Exhibit A: Project Scope

Similar documents
REPORT TO COUNCIL City of Sacramento

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Rotary Park / Railroad Lake

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Recreation Facility Evaluation - Conclusions

Burrus Old Mill Park

Long Branch-Wayne Local Park Renovation Project

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

TA B L E O F C ON T EN T S

Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012

FY Capital Improvement Program Parks and Landscaping. 8 - Summary

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

MER BLEUE URBAN EXPANSION AREA

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

I-70 Highway Cover Study MARCH 4, 2015 COMMUNITY WORKSHOP SUMMARY

Charles P. Johnson and Associates. Annapolis Landscape Architects

TWAIN HARTE COMMUNITY SERVICES DISTRICT

Briar Crest Elementary

School District of Milton 5- Year Capital Maintenance and Improvement Plan

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Master Project List Report

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

CARMODY PARK MASTER PLAN

City Council March 27, Parks, Recreation, and Trails Master Plan

29 Bella Fontaine Park

Heritage Park Master Plan. Heritage Park Master Plan

Forest Hills Facilities Plan

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

REQUEST FOR COUNCIL ACTION

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

Coffey Neighborhood Park Master Plan/Design/Rebuild Workshop. August 4, :00pm 4:00pm

Trustee update - Nov 9, Fire alarms: Quarterly Koorsen fire alarm system test was performed.

Revitalization of Durand Park. Durand Park Proposal June 2008

SAN FRANCISCO PARK MAINTENANCE STANDARDS: EVALUATION FORM

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

CITY COUNCIL STAFF REPORT

FY Capital Improvement Program Parks and Landscaping - Park Projects

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

Final Report from the Measure N Bond Oversight Committee February 5, 2014

LIDO KEY RESIDENTS ASSOCIATION CITY OF SARASOTA PRESENTATION

The leader in physical activity for young children!

Cover Planning. January I-70 East Final Environmental Impact Statement

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

PARK DATA THEMES SUMMARY:

City Commission Agenda Cover Memorandum

Trustee update Oct 16, 2018

PARTF Scoring System for Grants

Table of Contents. Planting of Trees and Grasses. Purpose. Research approach. Downtown District. Findings. Decorative Antique Lighting

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

CITY OF DAVIS DESIGN REVIEW INFORMATION CHECKLIST

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Park Types and Attributes

Design Considerations

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Terrace View Park. Master Plan

Preferred Riverwalk Alternative Components August 17, 2017:

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

Canal Winchester Parks Master Plan. Public Meeting 2 Thursday, February 2 6:30pm

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Southward Community Recreation and Sports Park Southward Community Recreation and Sports Park Concept Design Images and Information.

Enhancing Attawandaron Park

SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department

Josefa Ortiz De Dominguez Elementary School

Brains and Archibald park concept plan

Special Revenue Funds

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

ADA Descriptions Website Posting 12/12/17

SAN FRANCISCO RECREATION + PARKS DEPARTMENT HYDE & TURK MINI PARK COMMUNITY PRESENTATION #2 WEDNESDAY,

4.0 Concept Plan Implementation

(Exhibit A) Site Plan Adoption Detail and Support Information

Littleton Fields Master Plan

Measure W Review. East Nicolaus High School District March 9, 2017

Edward Jenner Elementary Academy of the Arts

Juri Commons Design Review

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

MetroParks Board Meeting 2018 Capital Improvement Projects

Bullhead City Rotary Park Plan Update

City of Los Angeles Department of Public Works

Joseph Brennemann Elementary School

THE VILLAS AT SNOWDEN OVERLOOK: PROCEDURES AND GUIDELINES FOR EXTERIOR ALTERATIONS RESPONSIBILITY OF UNIT OWNERS

Las Colonias Park Master Plan

MUNICIPALITY OF ANCHORAGE

South East Sports Complex Phase I

SAN FRANCISCO RECREATION + PARKS DEPARTMENT MARGARET HAYWARD PLAYGROUND COMMUNITY WORKSHOP #1 WEDNESDAY, JANUARY 27, 2016

Open Space Considerations

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

RHBL 7325 ENVIRONMENTAL ANALYSIS. By: Whitney Musick

BROADVIEW PARK. Projects Status Update February Estimated Investment. Project Status Update Agency Anticipated Completion

