Operating Manual PWS 0601-A and PWS 1201-A (Models Twist 6 + Twist 12)

Similar documents
Operating Manual. PS0601- A (Model Auris) English

USER MANUAL 9kW LILLY PELLET STOVE

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

Operating Manual PELLEMATIC PES CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH. PE 1491 EN_TO 1.0 Europe s specialist in pellet heating

PELLET BURNER PV 350

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters T (0)

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

Operating Instructions

User Manual. If you have any issues or questions, please contact us via

User Manual. If you have any issues or questions, please contact us via

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

Cooker Hood Instruction Manual

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

Rocket heater GAMERA

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40)

Operating manual. Wood pellet boiler. PL M 15 and PL M 25

BIX B-One 100 kw INSTALLATION GUIDE

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

1. Contents Principle General information Parts list Assembly Technical drawing... 18

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600

AXIS-QA G TUBO-M/MZ AXIAL FANS. Axis / Tubo OPERATION MANUAL

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

Operating Instructions

Climapro 2. User manual. wireless room thermostat without receiver. To be left with the user.

English. Heating with logs & wood pellets 20-40

Cooker Hood Instruction Manual

Cookshack, Inc. Model FEC100 Fast Eddy Oven. Version /1/10

WHE 2.24 / WHE 2.24 FF

HERZ ECO-Line Heating with logs or wood pellets

SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED PAPER. OWNER S MANUAL

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX 2218 F/2TDH4P

Corn Flame Energy Corn Stove Model 3000

Installation instructions. For the competent person. Installation instructions VRT 350 VRT 350 GB, IE

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

Eco Angus Wood Pellet Boilers

VETO CLEANER 500 FLUE GAS CLEANER

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL

INSTRUCTIONS FOR ASSEMBLY, USE, AND MAINTENANCE PELLET STOVE LUCA S/LUKA S8

Smart Smart IR. Service instruction SALES DATE MANUFACTURED ON (DATE): APPROVAL MARK SOLD. model (check applicable) is recognized as serviceable

testo 316-EX gas leak detector Instruction manual

Maintenance 50 Serie CAUTION. Before resetting your electronic card that displays an error code. OVERHEAT MESSAGE

M-Sens 2. Online-Moisture Meter for Solids. Operating Instructions. SWR engineering Messtechnik GmbH

AirUnit. Operating manual. mfh systems modern floor heating. Decentralised domestic ventilation

Heating with log wood

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400

Air Comfort. Installation instructions (English) A

Operating and installation instructions for Fire Lotus H586

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

PELLETS MODULE USER MANUAL P6 / P7 LCP 70 LCP 75A LCP 75B(-Z) LCP 80 (-Z) WITH INSTALLATION INSTRUCTIONS. page 1

Operating Instructions Thermo 50. Introduction. Maintenance and Safety Instructions

Operating instructions

AXIAL FAN User s manual. Quiet-dMEV 100 DC.

PELLET BOILER BIODOM 33. Instructions for use, maintenance and installation

Alarm System SECURE AS 302

TS400. Operating Manual. Test Station for Microtector II Series (G450/G460)

Installation and user manual

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Read this manual through carefully before installing/using the cleaner, paying special attention to the SAFETY INSTRUCTIONS

Instruction manual for downdraft hood

Trumatic E. Trumatic E 2400 (Australia) Operating instructions Page 4 Installation instructions Page 7. To be kept in the vehicle!

METAL INDUSTRY VRANJE

Operating instructions for the radio heat detector GS412

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

TDS 20 R / TDS 30 R / TDS 50 R

EW 40 Wireless Fan Control

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

Safety Temperature Limiter STL 50 Certified to DIN EN (replaces DIN 3440)

Biomass Pellet Boilers

Test Unit GTL 100 for Fire Detectors

Light oil / kerosene burner

Safety. DANGER Indicates potentially fatal situations. WARNING Indicates possible danger to life and limb.

