CivTek International. Ph

Similar documents
City of Orange Trails at Santiago Creek Specific Plan Recirculated Draft EIR Appendix C: Notice of Preparation (NOP) and Comment Letters

STEVEN T. MATTAS. Representative Experience

Chapter 5: Recreation

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

3.0 Project Description

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Pebble Beach Community Services District

LANGAN QUALIFICATIONS FOR THE MORGAN COMPANIES

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Peppertree Business Park

INTRODUCTION. What is a General Plan? What is the role of the General Plan?

Cherokee. Corporate Headquarters 111 East Hargett Street Suite 300 Raleigh, NC

Planning Projects: Highlights

Ramsey County Riverfront Property Recommendation of Project Vision and Master Developer. November 20, 2018

San Diego River Coalition 2012 Work Plan

Northeast Quadrant Plan

Riverside County Flood Control and Water Conservation District LAKELAND VILLAGE MDP LINE H, STAGE 1

Economic Redevelopment of Underutilized Parcels. May 16, 2012 Northland Arboretum Brainerd, Minnesota

EXECUTIVE SUMMARY. Introduction

SECTION 2.0 INTRODUCTION

I. INTRODUCTION. A. Project Location

Durango Parks & Recreation Department. Strategic Plan

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

CITY OFLOS ANGELES CALIFORNIA

Ottawa County Parks, Recreation & Open Space Plan. February, 2006

AQUATIC FACILITIES ARCHITECTURE + ENGINEERING + ENVIRONMENTAL + PLANNING. True Expertise + Working Ingenuity

4.1 AESTHETICS AND VISUAL QUALITY

Union Station, Los Angeles Dec. 4-9, 2011

BROOKE PETERSON, AICP Associate Principal

Wisconsin downtown action council Downtown project case study profile

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

SECTION 3: PROJECT DESCRIPTION

EASTERN GOLETA VALLEY COMMUNITY PLAN

City of Placentia ADMINISTRATION DEPARTMENT

Planning Districts INTRODUCTION

Functional Areas of Practice AICP EXAM REVIEW. February 20, 2009 Georgia Tech Student Center

201 PLANNING CONCEPTS AND AREA BOUNDARIES. This revised 1998 Forster Ranch Specific Plan is based on the following planning concepts:

Developer s Program. The Station at East 54

Notice of Completion Form A See NOTE BELOW Mail to: State Clearinghouse, 1400 Tenth Street, Sac., CA / SCH #

Optimize. Innovate. Deliver. Engineering the Future of Bus Rapid Transit

Northwest commuter rail station US 36 BRT. Westminster Station

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

SAN FRANCISCO PENINSULA EXPERIENCE. CONTACT Andrew Bro PE GE Senior Project Manager Direct:

Section 3 INVENTORY OF RECREATION LAND AND FACILITIES

Chapter 2 Project Description

M E M O R A N D U M July 27, 2018

Green Gables. April 24, 2013

Easton. Smart Growth Through Innovation. Easton

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

City of Meriden Harbor Brook Flood Control Project Overview

Courthouse Planning Area

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

9IMPLEMENTATION AND PHASING

Partnerships in Transportation Transit-oriented Development The Return on Investment

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

Experience the difference.

Parks and Open Space Preservation and Dedication. January 26, 2016 Fort Worth City Council Pre-Council Meeting Randle Harwood and Richard Zavala

III. PROJECT DESCRIPTION

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIMOTHY E. DATERS, P.E. White-Daters & Associates, Inc. 24 Rahling Circle Little Rock, AR (501)

LOOK BOOK pacificsales.com/inspiration

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SCCASLA 2016 QUALITY OF LIFE DESIGN AWARDS SUBMISSION: Ruth Shellhorn Communication Category: Publications on landscape architectural history

7700 College Town Drive, Suite Ninth Street, Suite 212 Sacramento, CA Sacramento, CA 95814

FY Capital Improvement Program Arroyo Projects

Downtown Dubuque...it s a great time.

