SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Similar documents
SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SECTION AMENDED TOPSOIL

2.1.4 Roof Downspout Rain Gardens

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

Infiltration. Keep Water Where it Falls. Frank Franciosi Novozymes

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

2008 SWMM, 2010 Revision City of Tacoma

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Pavement Removal Fact Sheet

Guidance on Preparation of Construction and Maintenance Costs

4.6. Low Impact and Retentive Grading

Chapter 2 Roof Downspout Controls

SECTION TURF AND GRASSES

The following general requirements will be met for all planter box installations:

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

DECLARATION OF COVENANT FOR IMPERVIOUS SURFACE LIMIT

SECTION SOIL PREPARATION

Healthy Soils Part 2 2/19/2014

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

WQ-07 INFILTRATION TRENCH

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

Vegetation Management

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

SITE TOPSOIL & FINISH GRADING

SMALL PROJECTS SIMPLIFIED APPROACH

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

USDA Rain Garden Video fluid_planet.html

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Case Study Bioretention Installation and Maintenance

LANDSCAPE AND IRRIGATION REGULATIONS FOR THE CITY OF SAN MARINO

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Raingardens. Conserving and Protecting Water L

Tips for Maintaining and Enhancing Stormwater Management Areas

Erosion Control for Home Builders in the. City of Jacksonville

EAGLE POINT PARK. Issues of Concern. Eagle Point Park is a cultural, historic, and ecological treasure

Lesson 2: Stormwater Best Management Practices (BMPs)

Up By Roots Healthy Soils and Trees in the Built Environment

Background on LID in Western WA

Healthy Watershed Practices

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Ecological Landscaping Association's 2013 Conference & Eco-Marketplace February 27, Geoff Kuter, Ph.D. Agresource Inc.

SECTION FINE GRADING AND SOIL PREPARATION

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

WHATCOM COUNTY LID CODE INTEGRATION PROJECT WCC (DEFINITIONS)

Create your own. Rain Garden

COMPOST A USER'S GUIDE TO. The Beauty of Your Lawn & Garden Blossoms from the Soil

BMP 6.7.3: Soil Amendment & Restoration

Use of Best Management Practices

Structural Stormwater Best Management Practices

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

Homeowners Guide to Stormwater BMP Maintenance

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Low Impact Development Practices

Inspection and Maintenance of Stormwater Best Management Practices

2012 FINAL SOILS AREA 2 Envirothon Questions Answer KEY

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

A. Contractor shall provide product data for each type of product indicated.

SECTION 900 TURF ESTABLISHMENT

West Norriton Township

ABBREVIATIONS. Dwg LID of 1. Abbreviations

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Appendix C. Soil Amendments. Appendix C. C.1 General Description. C.2 Physical Feasibility & Design Applications

River Friendly Landscape Program Frequently Asked Questions (FAQs) December 2016

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Save Time and Money and Have a Greener, Healthier Yard!

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Rice SWCD Rain Garden Cost-Share Program

Rain Gardens. A Welcome Addition to Your Landscape

Soil Health in Urban Areas

Development of LID Design Guide in Edmonton

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Small Project Guidance Document

SOILS BACKYARD CONSERVATION

3/26/2011. David Dods URS Corp., Overland Park, KS. Year 5. Photos: David Dods

Tree Pits Construction Guide

Eric Konzelmann, CPESC, CPSWQ Assistant District Manager. Montgomery County Conservation District

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

TO BE FILLED OUT BY APPLICANT

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Section Seeding

COMPOST : PART OF THE RAINSCAPES STRATEGY FOR REDUCING RUNOFF AND IMPROVING WATER QUALITY

COUNCIL POLICY Policy Effective Number Subject: Number Date of Pages SINGLE FAMILY RESIDENTIAL LANDSCAPE

6Natural. Environment Development Permit Guidelines

Chapter 5 - On-Site Storm Water Management

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

Landscaping at the Water s Edge: An Ecological Approach

2-B-18-UR. Revised: 3/27/2018

Town of Essex Small Site Erosion Control Guide

ACTIVITY: Trees, Shrubs and Vines ES 10

Transcription:

SUPPTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WKSHEET For Department of Ecology Stormwater BMP T5.13 This submittal worksheet will help determine what soil amendments are needed to meet the requirements for post-construction soil quality and depth. The Kitsap County Stormwater Design Manual requires soil amendment where native soils or vegetation are disturbed by construction or development activity. This requirement applies to all projects that create 2,000 square feet or more of hard surface area disturb over 7,000 square feet. It applies to all disturbed areas on a project site except: The building footprint Hard surface areas such as driveways, parking areas, sidewalks, patios, storage areas, or walkways (gravel or paved) Areas within the drip line of existing trees where tilling may damage roots Slopes greater than 33 percent (3.3 feet of rise over 10 feet of length) Wetland soils high in organic matter (non-mineral) Disturbed areas include (but are not limited to) those areas where: Any activity results in movement of earth, a change in the existing soil cover (both vegetative and nonvegetative), or a change in the existing soil topography Vegetation has been cleared, destroyed, or removed by manual, mechanical, or chemical methods Woody vegetation (including shrubs and understory) or stumps have been removed Grading, filling, trenching or excavation has occurred Ground-breaking activity has occurred Soils have been moved or stockpiled Soils have been compacted by vehicles or equipment (wheeled or tracked) STEP 1 TOTAL DISTURBED AREA On your site plan, show the edge of all ground and vegetation that will be disturbed by the project. 1. Total Disturbed Area (should match line 1 on the Stormwater Worksheet): square feet 2. Onsite hard surfaces (should match line 5 on the Stormwater Worksheet): square feet 3. Area of lawn or turf: square feet 4. Area of landscaping and planting beds: square feet 5. Areas exempted from soil amendment requirements due to existing tree roots, steep slopes, or wetland soils: square feet 6. CHECK: The total of lines 2 through 5 should equal line 1. www.kitsapgov.com/dcd/ Page 1 of 5