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

PELLET BOILER BIODOM C15. Instructions for use, maintenance and installation

LFE50. UV Flame Safeguard. Building Technologies Division DETACTOGYR

HEAT RECOVERY AIR HANDLING UNIT

Installation & Manual. Model T-25

OPERATION MANUAL CENTRIFUGAL INLINE FAN WITH ELECTRONICALLY COMMUTATED MOTOR VKM EC SERIES. F88EN-02.indd :07:11

EasyTech.One Temperature Controller for Pellet Burner

Premium Desoldering station with Electric Pump

1 DOCUMENT REVISION CONTROL ELEMENTS... 9

AZSG10000/AZSG10005/AZSG10010 ABUS Wired Outdoor Siren

M-Sens 2. Online moisture measurement for solids. Operating Instructions. SWR engineering Messtechnik GmbH PART OF THE ENVEA GROUP

Pellet burner PV 180a. User manual

Operating instructions Page 14. Refrigerator Read the operating instructions before switching on for the first time

Silencer Preheater unit Electric post-heating unit Water circulated post-heating unit CO 2 sensor %RH sensor Pressure difference switch LON converter

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX. RG CPAP 24 V mit Powermodul 24V sensorless

USERS MANUAL FOR GAS BOILERS

STILE BEAUTY AND TECHNOLOGY

Electronically controlled instantaneous water heater. CEX 9-U: C models. Installation instructions

ir-range 8G /03.15 Changes reserved.

Transcription:

Operating Manual PWS 0601-A and PWS 1201-A (Models Twist 6 + Twist 12) English

Version: mst 110208 PWS 0601-A & PWS 1201-A BA_EN Article number: 102471 From SW 2.03 All information subject to change. All rights reserved.

Table of Contents 1 Preface... 2 2 Important notes... 2 2.1 Safety... 2 2.2 Identification... 3 2.3 Liability... 3 2.4 Notes on legal regulations... 3 2.5 Stove-related hazards... 4 3 Approved fuel... 4 3.1 Storage of pellets... 4 4 Construction of the stove... 5 4.1 Standard accessory... 5 4.2 Front view... 5 4.3 Rear view... 6 5 Installation... 7 5.1 Minimum distances... 7 5.2 Flue... 8 5.3 5.4 Connecting piece, pellet stove - chimney... 8 Combustion air... 8 5.4.1 Intake from external source (preferred)... 8 5.4.2 Intake from internal source... 9 5.5 Flue with air intake system (AIS)... 9 5.6 Non-dependence on ambient air... 9 5.7 Backflow system... 9 6 Control system max3... 10 6.1 Operating modes... 10 6.2 Overview of user and service menus... 11 6.3 External requirement... 12 7 Start-up, operating mode... 13 7.1 Filling the pellet bin... 13 7.2 Functional characteristics of the heating operation... 13 7.2.1 Self-test... 13 7.2.2 Starting phase, pre-heating phase... 13 7.2.3 Heating phase... 13 7.2.4 Cleaning phase... 13 7.2.5 Cool-down phase:... 13 7.2.6 Standby... 13 7.3 Heating mode... 14 7.4 Performance-regulated heating mode... 14 7.5 Setting date / time... 15 7.6 Setting timer switch... 15 7.7 External control with internal timer switch... 16 7.8 Activating the timer switch... 16 7.9 Resetting to factory settings... 16 8 Cleaning and maintenance... 17 8.1 After 200 kg or 14 days... 17 8.2 After 800 kg or annually... 18 9 Errors - causes - remedies... 20 9.1 Service request... 21 10 Technical data... 22 10.1 Dimensions... 23 11 Conformity... 25 12 Notes... 27 1

1 Preface Thank you for choosing one of our products. Please inspect the pellet stove upon arrival very carefully for damage and completeness of the accessory equipment included with delivery. 2 Important notes 2.1 Safety Before installing your appliance and starting it, please take care to read the operating manual in detail. This will ensure that you avoid damage caused by incorrect installation or operation. To carry your pellet stove only approved conveying equipment with a sufficient load rating may be used. When burning pellets, heat energy is released causing intensive heating of the stove surface and glass door. If these parts are touched without using appropriate protective clothing, or aids such as e.g. suitable gloves, there is a risk of burns. Draw your children's attention to this specific danger and keep them away from the heating appliance whilst it is operating. Placing inflammable objects on or close to the heating appliance is prohibited. The pellet stove may only be connected to the mains supply after it has been connected to the flue by an approved specialist. Do not place items of washing on the stove to dry. When drying items of clothing and suchlike, they must be positioned sufficiently well away from the stove (fire risk)! Using or working with highly combustible or explosive materials in the same room or adjoining rooms whilst your stove is in operation, is prohibited. Filling the pellet bin: The opening of the pellet bin is sufficiently large to allow it to be easily filled. Take care to ensure that no pellets fall onto the grill of the vent, or the body of the hot stove. This could cause formation of dense smoke. Never operate the stove with the glass door or the pellet bin open. A flash fire or misfire could be caused. Never remove the safety equipment such as grills etc.. Always remove the mains plug before doing any work. Make certain that there is always sufficient combustion air in the room where the stove is set up in. The pellet stove is only designed to use standard low-dust wood pellets according to EN 14961-2 (class 1). If weather-related conditions, such as positive pressure in the chimney for example, are prevalent, the stove must not be started. The stoves are designed to be used in domestic living spaces with normal humidity and temperatures of 0 C to 30 C. Stoves are not protected against water splashing and must not be installed in wet rooms. 2

