Permeable Pavement Binder. Walkways Patios Tree Wells

Similar documents
GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

PolyPavement TM. The Natural Soil Pavement

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

Installation Manual May 9/14 No revision

Tile Tech Warnings. Paving America one step at a time! MANUFACTURER OF DETECTABLE WARNING PAVERS AND TILES

Instructions for Coating Fimbel Garage Door Panels

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

815 NE 172 nd Avenue Vancouver, WA Installation Manual

APPLICATION INSTRUCTIONS FOR MASCOAT SOUND CONTROL-dB

Permeable Pavement Systems

IRON METAL FRAME MAINTENANCE

For routine maintenance of polished granite installations with a cleaner and protector:

Brick Paver Installation Guide

PAVERS AZEK PAVERS #1 IN RECYCLED PAVERS PAVERS RE-INVENTED

317)

Subsurface Infiltration Bed

Application Guidelines Specific to Mold Stain Away and Keep Away Mold Remediation Products Mold Science Technologies Inc.

The Concept. Features. Benefits

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

Specify Rubbersidewalks Get Rubbersidewalks

BuildingProductsCorp.com

9 Steps to a Lasting Paver Installation

Creating Patio Spaces

CANADIAN Application Guidelines For On & Gone, Gone 4 Good and OSR Dry Mold Remediation Products. Mold Science Technologies Inc.

Paving - 8 easy steps for DIY and professional landscapers

1.01 General requirements of the Project Manual shall apply to all work specified in this section.

CUTTING EDGE TURF PRODUCTS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Application Guidelines Specific to On & Gone and Gone 4 Good Mold Remediation Products Mold Science Technologies Inc.

CUSHIONWALK PAVERS OUTDOOR RUBBER SURFACING INSTALLATION / MAINTENANCE GUIDELINES

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Mixer, Planetary Food STANDARD OPERATING PROCEDURE

MAINTENANCE SEAL MAINTENANCE PREVENTING WINDOW CONDENSATION. Kohltech.ca

Pavers Spade, rake (metal prongs), wheelbarrow, wooden stakes, string line, tape measure, pegs and spirit level

FLOOR FINISH. Extended Performance Floor Finish

Sunbrella Marine Tops & Covers Care and Maintenance

THE PATH TO YOUR HOME S BEAUTY STARTS AT YOUR DRIVEWAY.

ACIDS & ACID CLEANERS

Installation guidelines

Rhinoskin Spray On Insulation Ceramic Insulation Coating

Canada Application Guidelines For On & Gone, Gone 4 Good and OSR Dry Mold Remediation Products. Mold Science Technologies Inc.

CARING FOR YOUR ELLISON WINDOWS AND DOORS

HORSE STABLE USING AZEK PAVERS.

Ekopel 2k. 2K bathtub resurfacing coating. pabrec.com. Description. Package. Advantages. Technical data sheet

MAINTENANCE AND CARE GUIDELINES

CARING FOR YOUR WINDOWS AND DOORS

Container Gardening for Small Spaces

REGULAR MAINTENANCE AND CARE

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Application Instructions

TANDUS CENTIVA CLEAN GREEN MAINTENANCE PRODUCTS CENTI Clean

Hardscape Cleaning. Hardscape Cleaning Protocol with EaCo Chem, Inc.

Product Data Sheet. NeverStrip UV Resilient. Matte. A NeverStrip Instant Film Coating. UV Resilient Matte

STONETECH Maintenance & Care Porcelain, Ceramic & Quarry Tile with Cement Grout

Cleaning and Sanitation Procedures Module Deli

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Hoshizaki America, Inc.

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Product Care. Indoor & Outdoor Furniture.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Roadware MatchCrete Clear. Standard Product Data Sheet

Cleaning/Environmental Maintenance Guidelines Metropolitan Ceramics Quarry Tile

moss max ready to spray

CARING FOR YOUR ATRIUM WINDOWS AND DOORS

EuroGrower. Assembly Guide

TERREWALKS Installation Manual

TOTAL VEGETATION KILLER

82. Siphon all gas out of the tank. 83. Disconnect the fuel filler and vent tube with a Phillips screwdriver.

As a public park, it is important to plan your community garden to ensure everyone can gain

planning, designing and installation guide for interlocking segmental pavers installation guide

Hoshizaki America, Inc.

Rebate Amount for Lawn Conversions. $150 (300 ft² LOTS < 4,750 ft²) $250 (500 ft² LOTS 4,750 ft²)

Direct sunlight will cause the colors in your area rug to fade over time.

AquaBlox Water Matrix

stone oasis collection oasis circle patio (diameter ) instruction guide

Portland, Oregon, (population 551,000) endeavors to maintain

Technical Assistance Permeable Interlocking Concrete Pavement PICP

MAINTENANCE GUIDE RESIDENTIAL AREAS

Concrete Interlocking Pavers

CUSHIONWALK PAVERS OUTDOOR RUBBER SURFACING INSTALLATION / MAINTENANCE GUIDELINES

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

STORMWATER TOOL. Rain Garden

Caring For Your Atrium Windows and Doors

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

Milpitas College Extension Milpitas Dry Landscape

CARING FOR YOUR EXTREME WINDOWS AND DOORS

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

A New Generation of Permeable Pavers

PARTS LIST. 1 x POST. 1 x BOOM. 1 x ELBOW. 1 x CANOPY CLIP BRACKET. 1 x CRANK HANDLE. 1 x BASE SLEEVE. 1 x RUBBER COVER. 6 x WASHERS LOCKING PIN

Hoshizaki America, Inc.

