INSTALLATION MANUAL. TBA Evaporative Cooler. (English) (TBA) ILL1456-A

Similar documents
INSTALLATION MANUAL TBA Evaporative Cooler

INSTALLATION MANUAL. CPL CPS LCB BM Evaporative Cooler. (English) (CPL CPS LCB BM) (Original English Instructions) ILL1456-A

OWNER S MANUAL. Evaporative Cooler. Original English Instructions. (English) (LCB, CPL, CPS, BM)

OWNER S MANUAL. CPL Evaporative Cooler. (English) (CPL) ILL1456-A

OWNER S. m a n u a l C P L S E R I E S

OWNERS INSTRUCTION MANUAL FOR FIXED INSTALLATION COMMERCIAL AND RESIDENTIAL EVAPORATIVE AIR CONDITIONERS

OWNER S MANUAL. Evaporative Cooler. (English) (EXH, EZH) ILL239-D ILL1140-A FAN SPEED REMOTE CONTROL ECONOMY

OWNER S MANUAL. EXQ / EZQ / EXS Evaporative Coolers. Original English Instructions. (English)

OWNER S MANUAL. Evaporative Cooler. (English) (EA, EXH, EZH) ILL239-D ILL1140-A FAN SPEED REMOTE CONTROL ECONOMY

REMOTE CONTROL FAN SPEED ECONOMY BATTERY LOW. owner s manual

OWNER S & INSTALLATION MANUAL RPCQ / RPC Evaporative Cooler

FOR FIXED INSTALLATION COMMERCIAL AND RESIDENTIAL EVAPORATIVE AIR CONDITIONERS

WV Series Evaporative Cooler. Installation Manual

Safety / Kit Components 1

INSTALLATION MANUAL EA Evaporative Cooler

Breezair RPA Series Installation Manual

Wall Controller & Thermostat

Spectrolink Comfort Controller. Home Owner's Manual Heating. baby, outside. Come home to ECOST R

52 CEILING FAN READ AND SAVE THESE INSTRUCTIONS FAN RATING AC 120V.

OWNER S MANUAL. Portable Refrigerated Air Conditioner. CP12CW2 (English) (CP12CW2)

Spectrolink Comfort Control. Home Owner's Manual Heating

C-IV 60 CEILING FAN READ AND SAVE THESE INSTRUCTIONS. FAN RATING AC 120V. 60Hz

COOLING Installer s Manual

Hanson LED C e i l i n g F a n

3MAVR60XX Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3MAVR60XX

Auto Drain Installation Instructions.

3DIR52XXD Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3DIR52XXD

HOME OWNER S MANUAL. Spectrolink Comfort Control - Heating

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

DOUBLE DISHDRAWER TM DISHWASHER

Operation and Maintenance Manual BLIZZARD50 CS6-50-VD 120V/60HZ

3MAVR60XXD Series Fan. Owner s Guide and Installation Manual. CUL Model NO. : 3MAVR60XXD

5COM52XXD Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 5COM52XXD

OWNER S MANUAL. EA Evaporative Coolers. Original English Instructions. (English)

Operation and Maintenance Manual 120V/60HZ

Downdraft Ventilation

Select. Sutter PlaceTM. Instruction Manual. A Kichler Select ceiling fan

TECHNICAL INFORMATION Touchtronic Clothes Dryers

INSTALLATION MANUAL. MaglQtouch Air Sensor. Original English Instructions

DISHWASHER. Models DW2432 and DW2432SS. Installation Manual. Write Serial Number (on inner door of unit) here:

1. SAFETY RULES WARNING WARNING. 8. Avoid placing objects in the path of the blades.

Auto Drain Installation Instructions.

PRODUCT GUIDE. Seeley International Americas 1002 S 56 Ave Suite 101 Phoenix AZ Phone Fax Web Seeleyinternational.

5YK60XXX Series Fan. Owner s Guide and Installation Manual. CUL Model NO. : 5YK60XXX

SINGLE DISHDRAWER TM DISHWASHER

52 StarkkTM. Instruction Manual. A Kichler Select ceiling fan

Hatteras BayTM. Patio. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

READ AND SAVE THESE INSTRUCTIONS

5DI52XXD/5DI52XXD-L Series Fan UL Model No. : 5DI52. Owner s Guide and Installation Manual

52 BERKSHIRE CEILING FAN

60" Tulle PatioTM. Instruction Manual. A Kichler Select ceiling fan

52 DorsetTM. Instruction Manual. Basic Function Wall Control System Included. A Kichler Decor ceiling fan

42 Kevlar. Instruction Manual. Kichler Lighting 7711 East Pleasant Valley Road P.O. Box Cleveland, Ohio

Installation Instructions

CEILING FAN OWNER'S MANUAL

Owner s Guide and Installation Manual

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

Sunburst. Instruction Manual. Includes our new Wall Control System. A Kichler Décor ceiling fan

Table of Contents What to Expect with Your Installation. Ceiling Plate. Tools Needed.

