Gerber Innovations M Series Laser. Site Preparation & Installation Manual

Similar documents
Pulsar NT 1212 & 2415 Laser Machine User Pre-installation Guide June, 2006

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

BASIL 6000 TUNNEL CAGE WASHER

Owner s Manual Refrigerated Compressed Air Dryers Model F-100

Rev B, 9/2/2009. Kodiak Chiller Overview

Advantage Series Bathing System Specifications

Roto-Jet I & II Tube Cleaning Systems

Owner s Manual Refrigerated Compressed Air Dryers Models F-3528, F-3529, F-3530, F-3531 & F-3532

Chiller installation, contractor s scope of work:

WineZone Ceiling Mount Ductless Split 15

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

CH750, CH751 & CH951 CHILLERS

CHILLER. Operator s & Installation Manual

Compressed Air. Filtration. Balston Membrane Nitrogen Generators. 157 Parker Hannifin Corporation

CHILLERS. Operator s & Installation Manual

CH250 AND CH251 CHILLERS

OWNERS GUIDE TO INSTALLATION AND OPERATION

INTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies

CHILLER. Operator s & Installation Manual

5.0 Installation Instructions

NQ Series Portable Chillers

CFF-500 CHILLER. Operator s & Installation Manual. Release Date: November 3, 1996 Publication Number: Revision Date: March 25, 2014 Revision: F

SF180 Installation Instructions

OPERATING MANUAL 12 AXIAL FANS

Automatic Laser Welding Machine LSM 212

VENTILATION FAN / LED LIGHT

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

Owner s Manual Refrigerated Compressed Air Dryer Model F-50

HT4700 Heating Jacket Instruction Manual

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION WATER TREATMENT

WL User Manual. Innovative Technology for a Connected World. global solutions: local support TM

4A6H5049E1000B 208/230/1/ /8 7/8 7/8 7/8 DURATION 208/230/1/ /230/1/ SPINE FIN 13 LBS., 10 OZ. YES

APPLICATION DATA SHEET

G71MPP WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

Enclosed Scroll Air Compressor System SES 3-5 HP

POWER VENTER. Model: PVE Series

User Manual. TN1500 Embedding Center. Read Prior to Operation! Always keep this manual near the unit! WP

Sullair Drains for Compressed Air Systems Zero Air Loss and Timed Solenoid

ENSPECO Recovery/ Recycle/ Evacuate/ Recharge

Service Facts. Split System Cooling 3.0 Ton 4A7A6036J-SF-1B-EN. January A7A6036J1000A

Site Requirements ADVANTAGE PLUS

7/8 NO NO NO PROPELLER DIRECT / /230/1/ SPINE FIN /8 8 LBS., 0 OZ. YES 7/8 3/8

KNHE48 SERIES WATER-TO-AIR HEAT EXCHANGER

DOLE REFRIGERATING COMPANY 1420 Higgs Road Lewisburg, Tennessee Phone (931)

AHU INSTALLATION & OPERATION MANUAL

G I E TECHNICAL GUIDE 95.5% AFUE SINGLE STAGE RESIDENTIAL GAS FURNACES MULTI-POSITION MODELS: TG9S DESCRIPTION FEATURES WARRANTY SUMMARY

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6024-SF-1B. Split System Cooling 4TTR6024A1000B CAUTION CAUTION WARNING

Owner s Manual. Terpene Trap CF 1000

SYSTEM DESIGN REQUIREMENTS

MARTIN Insertable Dust Collector

28 1/2"* 72.4 cm. (*28 1/2 " to include hinges.) 41 3/4" 106 cm. 27" 68.6 cm. 28 1/2"* 72.4 cm. (includes hinges.) 28 1/2"* 41 3/4" 106 cm

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

VENTILATION FAN READ AND SAVE THESE INSTRUCTIONS MODEL 50F / 70F / 70HS TABLE OF CONTENTS. Package Contents 2. General Safety Information 3

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

Screw Compressors AS SERIES. Capacities from: 59 to 124 cfm Pressures from: 80 to 217 psig

KHP Models. KHP Series. Heat Recovery Ventilator IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES

208/230/1/ CLIMATUFF /230/1/ YES NO NO PROPELLER 23-1 DIRECT / /230/1/ SPINE FIN

4TTR6036B1000A 208/230/1/ CLIMATUFF - SCROLL 3/4 3/4 3/4 3/4 3/4 208/230/1/ NO YES NO PROPELLER DIRECT

PDF Created with deskpdf PDF Writer - Trial ::

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

Installation Operation Maintenance

PVE SERIES POWER VENTER SYSTEM MANUAL

MACH N-407 Heat Pump Air-Cooled Chiller

Nitrogen Generation Systems Compressed Air Dryers

Installation, Operating & Maintenance Instructions. Air Handler Models: AH & AV

Casey Craft

Please Read and Save These Instructions.