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

NeverStrip Color. Color Product Data Sheet

Lesson 2: Stormwater Best Management Practices (BMPs)

Pavements Built for the Future

Recommended Floor Care Procedures

Porcelain Surfaces for Your Yard or Patio

VELVET MARMORINO. Fine natural mineral lime finish

C L AY PAV E R S Naturally best. How to pave. Easy guide to a good professional finish with Claypave

Transcription:

Permeable Pavement Binder Walkways Patios Tree Wells

Features & Benefits Creates Beautiful Pebble Surfaces Water Permeable Technology Superior Bond Strength Freeze-Thaw Resistant Eco-Friendly TOP 5 TIPS EkoFlo should be installed within an ambient and surface temperature range of 55-90 F. Shaded, low sunlight, or colder areas will lengthen cure times. Conversely, direct sun, warmer areas will shorten cure times. Avoid temperatures at or below 55 F and above 90 F for EkoFlo curing phase or storage. Under-applying EkoFlo binder will reduce bond strength. Conversely, over-applying will adversely affect the curing process and aesthetic. Always consult manufacturer coverage rate guidelines, or contact TechniSoil technical support at: 877-356- 2250. Do not install EkoFlo less than 48 hours before or after rainfall. In damp conditions, allow to dry completely before application. Disable any irrigation systems near treated areas during application and cure phase. EkoFlo binder should not come into contact with water at any time until fully cured. Ensure tools, mixing equipment, and project area are dry. Product video and install guide available online at: TechniSoil.com Mask all adjacent surfaces with tape and polyethylene film to protect surface materials from possible staining (i.e. stone, pavers, concrete, etc.). Clean any accidental spills immediately with acetone and wash cloth. ALWAYS PERFORM A TEST SECTION TO CONFIRM SUITABILITY OF MATERIALS & PROJECT CONDITIONS!

COVERAGE GUIDELINES EkoFlo permeable pavement binder is best suited for use with screened, triplewashed, and dried pebbles. When mixed properly, pebbles should be evenly coated throughout before installing. Do not use more EkoFlo binder than recommended unless pebbles are not evenly coated after mixing. Over-applying EkoFlo binder can cause foaming to occur during the cure phase. EkoFlo is not recommended for vehicular surfaces. Pebble Size Range EkoFlo ounces / 5-gallon bucket of pebbles Coverage Rate ¼ 24 ounces 30 ft 2 /gal ¼ 16 ounces 40 ft 2 /gal ½ 12 ounces 50 ft 2 /gal 1.5" recommended installation depth 5-gallon bucket = 45-55 lbs Use EkoFlo with: Pebbles & Rocks Recycled Glass Synthetic Mulch Chips Materials should be: Cleaned thoroughly Moisture free Sediment & dust free No larger than ½ inch

INSTALLATION INSTRUCTIONS 01Pebbles or other suitable Pebble Selection materials ranging in size from 1/8" - 1/2" in diameter are recommended for optimal results. 02 Subgrade & Subbase Excavate project area to account for water percolation and drainage. Install subbase that satisfies load bearing and drainage needs. 04 Mix EkoFlo Add pebbles to 5-gallon bucket, wheelbarrow, or mortar mixer. Use mixing equipment that is free of sediment or moisture. Refer to coverage chart to determine EkoFlo binder needed. Mix until all pebbles are evenly coated. 05 Install Material Pour blended pebble mixture directly onto subbase and rake or screed into place. EkoFlo treated pebbles should be installed within 15 minutes of mixing. 03 Pebble Washing Using a bucket or wheelbarrow, thoroughly wash pebbles with water and mild detergent (if needed). Agitate pebbles, rinse, and allow to dry completely. 06 Finishing Trowel and compact pebble mixture to grade. For ease of use, coat tools lightly with cooking oil spray. Pebbles should be flush and smooth at surface level. Allow 24-72 hours to cure. Clean tools immediately after use with WD-40 and a rag.

READY-TO-USE BUCKET KIT 4 ft 2 at 1.5 depth Mix material inside bucket Binder, gloves, and instructions included Ideal for small to medium size projects Trinity Creek Cabo Mountain Redwood Beach

BUCKET KIT INSTALLATION INSTRUCTIONS 02 Mix EkoFlo Use 5-gallon bucket as a mixing container. Pour entire contents of 16oz binder bottle into pebbles. Use EkoFlo Mixing Wand to mix until all pebbles are evenly coated. 03 Install Material Pour blended pebble mixture directly onto subbase and rake or screed into place. EkoFlo treated pebbles should be installed within 15 minutes of mixing. 01 Excavate Subgrade & Subbase project area to account for water percolation and drainage. Install subbase that satisfies load bearing and drainage needs. 04 Finishing Trowel and compact pebble mixture to grade. For ease of use, coat tools lightly with cooking oil spray. Pebbles should be flush and smooth at surface level. Allow 24-72 hours to cure. Clean tools immediately after use with WD-40 and a rag.

Made with pride in the USA Permeable Pavement Binder