Operation and Maintenance Manual 120V/60HZ

Over-the-Range Microwave Oven Installation Instructions MVH130* MVH230* MVH330*

KimberleyTM A Kichler Décor ceiling fan Designed to coordinate with a popular Kichler Lighting collection.

CEILING FAN OWNER'S MANUAL

Standard Downrod for ceilings 8-10 feet high. Longer Downrod for ceilings 10 feet or higher

3MNLR72XXD Series Fan. Owner s Guide and Installation Manual. UL Model NO. : 3MNLR72

5CO52XX Series Fan UL Model No. : 5CO52. Owner s Guide and Installation Manual. Attach sales receipt to this card and retain as your proof of purchase

Installation and Operation Manual For Hunter Ceiling Fans

CEILING FAN OWNER'S MANUAL

e Bath Fan with Light User s Guide

ChicagoTM. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Ceiling Fan Installation Instructions

INSTALLATION INSTRUCTIONS

1. SAFETY RULES. 1. To reduce the risk of electric shock, insure electricity has been turned off at the circuit breaker or fuse box before beginning.

52 CEILING FAN. Owner s Manual Models #50336, 50337

Operation and Maintenance Manual GLACIER TALL BASE CS5-16-VD-TB CS5-18-VD-TB2 120V/60HZ

Owner s Manual BONAIRE. Model 3500M, 4200M

INSTALLATION INSTRUCTIONS

WAILEA OWNER S MANUAL

INSTALLATION INSTRUCTIONS

CEILING FAN OWNER'S MANUAL

CEILING FAN OWNER'S MANUAL

Table of Contents What to Expect with Your Installation. Top Housing. Ceiling Plate. Tools Needed.

INSTALLER S MANUAL. Evaporative Air Coolers. Safety Information Installation Commissioning. Models

INSTRUCTION MANUAL. FOR MODELS MobileMAX II & MobileMAX III High Performance Mobile Evaporative Coolers

OWNER S MANUAL. EXQ / EZQ / EXS Evaporative Coolers. Original English Instructions. (English) ILL1672-A

Zip Chilltap Extra. Affix Model Number Label Here Installation and Operating Instructions. Filtered Ambient and Chilled drinking water

Owner s Manual BONAIRE. Durango Window Cooler. Model 4500E, 5900E

60" Hatteras BayTM. Patio. Instruction Manual. Includes our new Wall Control System. A Kichler Décor ceiling fan

Commercial Evaporative Air Conditioning Bonaire 700C 1500C. IMPORTANT NOTICE Please leave this manual with the owner of this air conditioner.

INSTALLATION INSTRUCTIONS

Installation Instructions

54" Skye. Instruction Manual Customer Service :30 AM to 5:00 PM EST, Monday - Friday A Kichler Decor ceiling fan

RPA. Installation. Operation. Service INDUSTRIAL EVAPORATIVE AIR CONDITIONERS. January 09

INSTALLATION INSTRUCTIONS

Model K 280 M Part No

Commercial Evaporative Air Conditioning Bonaire B18 B36. IMPORTANT NOTICE Please leave this manual with the owner of this air conditioner.

52 Lacey LED. Instruction Manual. 6 Speed DC Wall Control System

60" Lyndon Patio. Instruction Manual Customer Service :30 AM to 5:00 PM EST, Monday - Friday A Kichler Decor ceiling fan

EBAC MODEL WM150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Transcription:

INSTALLATION MANUAL TBA Evaporative Cooler ILL1456-A (English) (TBA)

