Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Similar documents
St. Clair Avenue West Area Transportation Master Plan

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

Master Environmental Servicing Plan & Secondary Plan

Leaside to Main Infrastructure Refurbishment Project

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

City of Toronto. Emery Village Transportation Master Plan

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

CHAPTER 5: GUIDING PRINCIPLES

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Highway 2, Courtice

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

The Gore Road Queen Street East to Castlemore Road

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Bridge Type Assessment and Evaluation

Burloak Drive Grade Separation

Master Environmental Servicing Plan & Secondary Plan

Public Information Centre. Welcome

Rapid Transit Implementation Working Group

Commissioners Road West Realignment Environmental Assessment

Elevated Water Storage Facility and Pumping Station Municipal Class EA for Pressure District 7: PIC # 1 Summary

Building the transportation network we need for the future

Welcome. Walk Around. Talk to Us. Write Down Your Comments

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

Rapid Transit Implementation Working Group September 14, 2017

Commissioners Road West Realignment Environmental Assessment

HURON COMMUNITY PLAN

A Guide to Open Space Design Development in Halifax Regional Municipality

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Portage Parkway Environmental Assessment Public Information Centre No. 1

Public Information Centre #1

SUBDIVISON & ZONING BY-LAW AMENDMENT

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

APPENDIX L3. Table of Contents. SWP EA Information Sheets

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Evaluation Criteria. Detailed Evaluation Criteria

Variance from Chapter 297, Signs, of the Former City of Toronto Municipal Code Bloor Street West (High Park)

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Ashbridges Bay Erosion and Sediment Control Project

Emery Village Road 2A Municipal Class Environmental Assessment Study

Bloor St. W. Rezoning - Preliminary Report

PORT WHITBY COMMUNITY

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Mavis Road Class Environmental Assessment

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

WELCOME TO OPEN HOUSE # 3

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

MAYFIELD WEST SECONDARY PLAN PHASE 2

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

March 21, 2018 ALCA Meeting. March 21, 2018

1071 King Street West Zoning Amendment Application - Preliminary Report

CALL TO ARTISTS Expression of Interest (EOI)

From: Director, Community Planning, Etobicoke York District

Director, Community Planning, Etobicoke York District

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

Public Information Centre

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

KING CITY COMMUNITY PLAN

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Scarborough Waterfront Project

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Lawrencetown Beach & Rainbow Haven Beach

WELCOME TO OPEN HOUSE TWO November 28, 2018

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Transportation Master Plan Schedule B Projects Road Name From To Description of Works Southcote Road Garner Road Twenty Road Extension

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

6461 Steeles Avenue East - Zoning By-law Amendment Application - Preliminary Report

1 of :37 PM

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Dublin Mountains Visitor Centre

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017

BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Relief Line Project Assessment

elcome Public Information Centre No. 3 May 12, 2009 Burnhamthorpe Road East From Arista Way to Dixie Road Class Environmental Assessment (EA) Study

Transcription:

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study Public Drop-in Event 1 Thursday, October 12, 2017 6:00 p.m. to 8:00 p.m. Humbercrest United Church

Welcome Welcome to the first Public Drop-in Event (PIE) for the Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment (EA). Purpose of this Public Drop-in Event The panels will present information about the following: The study area Environmental assessment process being followed Problem to be addressed Existing conditions Proposed alternatives Criteria that will be used to evaluate the alternatives. We are seeking your feedback regarding: Proposed alternatives Criteria that will be used to evaluate the alternatives. Project Team representatives are available to discuss the project with you. You are encouraged to share your input using the comment forms provided.

Project Study Area The existing Baby Point Wastewater Pumping Station Forcemain is located in the vicinity of Bloor Street West and the South Kingsway in the City of Toronto. The Study Area includes the neighbourhoods of Baby Point, Old Mill, and Kingsway South in the City of Toronto. It falls within the land holdings of the Toronto and Region Conservation Authority (TRCA) and the City of Toronto, passing through Étienne Brûlé Park and King s Mill Park adjacent to the Humber River.

Municipal Class Environmental Assessment Process This study is being carried out as a Schedule B project in accordance with the Municipal Class Environmental Assessment (MCEA) process. This is an approved assessment approach for municipal infrastructure projects under the provincial Environmental Assessment Act. As a Schedule B project, the Study requires the completion of Phases 1 and 2 of the MCEA process. Upon completion of the Study, a Project File Report will be prepared and placed on the public record.

Problem Statement The problem statement for the Baby Point Wastewater Pumping Station Forcemain is defined as follows: The Baby Point Wastewater Pumping Station Forcemain is nearing the end of its service life. In order to ensure reliable future operation of the pumping station, an upgrade to the existing infrastructure will be required to provide redundancy and back up to the existing forcemain. The City of Toronto has initiated a Municipal Class EA Study to select and evaluate alternatives for the forcemain upgrade, and identify a preferred solution that minimizes effects to the environment while ensuring continued reliable operations of the pumping station.

Existing Natural Environment Conditions It is important to understand the existing natural conditions in the study area in order to determine the effects that the proposed alternatives may have on them. The Humber River is present within the study area, and is a Canadian Heritage River. Vegetation present in the study area includes cultural meadow (lawn), as well as some cultural forest and some swamp and marsh areas.

