GENERAL PLUMBING NOTES 6. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN

Similar documents
GENERAL PLUMBING NOTES

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

SECTION PLUMBING

MATERIALS Traps TRAPS. No. IPC IRC Description

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DOMESTIC WATER PACKAGED BOOSTER PUMPS

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards

GENERAL PLUMBING REQUIREMENTS

DRAWING SCHEDULE TAB REQUIREMENTS BY EQUIPMENT TYPE TYPE OF EQUIPMENT DESCRIPTION COMPONENT TAB REQUIREMENTS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SHOE PALACE HUNTINGTON PARK M.200

A. Section Joint Sealants: Seal fixtures to walls and floors.

University of Rochester October 17, 2008 Brooks Landing Business Center

Level I Chapter 1 Worksheet


Sanitary Drainage Systems

JAMES P. KISSANE, ARCHITECT

SECTION PLUMBING FIXTURES

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

A. All fixtures shall meet the requirements of ANSI A117.1, ANSI Z124.2 and the State of Texas Accessibility Standards (TAS).

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

GENERAL PLUMBING REQUIREMENTS

PLUMBING CURRICULA OUTLINE

B. Shop Drawings: Include diagrams for power, signal, and control wiring.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Mechanical Inspection Plumbing

CHAPTER VI BUILDING PLUMBING

PLUMBING INSTALLATIONS

SECTION PLUMBING FIXTURES AND TRIM. A. Types of plumbing fixtures required for the project include the following:

Pro Vent TM. Provent Systems Inc Capital Circle Lawrenceville Georgia

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

APPENDIX J ILLUSTRATIONS

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

GARCIA GALUSKA DESOUSA Consulting Engineers

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION

APPENDIX A. A 3.2 Determine the elevation of the highest. A 3.3 Subtract the sum of loss in static pressure

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

Read Only Document Not For Distribution

PLUMBING FIXTURES CHAPTER 27

2016 Plumbing Supplemental Plan Review List

APPENDIX L ALTERNATE PLUMBING SYSTEMS

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SPRINGS AT HAMMOCK COVE

Mechanical/Plumbing Specification

GENERAL PLUMBING REQUIREMENTS

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER

Ventilation Requirements Schedule SCHEDULE BASED ON IMC 2009

1 Exam Prep Plumber s Handbook Tabs and Highlights

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015

CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX A - RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM 1 2 1/AC AC SS SS/CC

WARRANTY POLICY & RECOMMENDED MAINTENANCE

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Read Only Document Not For Distribution

ABV AD AFF CO CODP COTG COWP CW DN EWC FD HB HW

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

Building Utilities 1 Plumbing and Sanitary Systems

PLUMBING REQUIREMENTS

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R

SECTION DOMESTIC WATER PIPING SPECIALTIES

2. All necessary storm and sanitary pumps shall be tied into emergency power, and sump levels shall be monitored electronically through the B.A.S.

2015 UPC Chapter 8 Indirect Wastes RV

c. Direct or indirect?

ASME STANDARDS IN MODEL CODES

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

SECTION PLUMBING SPECIALTIES

DOCUMENT TABLE OF CONTENTS

1 Exam Prep Plumbing State Contractors Practice Exam 2

Plumbing. September 8, 2018 Prices and product availability are subject to change without notice. 32" Curved Shower Pan with Round Front - Parchment

PRICE BOOK CONTENTS 010 PIPE

FEATURES. Other Fed-Flush Arrangements

PLUMBING FIXTURES Reserved

DeCA DESIGN CRITERIA HANDBOOK PLUMBING SYSTEMS

8 Kitchen Gooseneck. 4 Lavatory/Shower. 8 Shower. Adjustable Garden Tub. Diverter Spring & Spool Diverter Knob Plastic Aerator Speedy Locknut

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

Willoughby Industries - Security Products

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

GRILLE, REGISTER AND DIFFUSER SCHEDULE

STACKS AND STACK VENTS

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

Yale University Design Standards

PLAN REVIEW SUBMITTAL GUIDE

Work Order Number PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20

PRE-INSTALLATION GUIDE

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

1. Division 22 Section "Emergency Plumbing Fixtures." 2. Division 22 Section "Drinking Fountains and Water Coolers."

Plumbing and Drainage

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Transcription:

