SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Similar documents
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

TO BE FILLED OUT BY APPLICANT

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

New Development Stormwater Guidelines

Vegetated Filter Strips and Buffers

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Vegetated Filter Strips and Buffers

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Stormwater Drainage Assessment For Single Family Residence

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Huntington Stormwater Utility

Chapter 4 - Preparation of Stormwater Site Plans

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

PLAN SUBMITTER'S CHECKLIST


SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Use of Best Management Practices

Town of Essex Small Site Erosion Control Guide

Draft Rhode Island Stormwater Design and Installation Standards Manual

2.1.4 Roof Downspout Rain Gardens

Gloucester County PLAN SUBMITTER'S CHECKLIST

WHATCOM COUNTY LID CODE INTEGRATION PROJECT WCC (DEFINITIONS)

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Appendix I. Checklists

Plan Review Checklist

Erosion Control for Home Builders in the. City of Jacksonville

Wisconsin Contractors Institute Continuing Education

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

Lesson 2: Stormwater Best Management Practices (BMPs)

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

4. Contractor (and subcontractors if applicable) certification statement(s)

EROSION & SEDIMENT CONTROL

Structural Storm Water Best Management Practices (BMPs)

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Kearney Post-Construction Stormwater Program

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Analyzing the Bioretention Construction Sequence

SMALL PROJECTS SIMPLIFIED APPROACH

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

The Low Risk Site Handbook

Chapter 2 Roof Downspout Controls

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

2008 SWMM, 2010 Revision City of Tacoma

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Appendix D - Technical Design Criteria for BMPs

Pavement Removal Fact Sheet

Worksheet #14 Water Runoff Management

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

Homeowners Guide to Stormwater BMP Maintenance

Table of Contents. Preface... xv

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

Case Study Bioretention Installation and Maintenance

4. CONCEPT PLAN DEVELOPMENT

Erosion & Sediment Control Plan Application Form & Checklist

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

All materials in this presentation are taken from materials produced by:

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Preventing Storm Water Pollution: What We Can Do

Illinois Urban Manual

Drainage Control Plans

Storm Water Basics for Construction Sites Presented by Representatives from the City of Grass Valley and Nevada County

Types and Basic Design of Post-Construction BMPs

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Just The Basics: Illicit Discharge. What does it mean to me?

The proper use of erosion and sediment controls will allow the following objectives to be met:

Green Infrastructure and Low-Impact Development Technologies

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

a. Site Topography and Relationship to Surrounding Topography

CITY OF LACEY 2016 STORMWATER DESIGN MANUAL. Table of Contents. Chapter 1 Introduction Chapter 1 References and Information Sources...

Raingardens. Conserving and Protecting Water L

C-10. Disconnected Impervious Surface

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

Florence County Small Commercial Land Disturbance Permit Application

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

Town of West Point Plan of Development

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

APPENDIX G: TOWN ORDINANCE REVIEW

Transcription:

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol. II, Chapter 2. Applicant Name: Assessor Tax Parcel #: Project Name: Project Description Size of property: Total proposed area to be disturbed (includes all areas graded for septic systems, wells, driveways, yard area, etc): Total hard surface area to be created or replaced: Total volume of proposed cut: Total volume of proposed fill: Existing Site Conditions Describe existing topography: Describe existing vegetation: Describe any existing drainage features. Include any problematic areas: ie: seasonally wet areas, streams, steep slopes: Identify adjacent areas which may be affected by site disturbance: Streams Lakes Wetlands Residential Areas Roads Other www.kitsapgov.com/dcd/ Page 1 of 4

