Implementing Low Impact Development (LID) in the Lake Simcoe Watershed: Progress, lessons learned and applicability to Muskoka watershed

Similar documents
Soak it up! Policies and tools for community-wide implementation of green stormwater infrastructure. Alix Taylor, Green Communities Canada

Soak it Up! Toolkit. Community-wide implementation of green stormwater infrastructure

COBOURG Cobourg Heritage Advisory Committee. Alison Torrie Lapaire Planner I - Heritage

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Chesapeake Bay Landscape Professional

LID Performance and Risk Assessment Program

Revolutionizing Green Roof and Green Wall Performance: The Living Architecture Performance Tool

GREEN STREETS TO. Complete Streets Forum October 1, Sheila Boudreau, Urban Design Patrick Cheung, Toronto Water

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Structural Measures at a Glance

The Benefits and Challenges Associated with Green Infrastructure Practices

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Potential Green Infrastructure Strategies May 6, 2015 Workshop

LID. Low Impact Development: Protecting Oregon s waters as we grow

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

WEFTEC.06. ** City of Caldwell, Idaho

TEXAS STORMWATER SCORECARD

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

Green Infrastructure and Adaptive Management

13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1 INTRODUCTION

Green Infrastructure & Low Impact Development

Appendix E: Illustrative Green Infrastructure Examples

Work Plan. Introduction:

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

green Infrastructure in the Milwaukee Region

Stormwater & South Carolina. A Case for Low Impact Development

Costal Sustainability and Green Streets, Mobile, Alabama

Worksheet #14 Water Runoff Management

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

The purpose of this report is to present the Building Better Campaign to Council and provide an opportunity for comment before it is implemented.

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

Social Dynamics of Stormwater Management Private Property in the Alley Creek Watershed Queens, NY

Sewer Flooding Alleviation in the Counters Creek Catchment

Green Infrastructure

Cost Effective Low Impact Development

Edgeley Pond + Park Public Meeting

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Going Green with the NYS Stormwater Design Standards

Municipal Guide to. Storm Water Management Techniques

Don River Watershed Site Evaluation Predicting Effectiveness of Stormwater Source Controls in Urban Watershed Revitalization

The Mars Hill Stormwater LID Demonstration Project

Planning for Sustainable Infrastructure: A Collaborative Integrated Approach. Background on Berkeley. Background on Paving Needs 8/30/2015

Are Trees Green Infrastructure? Municipal policy and green infrastructure definitions

COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

Melissa Bernardo Hess, PE, CFM February 18, 2016

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Whitemarsh Township Greenway Plan

1 Introduction. Chapter. In this chapter:

STORMWATER UTILITY PRESENTATION November 18, 2014

Sewer Flooding Alleviation in the Counters Creek Catchment

LRPC VISION GOALS-OBJECTIVES-STRATEGIES

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Green Infrastructure and Low-Impact Development Technologies

Wake County - Falls Lake Program

San Francisco Bay Pilot: Sausal Creek Community Leader Charrette May 11, 2016 Marcus Griswold

Stormwater Retrofits. Lessons Learned in Low Impact Development Construction For Contractors. Case Study

Syme Residence Hall Rain Garden

Introducing Green Infrastructure for Coastal Resilience

Funding Assistance to Stormwater Utility Fee Payers for Stormwater Solutions and Incentives. Danny Bowden City of Raleigh Stormwater Utility

Green Infrastructure-A New Approach to Floodplain and Stormwater Management. Presenter: Kari Mackenbach, URS

York Region Northern Six (N6) Shared Services & Collaboration

13 Maintenance and Operations Plan 223

FOCUS ON STORMWATER AN OVERVIEW OF WESTMORELAND CONSERVATION DISTRICT S STORMWATER PROGRAM. March 19-20, 2015

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Green Infrastructure Program Updates

Green Infrastructure and LID Practice Construction Workshop

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117

Maryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017

Scaling Up Stormwater Green Infrastructure in the Hudson Valley

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent

City of Greater Sudbury Subwatershed Study Program. Public Open House Tom Davis Square, C-13 A and B March 9, 2016

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Physical Approaches to Flood Mitigation

RECOMMENDED DIRECTIONS REPORT FOR THE TOWN OF RICHMOND HILL

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Rebecca Dohn October 13, 2017

Low Impact Development for your homes, businesses & streets

3. Are there any projects exempt from the definition of Regulated Projects?

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Green Infrastructure for Stormwater Management in Syracuse, New York. Atlantic States Legal Foundation, Inc.