IH35 Corridor Plan Amendment to the Comprehensive Plan

Project Description. 2.1 Project Location

Residential Alcohol & Drug Rehabilitation Facilities

Tijana S. Hamilton, P.E.

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

INTRODUCTION. 1.1 What is a General Plan? 1.2 Requirements for a General Plan. 1.3 Introduction to Monterey County

Lynn Waterfront Master Plan

Venice Pumping Plant Dual Force Main Project Draft EIR

THE ASHLAND OVERVIEW. FXCollaborative SPAN Architecture WSP USA ICOR Associates Site/Civil Geotechnical Environmental Surveying/Geospatial

Flooding Hearing: Long and Short Term Strategies

CHAPTER 10 AESTHETICS

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

4 C OMMUNITY D ISTRICTS

NOTICE OF PREPARATION ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

Town of Rico Three Mile Plan for Annexation

Drexel, Barrell & Co.

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

STOCK RANCH SITE AUBURN BOULEVARD CITRUS HEIGHTS :: CALIFORNIA NOW MARKETING PHASE II OF A ±401,322 SF REGIONAL DRAW SHOPPING CENTER

Prince George s County Economic Development Corporation David Iannucci President & CEO

Welcome to Greenwood Village Corporate Capital of Colorado

LAURA BURNETT, FASLA, LEED AP PRINCIPAL / LANDSCAPE ARCHITECT

Splendor Test Tour TEST TOUR SPLENDOR - 08/02/17

REQUEST FOR BOARD ACTION

WinBrook Business Park ROCKY HILL, CONNECTICUT OFFERING PACKAGE

City of Ennis. Downtown Master Plan Catalyst Projects

APPENDIX C SPECIAL PLANNING AREAS

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

TOTAL $795,376 $1,169,593

CENTERTON ROAD BRIDGE REPLACEMENT

Transcription:

Newport Coast - 9000 acre luxury residential & Historic District, Orange County, CA Acted as master developer s project manager and engineering lead starting with raw land working through evolution of the master plan and entitlements until finished lots were sold to merchant builders. This includes several miles of backbone roads and infrastructure, realigned 2.5 miles of PCH, extensive grading, utilities, endangered species, archaeology and brutal environmental permitting. 1

Skyborne Development (Coachella Valley, California) - Performed final Survey and Engineering Quality Control Services for large one square mile private project. CivTek s services were usually on the overall project s critical path schedule. Construction activities commenced as soon as CivTek completed its services. Construction activities peaking at an estimated $200,000 per day relied on timely Quality Control and Surveying services. CivTek mobilized with a professional survey and engineering team of 150 years combined experience plus GPS, conventional survey equipment, computers, and job trailers to run up to ten field survey crews. CivTek employed GPS and conventional survey techniques. The project required hiring local labor and running as many as seven survey crews simultaneously. Staff and workers performed in up to 122 degree heat at an extremely fast pace seven days per week, 16 hours per day, for approximately eight months during 2006. CivTek conducted final quality control checks and redesign to fit field conditions on engineering plans and surveying, including sewer, water, site design (including engineering elements of landscape architecture), roadway and, when required, performed pragmatic redesign in the field under severe schedule constraints. In addition to the entire subdivision infrastructure, the project involved developing a fire house site (including trash enclosures and ADA requirements) as well as public roads, drainage channels, and bridge structures. 2

Crystal Cove Historic District Orange County, CA Founded a development partnership that was contracted by the State of California to design, build, finance and operate a boutique resort hotel (we were bought out before construction started). 3

Newport Coast Builder Sites Newport Beach, CA Joint design program with TIC and builders, design master plan, grading, and infrastructure through build-out 4

Hoag Hospital South Campus Newport Beach, Ca Fixed Fee Design-Build of site expansion including a 1,000 x 40 retaining wall in the Coastal Zone 5

Irvine Spectrum Entertainment Center - 150 acre destination retail Irvine, CA Master developer s engineer for 3 phases of infrastructure, grading, streets and utilities (there were 5 total) 6

