon Testing and Reporting Plan. Tillamook School District #9 Tillamook, Oregon

Job Description. Role/Job Title Receptionist/Concierge of Plassey House Grade. Reporting To Line Manager on behalf of Campus Life Services.

Radon Measurement Survey Report. McKnight School Service Center 417 Fifth Street Aurora, Illinois Prepared For:

Overview of HEOA Fire Safety Requirements

Carbon Monoxide Alarm

Vibra LITE 8 CONGRATULATIONS!

[EMERGENCY PREPAREDNESS PLAN] Evergreen Nursing Services 3057 West 33 rd Avenue Vancouver, BC V6N 2G3

REQUEST FOR PROPOSALS CLEANING SERVICES

Radon Measurement Survey Report. Krug Elementary School 240 Melrose Avenue Aurora, Illinois Prepared For:

IC Chapter Severe Weather Warning Sirens

Banff Mineral Springs Hospital EMERGENCY RESPONSE CODE RED Fire

QUALITY SYSTEMS MANUAL. Plant Hygiene

LA GRANGE FIRE DEPARTMENT JANUARY 2018

AIC College of Design 2015 Annual Safety Report

Southern Baptist Theological Seminary. The Michael Minger Act Report for Activity Reported for Calendar Year 2004

Hall Council Elections

Health & Safety Policy HSP 03 Fire Safety Version Status Date Title of Reviewer Purpose/Outcome

CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY

Life Safety and Professional Standards Bureau

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

St Edward s Oxford FIRE SAFETY POLICY

Health and Safety Policy

Radon Measurement Survey Report. Rollins Elementary School 950 Kane Street Aurora, Illinois Prepared For:

Fire safety procedure

Radon Measurement Survey Report. Oak Park Elementary School 1200 Front Street Aurora, Illinois Prepared For:

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

ADMINISTRATOR S WEEKLY REPORT # August 6 th through August 12 th, 2012

FIRE PREVENTION, PROCEDURES AND RISK ASSESSMENT POLICY

Peninsula Dental Social Enterprise (PDSE)

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Fire Safety Management Audit Specification August 2017

Index. Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8. Fire Risk Assessments 9

May 27, Mayor Joanne D. Yepsen Saratoga Springs Commissioners City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866

Carbon Monoxide Alarm Response Guide. High Country Training Center Training On Demand

Operating your heating system with the Prefect PRE5701 Programable Thermostat

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

Transcription:

POLICY Number: 7311-20-020 Title: Carbon Monoxide Monitoring and Reporting Overnight Stay Facilities Authorization [ ] President and CEO [X] Vice President, Finance and Corporate Services Source: Director, Enterprise Risk Management Cross Index: Date Approved: June 28, 2013 Date Revised: Date Effective: July 17, 2013 Date Reaffirmed: Scope: SHR and Affiliates Any PRINTED version of this document is only accurate up to the date of printing. Saskatoon Health Region (SHR) cannot guarantee the currency or accuracy of any printed policy. Always refer to the Policies and Procedures website for the most current versions of documents in effect. SHR accepts no responsibility for use of this material by any person or organization not associated with SHR. No part of this document may be reproduced in any form for publication without permission of SHR. DEFINITIONS Carbon Monoxide (CO) is an odorless, colorless gas that can cause sudden illness and death. 1 means is the number displayed on the unit and visible at all times (this reading should be zero (0)). Site Leader/Manager means SHR or affiliate employee responsible for the site (for acute care urban sites these individuals are now known as Property Managers (Facilities Management personnel). 1. PURPOSE The purpose of this policy is to establish Saskatoon Health Region s (SHR s) requirements for monitoring, recording and reporting carbon monoxide (CO) level readings at all SHR owned, operated and affiliated sites that provide overnight stays. 2. PRINCIPLES 2.1 Carbon monoxide levels are monitored, recorded and reported at sites that provide overnight stays to maintain a safe environment for our patients, clients, residents and staff. 2.2 In the event CO levels exceed zero, an investigative process and emergency preparedness procedures exists to support sites to deal with this situation and ensure everyone s safety. 1 Centre for Disease Control Fact Sheet, April 2009 http://www.cdc.gov/co/faqs.htm Page 1 of 9