FIXTURE SCHEDULE DESIGNATION MANUFACTURER MODEL # FIXTURE DESCRIPTION P- AMERICAN STANDARD. P-A AMERICAN STANDARD. " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL LOW CONSUMPTION FLUSH TANK (. GPF) SEAT (NO LID) - CHURCH MODEL 900-SSC /" HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL (HANDICAP) LOW CONSUMPTION FLUSH TANK (. GPF) SEAT (NO LID) - CHURCH MODEL 900-SSC MOUNT FLUSH CONTROL ON WIDE SIDE OF STALL CONNECTION SCHEDULE WASTE VENT CW HW " " /" -- " " /" -- GENERAL NOTES. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS USED CERTAIN ABBREVIATIONS, CONVENTIONS, AND SYMBOLS, THE MEANING OF WHICH ARE ILLUSTRATED AND EXPLAINED WITHIN THE LEGEND.. PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE CAPACITY, SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT, BUT NOT EXACT DETAILS OF CONSTRUCTION. THE FACT THAT ONLY CERTAIN FEATURES OF THE INSTALLATION ARE INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER FEATURES WILL NOT BE REQUIRED.. COORDINATE WITH THE OTHER TRADES TO ENSURE THAT EACH TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, ` ELECTRICAL WORK, ETC.). LEGEND COLD WATER PIPE HOT WATER PIPE SOIL OR WASTE PIPE VENT PIPE TURNED TURNED DOWN TEE, OUTLET DOWN ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. P-B AMERICAN STANDARD "MADERA".000 " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL FLUSH VALVE - SLOAN NO. SEAT (NO LID) - CHURCH MODEL 900-SSC. GPF) " " " --. ONCE THE PIPING HAS ENTERED EACH UNIT FROM BELOW THE FLOOR SLAB, PIPING SHALL BE RUN ABOVE THE CEILING IN EACH UNIT UNLESS NOTED OR INDICATED OTHERWISE.. VERIFY ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND FIELD DIMENSIONS. TP TEE, OUTLET TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING c 0. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN ED EMERGENCY DRAIN PAN PIPING P-BA AMERICAN STANDARD "MADERA" 0.00 " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL (HANDICAP) FLUSH VALVE - SLOAN NO. SEAT - (NO LID) - CHURCH MODEL 900-SSC LOW WATER CONSUMPTION (. GALLONS PER FLUSH) LOCATE FLUSH CONTROL ON WIDE SIDE OF STALL " " " --. PROVIDE STOP OR ANGLE VALVES ON EACH WATER CONNECTION TO EACH FIXTURE.. PROVIDE ALL STRUCTURAL MEMBERS, SPORT BRACKETS, FLASHING, HARDWARE, ETC. REQUIRED TO INSTALL A COMPLETE SYSTEM. GATE VALVE PRESSURE RELIEF VALVE P-C AMERICAN STANDARD "TRIMBROOK".0 P- AMERICAN STANDARD "AQUALYN" 0.0 WALL- HUNG, VITREOUS CHINA, FLUSH VALVE URINAL FLUSH VALVE - SLOAN NO.-.0 LOW WATER CONSUMPTION (.0 GALLON PER FLUSH) MOUNT TOP OF FRONT RIM AT " A.F.F. PROVIDE SUITABLE FIXTURE CARRIER VITREOUS CHINA COUNTER TOP LAVATORY MIN. GPM @0PSI FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS " " /" -- " /" /" /" 9. PROVIDE CHROME PLATED ESCUTCHEON PLATES AT ALL EXPOSED WALL PENETRATIONS AND CEILING PENETRATIONS. 0. PROVIDE CLEANOUTS ON SANITARY LINES AND CONDENSATE DRAIN LINES AS REQUIRED BY CODE.. PROVIDE ACCESS PANELS FOR ALL SHUT-OFF VALVES LOCATED ABOVE GYPSUM BOARD CEILINGS. COORDINATE WITH GENERAL CONTRACTOR. FIXTURE BALL VALVE FIXTURE DESIGNATION (UNDER LINED) HOT WATER RETURN PIPE EXISTING COLD WATER EXISTING HOT WATER P-A AMERICAN STANDARD "AQUALYN" 0.0 VITREOUS CHINA COUNTER TOP LAVATORY MOUNT AT A.D.A. HEIGHT. GPM @0PSI FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS PROVIDE OFFSET TAIL PIECE. INSULATE TRAP, WATER SPLY TO MEET ADA MIN " /" /" /" ABBREVIATIONS EXISTING HOT WATER RETURN CONNECT TO EXISTING VACUUM P- FLORESTONE 0TS-W P- SPECIALTY PRODUCTS OB-0 P- ELKAY LR- P-A ELKAY LRAD- P-B ELKAY ECTSRADGBG 0x PREFAB FIBERGLASS BARRIER-FREE SHOWER MOUNT AT STANDARD HEIGHT. VALVE/HEAD: CFG 0CGR/ SINGLE LEVER DRAIN: INTEGRAL ICE MAKER BOX W/ WATER HAMMER ARRESTERS. USE MODEL OBFS-00 WHEN IN FIRE RATED WALL DOUBLE-COMPARTMENT, STAINLESS STEEL SINK FAUCET - SPEAKMAN NO. SC--BOCA/FLO C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG DOUBLE-COMPARTMENT, STAINLESS STEEL SINK (ADA) MOUNT AT A.D.A HEIGHT FAUCET - CFG- B C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG PROVIDE OFFSET TAIL PIECE. INSULATE TRAP, WATER SPLY TO MEET ADA SINGLE-COMPARTMENT, STAINLESS STEEL SINK (ADA COMPLIANT) FAUCET - SPEAKMAN NO. SC--BOCA/FLO C STRAINERS - () ELKAY MODEL LK- SPLY - /" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG " /" /" /" -- -- /" -- " /" /" /" " /" /" /" " /" /" /" AFF BTU CONN CW ED EX FL FU GC GPM HW IN MIN PC SAN OR S V VTR WTR W/ W/O W HW HWR CO WCO ABOVE FINISHED FLOOR BRITISH THERMAL UNIT CONNECTION COLD WATER EQUIPMENT DRAIN EXISTING FLOOR FIXTURE UNIT GENERAL CONTRACTOR GALLONS PER MINUTE HOT WATER INCHES MINIMUM CONTRACTOR SANITARY VENT VENT TO ROOF WATER WITH WITHOUT WASTE DOWN HOT WATER HOT WATER RETURN CLEANOUT WALL CLEANOUT COMPRESSED AIR NITROUS OXIDE OXYGEN NITROGEN EXISTING SOIL OR WASTE PIPE EXISTING VENT PIPE GENERAL SYMBOLS PLAN OR DETAIL NO. SHEET NUMBER KEYED NOTE NUMBER REVISION NUMBER P- SPECIALTY PRODUCTS OB- WASHING MACHINE BOX W/ WATER HAMMER ARRESTERS. USE MODEL OBFS-00 WHEN IN FIRE RATED WALL " /" /" /" N BUILDING NORTH ARROW /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P-A FLORESTONE -H P- AMERICAN STANDARD 0. P-9 FLORESTONE -W P-0 FIAT MSB EWH- A.O. SMITH ENLB-0 EWH-A A.O. SMITH ENLB-0 EWH- A.O. SMITH DEN-D EWH-A A.O. SMITH DEN-D 9x9 PREFAB ACRYLIC A.D.A. BARRIER-FREE SHOWER FIXTURE: PROVIDE A.D.A. GRAB BARS AND SEAT VALVE/HEAD: CFG 0CG/ SINGLE LEVEL DRAIN: INTEGRAL STANDARD FLOOR MOUNTED "x0" PEDESTAL LAVATORY FAUCET - CFG L TRAP - /" CAST BRASS WITH C.O. PLUG SPLY - /" ANGLE -TYPE WITH STOPS "x" PREFAB FIBERGLASS BARRIER-FREE SHOWER VALVE/HEAD: CFG 0CG/ SINGLE LEVEL DRAIN: INTEGRAL FLOOR-MOUNTED MOLDED STONE MOP BASIN FAUCET- FIAT 0-AA FURNISH WALL- MOUNTED MOP HANGER 0-GALLON ELECTRIC WATER HEATER (LO BOY). KW, 0--0,. AMPS SET WATER TEMP. CONTROL TO 0 F 0-GALLON ELECTRIC WATER HEATER (LO BOY). KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG A APARTMENTS ONLY) 0-GALLON COMMERCIAL ELECTRIC WATER HEATER 9.0 KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG C ONLY) 0-GALLON COMMERCIAL ELECTRIC WATER HEATER.0 KW, 0--0 SET WATER TEMP. CONTROL TO 0 F (BLDG A ONLY) " /" /" /" " /" /" /" " /" /" /" " " /" /" -- -- /" /" -- -- /" /" -- -- /" /" -- -- /" /" P- J.R. SMITH WALL CLEANOUT - PROVIDE SCREW COVER MATCH SIZE OF PIPE. -- -- -- -- P- J.R. SMITH 0 P- ZURN Z- W/ TYPE "E" STRAINER P- ZURN Z-00 GROUND CLEANOUT - PROVIDE CAST IRON TOP. PROVIDE "x"x" THICK CONCRETE PAD AT GRADE. FLOOR DRAIN W/ " NICKALOY STRAINER TOP W/ FUNNEL PROVIDE WITH "TRAP GUARD" AT PIPING INLET CONNECTION FREEZE-PROOF, ENCASED, ANTI- SIPHON, RECESSED WALL HYDRANT W/ LOCKABLE COVER PROVIDE OPTIONAL WALL CLAMP AND PLAIN BRONZE BOX -- -- -- -- " " -- -- -- -- /" -- FIRE HYDRANT WATER FLOW INFORMATION FIRE HYDRANT AT NE CORNER OF TH STREET AND PEGRAM TEST DATE: 9/0/0 STATIC PRESSURE = PSI RESIDUAL PRESSURE = PSI 0 GPM WATER FLOW AT RESIDUAL PRESSURE GPM AT 0 PSI PRESSURE FIRE HYDRANT AT NW CORNER OF TH STREET AND PEGRAM TEST DATE: 9/0/0 STATIC PRESSURE = 0 PSI RESIDUAL PRESSURE = PSI 0 GPM WATER FLOW AT RESIDUAL PRESSURE 9 GPM AT 0 PSI PRESSURE 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 SCHEDULES, NOTES, AND LEGENDS -00 December 0, 0 P00

FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units A,AHC, AM, AM, A, AHC, AM,AMHC FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private.0.0.0 KS Kitchen Sink, Two Compartment with Disposer Private.0.0.. DW Dishwashing Machine Private -.. 0.. IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private 0 0 0. - 0. 0. 0 0. WMB Washing Machine Box ( lb) Private.0.0.. CALCULATION NOTES REFERENCE THE FIXTURE CALCULATIONS ON THIS SHEET FOR THE DEMAND OF EACH UNIT TYPE. THESE NUMBERS ARE INCLUDED IN THE OVERALL CALCULATIONS FOR EACH BUILDING. THE BUILDINGS SHOW HOW MANY OF EACH UNIT TYPE ARE IN EACH BUILDING AND THAT UNIT NUMBER IS MULTIPLIED BY THE DFU AND WSFU FOR EACH APARTMENT TYPE. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.9.0. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D.. c 0 FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units B, BHC, BM, BHC FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private 0.0.0.0 KS Kitchen Sink, Two Compartment with Disposer Private.0.0.. DW Dishwashing Machine Private -.. 0.. IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private 0 0 0. - 0. 0. 0 0. WMB Washing Machine Box ( lb) Private.0.0.. TOTALS DFU. 9. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT..0 9. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: November 0, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks Units B, C FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL Bathroom Group, Flush Tank,. GPF Private 0.0.0.0 Toilet, Sink Private.0.0.0 KS Kitchen Sink, Two Compartment with Disposer Private.0.0.. DW Dishwashing Machine Private -.. 0.. IMB Ice Maker Valve Box - (Refrigerator / Ice Maker) Public or Private 0 0 0. - 0. 0. 0 0. WMB Washing Machine Box ( lb) Private.0.0.. TOTALS 9 DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.9.. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) " /" " INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: December, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING A HB Hose Bibb Public or Private 0 0 0.0 0.0.0 0 0 0 WMB Laundry Washing Machine Boxes Public or Private.0.0.. MS Janitor's Mop Sink Private.0.0.. LAV Lavatory Private.0.0.. UR Urinal (flush valve) Private.0 0.0.0 0 WC Water Closet (flush valve) Private 9.0 0.0.0 0 /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt Units A, A-M, A-M, A-M.. Units B, B-M. 9.. TOTALS DFU.. 9. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT..9 0. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES) INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private 0 0.0 -.0 0 Units B and C 9 9.. TOTALS 9 DFU 99.. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 FIXTURE DEMAND CALCULATIONS -00 December 0, 0 P00

FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private 0 0.0 -.0 0 Unit B... TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.. 9. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private 0 0.0 -.0 0 CALCULATION NOTES REFERENCE THE FIXTURE CALCULATIONS ON THIS SHEET FOR THE DEMAND OF EACH UNIT TYPE. THESE NUMBERS ARE INCLUDED IN THE OVERALL CALCULATIONS FOR EACH BUILDING. THE BUILDINGS SHOW HOW MANY OF EACH UNIT TYPE ARE IN EACH BUILDING AND THAT UNIT NUMBER IS MULTIPLIED BY THE DFU AND WSFU FOR EACH APARTMENT TYPE. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 Units B and C 09... TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING B HB Hose Bibb Public or Private 0 0.0 -.0 0 FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING D HB Hose Bibb Public or Private 0 0.0 -.0 0 Units B and C 09... Units B and C-HC... TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. TOTALS DFU... WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT.. 9. GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING C HB Hose Bibb Public or Private 0 0.0 -.0 0 WMB Washer Mixing Box Public or Private.0.0.. LAV Lavatory Private.0.0.. WC Water Closet Private.0.0 /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt KS Kitchen Sink, Two Compartments Private.0.0.. Units A, A-M, A-MHC, A-HC 9... TOTALS DFU 0.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. FIXTURE DEMAND TABULATION Project Name: BUILDING TYPE: NEW Project No.: PREDOMINANTLY: FLUSH TANK Date: September, 0 FIXTURE DESCRIPTION OCCANCY QTY. DRAINAGE SUB- LOAD VALUES IN WATER (EACH) LOAD VALUES IN WATER (TOTAL) Remarks FIXTURE TOTAL SPLY FIXTURE UNITS (WSFU) SPLY FIXTURE UNITS (WSFU) UNITS COLD HOT TOTAL COLD HOT TOTAL BUILDING D HB Hose Bibb Public or Private 0 0.0 -.0 0 Unit C-HC 9... Units B and C 9 9.. TOTALS DFU.. 0. WSFU DFU = DRAINAGE FIXTURE UNITS EIGHTH INCH SLOPE PER FOOT... GPM WSFU = WATER SPLY FIXTURE UNITS DIAMETER OF PIPE (INCHES).. INCHES REQ'D. 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 FIXTURE DEMAND CALCULATIONS -00 December 0, 0 P00

UNIT SHUTOFF VALVE TO BE LOCATED IN ACCESSIBLE LOCATION OUTSIDE OF MECHANICAL CLOSET. ROUTE INCOMING WATER SERVICE FOR UNIT TO LAUNDRY ROOM OR NEAREST BATHROOM VANITY. COORDINATE EXACT LOCATION WITH OWNER/ARCHITECT. ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BATT OR BLOWN INSULATION. BATT INSULATION OVER ALL EXPOSED PIPING. FIRE DAMPER P. WATER METER ASSEMBLY DETAIL NTS WATER METER (PROVIDED BY OWNER) LOCATED IN MECHANICAL CLOSET. COORDINATE LOCATION WITH MC AND OWNER. c 0 P00 INSULATION OVERLAP PIPE INSTALLATION DETAIL NTS JOIST NO INSULATION PIPING W/INSULATED JACKET RUN BELOW BATT INSULATION. NOTE: INSTALL PIPING ON WARM SIDE OF INSULATION -GALLON EXPANSION TANK CW SPLY MIXING VALVE, SET TO 0 MAX. EQUAL TO SYMMONS - SERIES. AHU LOW-BOY WATER HEATER ACCESS PANEL FOR FIRE DAMPER HW SPLY BALL VALVE (TYP.) REFRIGERANT PIPING FLOAT SWITCH ON SECONDARY DRAIN WIRED TO SHUT DOWN UNIT ON ACTIVATION BY WATER IN COND. LINE CONDENSATE DRAIN LINE W/ '' DEEP P-TRAP PROVIDE CORRUGATED STEEL SPLY LINES TO WATER HEATER WITH DIELETRIC NIPPLES TERMINATE /" COND. DRAIN LINE INTO HUB DRAIN WITH " AIR GAP HUB DRAIN CONNECTED TO STORM UNIONS AT INLET AND OUTLET CONNECTIONS (TYPICAL) COLD WATER ''DIP'' TUBE W/ HOLE AT THE TOP. INSULATED HOT WATER LINE HEAT TRAP " EXPANSION TANK EQUAL TO AMTROL WATER HEATER SHUT-OFF VALVE TO BE SAME SIZE AS THE PIPE IT SERVES. COLD WATER LINE. SEE DRAWINGS FOR SIZE AND SPECIFICS A.S.M.E. RATED PRESSURE TEMP. RELIEF VALVE PIPE PT RELIEF VALVE DWV COPPER FULL SIZE TO OUTSIDE OF BUILDING WATER HEATER - SEE FIXTURE SCHEDULE PROVIDE A '' HIGH PLASTIC SAFEPAN FOR ALL WATER HEATERS HUB DRAIN ON FIRST FLOOR ONLY ROUTE TP/PAN DRAIN, AND MECH. CONDENSATE DOWN TO FIRST FLOOR HUB DRAIN. '' SAFEPAN DRAIN, PIPE TO FLOOR DRAIN P00 MECHANICAL CLOSET DETAIL NTS P00 WATER HEATER PIPING DETAIL EWH- NTS CLEANOUT AND ACCESS COVER. TOP OF COVER TO BE FLUSH W/TOP OF FLOOR FLOOR LINE CLEANOUT AND ACCESS SINK COUNTER / BEND FLOOR LINE BALANCE OF PIPING SAME AS CLEANOUT TO GRADE STUDOR FLOOR CLEANOUT (FCO) CLEANOUT NOT TO BE LOCATED IN CARPETED AREA FLOOR LINE / BEND BALANCE OF PIPING SAME AS CLEANOUT TO GRADE P-TRAP /9/0 ::0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt NOTES:. Stancor Model SE-0 submersible effluent pump. HP, volt, 00 RPM, " discharge connection (shown as example).. Check valve (").. Stancor Oil-Minder V, A control system with built-in audible and visual alarm when pump does not run due to oil in pit or high liquid or high amperage condition. Provide silencing button for audible alarm built into panel. Panel shall have two contacts for a remote alarm location (one each for oil and high water or amperage alert). Junction box will be provided with multi-pin connector and cord in lengths as required, ft. standard, optional ft. increments.. Junction box will be provided with multi-pin connector and cord in lengths as required; ft. is standard, optional ft. increments available up to 0 ft.. All buried pump pressure discharge piping shall be protected with tapecoat CT corrosion protection tape.. Pump cable, probe cable, high liquid alarm cable, and pump "on" float cable ( ft. lengths).. High liquid alarm float with clamp device to mount to pump discharge piping.. Pump On float. 9. Power cord and molded ground plug ( ft. length) for V and 0 V single phase only under hp. Items,,,,, and 9 provided by Stancor as a Standard Package. P00 ELEVATOR PIT SUMP PUMP DIAGRAM NTS / TEE CLEANOUT AND ACCESS WASTE STACK/ STORM LEADER CLEANOUT (HORIZONATAL) P00 WASTE STACK/ STORM LEADER CLEANOUT (VERTICAL) / BEND CLEANOUT DETAILS NTS / BEND IF CLEANOUT OCCURS AT END OF LINE CLEANOUT TO GRADE (COTG) BRASS CLEANOUT PLUG W/COUNTER SUNK HEAD FINISHED GRADE '' SQUARE CONCRETE PAD WASTE LINE; LENGTH TO SUIT WASTE LINE TROWEL SMOOTH AND EDGE CONCRETE '' DEEP WITH WWF REINFORCEMENTS P00 FLOOR NOTES: ) THE AIR ADMITTANCE VALVE SHALL BE LOCATED A MINIMUM OF " ABOVE THE HORIZONTAL BRANCH DRAIN OR FIXTURE DRAIN BEING VENTED. ) ACCESS SHALL BE PROVIDED AT ALL AIR ADMITTANCE VALVES. THE VALVE SHALL BE LOCATED WITHIN A VENTILATED SPACE THAT ALLOWS AIR TO ENTER THE VALVE. ) THE AIR ADMITTANCE VALVE SHALL BE RATED IN ACCORDANCE WITH THE STANDARD FOR THE SIZE OF THE VENT TO WHICH THE VALVE IS CONNECTED. SAN. PIPE AIR ADMITTANCE VALVE DETAIL NTS 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 DETAILS -00 December 0, 0 P00