TIMER AUTO COOL ILL1128-A ILL239-D TIMER AUTO COOL ILL1128-A ILL972-A Step 1 Step 2 Step 3 Step 4 SAFETY FIRST! 1. Read & understand the safety section. Page 4 1. Unwrap the Cooler. Page 7 1. Remove pads. ILL187-F Page 7 1. Remove the venturi. 2. Remove the transition. Page 8 Step 5 Step 6 Step 7 Step 8 ILL969-A 1. Check cooler location. 2. Be aware of local regulations. 3. Discuss with customer. Page 9 1. Position, level and secure the dropper. 2. Flash the dropper. Page 9 1. Fit the transition to the dropper and secure. 2. Break weatherdamper transport clips and fit weatherdamper. Page 10 1. Transport the cooler to the roof. 2. Always handle the cooler using 2 people. Page 10 Step 9 Step 10 Step 12 Step 14 1. Run the power and wall control cables down the dropper. Page 11 1. Read and adhere to the local electrical and plumbing rules and regulations. 1. Fit the float valve. 2. Fit the drain valve (or Page optional bleed tray). 12-16 3. Connect water supply to the cooler. 1. Connect the components to the electronics module. Page 17-18 Step 13 Step 11 Step 15 Step 16 Auto LESS WATER Cool ILL1083-A ILL1084-A MORE WATER ILL998-B 1. Install the venturi. Page 19 1. Locate and install the wall control. Pages 20 1. If there is a drain valve fitted to the cooler, set the drain rate at the wall control if necessary. Page 24 1. Set the water level. Page 25 Step 17 Step 18 Step 19 Step 20 Auto Cool 1. Test run the cooler. Page 26 1. Clean up the site. 1. Show the customer how to operate their new cooler. 2. Give the customer their owners manual. Page 30 1. Complete the checklist. Page 30 1 1 TBA Evaporative Cooler

MASTER MASTER CPMD CPMD 20m HUB 1 40m 20m 20m CPMD CPMD 20m SLAVE SLAVE Standard Breezair Wall Control Standard Breezair Wall Control Coolers are supplied with 20m data cable in accessories kit Hubs are supplied with 20m data cable in kit. 20m data cable in re-sealable bag available 40m data cable on reel available Data cables may be shortened or lengthened (to maximums shown) using ONLY correct RJ connectors and crimping tools Cables supplied by Breezair are 26AWG, 7/016, 4 core flat. ALWAYS route cables at least 300mm away from regular power cables and high power machines. Cross over power cables at right angles. Where maximum data cable and sensor cable lengths are exceeded, or cables are not routed in accordance with our recommendations Seeley technical support is not available and the product warranty may be voided. Breezair Control System Cable Lengths Standard Wall Control 0703 SEELEY INTERNATIONAL INSTALLATION MANUAL 2

COOLER COMPONENTS 3 TBA Evaporative Cooler

SAFETY NOTES Please read this manual carefully. Your failure to do so could result in injury to you or damage to the cooler and property. Disconnect electrical power at the fuse or circuit breaker box and turn "OFF" the isolating switch located inside the cooler on the Electronics Module before you begin to install the cooler. Always comply with your local laws and safety regulations. INSTALLATION & OPERATION Installation of the cooler must comply with local electrical, water supply and environmental codes, laws and safety regulations as well as with applicable National Standards. Dress safely. Wear non-slip shoes at all times. Open shoes, sandals and bare feet are NOT safe when working with tools and machines. Do not wear loose clothing and decorations while installing the cooler as they can get caught in the moving parts. Always lift the cooler to its location using safe methods and equipment. Never drain the cooler directly onto the roof. Always use pipes to carry the drain water to a proper point. Failure to do this can stain the roof and make the roof slippery and unsafe. All installation, maintenance and repair work must be done by trained and qualified technicians. The plastic packaging from the cooler can be a safety hazard. Please dispose of it in accordance with local laws and regulations. ALWAYS route cables at least 300mm away from regular power cables and high power machines. Cross over power cables at right angles. Where maximum data cable and sensor cable lengths are exceeded, or cables are not routed in accordance with our recommendations, Seeley technical support is not available and the product warranty may be voided. Keep long hair, loose clothing and fingers away from moving parts. Do not install the cooler during rain, high winds, or severe weather conditions. The appliance is not intended for use by young children or infirm persons without supervision. Young children should be supervised to ensure that they do not play with the appliance. Wear protective clothing when working with power tools. Always ensure that electrical power cables conform to relevant government safety requirements. SEELEY INTERNATIONAL INSTALLATION MANUAL 4

SPECIFICATIONS ELECTRICAL It is a requirement of Seeley International that the electrical power supply to all coolers is not mixed with other machines or electrical circuits. Electrical installation must comply with local laws and regulations. Each cooler requires a minimum10 amp power supply. Disconnection from the mains supply may be achieved by having the plug accessible or by incorporating a switch in the fixed wiring in accordance with the local wiring rules. Specification : 115V, 230V / 50Hz, 60 Hz Single Phase (see nameplate for exact data for this air cooler.) The electronics module is fitted with a 12 amp manual reset circuit breaker. To reset the circuit breaker turn off the isolation switch, remove the Electronics Module and push the manual reset toggle switch located underneath the Electronics Module. The isolation switch on the module cannot be turned on without the securing screw being in place. WATER Specification : Water Connections : 1/2 inch BSP Maximum pressure: 800 KPa (115 PSI) IMPORTANT: If the water pressure exceeds 800KPa, then a pressure reducing valve must be fitted near to the air cooler by the installer. The air cooler will function best when clean water is supplied. Water that contains dissolved salts and other impurities will cause the cooling pads to become blocked more quickly and then they require maintenance. The water management devices fitted will help to control the effects of poor quality water, BUT THEY CANNOT ELIMINATE THE PROBLEM. If at any time the electrical supply cable is damaged, it must be replaced by a special cord or assembly available from the manufacturer or its service agent in order to avoid a hazard. 5 TBA Evaporative Cooler