Refrigerated Compressed Air Dryer

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

Energy Impacts of Compressed Air

SITE REQUIREMENTS 1 USER MANUAL INSTALLATION PACKAGE SITE REQUIREMENTS

General Purpose Ventilation Fan - Venturi-Style Blower PSIG

Connection Instructions: Welch 2042 Vacuum Pump To TVO-2 Vacuum Oven

WIRING DIAGRAM. This manual describes the unit features and explains how to set-up, operate and maintain these AirPac Models. COOLIT2600 COOLIT2900

CHEF BASE CABINETS Installation, Operation and Maintenance Instructions

PRE-INSTALLATION GUIDE

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

Installation and Operation Guide For

MDX. Non-Cycling Refrigerated Compressed Air Dryers with zero-loss Intellidrain. Operation & Maintenance Manual MODELS MDX

MDX. Non-Cycling Refrigerated Compressed Air Dryers with zero-loss Intellidrain Drain Trap. Operation & Maintenance Manual MDX MODELS 18 THRU 250

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS

RP, GP, XP Pro Series Installation Instructions

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6048-SF-1A. Split System Cooling 4TTR6048A1000A CAUTION CAUTION WARNING

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTB6-SF-3. Split System Cooling 4TTB6048A1000A, 4TTB6049A1000A CAUTION

Eco-Safe Digester. Installation Manual For E3 Series Digesters. Version 1.6 Published: Apr. 13, 2017

DRYMAX DRYMAX DRYMAX DRYMAX

Math. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb.

Product Data. Features/Benefits. 19XB Positive Pressure Storage System

Service Step by Step Trouble-Shooting Check-List

RIGID DC LIQUID CHILLER

208/230/1/60 5/8 5/8 5/8 5/8 5/8 20 CLIMATUFF /230/1/

Installation, Operation, and Maintenance Information

Installation Instructions Remote Blowers

Chromalox. Installation, Operation. Portable Industrial Unit Blower Air Heater Types SDRA and SDRA-RG RENEWAL PARTS IDENTIFICATION

Chapter 10: Laboratory Equipment

Watt-Muncher Load Bank Manual WATT-MUNCHER. Portable Load Bank. 6 June 2018 Simplex Service Page 1 of 13

INSTALLATION INSTRUCTIONS

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

SECTION AIR COMPRESSORS AND ACCESSORIES

Transcription:

Gerber Innovations M Series Laser Site Preparation & Installation Manual

Copyright Notice COPYRIGHT 2011 Gerber Innovations, Inc. All Rights Reserved. This document may not be reproduced by any means, in whole or in part, without written permission of the copyright owner. This document is furnished to support the Gerber Innovations RQL Laser. In consideration of the furnishing of the information contained in this document, the party to whom it is given assumes its custody and control and agrees to the following: The information herein contained is given in confidence, and any part thereof shall not be copied or reproduced without written consent of Gerber Innovations. This document or the contents herein under no circumstances shall be used in the manufacture or reproduction of the article shown and the delivery of this document shall not constitute any right or license to do so. Information in this document is subject to change without notice. Printed in USA 2

Chapter One: Introduction This manual is divided into the following sections: Chapter One: Introduction Chapter Two: Site Preparation and Installation Appendix A: Fax Form Appendix B: Floor plan Appendix C: Shipping Crates Conventions used in this manual WARNING: A warning statement contains information which, if not followed, could result in electrical shock hazard. CAUTION: A caution statement contains information which, if not followed, could result in personal injury or equipment damage. NOTE: A note contains important information that affects the successful completion of a task. TIP: A tip contains a suggestion to make your task easier or to remind you of something that may appear elsewhere in the booklet. 3