Suitable antifreeze (approved for use in solar systems) must be used for stoves with water heat exchangers where room temperatures are < 5 C. 2.2 Identification The documentation included with delivery will assist with: operating the pellet stove safely exploiting all potential for use of the stove performing cleaning and maintenance work This operating manual should be kept in good condition and in an easily accessible location until the stove is disposed of. It should be given to any new owner(s). If the operating manual is lost or destroyed, a new copy can be requested any time from your specialist dealer. The illustrations and sketches are intended as basic information only. They are not to scale. Directional information such as right/left, front/back always relates to the position facing the front of the pellet stove. ISO units of measurement are used for dimensions, which are given in mm unless otherwise indicated. 2.3 Liability In the event of personal injury or property damage, the manufacturer shall be responsible for the building standard and safety of the machine only if design defects can be verified. No liability for: inappropriate use inappropriate operation inadequate maintenance use of non-original spare parts structural modifications Non-intended use Inappropriate use of the pellet stove can result in life-threatening injuries and other major property damage as well as in loss of warranty. Uses not conforming to the intended use are: any structural modification of the pellet stove operation without proper connection to the flue operation with open doors and covers operation without knowledge of the operating manual installation of non-original spare parts use of wood pellets that are not approved by the manufacturer 2.4 Notes on legal regulations Please observe local, national and European regulations and standards applicable for the installation and operation of combustion appliances. 3

2.5 Stove-related hazards Danger of fire / burn injuries The pellet stove must never be used with open doors or covers; sparks or flames could be released. Never cover the stove with blankets, towels or similar items. During operation, various surfaces reach temperatures of over 65 C. The materials could catch fire. If required, please use suitable protective equipment. Chimney fire or burnback Never pull the power plug and keep closed all doors and covers. Open windows and doors. Poisoning and suffocation hazard The flue gases contain harmful constituents, including carbon monoxide. This gas is odourless and poisonous. Self-protective action for rescuing unconscious persons: thoroughly ventilate closed rooms before entering. Electrocution hazard For power supply voltages of 50 Hz and an exposure time of more than one second, the following applies: Currents higher than 50 ma and voltages of 50 V or higher are extremely dangerous. Power cut Never open the doors or the bin lid during a power cut. Poisonous gases could be released. Following a short power cut, the heating mode is automatically continued. After a longer power cut, the stove first switches to cool-down mode and subsequently to starting phase. 3 Approved fuel The requirements for approved fuel are defined in the EN 14961-2 (class A1), EN plus (class A1) or ÖNORM M7135, DIN 51731, DIN Plus standards. Low-dust wood pellets are to be used. Length 10-30 mm Diameter 6 mm or 8 mm*) Bulk density 650 kg/m³ Calorific value 5 kwh/kg Residual moisture < 10 % Ash content < 0.5 % Density 1.12 kg/dm³ *) Manual adjustments by the service engineer are necessary! ATTENTION: Waste materials and liquids are not to be burned in the stove! 3.1 Storage of pellets To ensure combustion of pellets without any problems, it is necessary to store them in dry condition and free of contaminants. 4

4 Construction of the stove 4.1 Standard accessory Operating manual, burn pot brush, power lead, multi-functional tool. 4.2 Front view Transition period / summer use. 1. Dismount deflector plate, f b a c 2. Pull out insulating plate. f f e Door opener c d a b c d e f Control panel max3 Pellet bin lid Door-opening mechanism Glass door Side panel Insulating plates for summer use 5