SCHEDULES OF HILTI THROUGH PENETRATION FIRESTOP SYSTEMS CONCRETE FLOORS CONCRETE OR BLOCK WALLS WOOD FLOORS GYPSUM WALLBOARD ASSEMBLIES TYPE OF PENETRANT CIRCULAR BLANK OPENINGS SINGLE METAL PIPES OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM F-A-000, C-AJ-00, C-AJ-000 F-A-000, C-AJ-00, C-AJ-000 F-A-000, C-AJ-00 C-AJ-, F-A0 C-AJ-, F-A0 C-AJ-, F-A0 C-BJ-0, C-BJ-0 TYPE OF PENETRANT CIRCULAR BLANK OPENINGS SINGLE METAL PIPES OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM C-AJ-00, C-AJ-000 C-AJ-00, C-AJ-000 C-AJ-00 C-AJ-, W-J-0 C-AJ-, W-J-0 C-AJ-, C-AJ-0, W-J-0 C-BJ-0, C-BJ-0 W-J-0, W-J-0 TYPE OF PENETRANT METAL PIPES OR CONDUIT NON-METALLIC PIPE OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM F-C-009, F-C-09 F-C-009, F-C-09 F-C-0, F-C-00, F-C-0 F-C-0, F-C-09, F-C- TYPE OF PENETRANT METAL PIPES OR CONDUIT NON-METALLIC PIPE OR CONDUIT F-RATING (HR) UL-CLASSIFIED SYSTEM W-L-0, W-L-0, W-L- W-L-0, W-L-0, W-L- W-L-0, W-L- W-L-0, W-L-0, W-L- W-L-0, W-L-0, W-L- W-L- ARCHITECTURE PLANNING INTERIORS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 SINGLE NON-METALLIC PIPE OR COUNDUIT (I.E. PVC, CPVC, ABS, FRP, ENT) F-A-0, F-A-0, C-AJ-09 C-AJ-09, C-AJ-, C-AJ- C-BJ-0 F-A-0, F-A-0, C-AJ-09 C-AJ-09, C-AJ-, C-AJ- C-BJ-0 SINGLE NON-METALLIC PIPE OR COUNDUIT (I.E. PVC, CPVC, ABS, FRP, ENT) C-AJ-09, C-AJ-09, C-AJ- C-AJ-09, C-AJ-09, C-AJ- C-AJ-09, C-AJ-09 SINGLE OR BUNDLED CABLES F-C-0, F-C-0 F-C-0 SINGLE OR BUNDLED CABLES W-L-0, W-L-, W-L- W-L-0, W-L-, W-L- W-L-9 SINGLE OR BUNDLED CABLES CABLE TRAY SINGLE INSULATED PIPES C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 F-A-00, C-AJ-09, C-AJ-09 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 F-A-0, F-A-0, C-AJ-090, C-AJ-09, C-AJ-09 F-A-0, F-A-0, C-AJ-090, C-AJ-09, C-AJ-09 F-A-0, C-AJ-090 C-BJ-00 SINGLE OR BUNDLED CABLES CABLE TRAY SINGLE INSULATED PIPES W-J-0 C-AJ-0, C-AJ-09, C-AJ-09 C-AJ-0, C-AJ-09, C-AJ-09 C-AJ-09, C-AJ-09 W-J-00 W-J-0, C-AJ-0, C-AJ-0 W-J-0, C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 W-J-00 C-AJ-090, C-AJ-09, C-AJ-0 C-AJ-090, C-AJ-09, C-AJ-0 C-AJ-090, C-AJ-0 C-BJ-00, W-J-0 INSULATED PIPES NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS F-C-00, F-C-0, F-C-0 F-C-00, F-C-0, F-C-0 F-C-0 F-C-009, F-C-0 CABLE TRAY INSULATED PIPES NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS W-L-0, W-L-09 W-L-0, W-L-09 W-L-0 W-L-0, W-L-09, W-L-0 W-L-0, W-L-09, W-L-0 W-L-0 W-L-0, W-L-00, W-L-0 W-L-00, W-L-0 W-L-09, W-L-0 W-L-09, W-L-0 W-L-0 ELECTRICAL BUSWAY /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0 C-BJ-00 ELECTRICAL BUSWAY NON-INSULATED MECHANICAL DUCTWORK WITHOUT DAMPERS MIXED PENETRANTS C-AJ-00, C-AJ-0 C-AJ-00, C-AJ-0 C-AJ-0, C-AJ-0, W-J-0, W-J-0 C-AJ-0, C-AJ-0, W-J-0, W-J-0 C-AJ-0, C-AJ-0 C-AJ-0, C-AJ-0, W-J-00 C-AJ-0, C-AJ-0, W-J-00 C-AJ-0, C-AJ-0, W-J-00 C-BJ-00, W-J-00 NOTES:. JOBSITE CONDITIONS OF EACH THROUGH-PENETRATION FIRESTOP SYSTEM MUST MEET ALL DETAILS OF THE UL-CLASSIFIED SYSTEM SELECTED.. IF JOBSITE CONDITIONS DO NOT MATCH ANY UL-CLASSIFIED SYSTEMS IN THE SCHEDULES ABOVE, CONTACT HILTI FOR ALTERNATIVE SYSTEMS OR ENGINEER JUDGEMENT DRAWINGS - 00-9-000.. WHERE MORE THAN ONE APPLICABLE UL-CLASSIFIED SYSTEM IS LISTED IN THE SCHEDULES, CHOOSE THE UL SYSTEM WHICH IS MOST ECONOMICAL FOR EACH THROUGH-PENETRATION FIRESTOP SYSTEM.. COORDINATE WORK WITH OTHER TRADES TO ASSURE THE PENETRATION OPENING SIZES ARE APPROPRIATE FOR PENETRANT LOCATIONS, AND VICE VERSA.. FOR -HOUR RATED GYPSUM WALLS, CONTACT HILTI FOR A UL-CLASSIFIED SYSTEM OR ENGINEER JUDGEMENT DRAWING - 00-9-000. 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: License No.: DETAILS -00 December 0, 0 P00