Oak Creek - 200 acre infill residential sold to 40 builders simultaneously Irvine, CA Master developer s lead engineer for planning, subdivision mapping, back-bone street and utilities design and construction and construction management support 7

Armstrong Ranch - 160 unit infill residential Shea Homes, Santa Ana, CA Master development engineer, EIR technical studies, purchase and sale agreement, all perimeter and intract streets and utilities, brought in home builder/buyer and acted as his entitlement and engineering leader until built out 8

Armstrong Ranch YMCA, Aquatics Center and Temporary Church Santa Ana, CA Subdivided, designed and permitted all facilities 9

La Habra Westridge Plaza - 60 acre Chevron Oil headquarters redevelopment as retail La Habra, CA Engineering lead to owner. Started with an existing campus, planned, entitled, mapped, designed, permitted, demolition of existing buildings and supervised construction of all horizontal improvements including 2 CalTrans highways (Beach and Imperial). 10

Brea Union Plaza - Brea, CA 50 Acre retail center design, entitlement, permitting and construction on former Unocal campus with remediation 11

Imperial Properties Brea, CA Oilfield redevelopment as residential, master plan, grading, infrastructure and remediation 12

Crossroads Irvine, CA 50 acre retail center re-imaging, all site design, permitting and construction oversight. 13

FoodPark Irvine, CA 12 acre retail center reimaging, all site design, permitting and subdivision 14

Harbor Center Costa Mesa, CA 26 acre retail center demo and redevelopment, all site design, permitting and subdivision 15

Security Capital Industrial Trust - Acquisition of industrial property for warehouse and distribution REIT Foothill Ranch, CA Advisor to acquiring REIT, prepared feasibility studies, cost estimates, purchase recommendations, mapping and master plans and then stepped out after sale. 16

Fashion Island Newport Beach, CA Retail center landscape re-imaging, provided precision base mapping. 17

Bristol Market Place Santa Ana, CA Retail center redevelopment master planning and engineering including school site 18

University Center Irvine, CA Retail Center Expansion provided subdivision and infrastructure. 19

Shady Canyon Golf Residential Irvine, CA Phase 1 Infrastructure master plan, access, water supply system and NCCP reserve reconfiguration 20

El Palomar Golf Community Guadalajara, Mexico Master plan, infrastructure, golf routing, subdivision mapping, water & sewer plant, EXIM Bank and NAFTA 21

Indian Creek (golf course & residential), Prestonwood Country Club - Dallas, Texas Project engineering manager, prepared master plans, designed subdivision maps (called Preliminary Plats in Texas), infrastructure and subdivisions, lake and flood control systems, supervised construction and apportioned costs to consortium of property owners. 22

Vellano Country Club Chino Hills, CA A Reese Jones turned Greg Norman gold course community, master plan, course lay-out, entitlement, TTM, grading (300 relief), infrastructure and custom lot marketing Aerojet General Site Re-Use Chino Hills, CA Master planned the re-use, remediation and development. 23

Marbella Country Club San Juan Capistrano, CA Development master plan, lot lay-out, golf water feature system 24

The Admiralty Dana Point, CA Luxury condos, designed site improvements, utilities and subdivision 25

Winchester Ranch / Silverhawk - 650 acre master plan in Riverside County, CA Prepared the master land use plan, TTM, grading plan, flood control channel, bridge, reservoir, all infrastructure plans and permits, CalTrans encroachment permits, acted as Special District Engineer formed CFD 88-4 and raised $30M 26

Vons Retail Center Riverside County, CA 12 acre Retail Center design, permitting and construction 27

Sky Canyon Plaza Riverside County, CA 3 acre retail center, design, entitle, build 28

Winchester Office Park Riverside County, CA 2 40k SF office buildings, design, entitle, map, condominium, construction support 29

Colorado Commons - 64 unit mixed use condo wrapping a new parking structure Monrovia, CA Engineering, subdivision and entitlement design consultant to public private partnership. Prepared, processed, permitted and supervised construction of all horizontal improvements. 30