4.3 Rear view b a d c e f a Voltage rating 230 V b Safety temperature limiter (STL) c Air-intake pipe d Flue pipe connection Ø 100 e Opening for safety valve overflow f Opening for heating flow or respectively return b 6

5 Installation 5.1 Minimum distances y Wall X y Minimum permissible distances to combustible materials: Rear (x): 5 cm Sides (y): 15 cm Front (z): 80 cm Recommended permissible distances to combustible materials: Rear (x): 25 cm Sides (y): 50 cm Front (z): 80 cm Z Floor protection: Because the temperature in the lower areas of the pellet stove increases only minimally during operation, installation of a fireproof plate under the stove is not required. Front 7

5.2 Flue The flue system is to configured according to EN 13384-1. Before starting the pellet stove, a positive conformance report regarding the chimney must have been obtained. Flue draught limitation: If there is a strong flue draft (>30 Pa), a suitable auxiliary air facility is to be fitted. The local regulations must be followed! Multiple-stove arrangements with one chimney: Pellet stoves PWS 0601-A or PWS 1201-A with max3 controls and integral air sensor, are suitable for multiple-stove arrangements with one chimney. Prerequisites: The chimney is to be dimensioned according to EN 13384-1 and it must be ensured that there is a negative pressure (greater than 1Pa). There is a positive report on the chimney issued by the relevant authority. Regional regulations must always be followed! The operator is to ensure that the stoves do not operate simultaneously. That as far as the construction of the pellet stoves are concerned, it is not a just burner, but an automatically loaded stove with a day feed bin for burning solid biomass fuel (pellets) and with a fluegas fan. This flue-gas fan conveys the flue gases into the chimney. That no positive pressure can be caused in the connecting piece or in the chimney. Danger! Incorrect operation can result in emission of flue gases (carbon monoxide poisoning). 5.3 Connecting piece, pellet stove - chimney The connecting piece between pellet stove and entry into the chimney, is to be designed so that the flue gases enter the chimney with negligible loss of pressure or cooling (see DIN 18160). Inspection and cleaning must be possible. An external sleeve is sufficient to ensure tightness of the connecting piece. 5.4 Combustion air 5.4.1 Intake from external source (preferred) It is highly recommended that combustion air be taken in from an external source. By this means you ensure that operation of the stove is independent of the ambient air, reduce energy consumption and avoid possible dirtying of the air sensor. Where room ventilation or fume extractor is fitted, air intake from an external source is mandatory. Maximum tube lengths and diameters are to be taken from the table. The end of the air extraction pipe needs to be located outside or in a well-ventilated room inside the building. The air pipe must be designed so that no formation of condensation is possible and that no water can enter the stove. See DIN V 18160 standard. The internal surface of the air pipe must be smooth e.g. Geberit tubing A filter is to be attached across the entrance of the air intake (mesh size 1 mm) to prevent small animals or foreign matter entering and impeding the intake of air. The air-intake pipe is to incorporate a 90 downward elbow where it enters the building, so that gusts of wind do not affect the air supply. 8

Table: Diameters and tube lengths of the flue-gas pipe Max. length Max. number of 90 elbows *Extension pipe Ø 75 4 m 3 or *Extension pipe Ø 110 9 m 4 *External dimensions in mm 5.4.2 Intake from internal source The combustion air can also be taken in from the installation room. The operator of the stove must ensure without fail that sufficient combustion air is available (approx. 30 m³/h). Never exceed the maximum ambient negative pressure of 4 Pa! 5.5 Flue with air intake system (AIS) The AIS flue system is approved and certified for solid fuels. The cross-section of the connection the combustion air intake connection from stove to chimney is equal to at least the circular area of a 100 mm tube. The air duct is insulated from the flue-gas duct. This means that no transmission of heat from flue gas to combustion air occurs. The cross-sectional area of the air intake is at least equal to the circular area of a 100 mm tube. There must be no contact between flue gas and air intake at the point of entry to the chimney or along its length. 5.6 Non-dependence on ambient air The tightness of the stove conforms to German requirements for solid fuel combustion appliances nondependent on ambient air. The approval allows use in passive houses, low-energy houses and rooms with controlled ventilation and external combustion air intake. The test was carried out by TÜV Southern Germany. Approval has been applied for to the DIBt (Deutsches Institut für Bautechnik). The pellet stove s installation must be inspected by the regional master chimney sweep before being used for the first time (valid certificate of chimney sweeping). 5.7 Backflow system ATTENTION: It should be ensured that the return temperature at the intake connection to the heat exchanger does not fall below 50 C during heating mode. Undercutting this temperature results in corrosion and soot formation and thereby, destruction of the heat exchanger. To ensure safe operation the stove is to be properly connected to a reliable heat take-out facility (buffer tank). The requisite water quality is stipulated in Ö NORM H 5195 and is to be observed. Without a regulation return riser the guarantee is invalidated! 9