P0 TYPICAL DOMESTIC WATER RISER SCALE: NTS "CW TO APT. "CW TO APT. "CW TO APT. "CW TO APT. i"cw r"cw r"cw r"cw r"cw "CW i"cw NOTE: INSTALL SHUTOFF VALVE FOR DOMESTIC WATER IN ACCESSIBLE LOCATION. P0 "S "VTR TYPICAL WASHING MACHINE SANITARY VENT RISER SCALE: NTS WCB WCB WCB WCB "V "S "S "S WCO P0 "VTR TYPICAL KITCHEN SINK (WITHOUT AAV) SANITARY VENT RISER SCALE: NTS UNDER COUNTER UNDER COUNTER KIT SINK KIT SINK KIT SINK KIT SINK "S "V "S "S "S WCO NOTE: PROVIDE EXPANSION JOINTS EQUAL TO FERNCO "XJ" ON VERTICAL STACKS BETWEEN FLOORS / P0 "S "VTR TYPICAL FLOOR DRAIN SANITARY VENT RISER SCALE: NTS HUB DRAIN HUB DRAIN HUB DRAIN HUB DRAIN "V "S "S "S WCO LAV TUB/SHOWER "S LAV TUB/SHOWER "S LAV TUB/SHOWER "S LAV TUB/SHOWER "S "V LAV WC "S "V LAV WC "S "V LAV WC "S "V LAV WC "S "V "S "VTR "S "S "S WCO "S "S "V "V "V ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS ADDITIONAL SINK ON SELECT UNITS SEE ENLARGED PLANS 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 "VTR "VTR "VTR NOTE: WASTE STACK VENTS SHALL NOT HAVE AN OFFSET BETWEEN FLOORS. A VENT IS REQUIRED FOR ANY OFFSETS IN A WASTE STACK PER NCPC 90. P0 TYPICAL BATHROOM SANITARY VENT RISER SCALE: NTS "VTR "VTR /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 P0 HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK NOTE: WASTE STACK VENTS SHALL NOT HAVE AN OFFSET BETWEEN FLOORS. A VENT IS REQUIRED FOR ANY OFFSETS IN A WASTE STACK PER NCPC 90. OFFSET KITCHEN SINK, HUB DRAIN WASHING MACHINE SANITARY VENT RISER SCALE: NTS "V "V "V "S "V CO "V HUB DRAIN WCB KIT. SINK "S "V "S WCO HUB DRAIN WCB KIT. SINK "V "S CO HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK "S "V "V HUB DRAIN WCB KIT. SINK "S "V "V "V "V "S WCO HUB DRAIN WCB CO KIT. SINK HUB DRAIN WCB KIT. SINK HUB DRAIN WCB KIT. SINK "S "V "S "V "V "S "S WCO HUB DRAIN WCB KIT. SINK "V "S "V "V "V CO "V LAV WC TUB/SHOWER "S "S "V LAV WC TUB/SHOWER "S "S "V LAV WC TUB/SHOWER "S "S LAV TUB/SHOWER "S "S "S "S "VTR "S "V "V "V CO "V WC "S "S "V "S WCO "S "S "V P0 LAV TUB/SHOWER "S OFFSET STACK-UNITS SANITARY VENT RISER SCALE: NTS LAV TUB/SHOWER "S TUB/SHOWER "S "V "S WC LAV TUB/SHOWER LAV "S "V "S "S WC "V "S WC CO "V "S "S "V WC "S "S "S "S "V "V "S "S "V "V "S WCO "V CO TUB/SHOWER "S TUB/SHOWER "S TUB/SHOWER LAV LAV LAV "S LAV TUB/SHOWER "S "V "S "V "S "V "S WC WC WC "S "V "S WC "S "S WCO "S "S "S "S "V "V "V "S "S "V "V "V CO P0 "VTR TYPICAL KITCHEN SINK (WITH AAV) SANITARY VENT RISER SCALE: NTS AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR AAV KIT SINK BELOW FLOOR "S "V "S "S "S WCO 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: License No.: DETAILS -00 December 0, 0 P00

