River Road New Castle Marsh Restoration Recommendations

Similar documents
Shoreland Protection in Maine Communities of the Piscataqua River Estuary

Freshwater Wetlands Inventory Outreach Activities for the Freshwater Wetland Mitigation Inventory of Nineteen Coastal Communities Report

COMMUNITY RESILIENCE IN COASTAL NEW HAMPSHIRE

Eelgrass Distribution in the Great Bay Estuary and Piscataqua River for 2013

The Napa River Flood Protection Project

Developing 2015 High-Resolution Impervious Cover Estimates for the 52 Towns in the Piscataqua Region Estuaries Partnership: Final Report

Prioritizing Tidal Wetlands: A Landscape Approach

Shoreland Buffer Module for GRANIT Data Mapper

Draft Rhode Island Stormwater Design and Installation Standards Manual

EMERGENCY ACTION PLAN

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

STATE OF NEW HAMPSHIRE. RSA Chapter 482-A. Water Division/Wetlands Bureau

TOWN OF BEDFORD CONSERVATION COMMISSION

Regional Restoration Planning:

NJ Department of Environmental Protection

Town of Peru Comprehensive Plan Executive Summary

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

How much of the Piscataqua Region watershed is currently covered by impervious surfaces and how has it changed over time?

Appendix E Preliminary Location Hydraulic Study

SECTION 5: REACH RECOMMENDATIONS/MAPS

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Preparing New Hampshire for Projected Storm Surge, Sea-Level Rise, and Extreme Precipitation

Shoreline Master Program Town of La Conner, Washington

Erosion & Sediment Control Plan Application Form & Checklist

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Leduc Industrial Outline Plan SE W4

Town of New Durham Zoning & Land Use Odinance

HAZARD MITIGATION GOALS AND OBJECTIVES

Weston Conservation Commission

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Letter of Notification For East Lima Station Expansion Project

THE PROTECTION OF CHATHAM COUNTY S NATURAL RESOURCES - THE POLICY SIDE

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Information for File #MVP MVM

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

ITEM # _ 41 _ DATE: COUNCIL ACTION FORM MAJOR FINAL PLAT FOR MENARDS SUBDIVISION BACKGROUND:

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Review of Northwood s Stormwater Management Regulations Northwood, New Hampshire

Recent Tidal Creek Restoration Efforts in Tampa Bay

Why a new Food & Farm Ordinance?

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

Existing Conditions and Environmental Consequences Floodplains

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

Mitigation for the I-93 Improvements Salem to Manchester

Weston s Wetlands, Stormwater, & Open Space

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Ecosystem Restoration Business Line Budgeting A Systems Approach

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Whitemarsh Township Greenway Plan

City of Waco Stormwater Management Regulations

Driveway Regulations TOWN OF FREMONT ROCKINGHAM COUNTY NEW HAMPSHIRE

Central Lake Ontario Conservation Conservation Lands Master Plan

Ashbridges Bay Erosion and Sediment Control Project

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

Peninsular Florida Landscape Conservation Cooperative. Marine and Estuarine Priority Resources and Conservation Targets

ITS Concept Development Activity Descriptions

Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders. Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

The Moors at Arne Project, Managing Coastal Change

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

LAMPREY RIVER SUBWATERSHED

Assessment of Key Municipal Planning Regulations for. Derek Sowers Conservation Program Manager Piscataqua Region Estuaries Partnership

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

POLE BRIDGE ROAD NEAR FIVE LOT FARM

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Anne Arundel County s Severn River Watershed Implementation Strategy. Severn River Association

Waterfront Land Use Planning Survey! Celebrating 20 years of Partnership

6. CPRC Group, requests sketch plan review for 70 Pleasant Hill Road, Map R77, Lot 7

City of Easton Storm Water Program Development Project Frequently Asked Questions August 27, 2018

Innovative Land Use Techniques

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Westport Master Plan. Town of Westport. Master Plan Master Plan Update Committee. Westport, Massachusetts

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

Information for File #MVP DAS

Highlands Region Stormwater Management Program Guidance

A: Downtown Diversion Pipe

TOWN OF BETHLEHEM OPEN SPACE CONSERVATION PLAN PUBLIC MEETING: OCTOBER 12, 2017

Living Underwater: Hazard Mitigation Challenges from Sea Level Rise and Tidal Flooding

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

The South Carolina Stormwater Ponds Research and Management Collaborative

Point-No-Point Tide-Gate & Outfall Replacement Project. Briefing Memo 2013

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

1/21/2014. Definitions vary widely Legal vs. functional Not always obvious. Wetlands are legally protected by Clean Water Act (1972)

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

30% Design Technical Report

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Restoring Water Ecosystems in NYC Parks

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

Lake and Stream Restoration Project

Inventing The Future 2005 Planning Retreat

Severn River Sub-Watershed: BMP 09-Retrofit

San Diego River Coalition 2012 Work Plan

Transcription:

University of New Hampshire University of New Hampshire Scholars' Repository PREP Reports & Publications Institute for the Study of Earth, Oceans, and Space (EOS) 6-2010 River Road New Castle Marsh Restoration Recommendations Rockingham County Conservation District Follow this and additional works at: https://scholars.unh.edu/prep Part of the Marine Biology Commons Recommended Citation Rockingham County Conservation District, "River Road New Castle Marsh Restoration Recommendations" (2010). PREP Reports & Publications. 112. https://scholars.unh.edu/prep/112 This Report is brought to you for free and open access by the Institute for the Study of Earth, Oceans, and Space (EOS) at University of New Hampshire Scholars' Repository. It has been accepted for inclusion in PREP Reports & Publications by an authorized administrator of University of New Hampshire Scholars' Repository. For more information, please contact nicole.hentz@unh.edu.