COMPONENTS OF THE AIR COOLER 1. Transition (used for the transport base, this becomes the air cooler base for connection to the duct) 2. Weatherseal (stops air flowing in and out when the air cooler is not operating) 3. Transition Plug in the factory) (fitted 4. Cooling Pad Frame 5. Flexible Hose 6. Solenoid Valve Cover 7. Solenoid Valve 8. Extension Tube 9. Water Tank (reservoir) 10. Corner Pillar 11. Water Sensor 12. Float Valve 13. Water Pump 14. Drain Valve 15. Motor Cable 16. Electric Power Supply Cable 17. Electronics Module 18. Pump Hose 19. Venturi/Fan Assembly 20. Lid (for mains water connection) (connects the Float Valve to the Solenoid Valve) (detects conductivity of water) (for control of main water supply level in the Water Tank) (for releasing water in the tank automatically or when the user requires) with two plugs 21. Distributor Cap with plug (for directing water from the pump into the water distribution channels in the lid) SEELEY INTERNATIONAL INSTALLATION MANUAL 6

DISMANTLING THE COOLER The air cooler is designed to be partially dismantled in order to reduce the weight for installation. COOLING PAD FRAME REMOVAL To remove the Cooling Pad Frame, first disengage the top clips of the pad frame using a screw driver as shown. Then hold the pad frame with both hands and pull it towards you as shown. See diagram. This disengages the side clips. Then lift the frame up and out as shown. See diagram. Do this with each Cooling Pad Frame. 7 TBA Evaporative Cooler

DISMANTLING THE COOLER REMOVING THE VENTURI/FAN IMPORTANT! Ensure the motor plug has been removed from the control box before removing the venturi (see page 9 for removal of plug). With both arms hold each side of the Venturi/fan assembly. Press the large clips at each side and lift the Venturi/fan assembly upwards and carry it out of the cabinet. Place the Venturi/fan assembly carefully aside until the cooler has been completely installed. You cannot install the various components of the air cooler unless you remove the Venturi/fan assembly first. REMOVING THE TRANSITION Turn the cooler onto its side to remove the Transition. It is held to the cabinet for transport with big clips. The Transition can be pulled off the cabinet with a strong pull by the installer. If it is difficult to remove, squeeze the clips together and then pull. See diagram. The Transition is now ready to be fitted onto the duct. SEELEY INTERNATIONAL INSTALLATION MANUAL 8

INSTALLING THE TRANSITION The air cooler is designed to be fixed to the first section of the duct without any additional frame for support. Therefore make sure the duct is fixed to the building using a strong method. The duct size must be 550 x 550mm. The top edge must be strong without any flange. The top edge of the duct must be level. The Weatherseal requires a 270mm section of straight duct under the air cooler before a bend is installed. Do not penetrate the duct with any fasteners in this section. The best location for the cooler is where the air is fresh and clean. Keep away from exhaust vents from factories and commercial kitchens. Do not locate the air cooler near the ground where there is dust and pollution. The sides of the cooler should be a minimum of 600mm from any wall. If the cooler is located on a platform, always build a safety rail around the platform. Place the transition onto the duct. If the roof is sloped then make sure the transition is located correctly according to the diagram. 9 TBA Evaporative Cooler

INSTALLING THE TRANSITION Use a spirit level in both directions to get the Transition level. Screw it to the duct using the eight (8) screws provided. There are eight (8) V-notch locations for the screws. See diagram. Now break off both clips on the Transition that retain the Weatherseal. IMPORTANT: There must be no obstructions to the weatherseal opening fully as that will reduce the air cooler performance. Check that the weatherseal flaps do not interfere with the duct or any screws. The flaps should move freely through 90º. See diagram. Lift the air cooler up and place it onto the Transition. It will only go one way. Make sure the clips in the four corners engage correctly. See Diagram. Do not use any screws to attach the air cooler. IMPORTANT Do not place the venturi assembly into the air cooler at this stage. SEELEY INTERNATIONAL INSTALLATION MANUAL 10

