Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35

Similar documents
CROWN POINT SUBDIVISION

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Major Subdivision Sketch Plan Checklist


APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Advance Engineering & Surveying PLLC

Leduc Industrial Outline Plan SE W4

Rule D Wetland and Creek Buffers

MacDonnell Heights Town Center

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Chapter 3 Site Planning and Low Impact Development

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH

SITE PLAN REVIEW APPLICATION AND CHECKLIST

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

Boston Water and Sewer Commission

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Appendix I. Checklists

Asbury Chapel Subdivision Sketch Plan

CITY OF ZEELAND PLANNING COMMISSION

Essential Skills: Reading and Interpreting Maps and Plans

Non-Metallic Mining Reclamation Checklist

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

PLANNED UNIT DEVELOPMENT PUD For The Proposed Antietam Subdivision Escambia County, Florida. Introduction

City of Richmond. Engineering Design Specifications

CHECKLIST FOR PHASE II DRAINAGE REPORT

4. UTILITIES ELEMENT.

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Project Narrative For Fruita RV Resort Conditional Use Permit

Riparian Buffer on the Bushkill Creek. Policies

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

A Guide to Open Space Design Development in Halifax Regional Municipality

STREAM BUFFERS

Zoning Ordinance Chapter 10

Procedures IV. V. Rural Road Design Option

PLANNING COMMISSION. Submitted

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Urban Planning and Land Use

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

City of Sun Prairie Wetland Buffer Reduction Request

ARTICLE VI: SITE PLAN REVIEW

Exhibit A. 8:9 Scuffletown Rural Conservation District

SUBMITTAL REQUIREMENTS

North Oakville East Parks Facilities Distribution Plan. November, 2009

I611. Swanson North Precinct

TOWN OF SPRINGFIELD, NEW HAMPSHIRE

CHAPTER 22 Rural Open Space Community Developments

When planning stormwater management facilities, the following principles shall be applied where possible.

HURON COMMUNITY PLAN

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

River Corridor Overlay Zone (RCOZ) Article 5

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1 INTRODUCTION

TENTATIVE MAP CHECKLIST

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

GENERAL LAND USE PLAN ELEMENT

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Rural Land Use Designations Kittitas County December 6, 2007 Draft

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

6 RURAL RESIDENTIAL. 6.1 Rural Use. Rural Use (RU) Goals and Objectives. Policy Goal

Erosion & Sediment Control Plan Application Form & Checklist

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

SHEFFIELD PARK Paulding County, GA DRI #588

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

Application for Site Plan Review

City of Grande Prairie Development Services Department

SOIL EROSION AND SEDIMENT CONTROL

Project Description June 24, DESCRIPTION OF THE PROPOSED ACTION. 2.1 Introduction

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

IV. Development in the Rural Overlay District

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

City of Waco Stormwater Management Regulations

Design Specifications & Requirements Manual

6 PORT SYDNEY SETTLEMENT AREA

The following principles guide the development of goals and strategies to protect and promote these amenities:

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

TABLE OF CONTENTS 1.0 INTRODUCTION GENERAL OBJECTIVES LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4

TABLE OF CONTENTS. Transportation Chapter 1 - Introduction and Purpose of Planning to 1-3. Utilities

ARTICLE 17 SITE PLAN REVIEW

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

ZONING COMPLIANCE PERMIT APPLICATION

Draft Rhode Island Stormwater Design and Installation Standards Manual

PLAN SUBMITTER'S CHECKLIST

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

Review Zone Application for D&R Canal Commission Decision

Transcription:

Development Impact Statement Name of Project: Red Tail Drive Acreage: 13.5 Acres± Type of Project: Residential Subdivision Owner: 96 East Street Development, LLC Location: rear of 112 East Street Parcel Numbers: Assessors Map 111, Parcels 31, 32, 33, 38, and 39 Engineer: James A. Gracia, PE Surveyor: Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35 I. Project Description: a. Number of Units 9 Single Family Lots b. Private Ownership c. Number of Bedrooms 4 Bedrooms/Dwelling (average) d. Approximate Price/Unit Market value at time of sale II. Circulation Systems: 1. Street Design New street shall intersect with East Street on land of sufficient width to accommodate the required width of the right of way, while providing sufficient frontage and lot area for the two existing properties on either side of the proposed new street. New street shall terminate in a cul de sac located approximately 825 feet from the East Street right of way. 2. Street Classification Minor Street with ATD = 36 and Peak Hour = 18 3. Parking/Bus Stops Not Applicable 4. Pedestrian and Bicycle Circulation Not Applicable III. Support Systems: a. Water Distribution Public water supply will be extended to all lots, with fire hydrants placed at appropriate intervals. b. Sewage Disposal Public sanitary sewer service shall be extended to all lots. c. Storm Drainage Proposed street shall be equipped with a storm drainage system which shall control and treat stormwater flows according to the municipal and state Stormwater Management Guidelines. Treated and detained flows shall eventually be discharged into the existing stormwater system in East Street. The existing system discharges onto the northerly James A. Gracia, PE 99 Glendale Street, Easthampton, MA 01027