Technical Support If you have questions regarding using, maintaining, or troubleshooting the Fastrack Laser please contact Gerber Innovations. 800-400-3458 (Toll free in USA) 860-871-3757 (Outside the USA) gicsc@gerberscientific.com www.gerberinnovations.com GERBERnet GERBERnet is an online resource for the latest documentation, service notes and firmware downloads. A password is required for access to service level items. Follow the instructions below to register for an account. How to open a GERBERnet account 1 Go to the Gerber Scientific Products website, www.gspinc.com. 2 Click Support located at the top of your screen. 3 Click GSP e-service located on the left of your screen to open the GERBERnet log in page. 4 From this page you can sign up for a GERBERnet account by clicking Sign Up on the top left of the page. 5 When you have a GERBERnet account, type your User Name and Password on the right to log into GERBERnet. 6 Once into GERBERnet you can choose Document Library or Software Library. 4

Chapter Two: Site Preparation and Installation Prior to the arrival of your machine, there are certain things you can have prepared to facilitate a quick and smooth installation. The following information will guide you. Floor Plan Refer to Appendix B Typical Floor plans for the dimensions of the machine and necessary clearance. Preparation Allow sufficient room for operator access and work handling. Exhaust, electrical and pneumatic connections are most conveniently attached at the rear of the machine. Clean and wax the floor if appropriate. To avoid static electricity, which can interfere with computer operations, carpets are not recommended. Isolation of machine by partitions or windowed walls should be considered, as the machine generates noise and fumes and contains a class IV laser device. Floor stability is important due to the precision requirements of a die board. If there is other equipment in the building that generates vibration in the floor, such as presses or fork truck traffic, you will need to install the laser in a way that isolates it from these vibration sources. Riggers Depending on the location of the equipment in your plant you may want to use the services of a professional rigger. Contact Gerber Innovations to discuss whether this will be required in your case. 5

External Inputs and Connections Exhaust Blower Prior to delivery of your machine, the exhaust blower should be shipped to you. The blower is usually installed on the roof and as close as is practical to the laser. See Figure 1 for dimensions. The blower moves a high volume of air, on the order of 2200 cfm (62.3 cmm). You should check with your HVAC supplier as to the impact this will have on your environmental controls. Assembly The blower is shipped in a kit form. You must install the pulleys and belt. Be sure to put the larger pulley on the motor and the smaller pulley on the wheel. This acts as a speed increaser and is the correct way to assemble the blower. Exhaust Ducting Ten inch sheet metal ducting must be provided between the inlet of the blower and the rear of the rotary laser system. The use of elbows should be kept to a minimum. There should be three 5" (12.7 mm) connections on the rear of the rotary. From these connections a 5" (12.7 mm) flexible hose is used to connect to the rear of the machine. Gerber Innovations supplies 22' (6.7meters) of this hose, so the connections must be within 7' (2.13 meters) of the rear of machine. Next to the middle 5" (12.7 mm) connection there should be a 2" (5.08 cm) connection for the nozzle exhaust hose. See Appendix D Exhaust Ducting for a drawing of a typical installation. Electrical Note: Contact customer service to be sure the exhaust blower is shipped early. The 5.0 HP motor is nameplate rated at 208-230/460 VAC, 14.2-12.8/6.4 Amps, 60 Hz, 3 Phase. The motor started is customer-supplied and must be wired in conformance with local electrical codes. The start/stop switch should be mounted near to the front left of the Laser System. Automatic Blower Operation If you would like to use a magnetic starter as opposed to a manual starter, provision is made inside the Gerber Innovations controller to pilot the starter. We provide a normally open set of relay contacts and two terminals for field hookup. The exhaust can then be automatically controlled by the cutting system. The contact is rated for 110V or lower. 6