INSTALLING ELECTRIC CABLES Disconnect the Electronics Module from the Water Tank by removing the screw under the isolation switch. See diagram. The switch cannot function with this screw removed. The installation kit supplied contains your power cable with ends ready to terminate and a wall control cable. Take the power cable and drop the non-plug end down the hole where the Electronics Module was and pass it through the conduit adaptor (factory fitted in the Transition). Then lock the plug on the other end in place as shown - see diagram. Pass the taped end of the wall control cable through the conduit adaptor also and leave about 0.5m in the Water Tank. Now pass the cables through your main conduit and connect the main conduit to the conduit adaptor (under the Transition). IMPORTANT: Pass the wall control cable through the conduit first. Terminate the power cable in a junction box installed nearby. The fixed wiring must be fitted with an isolation switch that breaks active and neutral in accordance with wiring rules. We recommend the junction box is located on the duct. Do not penetrate the duct near the Weatherseal. Note: The maximum length for the wall control cable to travel alongside the power cable is 10m. 11 TBA Evaporative Cooler

WATER CONNECTIONS You have the choice of installing the Drain Valve and water management system supplied, or not. If not, you need to install the Bleed Funnel alternative. See later note DRAIN VALVE ALTERNATIVE The function of the drain valve is to reduce the salts and minerals in the air cooler. It also provides overflow and water drain features. Assemble the drain valve into the Water Tank as shown - see diagram. Make sure the O-ring is fitted before putting the Drain Valve into the hole in the Water Tank. Screw the nut underneath tight by hand!! Attach the Drain Adaptor under the Drain Valve and attach a pipe to carry the water to a suitable drain point. Do not allow water to run freely onto the roof - it will stain the roof!! See diagram. The Water Sensor protects the pump and helps control water salinity. Fit the Water Sensor as shown by clipping it to the Water Tank. See Diagram. Make sure the clip engages fully. Route the sensor cable through the cable supports in the Water Tank as shown. See diagram. It will be connected later. SEELEY INTERNATIONAL INSTALLATION MANUAL 12

WATER CONNECTIONS If you have installed the drain valve, then fit the float valve and solenoid valve to the air cooler as shown. Make sure all washers and o-rings are fitted correctly. Do not over-tighten plastic threads!! Make sure the Float Valve is centrally positioned and is free to move up and down. Screw the Solenoid Valve into the extension tube. Check the direction of water flow with the arrow on the back of the valve. See diagram. Make sure Solenoid Valve seals against the rubber washer on the Extension Tube. Twist the Solenoid Valve so that the cover will fit on OK. 13 TBA Evaporative Cooler

WATER CONNECTIONS Connect the solenoid cable (supplied in the kit) to the Solenoid Valve. Route the cable through the hole in the Transition. See diagram. The other end will be connected later. IMPORTANT: Make sure the cable does not interfere with the Weatherseal and that it will not be crushed by the Venturi/fan assembly. Clip the solenoid cover into place under the air cooler. Then screw the flexible water hose (supplied in the kit) onto the Solenoid Valve. Make sure the rubber washer seal is in place. Important: Take care when connecting the flexible water hose to the solenoid valve or the float valve adaptor. The threads may become crossed and the connection will fail. SEELEY INTERNATIONAL INSTALLATION MANUAL 14

WATER CONNECTIONS BLEED FUNNEL ALTERNATIVE The bleed funnel is a simplified alternative to the drain valve. It also provides overflow and drain features. Assemble the bleed funnel to the Water Tank as shown. Make sure the o-rings are fitted correctly. Screw the nut tight by hand!! Attach the Drain Adaptor under the Bleed Funnel and attach a pipe to carry the water to a suitable drain point. Do not allow the water to run freely onto the roof - it will stain the roof!! The required rate of bleed will vary according to the water quality. Set it to the minimum rate, as shown in the following table. TBA250 TBA350 TBA450 TBA550 1 Plug in 1 Plug in 2 Plugs in 2 Plugs in If salt starts to build up on the Cooling Pads insert another plug. Adjust the bleed rate until the salt build up is minimised. The water management devices fitted will help control the effects of poor quality water, but they cannot eliminate the problem. 15 TBA Evaporative Cooler

WATER CONNECTIONS After fitting the Bleed Funnel, then fit the Float Valve as shown, complete with the Extension tube and 3/4 to 1/2 adaptor. See diagram. Make sure that all washers and o-rings are fitted correctly. Do not over-tighten plastic threads!! Make sure the float on the Float Valve is centrally positioned and is free to move up and down. MAIN WATER CONNECTION Connect the main water supply to the water inlet point under the air cooler. Always install a shut-off valve (do not use a non-return type valve) close by the air cooler. In areas where freezing might occur always install a drain-down point for the mains water supply. The water connection is 1/2 inch BSP male thread. SEELEY INTERNATIONAL INSTALLATION MANUAL 16