6 Control system max3 a b e f g c d a - Operating display with current operating mode b - Present flow temperature c - Start/Stop and menu display (-/+) d - Action pads (intuitive operation) e - Day of week and time of day f - Display for required type of operation: (hand for manual operation) Manually, temperature, or performance controlled Timer switch External 0-10 V External 0/1 g - Required flow temperature (target temperature) 6.1 Operating modes The stove can be operated in one of two different operating mode options: Temperature regulated 65 75 C (select in menu: manual temperature) Automatic operation: Heating performance is selected automatically Performance regulated 30 % 100 % (menu manual performance) Manual mode: Heating performance is selected manually The stove is supplied temperature regulated ex factory. 10

6.2 Overview of user and service menus MENU Fow temperature 65-75 C Manual-Power 30-100% Date / Time 22.7.2011 Working mode Ext. control Ext. analog signal Manual-Temperature Manual-Power Chrono-Thermostat Clock timer Service P01:00:00:00:00 language German English French Italian Error memory list Code: -Nr. 01/20 External filling Yes/No Filling time 30min - 7h Break time 22h00m - 06h00m Run time motor Aktuell/Limit Test Revs Flue gas fan RPM Flue gas fan RPM Auger motor Open burn grate Close burn grate Pump Ignition Sensors Flow temp. Chamber temp. Auger motor Air stream Revs STB Pellet tank lid Filling level Burn grate Ext. Contact Ext.Power signal Slid temp. Elect.board temp Start temp. 55-67 C Setup pump Yes/No Statistics Working hours Auger motor Ignitions Info Version Stove model Contrast Contrast Emergency mode Air sensor Chamber temp. sensor Factory settings Reset Cleaning Clean burn brate 11

6.3 External requirement External requirement (0/1) (EAB) The external requirement allows the integration of additional components which are equipped with a potential-free switching contact (room thermostat). Remove jumper EAB and connect bipolar connecting lead of the external controls. Applying voltage to the external deactivation switch connector interferes with the controls. External analogue signal (+10 V - GND) The external activator is used to tell the stove how much heat to put out (input signal: 0 10 V DC ). 3V-30%...6V-60%...10V-100% Applying voltages greater than 15 V DC to the plug for the external activator interferes with the controls. Activate external requirement (0/1) Activate external analogue signal (0-10 V) The respective modes are depicted in the display by the symbols 0/1 or 0-10 V if a signal is pending from the external controls. By pressing the stop key, this mode can be interrupted at any time. The hand symbol appears for manual mode. 12

7 Start-up, operating mode 7.1 Filling the pellet bin When filling the pellet bin, take care to prevent dust formation and spilling of pellets. 7.2 Functional characteristics of the heating operation The pellet stove is designed for the automatic burning of wood pellets in domestic living spaces. That means that the pellet stove starts up automatically and switches itself off after the selected temperature has been reached. The controller selects the heating output based on the set-point temperature. Thus the pellet stove provides optimised adjustment of the heat output to the current requirement. 7.2.1 Self-test To ensure safe operation of the stove, a self test is carried out before every start-up. 7.2.2 Starting phase, pre-heating phase In this phase, automatic ignition of the pellets is made by electrical ignition. The fire bed is prepared so that a smooth transition to heating mode is effected. 7.2.3 Heating phase Heating mode is fully automatic; the control adapts itself to changes resulting from burn-off loss: Adjustment to pellet grade used Adjustment to chimney or installation conditions Continuously variable adaptation of heat output to the set-point temperature Optimization of combustion in each heating phase Continuous monitoring of the heating operation using sensors There is therefore no need to make any adjustments to the combustion process. 7.2.4 Cleaning phase The heating phase is interrupted every four hours by a cleaning phase. After the cleaning, the stove returns to the heating phase. 7.2.5 Cool-down phase: Fuel feed is stopped in the cool-down phase and the remaining flue gases safely extracted into the chimney. The cool-down phase is introduced after every switching off.the cool-down phase is introduced after every switching off. 7.2.6 Standby If the set-point temperature has been reached, the pellet stove changes over to standby mode following the cool-down phase. In this phase, automatic restarting is possible at any time should the temperature fall below the switch-on temperature. 13