Figure 1 Exhaust Blower 7

Chiller The Chiller is required for the proper operation of the laser. It generates heat and noise which usually determines where it will be located and how it will be vented. The following list contains points of consideration. Due to the heat generated you may want to vent chiller out of the room. If the chiller is more than 15' (4.57 meters) away you may want to consider hard piping to a location at the rear of the machine. See the following optional piping section. The Laser includes 50' (15.25 meters) of flexible hose for connecting to the chiller or hard piping. The hose is 1½"ID. It is recommended to have the chiller visible from the operator s position on the laser system. This makes turning it on and off convenient and allows monitoring of the set-point and any fault conditions. The chiller is designed for an ambient temperature of 50 104 F. Please consult Gerber Innovations if your expected ambient temperature is outside this range. Hard Piping If you plan on installing hard piping from the chiller refer to the following points of consideration. The piping should have a pressure rating of 100 PSI and should be copper, schedule 80PVC or stainless steel. No other materials are allowed. The chiller has ½" NPTF fittings for inlet and outlet. The piping should be 1½" and have a minimum of elbows. Sweep elbows are recommended if more than 2 bends are required. Ball valve shutoffs should be provided at the end of the run. Both valves should terminate with a ½" NPTF connection fro the Gerber Innovations supplied hose barbs. As the water temperature is 74 F, the pipes should be insulated to minimize sweating and maintain the temperature. Hard piping should be installed before the installation date of the laser system. Electrical The chiller is nameplate rated at 460VAC, 60Hz, three phase, 17.5 amps. Coolant Fluid The coolant is not shipped with the laser. The chiller has a capacity of 36 gallons. The chiller requires distilled water which is readily available in the states. 30 gallons will be sufficient for most installations. In addition, a corrosion inhibitor must be added to the water. 10 gallons of Dowfrost SR1, (inhibited propylene glycol) must be purchased by the customer. This is to be mixed to a concentration of 20% - 35% by volume. (6 gal/30gal + 20%) so 6 gallons is the minimum you MUST use. 8

Rofin-Sinar Laser Services The laser system consists of an X-Y gantry system to carry the laser resonator plus a power supply/control. The laser system only requires electrical hookups. Electrical The Laser Control Cabinet requires 400 VAC, 60Hz, Three Phase, 25 Amp service. Note: 440VAC is at 10% threshold for Rofin Sinar Rating. If voltage is unstable in your area an AVR or a transformed voltage closer to 400 VAC. Gerber Innovations supplies two buck/boost transformers to convert to 440 VAC. These will need to be installed by an electrician, conforming to local electrical codes. If your facility voltage exceeds 460VAC then you will need to provide your own transformer to reduce the voltage to 400VAC. X-Y Table The X-Y system requires compressed air and electrical connections and optionally bottled cutting assist gas. In addition the X-Y system includes a computerized operator interface requiring an electrical connection. There is also a supplied refrigerated compressed air dryer that requires an electrical hookup. Pneumatic The optics and gas assist require extremely clean and moisture free air. The machine is supplied with a 4 stage filtration system and a refrigerated air dryer to provide high quality air for these functions. However, the plant air MUST be high quality to start with. An old compressor that is putting oil or oil vapor in the air or large amounts of water will quickly clog the supplied filtration. Your compressed air should be of good quality and water droplet free by the time it reaches the machine. You should provide at least 80PSI with a flow capacity of 15 SCFM to the machine. Electrical The motion controller requires a dedicated 120VAC single phase 60 Hz, 20 Amp service. The service outlet must be within 4 feet of the left rear of the machine. The machine must not be run thru an extension cord. The pneumatic sir drier and the operator interface computer can be supplied by a 4 outlet 120VAC single phase 60 Hz 20 Amp service. Optional Assist Gas If you have purchased the optional metal cutting kit then you can supply Oxygen and Nitrogen to the table. The MAXIMUM pressure is 300 PSI. These assist gases connect to the back of the machine using 5/16" OD tubing. Laser Installation Check list See Appendix A Fax Form for a Fax back form. Please FAX this form when the tasks are completed to the service department at (866) 418-4847. 9

Shipping and Handling Access During installation, large machine parts will need to be moved into final position. Any large objects in the work area should be moved out of the way prior to installation. Arrival Refer to Appendix C Shipping Crates for dimensions of the shipping crates. Four persons can handle the major assemblies, all of which break down into sub assemblies weighing 250lbs or less. Loading Dock Note: The exhaust blower is not listed and is usually shipped early. The availability of a loading dock will determine what type of truck is used. Please inform Gerber Innovations of this in advance of installation. Fork Lift A forklift is desirable but not necessary. A pallet and hand-operated jack and dollies are necessary. Uncrating Please wait for a Gerber Innovations service person before uncrating. Safety Please review the safety information as stated in the Laser Installation guide Tools When installing the machine, Gerber Innovations personnel will need access to the following: Claw hammer Pry bar 3/8" reversible/variable speed pistol drill Extension cord Fantastic or another general purpose cleaner Cloth rags Spray can of 10-weight oil Vacuum cleaner 10