River Road New Castle Marsh Restoration Recommendations This report is available at University of New Hampshire Scholars' Repository: https://scholars.unh.edu/prep/112

Background: Rockingham County Conservation District River Road Marsh and Stuart Farm Restoration Projects Final Project Report June 2010 PREP s 2009 (YR 13) workplan allocated $30,000 of EPA 320 funds for restoration project funding (Workplan ID 09-D-2). $9,500 of this allocation went to the Rockingham County Conservation District (RCCD) to fund planning work on two separate salt marsh restoration projects: 1. Stuart Farm (Stratham, NH) 2. River Road Marsh (New Castle, NH) Overview of Projects: 1. Stuart Farm (Stratham, NH) The project scope involved completing engineered plans and federal and state permits necessary to allow the replacement of a failing culvert located at the Stuart Farm in Stratham, NH. The purpose of this project was to obtain the plans and permits so that the landowners can move forward quickly with the construction component. The salt marsh directly affected by this culvert is approximately 12 acres in size, and connects to the Squamscott River. The property is owned by one landowner. The existing oval bituminous coated corrugated pipe (approximately 7 feet tall, 12 feet wide, and 60 feet long was installed in 1993 (with assistance from NOAA & USF&W S funds) to replace a tide gate that was limiting salt water flow. With the new culvert installed, the increased influence of salt water restored approximately 12 acres of salt marsh. Salt water corrosion greatly shortened the expected life of the corrugated culvert, which has nearly completely rusted out through the bottom. Several extreme flood events in 2009 and 2010 severely deformed the culvert and caused it to be a tidal constriction. Due to the failing culvert, the road at this site has been overtopped by floodwaters repeatedly and is a source of fine sedimentation into the adjacent marsh. Upstream inlet Downstream (bayside) outlet

The site was reviewed by NRCS staff and is included in the Evaluation of Restorable Salt Marshes in New Hampshire in 1994 (restriction # 110 in the above mentioned report). Restoration objectives have been revisited several times by NHCP and NHDES staff with agreement that an embedded HDPE culvert was probably the best solution due to the need to keep the farm road open and is resistant to salt water degradation. A low-cost bridge crossing option was also evaluated by the design engineer, but was not deemed feasible for the site. The RCCD evaluation of the site included hydrologic analysis, survey data, wetland delineation, an engineered design and specifications, and a permit application to the NHDES Wetlands Bureau for the failed culvert replacement. Results of the project were presented to the Stratham Conservation Commission, landowners, and PREP staff. Funding for the culvert replacement itself is expected to come from the NRCS EQIP program. The final engineering plans and wetlands permit for this project are on file within the PREP office library. The Stratham Conservation Commission provided $500 cash match towards the project. 2. River Road Marsh (New Castle, NH) The project scope involved completing an assessment and restoration evaluation of a small degraded salt marsh interfaced with a freshwater marsh. The purpose of the study was to provide a set of restoration alternatives for the site. The marsh is located in the middle of two properties (co-owned) by willing landowners on an extremely well traveled and viewed site on River Road in New Castle, NH. There is an existing sewer line and pump station adjacent to the marsh with an easement that the Town of New Castle holds that was installed in the mid 1970 s. An existing 15 RCP culvert that is 44 long (according to an NRCS field survey completed in 1993) connects the marsh to Portsmouth Harbor beneath River Road. The site was reviewed by NRCS staff and is included in the Evaluation of Restorable Salt Marshes in New Hampshire in 1994 (restriction # 54 in the above mentioned report). The site and restoration objectives have been revisited several times by NHCP staff. Although noted in the 1994 report, due to the lack of willingness of a former landowner, the restoration effort was stalled in 2003. The RCCD evaluation of the site included hydrology analysis, survey data, wetland delineation, and alternative restoration options/plans. Results of the study were described in a public presentation and a report to landowners and municipal officials in New Castle. The data that was collected under the assessment will be available for use in any future design plan. It will also assist in educating the landowners on appropriate methods that may restore natural surface hydrology and create conditions that will naturally and inexpensively manage mosquito populations, as well as to optimize the functionality of the salt marsh. It is anticipated that this ecological analysis/assessment and educational outreach project will result in a salt marsh restoration effort that will be completed efficiently, effectively and in an ecologically sound manner with interested, educated, and

willing landowners. The New Castle Conservation Commission spent $2,000 cash and $263 in-kind on this project. Attachments River Road New Castle Marsh Restoration Recommendations Report, June 1, 2010 This project was supported funding from the US Environmental Protection Agency through an agreement with the University of New Hampshire.