Required Elements Check the BMPs you will use to satisfy the required element and identify the BMP location on the SWPPP plan. A complete description of each BMP with associated detail is found in the Department of Ecology Stormwater Management Manual for Western Washington, Vol. II, Chapter 4.1 and Chapter 4.2. There are 13 Required Elements of the Construction Stormwater Pollution Prevention Plan. If an element does not apply to your proposal, provide a written justification identifying the reason an element is not applicable to the proposal. 1. Mark Area Disturbed by Construction Activity. Describe the total disturbed area (grading, building pad, driveway, septic installation, etc) and reference how you will clearly mark area of disturbance. BMP C101 Preserving Natural Vegetation BMP C102 Buffer Zones BMP C103 High Visibility Plastic or Metal Fence BMP C104 Stake and Wire Fence 2. Establish Construction Access. Describe construction access. BMP C105 Stabilized Construction Entrance BMP C106 Wheel Wash BMP C107 Construction Road/Parking Area Stabilization Not applicable - Existing access will prevent tracking of sediment onto public right of way. 3. Control Flow Rates. If there is substantial grading and/or the potential for stormwater runoff to flow off site during construction then one of the two BMPs must be identified and shown on the site plan. BMP C240 Sediment Trap BMP C241 Temporary Sediment Pond Not applicable Very little grading and/or site does not experience site runoff during storm events. 4. Install Sediment Controls. When there is grading on a site and the site is sloped, there is a potential for sediment to leave the site during storm events. Please identify a BMP below if your site has any slope to it. BMP C231 Brush Barrier BMP C232 Gravel Filter Berm BMP C233 Silt Fence BMP C234 Vegetated Strip BMP C235 Straw Wattles Site is flat and no potential for sediment to leave the site exists. www.kitsapgov.com/dcd/ Page 2 of 4

5. Stabilize Soils. All exposed soil must be protected from rainfall and wind erosion. From October 1 through April 30, no soil shall remain exposed and unworked for more than 2 days. From May 1 to September 30, no soils shall remain exposed and unworked for more than 7 days. BMP C120 Temporary and Permanent Seeding BMP C121 Mulching BMP C122 Nets and Blankets BMP C123 Plastic Covering 6. Protect Slopes. If the property has slopes, they must be protected from erosion if work is done on or near them. BMP C120 Temporary and Permanent Seeding BMP C130 Surface Roughening BMP C131 Gradient Terraces Not applicable The property does not have any slopes nor are there any slopes within 100 feet of the project boundaries. 7. Protect Drain Inlets. Storm drains shall be protected from sediment entering them. BMP C220 Storm Drain Inlet Protection Not applicable There are no storm drains on the property or within 100 feet of the stabilized construction access. 8. Stabilize Channels and Outlets. If temporary on-site conveyance channels are used, they must be stabilized to protect against erosion. BMP C202 Channel Lining BMP C209 Outlet Protection Not applicable Temporary on-site conveyance channels are not used for this project. 9. Control Pollutants. All pollutants shall be handled and disposed of in a manner that does not cause contamination of stormwater. Please identify any BMPs used for the project. BMP C151 Concrete Handling BMP C152 Saw cutting and Surfacing Pollution Prevention Above BMPs not expected to be necessary, however all necessary precautions will be taken to ensure pollutants are handled and disposed of in a safe manner. 10. Control De-Watering. If the site is expected to experience ponding and/or foundation is left in a manner that encourages water ponding, then the applicant shall make necessary plans to discharge the water in a manner that ensures it is safely cleaned before being discharged. Describe the plan for dewatering below. Not applicable. Site does not experience ponding and foundation will be kept dry such that water accumulation does not occur. www.kitsapgov.com/dcd/ Page 3 of 4

11. Maintain BMPs. All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. BMPs will be checked weekly and immediately after storm events. Other: 12. Manage the Project. Phasing of the project is encouraged to prevent soils from being exposed for extended periods of time. Please describe how you will be planning your project to ensure that construction impact and soil exposure is limited. If you are using pervious pavement, describe protection of underlying soils and timing of construction. 13. Protect Low Impact Development BMPs. Protect all Bioretention, Rain garden, and other LID BMPs from sedimentation, through installation and maintenance of erosion and sediment control BMPs on portions of the site that drain into LID areas or facilities. Restore BMP to fully functioning condition if sediment enters LID BMP. Prevent compaction of Bioretention and Rain garden BMPs by excluding both construction traffic and foot traffic. Protect lawn and landscape areas from compaction by construction equipment. Control erosion and prevent sediment from entering permeable pavement construction areas. Do not allow muddy construction equipment on base material or permeable pavement. Pavement fouled with sediment or no longer passing initial infiltration test must be properly cleaned. Keep all heavy equipment off existing soils under LID facilities that have been excavated to final grade. Coordinate with Utilities and other Contractors to ensure protection of LID facilities during construction. www.kitsapgov.com/dcd/ Page 4 of 4