7.3 Heating mode Start heating mode (temperature controlled) Start heating mode with the START key. The stove starts heating mode and switches automatically to standby mode when the set-point temperature is reached. When the set-point temperature has been undercut by 8.0 C (adjustable from 55-67 C in Start Temperature menu) the stove automatically restarts. Initial fill When it is the initial operation (software update) the respective query Initial Fill? is made before start-up. If the OK key is pressed the auger feed is started and filled with pellets. Change set-point temperature of flow temperature The set-point temperature of the stove can be varied during operation using the /+ keys (65-75 C). Stop heating mode Press the Stop key to discontinue the heating operation. Turn off the pellet stove To prevent accidental or unintentional switching off, the safety query appears: Switch off? Confirm with OK. The stove must then be restarted when required. 7.4 Performance-regulated heating mode Activate operating mode "Performance-Regulated" Select item Mode from the menu Select manual performance Confirm with OK Change performance The heating performance can be varied during operation using the -/+ keys (30-100 %). The heating mode can be stopped with the Stop key. 14

7.5 Setting date / time Date and time adjustment Press the Menu key in normal operating mode Select Date/Time - press key 2x Confirm with OK Setting day Press the key OK Set the date with the -/+ keys Confirm with OK 7.6 Setting timer switch Setting month Move to next item with key Press the key OK Subsequently proceed as for setting day Set year, hours, minutes and seconds in the same way Programming the timer switch Press the Menu key in normal operating mode Select Time switch program - press key 4x Confirm with OK Ten programable on and off cycles are available (P01 P10) Select desired program with key (if programings are already available) Confirm with OK Programme 01 Press the key OK Example: The stove heats from 4:30 until 16:00 hrs, until the desired temperature is reached From Monday to Sunday Program the switch-on time with the -/+ keys Confirm with OK Press key + Program the switch-off time with the -/+ keys Confirm with OK Select the desired day with the key Allocate the switching time by pressing the OK key Exit the menu by successively pressing the key. Up to 10 switching cycles can be programed and allocated to the weekdays as required. 15

7.7 External control with internal timer switch External analogue signal (0-10 V) Operating display stove controlled with internal timer switch. External requirement (0/1) Operating display stove controlled with internal timer switch. 7.8 Activating the timer switch Activate the timer switch Press the Menu key in normal operating mode Select mode - press key 3x Confirm with OK Press key 4x timer switch is selected Activate with key Exit program with key Operating display stove in operation 7.9 Resetting to factory settings Resetting switching times (delete) Should re-programing of the switching times be necessary, you can reset all programed switching times. All time programs are deleted! Select Reset - press key Confirm with OK 16

8 Cleaning and maintenance Regular cleaning and maintenance of the equipment is the most important task for the customer, to ensure years of trouble-free operation and achieve the highest possible performance, with the greatest efficiency. The number of cleaning intervals necessary is directly dependent on the ash content of the pellets. For the cleaning intervals described, we assume an ash content of 0.25 %. Doubling of the ash content halves the cleaning cycles described. Burning wood results in the depositing of a coating on the window which, dependent upon the quality of the pellets and performance settings of the stove, can turn be white to dark. This is a natural effect of combustion and does not represent a fault. Attention: Risk of injury! Before starting to clean, shut down the stove, let it cool down and disconnect the mains plug. Use the multi-functional tool supplied - if necessary wear protective gloves - risk of burns. 8.1 After 200 kg or 14 days Open glass door, clean the pane Attach the multi-functional tool supplied and press to the left. Clean the cold pane with a damp cloth. Attention: Do not use any aggressive cleaning agents. Clean the firebox Clean the firebox using a brush and the vacuum cleaner for ashes. Clean the burn pot Clean with the brush supplied. All bores and slots must always be clean. Clean the ash-compartment Open the locking mechanism of the ash pan. Remove ash pan and empty the ash. Clean out the ash compartment using the multi-functional tool. 17