P- "CW TO STRUCTURE PROVIDE SHUTOFF VALVE AT "AFF ARCHITECTURE PLANNING INTERIORS INDOOR SITTING AREA P-B AAV STAIR A 0 " S /" CW " S /" CW " S /" CW " CW FCO " S " S " S " CW " S ELEC HUB DRAIN " V /" CW " CW MECH. MULTI-PURPOSE ROOM A RISER /" CW " CW P- "FD KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0GPM @ 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE. 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /" CW P- /" CW " S MULTI-PURPOSE ROOM B /" HW " S " S " S " CW " S " S STO. 0 STO. LOUNGE " CW P-BA MEETING " V " S CORR 0 " S " CW ENTRY 00 P-B WOMEN 0 " S P- " V " S " S " S LEASING HUB DRAIN0 /" CW WAITING 0 /" CW " S /" HW EWH-A /" HW /" HW /" CW P- HVAC 0A MEN " S " CW " V P-C " V " S P-BA " S " S " S " V /" CW PROP. MGR 0 P- HUB DRAIN " S FCO " CW " S " S " S /9/0 ::9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a HVAC 9 TENANT STO. " S " CW " S /" CW " S P- ELEV 90 " S " CW " CW " S " S /" CW " S " S FCO /" CW BUILDING A. - FIRST FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA A - December 0, 0 P0a -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0GPM @ 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE.. c 0 P- P- /" CW /" CW FCO " S " S /" CW /" CW /" CW " S /" CW " S " S /" CW " S " S /" CW " S " S /" CW " S " S /" CW " S " S " S " S " S " CW " S " CW " S " S " CW " S FCO " S " CW " S " S " CW " S /" CW " S " S /" CW " S " S /" CW " S /" CW " S " S /" CW " S " S /" CW /9/0 :9:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - FIRST FLOOR PLAN - AREA B - SCALE: /" = '-0" /" CW P- 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA B - December 0, 0 P0b -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN P- CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. PROVIDE AN OIL MINDER CONTROL AND PUMP SYSTEM FOR ELEVATOR SUMP. STANCOR MODEL #OM0SR-ELV OR EQUAL. V//0, /HP, 0GPM @ 0 FEET OF HEAD. SEE DETAIL ON DETAIL SHEET. ROUTE DRAIN TO EXTERIOR AND DISCHARGE " ABOVE GRADE. PROVIDE SPLASH BLOCK. PROVIDE /" HW CONNECTION AND PIPING TO DISHWASHER. PROVIDE TEE ON SINK DRAIN TAILPIECE FOR DISHWASHER DISCHARGE. " S HUB DRAIN EWH-A /" CW /" HW " S /" CW HUB DRAIN " CW /" HW P- FCO /" V " S " S " S " CW " S /" CW " S /" CW /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c /" CW BUILDING A. - FIRST FLOOR PLAN - AREA C - SCALE: /" = '-0" " S " S P- /" CW /" CW " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - FIRST FLOOR PLAN - AREA C - December 0, 0 P0c -00

KEY NOTES TO PLAN ARCHITECTURE PLANNING INTERIORS CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0.. c 0 /" HW, /" CW /" HW, /" CW P-0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - SECOND FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA A - December 0, 0 P0a -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - SECOND FLOOR PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA B - December 0, 0 P0b -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. EWH-A HUB DRAIN /" CW /" HW /" CW P- /" CW " CW /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - SECOND FLOOR PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - SECOND FLOOR PLAN - AREA C - December 0, 0 P0c -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. c 0 " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. /" HW, /" CW FROM FLOOR BELOW P-0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - THIRD FLOOR PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA A - December 0, 0 P0a -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. P- /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - THIRD FLOOR PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA B - December 0, 0 P0b -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. EWH-A /" HW /" CW /" HW P- /" CW /9/0 :9:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - THIRD FLOOR PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - THIRD FLOOR PLAN - AREA A - December 0, 0 P0c -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0a BUILDING A. - ROOF PLAN - AREA A - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA A - December 0, 0 P0a -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0b BUILDING A. - ROOF PLAN - AREA B - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA B - December 0, 0 P0b -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :9: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P0c BUILDING A. - ROOF PLAN - AREA C - SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING A. - ROOF PLAN - AREA C - December 0, 0 P0c -00