ELECTRICAL CONNECTION Now the Electronics Module must be re-fitted. First take the wall control cable and the Solenoid Valve cable (if installed) that are loose in the Water Tank and route them out from the Electronics Module location, as shown. The cables must rest in the special channel provided. See diagram. Leave about 200mm (8 ) of cable for later connection. Connect the motor cable into the Electronics Module. Fit the Electronics Module to its base in the Water Tank and screw it in place. See diagram. 17 TBA Evaporative Cooler

ELECTRICAL CONNECTION Lift the flexible cover on the Electronics Module. You will see some plug points. Connect the wall control cable to its correct plug point. If the drain valve, water sensor and solenoid valve are fitted then connect those cables also. Route the drain valve cable as shown before connecting it. Do not connect the pump cable yet. IMPORTANT: Ensure the cables are connected in the correct way as shown Now turn on the isolation switch and replace the pad frames (except the front padframe to allow access). SEELEY INTERNATIONAL INSTALLATION MANUAL 18

INSTALLING THE FAN ASSEMBLY Carry the Venturi/Fan assembly to the air cooler and fit it back in place. It will only fit one way. Check that the two (2) clips are properly engaged. Locate the venturi into position, making sure the motor lead is secured via the channel in the venturi. Snare the lead into one of the brackets at the top of the opening. Important! Make sure the venturi is correctly and symmetrically located all the way around it s cavity. Check this by making sure the venturi sits inside the locating ridge all the way around. Ensure the plug / lead assy is not caught under the bottom lip of the venturi, by pulling the lead through fully. 19 TBA Evaporative Cooler

WALL CONTROL LOCATION Install the Wall Control station about 1.5 metres above the floor in the place where you want the temperature to be controlled from. When selecting a position for the Wall Control station avoid the following locations: Direct sunlight. Outside walls. Any heat sources. A position in direct line of a cooling outlet. Mounting the wall control in a position near any heat source or cooling outlet will affect its ability to control temperature. The Wall Control cable will plug into the back of the Control. SEELEY INTERNATIONAL INSTALLATION MANUAL 20

INSTALLING THE WALL CONTROL PLASTER BOARD OR BRICK WALL To mount the wall control on a plaster board or brick wall, use the template provided and drill the 16mm hole for the wall control cable and the (5mm Plasterboard or 6mm Brick) holes for the mounting plugs. Note: For brick walls, position the template so the screw and cable holes are not located into the mortar between the bricks. WARNING: Ensure there are no electrical wires behind the wall where you intend to drill. Insert the mounting plugs into the holes and ensure the plug face is against the wall. Position the wall plate over the screw holes and secure the top screw. Align the wall plate vertically and secure with the lower screw. Check alignment and tighten the screws. 21 TBA Evaporative Cooler

INSTALLING THE WALL CONTROL Pull the wall control cable through the large hole and wall plate, remove the protective tape and plug the cable into the wall control. Feed the excess cable back into the hole and slide the wall control over the protruding bracket tabs. Pull the wall control down so the bracket tabs engage with the keyway slots on the back. PLASTERBOARD WALL MOUNTING SHOWN BRICK WALL MOUNTING SHOWN SEELEY INTERNATIONAL INSTALLATION MANUAL 22

PROGRAMMING THE WALL CONTROL To enter the programming mode, the procedure must be started within four (4) minutes of power being applied to the wall control. If this time has elapsed then turn off power to the air cooler for a minimum of 6 seconds before starting the following procedure. SET UP FOR BLEED FUNNEL If you installed the Bleed Funnel instead of the Drain Valve then you will need to set the wall control and cooler for manual bleed operation. 1. While the wall control is OFF, hold down AUTO for at least 3 seconds. 2. Press while still pressing AUTO. 3. The setting A1 will be displayed. Press until A4 is displayed as shown. 4. Press AUTO. 5. A number will now be displayed. Press until 0 is displayed as shown. 6. Press AUTO. Exit the programming mode by pressing the POWER button. Abort an alteration by pressing the POWER button instead of AUTO. 23 TBA Evaporative Cooler