STEP 2 TREATMENT OF DISTURBED AREAS You may use the pre-approved soil amendment method a custom soil amendment. Check one. CUSTOM SOIL AMENDMENT Custom soil amendment must meet the requirements of the Kitsap County Stormwater Design Manual (Volume 2, Section 5.4.1, page 5-22) and the Stormwater Management Manual for Western Washington (Volume 5, BMP T5.13, page 5-8). Show, on your site plans, how the proposed custom soil amendments meet the content, depth, and installation standards of BMP T5.13. PRE-APPROVED SOIL AMENDMENT Pre-approved Amendment Materials You may: Purchase compost from off-site sources and till it into existing soil. Compost used for soil amendment must not exceed contaminant limits identified in Table 220-B, Testing Parameters, in WAC 173.350.220. The compost must have an organic matter content of 40-65% and a carbon to nitrogen ratio under 35 to 1. Stockpile, protect, and reuse existing soil and forest duff and till it into existing soil. Stockpiled soil and duff should be covered with woven weed barrier and protected during construction. Stockpiled topsoil may need to be amended with compost to meet the organic matter and volume requirements for the pre-approved rates. Chip and stockpile wood waste from site clearing and till it into existing soil. Branches and other woody material may be chipped and stockpiled along with stockpiled soil and duff. Invasive plant species such as Scotch broom, Himalayan blackberry, English ivy, and holly may not be used. Import topsoil of sufficient organic content and depth to meet the requirements below. Imported soils shall not contain excessive clay or silt fines (more than 5% passing a No. 200 sieve) because that could restrict stormwater infiltration. For planting beds: use a mix by volume of 35% compost with 65% mineral soil to achieve the requirement of a minimum 8% (target 10%) organic matter by loss-on-ignition test. For turf areas: use a mix by volume of 20% compost with 80% mineral soil to achieve the requirement of a minimum 4% (target 5%) organic matter by loss-on-ignition test. Scarify subsoil and mulch planting beds as described below. Use any combination of the above. www.kitsapgov.com/dcd/ Page 2 of 5

Pre-approved Lawn and Turf Amendment Method 1. Scarify or till existing soils to a depth of 10 inches. 2. Place and rototill 1.75 inches of amendment into the top 6 inches of scarified soil for a finished depth of 12 inches of un-compacted soil. 3. Roll and rake to level. 4. Plant as soon as possible to prevent erosion. 5. The final topsoil layer must: Be at least 8 inches deep. Contain a minimum of 5% organic matter. Have a ph of 6.0-8.0 or match the ph of the original pre-developed soil. Pre-Approved Planting Bed and Landscape Area Method 1. Scarify or till existing soils to a depth of 9 inches. 2. Place and rototill 3 inches of amendment into the top 5 inches of scarified soil for a finished depth of 12 inches of un-compacted soil. 3. Rake to level. 4. Mulch planting areas with 2-4 inches of woody mulch. 5. The final topsoil layer must: Be at least 8 inches deep. Contain a minimum of 10% organic matter. Have a ph of 6.0-8.0 or match the ph of the original pre-developed soil. www.kitsapgov.com/dcd/ Page 3 of 5

Calculate the Amendment Amount Needed 7. Area of lawn or turf (from line 3 above)... square feet Multiply by conversion factor from 1.75 inches to cubic yards:... 0.0054 8. Amendment quantity needed for lawn or turf... cubic yards 9. Area of landscaping and planting beds (from line 4 above)... square feet Multiply by conversion factor from 3 inches to cubic yards:... 0.0093 10. Amendment quantity needed for landscaping/planting beds... cubic yards 11. TOTAL AMENDMENT QUANTITY NEEDED (total of lines 8 and 10) cubic yards SOURCES: Portion of total amendment quantity (from line 11) that is: 12. Purchased from off-site sources... % 13. Stockpiled soil and duff from on-site... % 14. Chipped and stockpiled woody material from on-site... % 15. Imported topsoil... % 16. CHECK: The total of lines 12 through 15 should total 100%... 100 % 17. Area of landscaping and planting beds (from line 4 above)... square feet Multiply by conversion factor from 3 inches to cubic yards:... 0.0093 18. MULCH QUANTITY NEEDED... cubic yards SOURCES: Portion of total mulch quantity (from line 18) that is: 19. Purchased from off-site sources... % 20. Chipped and stockpiled woody material from on-site... % 21. CHECK: The total of lines 19 and 20 should total 100%... 100 % REMEMBER: These quantities are minimums. You may use more amendment if desired for your landscaping needs. These quantities are above and beyond any soil and amendments needed for rain gardens, filter strips, and other required bioretention. www.kitsapgov.com/dcd/ Page 4 of 5

Prepare for Inspection Inspection of your Post Construction Soil Quality and Depth will be one of the last inspections of your project. Plan ahead for that inspection. You should have ready for the inspector: Delivery tickets and receipts for any purchased compost, topsoil, or mulch, showing quantities purchased. Product lab test results for purchased products. If you are using stockpiled material, take photos of the stockpiles so the inspector can see what you used and the quantity of stockpiled material. Be prepared to distinguish, for the inspector, products used for any filter strips, rain gardens, or bioretention from those used for Post-Construction Soil Quality and Depth. www.kitsapgov.com/dcd/ Page 5 of 5