8.2 After 800 kg or annually Open glass door, clean the pane Attach the multi-functional tool supplied and press to the left. Clean the cold pane with a damp cloth. Attention: Do not use any aggressive cleaning agents. Clean the firebox Clean the firebox using a brush and the vacuum cleaner for ashes. Clean the burn pot Clean with the brush supplied. All bores and slots must always be clean. Clean the ash-compartment Open the locking mechanism of the ash pan. Remove ash pan and empty the ash. Clean out the ash compartment using the multi-functional tool. Clean the heat-exchanger 18 Dismount left-hand side cover. Open cleaning cover top left. Remove cleaning springs. Clean heat exchanger tube with brush.

Clean the heat-exchanger Open cleaning cover bottom right. Remove ash using ash vacuum cleaner. Cleaning the temperature detector Dismount left-hand side cover. Open cleaning cover top left. Clean off deposits using a cloth. Clean air sensor Dismount right-hand side cover. Loosen the fixing screw. Carefully pull the air sensor out of the holder. The air sensor is a delicate measuring instrument! If there are dust deposits, carefully blow off or clean in distilled water. Carefully and without using force, push the air sensor with the guide nose into the holder as far as the stop. Clean the flue-gas fan Remove the mains plug! Undo the screws of the flue-gas fan. Carefully pull out the motor with the impeller and clean with a wire brush and spatula. Remove ash in flue-gas duct using an ash vacuum cleaner. 19

9 Errors - causes - remedies Number Text on display Possible solutions 901 Safety temperature limiter has been triggered Check circulator pump Unlock the safety temperature limiter (info see 4.3) 902 Error maximum rpm Clean heat-exchanger, clean burn pot, air sensor 903 Error minimum rpm of flue-gas fan undercut Check flue-gas fan, rpm sensor 904 Error minimum combustion chamber temperature undercut Check fuel supply 905 Error maximum combustion chamber temperature exceeded 20 Check pellets (length), inspect combustion chamber temperature sensor Check that heat radiation possible at the back, replace the circuit board 906 Error maximum circuit board temperature exceeded 907 Error minimum flow rate undercut Check stove cleaning, air sensor; is the door, ash pan or cleaning cover open? 908 Error maximum flow rate exceeded Inspect the chimney draught 909 Error maximum chute temperature exceeded Check cleaning of combustion chamber (chute), check circulation pump 911 Error Maximum ignition time exceeded Check fuel supply, check cleaning of burn pot, check ignition 912 Error Minimum temperature cool-down time Check cleaning of stove exceeded 913 Error SD card Replace the SD card replace the control panel 914 Error EEPROM Overwrite SD card again 915 Error short circuit rpm measurement Check flue-gas fan, check rpm sensor 916 Error pallet bin switch open Close the pellet bin lid 920 Error flow sensor interruption Check room sensor (connection), replace the sensor(s) 921 Error flow sensor short circuit replace the sensor(s) 922 Error combustion chamber temperature sensor Inspect combustion chamber temperature sensor (connection), replace the sensor(s) 924 Error Chute temperature sensor interruption Check chute temperature sensor (connection), replace the sensor(s) 925 Error chute temperature sensor short circuit Replace the sensor(s) 926 Error circuit board sensor interruption Replace the circuit board 927 Error circuit board sensor short circuit Replace the circuit board 928 Error flow rate sensor Check sensor, replace the sensor 933 Error run time userware Replace the control panel 934 Error run time firmware Replace the control panel 935 Error self-test minimum rpm Check flue-gas fan, rpm sensor 936 Error self-test minimum air Check stove cleaning, is the door, ash pan or cleaning cover open? 937 Error acute air shortage Is the door, ash pan or cleaning cover open? 938 Error extended cool-down phase Check stove cleaning, burn pot 939 Error fuel shortage Refill the fuel 940 Error external filling run time Check silo empty, motor jammed 941 Notification to clean burn pot and grate Message after approx. 200 kg pellets 942 Error calibration air sensor MAX Calibration failed, limit exceeded 943 Error calibration air sensor MIN Calibration failed, limit undercut