PROGRAMMING THE WALL CONTROL DRAIN RATE ADJUSTMENT If you installed the Drain Valve then the water will drain when the sensor detects that the water salinity is too high. Alternatively and if necessary, the air cooler can be set to replace some water after a set time of cooling operation with the following procedure. 1. While the wall control is OFF, hold down AUTO for at least 3 seconds. 2. Press while pressing AUTO. A1 displays. 3. Release Auto. Press until A6 displays. 4. Press AUTO. 5. 00 will display. Press until 01 displays. 6. Press AUTO. 7. A6 will display. Press until A8 displays. 8. Press AUTO. 9. A number will be displayed. Press or until the number displayed corresponds to the desired drain delay time in the table below. Display Number 05 Time between drains 1.3 hours 07 11 15 STANDARD 2 hours 4 hours 10 hours 10. Press AUTO to complete the adjustment. Exit the programming mode by pressing the POWER button. SEELEY INTERNATIONAL INSTALLATION MANUAL 24

COMMISSIONING THE COOLER CORRECT WATER LEVEL With the water pump still disconnected, turn on the water supply and allow the tank to fill. If you have installed the drain valve instead of the bleed funnel you will need to turn the water on by pressing COOL on the wall control while it is in the OFF state. The water inlet valve will now remain open for 15 minutes. When the tank is full the float valve will stop the water entering the air cooler. Wait for this to happen and observe the level. The correct water level is approximately 5mm below the surface of the tank the float valve is mounted on. If the level is too high rotate the float clockwise. If it is too low rotate the float anticlockwise, as shown. If you installed the Drain Valve, a complete drain can be initiated by holding down both and for 1 second when the wall control is OFF. The signal dr will display to confirm the drain operation has activated. WATER PUMP CONNECTION Switch off the electronics module. Route the pump cord as shown and connect the pump to the electronics module. Switch the electronics module on. WARNING Do not run the pump while the pad frames are off and the fan is on. 25 TBA Evaporative Cooler

COMMISSIONING THE COOLER TEST OPERATION Check that the green light on the Electronics Module is on. This indicates that power is connected to the Electronics Module. Make sure that the flexible cover on the Electronics Module is fully closed as shown. Replace the pad frames and run the air cooler. To start the air cooler, press the power button on the wall control. If it has not been on before it will start in Manual control mode ( Man will display as shown). The display will flash Pre-Cool Cycle as shown and the pump will soon operate to saturate the pads. This will take a few minutes and then the fan will start automatically. Ensure the air cooler operates correctly and does not leak water. Make sure that the air flow from the outlets is balanced and that there are no air leaks in the ducting. If you installed the drain valve, test that the drain valve opens by holding down both and for 1 second when the wall control is OFF. The signal dr will display to confirm the drain operation has activated. Stop the air cooler and check that each of the pads are evenly saturated. Finally, instruct the owner on how to operate the new air cooler. SEELEY INTERNATIONAL INSTALLATION MANUAL 26

TROUBLESHOOTING GUIDE PROBLEM: Inadequate cooling CAUSE REMEDY 1. Pump not working correctly Check plug, wiring and circuit breaker. Check water level and sensor. Impellor may be jammed or obstructed. Rectify fault or replace pump. 2. Dry pads. Check water flow to pads. Inspect fitment of distributor cap. Check for blocked or kinked hose. If blocked, dismantle, clean and flush or unkink the hose. Check the inlet solenoid filter for blockage. 3. Leaking ducts Find leaks and seal. 4. Weatherdamper failing to open. Break off transport clips. Check for weatherseal/transition screw interference. Check minimum fan speed setting. PROBLEM: Motor starts and stops at intervals CAUSE REMEDY 1. 2. 3. Loose electrical connections. Fan not turning freely. Weatherdamper failing to open. Check all electrical connections. Determine cause and rectify. Break off transport clips. Check for weatherseal/transition screw interference. Check minimum fan speed setting. PROBLEM: Continually leaking water when turned off CAUSE REMEDY 1. Dirt under drain valve seal. Clean and refit seal, clean any remaining debris from tank. 2. Dirt under float valve seal. Clean and refit seal. 3. Water level set too high. Set water level as described. 4. Water pressure too high. Install pressure reducing valve. PROBLEM: Unpleasant odour CAUSE REMEDY 1. Odour from new pads Allow time to condition by running the cooler. PROBLEM: No variable speed CAUSE REMEDY 1. Faulty electronics module or thermostat. Replace electronics module or thermostat. 2. Minimum fan speed set too high. Adjust minimum fan speed (Fig 31 page 14). 27 TBA Evaporative Cooler