Existing Social and Cultural Conditions It is important to understand the existing socioeconomic and cultural conditions in the study area in order to determine the effects that the proposed alternatives may have on them. There are a variety of residential properties surrounding the study area, including detached and semi-detached homes, townhouses, apartments and condominiums. Businesses, including retail stores, services, and restaurants are present towards the east end of the study area, along Bloor Street West. The study area also passes through two parks, Étienne Brûlé Park and King s Mill Park. The study area north of Old Mill Road/Catherine Street falls within the Baby Point Heritage Conservation District Study area. The study area contains the Old Mill Bridge, and features stone retaining walls along the Humber River that have potential cultural heritage value or interest. The Toronto Transit Commission (TTC) Bloor Subway runs underneath Bloor Street along and adjacent to the south end of the study area. Old Mill Station is located southwest of the study area. Credit: Google Maps

Assessment and Evaluation Process This study is following the process outlined below to generate and evaluate alternatives and select a Preferred Alternative for the Baby Point Pumping Station Forcemain. Identify Alternative Solutions 1. Do nothing 2. Contingency planning 3. Replace existing forcemain 4. Construct a new, second forcemain Generate Alternatives for Evaluation Option 1 Option 2 Option 3 Option 4 Generate Evaluation Criteria Used to assess and evaluate the alternatives Public Drop-In Event 1 WE ARE HERE Evaluate Alternatives Select a Recommended Solution Public Drop-In Event 2 Date/Location to be determined Finalize Preferred Solution Based on outcome of evaluation and comments received Prepare Project File Report Notice of Completion Project File Report placed on the public record for mandatory 30-day review period

Alternative Solutions Approach Description Comments Carry Forward? Do Nothing No change. Does not address the current requirement for providing redundancy and backup to the existing forcemain. Contingency Planning Emergency pumping during times of pipe failure. Provides a short-term solution but does not address the requirement for providing redundancy and backup to the existing forcemain. Replace Existing Forcemain Replace existing pipe with larger diameter pipe. Does not address the requirement for providing redundancy and backup to the existing forcemain in the case of a pipe failure. Twin Forcemain Construct a new, second forcemain in addition to the existing forcemain. Addresses the problem of redundancy and backup to the existing forcemain.

Alternatives for Evaluation The Project Team will be evaluating four alternatives for the alignment of the new, twin forcemain: Alternative Option 1 Option 2 Option 3 Option 4 Plan Description New forcemain would run along the approximate alignment of the existing forcemain. New forcemain would run southwest from Baby Point Pumping Station, and terminate before Park Lawn Cemetery. New forcemain would run southeast from Baby Point Pumping Station, connecting to an existing sanitary manhole on Jane Street at Bloor Street West. New forcemain would run southeast from Baby Point Pumping Station, connecting to an existing sanitary manhole on Jane Street at Bloor Street West. *To minimize potential impacts from construction, the use of horizontal directional drilling (HDD) will be incorporated into the construction methods of the selected alternative, where feasible.

Alternatives: Option 1 Option 1 places the new forcemain along the approximate alignment of the existing forcemain. There is potential to use HDD through part of the alignment during the construction of this alternative.

Alternatives: Option 2 Option 2 places the new forcemain southwest of the Baby Point Pumping Station, passing under the Humber River, crossing Bloor Street West and terminating before Park Lawn Cemetery. There is potential to use HDD through part of the alignment during the construction of this alternative.

Alternatives: Option 3 Option 3 places the new forcemain southeast of the Baby Point Pumping Station to the Old Mill Drive / Halford Avenue junction, continuing south to Bloor Street West, then east to an existing sanitary manhole on Jane Street. This alternative would be constructed in conjunction with work already planned along part of this alignment.

Alternatives: Option 4 Option 4 places the new forcemain southeast of the Baby Point Pumping Station to the Old Mill Drive / Halford Avenue junction, heading east along Halford Avenue to Riverview Gardens, south to Bloor Street West, then east to an existing sanitary manhole on Jane Street. This alternative would be constructed in conjunction with work already planned along part of this alignment.

Evaluation Criteria Natural Environment Socioeconomic Environment Cultural Environment Technical Considerations Cost Aquatic Species and Habitat Changes to fish and fish habitat including species of conservation concern Terrestrial Species and Habitat Effects to vegetation communities, wildlife and wildlife habitat, including species of conservation concern Effects to Groundwater Effects to groundwater quality and quantity Surface Water Effects to water flow, surface water features drainage and stormwater management Private Property Temporary occupation Temporary access restrictions during construction Permanent Easements Traffic Effects to traffic operations during construction Noise and Vibration Construction noise and vibration Air Quality Construction-related dust and emissions Businesses Effects to local businesses during construction Archaeology Archaeological Resources Heritage Effects to built heritage resources and cultural heritage landscapes Constructability Ease of construction Construction staging Number of construction stages and duration of construction Redundancy Available capacity in downstream sewer systems Geotechnical and Hydrogeological Suitability of soil and groundwater conditions for construction Utilities Number and scale of utilities impacted Capital and construction costs Operational and maintenance costs

Next Steps Following this Public Drop-In Event, the Project Team will: Review and respond to comments; Evaluate alternatives; Select a recommended plan; and Prepare for Public Drop-In Event 2. Stay Informed Please sign-in to receive future study updates. Stay informed by visiting our project webpage: www.toronto.ca/babypointstudy We encourage you to ask questions and fill out a comment sheet before you leave. Comments can be left in the box provided or submitted to the Project Team by October 26, 2017. If you would like to submit your comments directly to the Project Team, please contact: Andrea Counsel, P.Eng Consultant Project Manager WSP Canada Group Limited Phone: 905-882-1100 Fax: 905-882-0055 Email: andrea.counsel@wsp.com