3. POLICY 3.1 CO monitoring and recording will be conducted daily in each site owned, operated and affiliated with SHR that provides overnight stays. 3.1.1 CO monitoring and recording will be conducted once every twenty four (24) hours. 3.1.2 All CO monitoring and recording will be documented on a standard weekly log (see Appendix A). 3.1.3 Standard weekly logs will be retained on file at each site for twelve (12) months. 3.2 All sites providing overnight stays must submit monthly CO monitoring compliance reports (see Appendix B). 3.2.1 Reports must be submitted electronically by the last calendar of day of each month. 3.2.2 CO monitoring compliance reports are submitted to the SHR Emergency Planner. 3.3 CO monitoring, recording and reporting will be audited (see procedure). 4. ROLES AND RESPONSIBILITIES 4.1 All Staff 4.1.1 All Staff must be informed of the requirements related to CO monitoring and reporting for their site and have a comprehensive understanding of their response duties in a Code Brown (procedures for Immediate Response to Carbon Monoxide Exposure). 4.2 Maintenance Staff (or designate) 4.2.1. Conduct and execute all tasks associated with CO monitoring and recording. 4.3 Site Leaders/Managers 4.3.1 Assign, coordinate and/or conduct all tasks associated with CO monitoring, recording, and response. 4.3.2 Conduct source investigations if at any time an excessive instant reading has been recorded. 4.3.2.1 This includes following Code Brown procedures for Immediate Response to Carbon Monoxide Exposure and the Carbon Monoxide Detector Instructions. 4.3.3 Conduct random audits of standard weekly logs and report noncompliance. 4.3.4 Submit monthly CO monitoring compliance reports (see Appendix B, accessible from: Infonet homepage, Fire Drill and CO Detector s). 4.4 Directors 4.4.1 Ensure the facility(s) they are responsible for are complying with these requirements. Page 2 of 9

5. POLICY MANAGEMENT The management of this policy is a collaborative responsibility. Implementation is the responsibility of Site Leaders/Managers; monitoring and amendment is the responsibility of the Director, Enterprise Risk Management and policy education is the responsibility of the Director, Facilities Management. 6. NON-COMPLIANCE/BREACH Non-compliance is promptly communicated to and reviewed by the Director, Enterprise Risk Management as well as the Director and Vice President for the site. Non-compliance may result in disciplinary action, up to and including termination of employment and/or privileges with SHR. Page 3 of 9

PROCEDURE Number: 7311-20-020 Title: Carbon Monoxide Monitoring, Recording and Reporting Procedure Authorization [ ] President and CEO [X] Vice President, Finance and Corporate Services Source: Director Enterprise Risk Management Cross Index: Date Approved: June 28, 2013 Date Revised: Date Effective: July 17, 2013 Date Reaffirmed: Scope: SHR and Affiliates 1. PURPOSE The purpose of this procedure is to establish the process for carbon monoxide monitoring, recording, reporting and response at all SHR owned, operated and affiliated sites that provide overnight stays. 2. PROCEDURE General 2.1 Maintenance staff (or designate) conduct daily CO monitoring and recording (see Appendix C) according to Carbon Monoxide Detector Instructions (see Appendix D). 2.2 Following activation of Code Brown and implementing procedures for Immediate Response to Carbon Monoxide Exposure the Site Leader/Manager notify the SHR Emergency Planner who will arrange for a debriefing meeting. Audit Procedure 2.3 Site Leaders/Managers conduct random audits of standard weekly logs. 2.3.1 Site Leaders/Managers randomly select standard weekly logs for auditing purposes (frequency and timeframe of audit are at the discretion of the Site Leader/Manager). If records are incomplete, not available as requested and/or noncompliance identified, advise the Director, Enterprise Risk Management as well as the Director and Vice President responsible for the site. 2.4 The Emergency Planner monitors submission of the CO monitoring compliance reports. 2.4.1 If non-compliance is found, the SHR Emergency Planner contacts the Site Leader/Manager, Director, Enterprise Risk Management and Director and Vice President responsible for the site. 3. PROCEDURE MANAGEMENT The management of this procedure is a collaborative responsibility. Implementation is the responsibility of Site Leaders/Managers. Page 4 of 9

Monitoring of this procedure and amendment is the responsibility of the Director, Enterprise Risk Management and procedure education is the responsibility of the Director, Facilities Management. 4. NON-COMPLIANCE/BREACH Non-compliance is promptly communicated to and reviewed by the Director, Enterprise Risk Management as well as the Director and Vice President for the site. Non-compliance may result in disciplinary action, up to and including termination of employment and/or privileges with SHR. Page 5 of 9