Development Impact Statement Red Tail Drive Page 2 of 5 side of East Street, which eventually merges with the Manhan River at its confluence with the Oxbow of the Connecticut River. d. Refuse Disposal Private refuse haulers shall provide refuse disposal services. e. Lighting One new street light shall be proposed at the cul de sac. Existing street lights on East Street shall be sufficient to illuminate the new intersection at East Street. f. Fire Protection No type of fuel or hazardous materials storage shall be proposed for this subdivision. The distance to the Easthampton Public Safety Complex shall be 3.0± miles. g. Recreation Proposed subdivision shall be 3.6± to the entrance to Nonotuck Park. h. Schools Projected student population is undetermined IV. Natural Conditions: a. Existing topography consists of a long continuous slope extending from East Street up to the Mount Tom Reservation boundary. The total change in elevation, from East Street to the Reservation Boundary, is approximately 110 feet. The maximum existing slope is approximately 20%. b. Soils underlying the entire project consists predominantly of fine sandy loams through out the project area. Bedrock is anticipated at depths greater than 6 feet for the entire length of the proposed roadway. c. Mineral resources No mineral resources of any economic importance has been identified on the project site. d. Surficial Geology Nothing of importance or of concern has been identified. e. Depth to Water Table Average depth to groundwater is estimated to be approximately 5 feet below grade. f. Aquifer Recharge Area Project area does not fall within the recharge area for any public water supply. James A. Gracia, PE 99 Glendale Street, Easthampton, MA 01027

Development Impact Statement Red Tail Drive Page 3 of 5 g. Wetlands there are no identified wetland resource areas within the project boundaries. No work shall be proposed within any Buffer Zone of wetlands outside of the project boundaries. h. Watercourses There are no watercourses within the project boundaries. i. Flood Prone Areas The entire project area is well above the nearest flood plain of the Manhan River or the Oxbow of the Connecticut River. j. Vegetative Cover The vegetative cover of the project area is presently low brush, with an occasional mature tree, and some grassy areas which had been mowed at some point in recent history. k. Unique Wildlife Habitat No unique wildlife habitat has been identified on the project area. l. Unique Flora - No unique flora has been identified on the project area. V. Design Factors a. Present visual quality of the area consists of an undeveloped slope along the Mount Tom range. The upper (southerly) boundary of the property is visually delineated by the high tension wires of the electric company power line and its easement. Above the power lines, the Mount Tom Reservation extends to the top of the mountain range. b. Significant Viewpoints There are no publicly owned view points on this parcel. The proposed dwellings on the upper lots shall enjoy a view out over the Oxbow and toward Northampton. c. Historic structures There are no structures of historic value within the project site. d. Architecturally significant structures - There are no structures of architectural significance within the project site. e. Architecture for development The proposed residential dwellings shall be of similar design to any other recently constructed residences. James A. Gracia, PE 99 Glendale Street, Easthampton, MA 01027

Development Impact Statement Red Tail Drive Page 4 of 5 VI. Environmental Impact This proposed residential subdivision shall be constructed to meet all current environmental standards. The nature of the structures to be built, and the site landscaping around each house, shall not lend itself to surface water or groundwater contamination. No detrimental land usage shall be allowed during the build out of this project. One of the project developers shall be the sole builder of houses on these lots, therefore, control of the lot excavating and eventual landscaping shall remain with this individual. There shall be no land uses allowed which would risk surface water or groundwater contamination, or cause air pollution of any kind. The current Stormwater Management Guidelines mandate that erosion controls be provided and maintained in good condition during all construction on the site, which includes roadway and utility construction as well as house construction. Since this site is located on a relatively steep slope, the stability of all slopes shall be an important consideration in controlling erosion during rainfall events. All disturbed surfaces shall be revegetated as soon as possible in order to minimize any erosion potential. There shall be no land uses which shall create an increase in normal everyday noise levels. Energy conservation shall be addressed by each individual house owner. Wildlife habitats shall be preserved by minimizing the amount of land clearing for the proposed houses. The lots on the high side of the proposed street shall be quite deep, therefore, significant area shall be available behind those houses to be left undisturbed for wildlife habitat. The existing development along East Street consists of residential dwellings with most being close to East Street, however, a number of dwellings are situated farther up from the road (East Street) on the side of the slope, therefore, having these proposed houses situated on the slope is not out of character for this section of East Street. Underwood Avenue is located a relatively short distance along East Street and the majority of houses on this street are located at about the same relative elevation as the proposed houses on Red Tail Drive. VII. Plans The proposed development is consistent with the Easthampton Master Plan and any other planning documents pertaining to Easthampton. James A. Gracia, PE 99 Glendale Street, Easthampton, MA 01027

Development Impact Statement Red Tail Drive Page 5 of 5 VIII. Phasing The proposed development shall be done in one single phase. Upon successful completion and approval of the roadway and utilities, house construction shall commence according to the demand of the housing market. It is anticipated that the nine houses could be constructed and sold within a two or three year period. James A. Gracia, PE 99 Glendale Street, Easthampton, MA 01027