CONCEPT BRIEF. 101 West Abram Street Arlington, Texas

Appendix C Park Design Guidelines

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Open Space and Recreational Resources

Transcription:

Exhibit A: Project Scope The Project Scope includes: A brief description of the work product and estimated cost to complete the work product by location at each of the 12 sites. A brief description of the work product and estimated cost to complete the work product by activity, listing the sites at which each activity will take place. A description of the in-kind contributions GVRD will provide, as a non-city public agency receiving funds through Participatory Budgeting. Exhibit A: Page 1

Description of Work Product By Location Location Activity # of items Cost of Item Total Cost Notes 1 Beverly Park Update playground surfacing $5,000 Pads to be replaced with pour-n-play, and if possible, replace sand with Fibar to be ADA compliant. Picnic Tables 5 $1,000 $5,000 Costs could include concrete pads, transportation, rental of special forklift, and installation. Sidewalk/pathway repair $20,000 Does not distinguish city sidewalk or pathways in park. 1584 feet to be repaired. Total Cost at Location $30,000 2 Blue Rock Springs Restoration of Lake Frisbee $12,000 Before site work begins, define area that needs to be restored. Research is needed to inform what is possible with available funds. Repair trash receptacles $3,000 Repair the existing 57 trash receptacles in the Park, or as many as possible with the available funds. Repair Restrooms $12,000 Repair/renovate roof, structural, electrical, plumbing, paint, interior, exterior, and other code repairs and upgrades. Total Cost at Location $27,000 3 Borgess Upgrade play structure $20,000 Review structure to clarify what meets existing code. Perform any safety upgrades, Total Cost at Location $20,000 4 Crest Repair/upgrade restrooms $30,000 Repair/renovate roof, structural, electrical, plumbing, paint, interior, exterior, and other code repairs and upgrades. Total Cost at Location $30,000 5 Delta Meadows Repair benches & trash receptacles Install new tot play structure $10,000 14 wood benches over 12 feet in length with curves, and trash receptacles. $30,000 Purchase tot play structure to meet current codes, and install in existing footprint. Replace trees $5,000 Investigate old sites, size of trees to plant, and cause of death of trees. May need to alter irrigation and plant in new sites. Total Cost at Location $45,000 6 Grant Mahoney Install 2 cement ping pong tables $11,000 Get specifications for base pads to support tables. Tables will also need graffiti coating. Cost includes delivery and installation. Exhibit A: Page 2

Repair asphalt pathways $20,000 Identify worst areas, rank priorities, measure, and get cost estimates. 661 feet to be repaired. Install picnic tables 4 $1,000 $4,000 Costs could include concrete pads, transportation, rental of special forklift, and installation. Request to research cement Ping Pong Table. Total Cost at Location $35,000 7 Hanns Repair restrooms $8,000 Repair/renovate roof, structural, electrical, plumbing, paint, interior, exterior, and other code repairs and upgrades. Replace trash receptacles $2,000 Costs could include concrete pads, transportation, and installation. Number of receptacles and locations yet to be determined. Total Cost at Location $10,000 8 N. Vallejo Replace trash receptacles $6,000 Costs could include concrete pads, transportation, and installation. Number of receptacles and locations yet to be determined. Repair or replace play equipment $40,000 Review structure to clarify what meets existing code. Perform any safety upgrades, Repair/replace drinking fountain 1 $4,000 $4,000 Total Cost at Location $50,000 9 Richardson Repair/upgrade plaground $20,000 Review structure to clarify what meets existing code. Perform any safety upgrades, Add soccer goals and nets $20,000 Research movement of power pole located in the middle of proposed soccer field. May need to purchase smaller goals to accommodate field. Total Cost at Location $40,000 10 Terrace Park Repair/upgrade playground $10,000 Review structure to clarify what meets existing code. Perform any safety upgrades, Repair/replace drinking fountain $4,000 Review existing fountain, and make reccomendation. If replaced, may need a second bowl for dogs. Total Cost at Location $14,000 11 Washington Repair Gates/fences/entrances $7,500 Review gates, fences, and entrances, for safety and proper function. May need to replace sections of fencing material. Install picnic tables $3,000 Costs could include concrete pads, transportation, rental of special forklift, and installation. Request is for three (3). Provide additional amenities $20,000 Additional amenities to be determined (e.g., basketball, handball, etc.) Add trees $10,000 Trees are requested to be planted near playground. Tree selection to provide shade, but allow line of site to be clear. May need to alter irrigation system. Total Cost at Location $40,500 Exhibit A: Page 3