Sunday Saturday Friday Thursday Wednesday Tuesday Monday Appendix B Appendix A Weekly Carbon Monoxide Log Sheets Weekly Test Date: Printed Name: Site Carbon Monoxide Detector Location CO #1 CO #2 CO #3 CO #4 CO #5 CO #6 CO #7 CO #8 CO #9 CO #10 CO #11 Note: These weekly logs MUST be kept as maintenance records and retained for 12 months - Must adhere to Code Brown Protocol Page 6 of 9

Appendix B Page 7 of 9

Appendix C Name of Activity: Carbon Monoxide Detectors Instructions For SHR Owned, Operated and Affiliate Sites Role performing Activity: Employee/Manager/Supervisor or designate of affected department/facility STANDARD WORK Location: SCH-Main Level Administration Document Owner: Lori Frank Date Prepared: Last Revision: January 8, 2013 November 16, 2017 Department: Risk Management Date Approved: Standard Work Summary: This process is to support staff when reading Carbon Monoxide Detectors within SHR Owned, operated and affiliate sites providing overnight stays. These steps are to support actions required if an excessive CO reading is discovered and/or reported. This occurrence may or may not result in a disruption to the day to day operation and/or activation an EPP Code Brown (see Appendix D-Carbon Monoxide Detectors Instructions for SHR Owned, Operated and Affiliate Sites). Task Sequence (Order in which tasks occur) Task Definition (Brief summary of task ) All Detectors must be read and levels recorded daily; 1. Record the digital display daily on the weekly log sheet in the instant reading column. : This reading is the number displayed on the unit and visible at all times. This reading should be zero (0). 2. If the digital display reading is 30 PPM or higher follow the instructions according to the; Carbon Monoxide Detector Instructions For SHR Owned, Operated and Affiliated Sites. 3. Record the Memory on the weekly log sheet in the peak level reading column. : This reading is displayed when the peak level reading button is pressed & held. This reading indicates the highest CO level in memory since the unit was last reset. Task Cycle (Define unit of measure - seconds, minutes etc.) 1-2 minutes 10 minutes 2 minutes 4. If the is 30 PPM or higher follow the 5 minutes instructions according to the; Carbon Monoxide Detector Instructions For SHR Owned, Operated and Affiliated Sites. 5. Determine if Code Brown needs to be activated? 5 minutes 6. Activate Code Brown immediately according to your site 15 minutes Code Brown Plan section titled: Immediate Response For Exposure To Carbon Monoxide 7. Follow direction from Facilities and/or Risk Management Next Business Day Page 8 of 9

Appendix D CARBON MONOXIDE DETECTORS READING INSTRUCTIONS FOR SHR OWNED, OPERATED and AFFILIATE SITES ALL DETECTORS ARE TO BE CHECKED DAILY DAILY READING INSTRUCTIONS (This is the digital number displayed during normal operations) Record the digital number displayed on the weekly log sheet in the instant reading column If the digital number displayed is 30 PPM Return to the detector in 1 hour and check the reading again If it reads 30 PPM or higher, Activate Code Brown procedures for Immediate Response to Carbon Monoxide Exposure immediately Call: Monday to Friday, 0700-1630: 306-655-2535 After hours and weekends: 306-221-0303 DAILY PEAK LEVEL MEMORY READING INSTRUCTIONS (This reading indicates the highest CO level in memory since the detector was last reset) How to obtain a peak level memory reading Press and hold the Memory button. The digital number displayed will be the highest CO reading taken since the last reset Record this reading on the weekly log sheet in the peak level reading column If the reading is 0, no action is required If the reading is 30 PPM or higher, reset the detector as per below To reset the Memory : Press the Memory button While still pressing the button, press the Test/Reset button for two seconds and release. The number on the display will turn to 0 The memory will be cleared and the alarm will begin monitoring for CO If the Memory is 30 PPM or higher Reset the detector Return to the detector and check the Memory again in 1 hour If the detector reading is still 30 PPM or higher, activate Code Brown and follow the Immediate Exposure to Carbon Monoxide section immediately Call: Monday to Friday, 0700-1630: 306-655-2535 After hours and weekends: 306-221-0303 Note: The Kidde Night Hawke 900-0230 detectors will not display below 10 ppm. Always assume the reading is correct. Note: Detectors have a +/ 30% reading accuracy. Note: The facility s maintenance staff is to check and record the readings. If maintenance staff is not available, a designate would check. Page 9 of 9