9.1 Service request If you request external service, please have the following data to hand: Specialist dealer Invoice date Model Serial number Year built Date of start-up 21

10 Technical data Model PWS 0601-A PWS 1201-A Controller Max3 Max3 Heating output 2.3 to 6.0 kw 2.3 to 12.0 kw Water output Max 4.6 kw Max 10.0 kw Height 942 mm (incl. adjustable feet) 1100 mm (incl. adjustable feet) Width 502 mm 617 mm Depth 545 mm 596 mm Weight approx. 125 kg 165 kg Room heating capacity* Up to 210 m³ 420 m³ Flue pipe connection Ø 100 external Ø 100 external Fresh-air connection Ø 50 external Ø 60 external Minimum flue draft at the connection 0 Pa 0 Pa Recommended flue damp-proof damp-proof Fuel content 20 kg 32 kg Burn duration:** up to 36 h up to 45 h Efficiency at nominal heating capacity*** 96.4 % 94.9 % Efficiency at partial load*** 97.7 % 97.7 % Flue-gas temperature at connection (min/max) 58 C / 96 C 53 C / 112 C Flue gas mass flow (min/max) 2.2 g/s / 3.7 g/s 3.0 g/s / 7.0 g/s CO2 content in exhaust gas (min/max) 6.9 Vol% / 10.9 Vol% 8.2 Vol% / 11.7 Vol% CO content in the exhaust gas < 0.01 Vol% < 0.02 Vol% Power connection 230 V / 50 Hz 230 V / 50 Hz Electrical power input (without UWP) 30 to 60 W 30 to 100 W Electrical ignition integrated integrated Safety temperature limiter (STL) included in scope of supply Max. operating pressure 3 bar Required volume of combustion air approx. 30 m³/h Approved fuel low-dust wood pellets according to EN 14961-2 (class A1), EN plus (class A1) ( ÖNORM M7135, DIN 51731) * Room-heating capacity varies with the quality of heat insulation and amount of ventilation. ** Burn duration varies with heat output and quality of fuel. *** Measured under test conditions. Product type approved by TÜV Munich to EN 14785. Conforms with emission limits according to Art. 15a B-V and 1. BImSchV, stage 2. Regional legislation with respect to flue configuration, fire safety, place of installation, etc. should be observed at all times. 22

10.1 Dimensions PWS 0601-A (Model Twist 6) 23

PWS 1201-A (Model Twist 12) 24

11 Conformity Declaration of conformity Company Energietechnik GmbH Schweizerstrasse 37, 6844 Altach, Austria Product Model Pellet stove PWS 0601-A EC guidelines observed Applied norms, specifications Machines Low voltage (el. appliances) Electromagnetic compatibility 98/37/CE 73/23/CEE Safety of machines EN 292, part 1 EN 292, part 2 89/336/CEE Electric equipment of nonelectric appliances for domestic use and similar purposes EN 50165 Electromagnetic compatibility demands on household appliances, electric tools and similar electric devices EN 55014, part 1 EN 55014, part 2 Safety of electric devices for domestic use and similar purposes DIN EN 60335-1 Room heating appliance for burning wood pellets EN 14785 This is to certify that the product described above corresponds with the mentioned EC guidelines. Altach, 01.12.2009 Place, date Christoph Erath, CEO 25

Declaration of conformity Company Energietechnik GmbH Schweizerstrasse 37, 6844 Altach, Austria Product Model Pellet stove PWS 1201-A EC guidelines observed Applied norms, specifications Machines Low voltage (el. appliances) Electromagnetic compatibility 98/37/CE 73/23/CEE Safety of machines EN 292, part 1 EN 292, part 2 89/336/CEE Electric equipment of nonelectric appliances for domestic use and similar purposes EN 50165 Electromagnetic compatibility demands on household appliances, electric tools and similar electric devices EN 55014, part 1 EN 55014, part 2 Safety of electric devices for domestic use and similar purposes DIN EN 60335-1 Room heating appliance for burning wood pellets EN 14785 This is to certify that the product described above corresponds with the mentioned EC guidelines. Altach, 01.12.2009 Place, date Christoph Erath, CEO 26

12 Notes 27

28

29

calimax Energietechnik GmbH Frixa Businesspark, Schweizerstrasse 37 6844 Altach, Austria +43-(0)-5576-73310 office@calimax.com www.calimax.com