12 Bocce Courts Improve lighting $30,000 Improve lighting for brighter bulbs, lower wattage, and better coverage. May need to install new fixtures and timer. Total Cost at Location $30,000 Total Project Cost $371,500 Exhibit A: Page 4

Description of Work Product By Activity Activity/Location Cost for Activity Notes 1 Bathroom Remodels Blue Rock Springs $12,000 Crest Ranch $30,000 Hanns $8,000 Cost for Activity $50,000 2 Trash Receptacles Blue Rock Springs $3,000 Delta Meadows $5,000 Hanns $2,000 N. Vallejo $6,000 Cost for Activity $16,000 3 Repair/Replace Benches Delta Meadows $5,000 Cost for Activity $5,000 4 Picnic Tables Beverly Hills $5,000 Grant Mahoney $4,000 Washington $3,000 Cost for Activity $12,000 5 Repair Gates/Entrance Washington Park $7,500 Cost for Activity $7,500 6 Repair/Replace Playground Beverly Park $5,000 Borges $20,000 Delta Meadows Park $30,000 N. Vallejo $40,000 Richardson Park $20,000 Terrace $10,000 Cost for Activity $125,000 7 Sidewalk/Walkway Repair Beverly Hills Park $20,000 Grant Mahoney $20,000 Cost for Activity $40,000 8 Lighting Improvements Bocce courts $30,000 Cost for Activity $30,000 9 Tree Replacement Delta Meadows $5,000 Washington $10,000 Cost for Activity $15,000 10 Lake Restoration Blue Rock Springs $12,000 Cost for Activity $12,000 11 Additional amenities Upgrade and repair restroom roof, structure, electrical, plumbing, lighting, exterior, interior, doors, lighting, and other related items. Remove and replace with similar outdoor all weather style receptacles. Pour new concrete pads where necessary, and secure with bolts. Budget may not allow total replacement of 80 receptacles. Replace or refurbish existing wood benches. New boards, and weld metal that is cracked. Repaint or stain as needed. Materials and possible labor through subcontractor. Rental of specialized forlift to place tables. May need to pour concret pads. Materials and possible labor through subcontractor. Review structures and layout to see if meet new codes. Upgrade where possible. Replace or repaint where needed. Delta Meadows tot lot to be replaced. Beverly Hills Park 1584 feet, Grant Mahoney 661 feet. Bocce courts at Amador. Various size trees. Prefer to plant native species. May need to adjust or add irrigation. Dig holes, add soil and fertilizer. Tree stakes/guards. Before beginning site work, define area that needs to be restored (actual irrigation pond or surrounding area of the pond) and research needs. Exhibit A: Page 5

Washington Park $20,000 Cost for Activity $20,000 12 Soccer Goals and Nets Richardson $20,000 Cost for Activity $20,000 13 Drinking Fountains N. Vallejo $4,000 Terrace $4,000 Cost for Activity $8,000 13 Ping Pong Tables Grant Mahoney $11,000 Cost for Activity $11,000 Total Project Cost $371,500 Reseach what additional ammenities would be appropriate at Park. Field at Richardson had power line in middle of area that would be designated for soccer. Check into relocating power pole. Goals size may be smaller than Repair or replace existing drinking fountains with ADA compliant. Due to frost and vandalism, may need heavy duty outdoor type. Install two cement ping pong tables. Cost include basepad,set up, and delivery. Exhibit A: Page 6

January 7, 2014 Joanna Altman Administrative Analyst II City of Vallejo RE: Value of Contribution by GVRD to P.B. Park Projects As requested, here is an estimated value of work to be completed by GVRD staff. In the calculations below, I have assumed that these projects will take approximately 6 months to complete. Labor costs are a percentage of annual costs. 100% Maintenance Worker II $70,790 15% Park Maintenance Supervisor $16,402 15% Facility Maintenance Supervisor $16,402 15% Maintenance Superintendent $18,839 5% General Manager $8,400 Finance Dept. (1% of $371,000) $3,700 Equipment and Vehicles $5,000 Misc. materials and outside services not covered by P.B. $20,000 Total estimated value of GVRD services and contributions $159,533 Exhibit A: Page 7