Barker Pacific 101 Continental - Office renovation and conversion to office + business hotel and retail (not built yet) El Segundo, CA Planning, engineering, mapping and entitlement nothing built yet. 31

Ritter Ranch Palmdale, CA 10,000 acre Master Plan for 7,000 units + golf, and commercial. Master infrastructure funding plan and development strategy, BK turn-a-round plan 32

Pacificana Bakersfield, CA 5,000 acre master plan, TTM, infrastructure, golf courses 33

Rivers Edge Kern County, CA Master plan, TTM and grading plan 34

Country Club Kern County, CA Master plan, TTM and development budget 35

Savi Ranch, Anaheim Hills, CA Flood Plain and FIRM revision 36

Indus Mixed Use Site Chino Hills, CA Master planned, financial modeling, entitlement strategy, subdivision mapping 37

Cielo Vista Yorba Linda, CA Residential development master plan, product repositioning and development budget 38

S&J Ranch Castle & Cooke Madera County, CA 7,000 acre Master development plan and infrastructure budget for Murdock. 39

University of California - County of Madera, CA 15,500 acre Master development and infrastructure plan 40

Sierra Vista Ridgecrest CA 340 acre, 520SF, 240MF golf community master plan, entitlement and funding strategy 41

Sage Sunrise 195, Las Vegas, NV 200 acre, 300 lot master plan, TTM and infrastructure plan 42

Sage Logandale, NV 240 unit equestrian master plan, TTM and entitlement extension 43

Vistas Moorepark, CA 110 lot conceptual grading and lotting plan 44

Live Oak Ranch Agoura Hills, CA 250 lot master plan, infrastructure plan and cost budget 45

Rodeo Ridge Estates Walnut, CA BK work-out 150 custom lot subdivision design, entitlement and build-out 46

Auburn Ranch Auburn, CA 5,000 acre development master concept plan 47

Georgia Pacific - Fort Bragg, CA Saw mill redevelopment master plan and value opinion 48

Coon Creek Steelhead Trout Fish Passage Santa Barbara, CA Watershed analysis and hydraulic restoration of blocked fish passageway from ocean to inland waterway 49

Jeffrey Corporate Center Irvine, CA Subdivision and infrastructure for multiple office park buyers 50

Trabuco Office Condos Irvine, CA Final site design, permitting and condo subdivision 51

The Lakes, Las Vegas, NV Phase 1 master plan and utility system design advisory 52

Apex Heavy Industry Park, NV 26,000 acre heavy high-hazard industry park master plan, development strategy and risk control 53

Waggoner Ranch Estate Texas 520,000 acre ranch, master plan concept, land use strategy, valuation, purchase and sale negotiation support 54

Orange Medical Center Orange, CA 2 MOB center with parking structure, design, entitle, permit and construction support 55

Vineyard Square Retail Center Escondido, CA 12 acre retail center demo and redevelopment for Albertson s Anchor 56

Beverly Hills High School CA Master infrastructure planning and remediation program 57

Laguna Beach High School CA Advisor to redevelopment and re-imaging team 58

San Juan Capistrano High School, CA Site and infrastructure engineering 59

Laguna Playhouse and Pageant of the Masters Laguna Beach, CA Legal descriptions and lease negotiation support 60

Blue Bird Canyon Acquisition Laguna Beach, CA Legal descriptions, merger and open-space acquisition support to City Manager 61

St Andrews Presbyterian Church Newport Beach, CA Site work and utilities design and permitting for demo and reconstruction program 62

Christ Presbyterian Church Huntington Beach, CA Site redevelopment engineering 63

Portola Parkway - Irvine, CA Initial development phase infrastructure, Flood Plain recovery 64

Jasmine Pumping Station Culver City, CA CM Design-Build pump station disguised as a residence 65

Escal Gold Mine Agrentina Master Plan access, paste plant, portals overburden stockpile 66

Waste Disposal Superfund Site, La County, CA Master plan for capping, closure and reuse 67

Barranca Parkway Pedestrian Over Crossing, Irvine, CA Elevated structure to increase clearance and re-aligned approaches to meet ADA accessibility 68