TROUBLESHOOTING GUIDE PROBLEM: Noisy unit CAUSE REMEDY 1. Resistance in the ducting system. Check that sufficient outlets are provided and are open. 2. Insufficient exhaust openings Refer to minimum exhaust opening requirements for the particular cooler, as shown in the table in the Owners Manual. 3. Fan is hitting the venturi. Check that the venturi is installed correctly and that the transport screws have been removed. Check for loose fan blades. PROBLEM: No water drain function (drain valve coolers only) CAUSE REMEDY 1. Drain valve failure. Replace drain valve. 2. Drain valve incorrectly connected to Check plug connection and orientation electronics module. 3. Water sensor not operating. Check sensor. Clean sensor. 4. No water from drain hose. Check for blockages in the drain hose. PROBLEM: Unit will not run / Wall control display fault CAUSE REMEDY 1. No power to cooler. Check GPO switch and fuse or circuit breaker. Check isolation switch, power cord plug and circuit breaker on the electronics module. 2. No power to the wall control Check for wall control cable unplugged, faulty or damaged cable, or faulty (no display or backlighting) wall control. Replace parts as necessary. 3. No signal to electronics module Check for damaged or faulty wall control cable. (wall control display appears correct, red light on electronics module flashes). 4. Wall control and electronics module Reset the wall control - press and hold for 6 not compatible (Wall control seconds until service disappears from the display. displays service ). 5. Mains supply frequency change. Reset the wall control by pushing ON/OFF. (wall control displays service, red light flashes on electronics module). 6. Water level sensor not working (if Check that the sensor is correctly connected, and the cable is water level sensor installed). plugged in. Clean sensor probes and remove all debris as (Wall control displays service, red necessary. light flashes on electronics module). 7. Insufficient water pressure to raise the Check that the water pressure is sufficient to fill the tank to water level to the sensor within 8 mins the sensor within 8 minutes. (if water level sensor installed). (Wall control displays service after 8 mins, red light on electronics module flashes) 8. Drain valve remains open so water does Check that the drain valve is closed when the unit fills. Clean not reach the sensor within 8 mins. (If debris from the drain valve. Check the drain valve cable is drain valve installed). Wall control connected and the plug is oriented correctly. displays service after 8 mins, red light flashes on electronics module. SEELEY INTERNATIONAL INSTALLATION MANUAL 28

2 x 5.0mm (Plasterboard) or 2 x 6.0mm (Brick) 16 ILL1135-B 29 TBA Evaporative Cooler

INSTALLATION CHECKLIST Owners Name: Telephone: Address: The cooler is secure and level on the dropper using all fixings supplied. The dropper and all penetrations are correctly flashed and sealed. Dealer: Installer: Date Installed: Model No.: Serial No.: TO THE INSTALLER Seeley International Pty Ltd is a company committed to continuous improvement. This includes all facets of our business. If you would like to be part of this ongoing commitment by expressing your thoughts on how we can improve this installation manual, or how we can improve the product or it's installation, we'd be more than pleased to receive them. The empty space (below) is your area to complete as you like. Simply forward it to any State Office of Seeley International Pty Ltd or mail it direct to: Seeley International Pty Ltd, 112 O Sullivan Beach Rd, P.O. Box 164 Lonsdale SA 5160 AUSTRALIA A.C.N. No. 054 687 035 Attention: Sales Manager. The Weatherdamper operates correctly and can open and close without interference. The water pipes were flushed of any foreign materials before connection to the cooler was made. The water is connected with no leaks at fittings. Water pipes are correctly saddled as per the plumbing regulations. The drain valve is installed correctly, as detailed in this manual. The owner has been instructed on how to isolate the water to the system in case of emergency. The drain water does not discharge onto the roof surface. Water level has been set correctly, as detailed in this installation manual. The power supply adheres to all local and national regulations and is wired back to the distribution board on it's own separate circuit. The following cables have been correctly connected to the Control box as required i.e. Power supply, Motor cable, Control loom, Drain valve, Solenoid cable, Pump cable, Probe cable. The owner has been instructed how they can electrically isolate the unit at the meter box in case of an emergency. All ducts are hung correctly and there are no air leaks. The system has been run from the customers wall control and all functions work correctly. All wall holes behind the controller have been sealed. The air balance for all outlets have been adjusted to the customers satisfaction. The customer has been shown how to operate the system and is aware of the need for the timed Drain or Bleed systems. The customer has been given the Owners Manual. All the installation rubbish has been removed and, if applicable, any property damage repaired. Signed by Installer: Dated: SEELEY INTERNATIONAL INSTALLATION MANUAL 30

It is the policy of Seeley International to introduce continual product improvement. Accordingly, specifications are subject to change without notice. Please consult with your dealer to confirm the specifications of the model selected. Service All regions: Please contact your local Breezair distributor. seeleyinternational.com seeleyinternational.com 839479-H AU 1110