Electrical Summary 600 WATT M LASER ELECTRICAL REQUIREMENTS DESCRIPTION AC VOLTAGE AMPERAGE FREQ., PHASE, OTHER Exhaust Blower 208-230/460 14.2-12.8/6.4 60Hz, 3 Phase Chiller 460 17.5 60Hz, 3 Phase Laser 440 25.0 60Hz, 3 Phase X-Y Table 120 20.0 60Hz, 1 Phase Computer, Air Drier 120 20.0 60Hz, 1 Phase, 4 outlets WARNING! This equipment utilizes a Class IV laser and appropriate safeguards associated with safe laser operation should be followed. Further information can be obtained via the Occupational Safety and Health Administration s (or OSHA s) Technical Manual (TED 01-00-015) and through the Laser Safety Institute of America (http://www.laserinstitute.org/). In addition, it may be advisable or required to designate a Laser Safety Officer (LSO) to ensure continued and safe operation of the laser. 11

Appendix A: Fax Form Fax Form Laser Install Gerber Innovations 24 Industrial Park Road West Tolland, CT 06084 Fax number 866-418-4847 Date: # of pages: Please put a checkmark in appropriate column YES NO 1) 440 VAC 3 Phase 20 KVA service for laser * (25A) 2) 460 VAC service for the chiller (17A) 3) 230/460 VAC service for exhaust blower (14.2-12.8/6.4) 4) 120VAC dedicated service for the motion controller (20A) 5) 120 VAC 4 outlet service for the air drier and computer (20A) 6) Compressed air lines 7) Exhaust blower installed and ducting run 8) Distilled water available (36 gallons) 9) Chiller hard piping (if desired) 10) Purchased 10 Gallons of Dowfrost SR1 * If facility voltage EXCEEDS 480 VAC then it must be lowered using a transformer prior to installing the laser. 12

Appendix B: Typical Floor Plans Floor Plans M1800L 102" x 117" 259 cm x 297 cm M2400L 102" x 157" 259 cm x 399 cm Recommended Total Clearance 159" x 170" 404 cm x 432 cm 159" x 210" 404 cm x 533 cm 13

Appendix C: Shipping Crates Description Skid Base & Tub M1800L M2400L Dimensions L x W x H Weight Dimensions L x W x H Weight 106" x 90" x 48" 269 cm x 229 cm x 122 cm Crate Gantry 105" x 63" x 55" 267 cm x 160 cm x 140 cm Crate Side Beams Crate Resonator Crate DC Power Supply 119" x 31" x 29" 302 cm x 79 cm x 74 cm 74" x 28" x 28" 188 cm x 71 cm x 71 cm 38" x 33" x 20" 97 cm x 84 cm x 51 cm Crate Chiller 56" x 38" x 54" 142 cm x 56 cm x 137 cm Crate RF Power Supply 54" x 19" x 29" 137 cm x 48 cm x 74 cm 1000 lbs 454 kg 800 lbs 363 kg 500 lbs 227 kg 350 lbs 159 kg 150 lbs 68 kg 1000 lbs (454 kg) 150 lbs 68 kg 138" x 90" x 48" 351 cm x 229 cm x 122 cm 105" x 63" x 55" 267 cm x 160 cm x 140 cm 153" x 31" x 29" 389 cm x 79 cm x 74 cm 74" x 28" x 28" 188 cm x 71 cm x 71 cm 38" x 33" x 20" 97 cm x 84 cm x 51 cm 56" x 38" x 54" 142 cm x 56 cm x 137 cm 54" x 19" x 29" 137 cm x 48 cm x 74 cm 1300 lbs 590 kg 800 lbs 363 kg 575 lbs 261 kg 350 lbs 159 kg 150 lbs 68 kg 1000 lbs (454 kg) 150 lbs 68 kg Dimensions Length x Width x Height (Weight) 14