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 " CW P- " CW " CW " CW " CW BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING.. c 0 EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. P- UNIT B UNIT B UNIT B UNIT C THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. EWH- P- P- UNIT C P- P- FIRE RISER ROOM P BUILDING B. - FIRST FLOOR PLAN - SCALE: /" = '-0" /9/0 :0:0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B " S " S " S " S UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT C UNIT B UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0:09 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BUILDING KEY NOTES THIS PLAN. " CW " CW " CW EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING. c 0 UNIT B UNIT B UNIT C EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0:9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT B UNIT B UNIT C " S FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT B UNIT B UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING.. c 0 UNIT C " CW " CW " CW " CW " CW " CW UNIT B UNIT B UNIT B UNIT B UNIT C EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME. FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C FIRE RISER ROOM BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S " S " S " S " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT B UNIT B UNIT B UNIT B UNIT C UNIT C BUILDING B. - SECOND FLOOR PLAN - P SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P UNIT C BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" UNIT B UNIT B UNIT B UNIT B UNIT C 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 UNIT C " CW " CW " CW " CW " CW " CW UNIT B UNIT B UNIT B UNIT B UNIT C BUILDING KEY NOTES THIS PLAN EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME SANITARY SEWER PIPING TO SITE UTILITIES. COORDINATE PIPING TIE-IN CONNECTION POINT WITH CIVIL. PROVIDE GRADE LEVEL CLEANOUT ON UNDERGROUND SAINTARY SEWER PIPING OUTSIDE OF BUILDING. EXTEND AND CONNECT BUILDING MAIN OR INDIVIDUAL TOWNHOME DOMESTIC WATER PIPING TO SITE UTILITIES. COORDINATE PIPING CONNECTION POINT WITH CIVIL. PROVIDE PIPING MAIN SHUT-OFF VALVE AT CLOSEST ACCESSIBLE POINT IN BUILDING. THE P.C. SHALL NOTE THAT BUILDING B, B, B, AND B HAS THE DOMESTIC WATER AND SANITARY SEWER PIPING ENTERING THE TOWNHOME UNITS ON OPPOSITE ENDS OF THE TOWNHOME. BUILDINGS D AND D WILL HAVE THE DOMESTIC WATER AND SANITARY SEWER ENTERING THE TOWNHOME ON THE SAME SIDE OF THE TOWNHOME. THE P.C SHALL COORDINATE THE SANITARY SEWER FLOW DIRECTION TO MATCH HOW AND WHERE THE SANITARY SEWER PIPING MAIN ENTERS THE TOWNHOME.. c 0 FIRE RISER ROOM P BUILDING B. - FIRST FLOOR PLAN - SCALE: /" = '-0" /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P " S UNIT C FIRE RISER ROOM " S UNIT B UNIT B UNIT B UNIT B UNIT C " S BUILDING B. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S " S " S 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - FIRST FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C P BUILDING B. - SECOND FLOOR PLAN - SCALE: /" = '-0" UNIT C UNIT B UNIT B UNIT B UNIT B UNIT C /9/0 :0: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt P BUILDING B. - SECOND FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - SECOND FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 /9/0 ::0 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING B. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING B. - ROOF PLAN - -00 December 0, 0 P

"CW U/G LINE TO ON-SITE DOMESTIC MAIN SEE SITE PLAN FOR CONTINUATION ARCHITECTURE PLANNING INTERIORS P- 0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 /" CW " CW " VALVE /" CW UNIT A UNIT A HC UNIT A HC /" CW " CW KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN.. c 0 P- EWH-A P-A P-A /" HW /" CW /" HW /" CW /" CW /" CW " CW " CW "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. P-A P-0 /" HW P- P- P- /" CW /" CW /" CW "CW RISER UNIT A UNIT A UNIT A HC UNIT A HC P- P- P BUILDING C. - FIRST FLOOR PLAN - SCALE: /" = '-0" " U/G SANITARY SEWER LINE TO ON-SITE SANITARY SEWER MAIN SEE SITE PLAN FOR CONTINUATION " S STOR 0 /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BATHROOM 00 P-A P-A " V " S MULTI-PURPOSE ROOM 00 P-0 MAINT " S 00 UNIT A P-A " V " S " S " S "S STACK P- LAUNDRY 00 P- " V " S " S P- P " S " S " S FCO " S " S " S " S UNIT A " S UNIT A " S " S " S UNIT A HC UNIT A HC UNIT A HC " S " S " S " S " S " S " S " S " S BUILDING C. - FIRST FLOOR PLAN - SANITARY/VENT SCALE: /" = '-0" " S HUB DRAIN FIRST FLOOR ONLY " S HUB DRAIN FIRST FLOOR ONLY " S HUB DRAIN FIRST FLOOR ONLY " S " S UNIT A HC HUB DRAIN FIRST FLOOR ONLY FCO FCO 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - FIRST FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. UNIT A UNIT A UNIT A UNIT A KEY NOTES TO PLAN c 0 CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT. " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. UNIT A UNIT A UNIT A UNIT A P BUILDING C. - SECOND FLOOR PLAN - SCALE: /" = '-0" /9/0 ::9 PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - SECOND FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0 UNIT A UNIT A UNIT A UNIT A KEY NOTES TO PLAN CW RISER. SEE RISER DIAGRAM FOR SIZES. PROVIDE SHUTOFF VALVE AND WATER METER ON TAKEOFF AT EACH UNIT.. c 0 " VENT RISER AND DOWN. ROUTE "VTR ON ROOF. " SANITARY STACK AND DOWN. "WASTE STACK VENT AND DOWN. ROUTE "VTR ON ROOF. /" HW AND /" CW CONNECTION TO MOP SINK P-0. UNIT A UNIT A UNIT A UNIT A P BUILDING C. - THIRD FLOOR PLAN - SCALE: /" = '-0" /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - THIRD FLOOR PLAN - -00 December 0, 0 P

0 West Morehead Street, Suite 0 Charlotte, North Carolina 0 T:0..09 F:0..0. c 0 -/" CW RISER INSTALL ALL COLD WATER PIPING LOW IN ATTIC SPACE ON THE WARM SIDE (APARTMENT SIDE) OF THE ATTIC INSULATION. -/" CW RISER " CW RISER FROM BELOW -/" CW. TO RD FLOOR WATER HEATER CLOSET (TYPICAL OF RISERS) /9/0 :: PM C:\Users\mernst\\ Allen Street Development - - 0_mernst.rvt BUILDING C. - ROOF PLAN - P SCALE: /" = '-0" 9 R.G. Skinner Parkway Jacksonville, Florida CA 0 Ph: (90) -00 Fax: (90) -00 Eng. of Record: Scott R. Campagna License No.: 0 BUILDING C. - ROOF PLAN - -00 December 0, 0 P