Green Infrastructure Incentives. Abby Hall EPA Headquarters Office of Policy, Economics and Innovation

Ted Turner Drive Resilience Corridor Challenge

TRCA Roles and Responsibilities in Planning and Development

Raingardens. Conserving and Protecting Water L

Town of Peru Comprehensive Plan Executive Summary

Transcription:

Implementing Low Impact Development (LID) in the Lake Simcoe Watershed: Progress, lessons learned and applicability to Muskoka watershed Ben Longstaff GM, Integrated Watershed Management September 15, 2017 Proud winner of the International Thiess Riverprize Member of Conservation Ontario

31% of Lake Simcoe Phosphorus loads from Stormwater - Urban: ~31 % - Rural/agric. ~25% 2

The trouble with SWM ponds - Costly to maintain, therefore not being maintained Estimated cost to bring 56 ponds back to design level: $18.5 million Diverting stormwater to ponds is reducing critical cold water habitat Change from ground to surface flow Stormwater ponds can become a source of phosphorus: Low dissolved oxygen causing dissolved P to be released from sediment 3

Our urban creeks have flashy high flows and periodic flooding Urban Rural 4

Only going to get worse unless we change the way we do business Meeting Growth Plan targets 2010 urban = 22,793 ha Future at 2031 = 35,028 ha Increase From 2014 = 9,990 ha 5

Only going to get worse unless we change the way we do business Climate Change 6

A market transformation program to promote Low Impact Development (LID) and more sustainable building practices. 7

Low Impact Development (LID) Definition An integrated ecological, planning, and aesthetic strategy for stormwater management to maintain natural hydrology by managing runoff as close to the source as possible. Source of Photos: L - City of Maplewood, MN via CVC/TRCA; C - City of Seattle ; R - Unilock 8

Protection New Development Restoration Retrofit Existing Urban Areas Developers, Builders and Municipalities Public Lands (Municipalities) Private Lands (Residential, Institutional, Commercial, Industrial) 9

Strategies to effective change Short and longterm funding Demonstration / pilot projects Model By-law and new LID SWM Guidelines Low Impact Development Technical Support (Municipal & Industry) Industry uptake: Charrettes, Design Tools Training, Education, Outreach, Collaboration 10

Building municipal support: Council and What was needed senior staff Council and senior staff understanding and supporting a change towards LID What have we done Workshops & council delegation: Showcase successes in other jurisdictions (Minnesota) Tour: showcasing LID Pilot projects Media events: ground breaking and ribbon cutting 11

Collaboration: Stormwater Management Working Group Aim Provide a forum to drive collaboration, consistency and knowledge sharing between all stakeholders What has been done Regularly bringing together municipal, Provincial, development, consultant & Low Conservation Impact Development Authority Progressed a number of key initiatives. e.g. development of model by-law & guidelines SWM Utility Fees / Credit Program; Grant programs, 12

New Development: Regulatory approach Aim: Capture and control 90 th percentile (25mm) rainfall event in all new development using principles of better site design & LID How: In collaboration with stakeholders; - Prepared template by-laws for municipalities to adopt - Updated LSRCA Stormwater Management Guidelines - Province updating their SWM guidelines, likely similar requirements 13

Getting developers on board: Design Aim Charrettes Promote the early integration of LID into site plan design What s being done Offering design charrettes for new development Defined opportunities & constraints for LID implementation Reducing the number of submissions to reach Final Draft Plan Approval Modelling tool to support early design 14

Providing technical & implementation support Aim Provide technical support for LID design and implementation, as requested for Municipal and Private projects What have we done Ensure municipalities are aware LSRCA staff available to assist / answer technical questions and issues Updating LID Guidelines Improving ESC inspection process 15

uilding knowledge: Training, Education, Aim Outreach Provide LID and related training courses for Municipalities and industry. What have we done Regularly providing subsidized training opportunities related to design, construction and maintenance Updating STEP website: Ontario water resource hub 16

Taking action: Funding the fixes Aim Immediate and long term funding. What have we done Immediate funds: grant applications and partnership (e.g. LSGBCUF) Reallocating LSRCA funds towards urban restoration Long term: Supporting municipalities in establishing SWM Utility Fees and Credit Programs. phosphorus off-setting program 17

New revenue sources Phosphorus Offset - Provincial enabling legislation passed. Pending LSRCA BOD approval - New & re-development required to ensure zero P exported from site - If cannot achieve requirement, payment at set price to support offsite P reduction - Revenue used for urban retrofit (e.g. LID) - Open and transparent reporting 18

Taking action: RainScaping Restoration What is needed Revitalized urban restoration program. What have we done New department within LSRCA Stewardship Prioritization Opportunities Tool (SPOT). Municipal: Pilot projects and incentives Residential: Implementing a residential Raingarden Grant Program, downspout redirection program ICI: establishing incentive program 19

Taking action: Municipal LID Demonstration What was needed Demonstration projects to showcase LID, learn a few lessons, make a difference! What have we done Projects Over 10 projects completed and more underway Secured up to 2/3 federal funding to complete each project Seeking funds and/or assisting municipalities to implement additional LID projects. Promoting projects: media, signage 20

Municipal Pilot Projects Municipality Feature treated LID installed Area treated (ha) Bradford Town parking Lot Permeable Pavement/Bioswale 0.29 0.43 Newmarket Residential Road (Woodland Crt) Enhanced swale 0.02 0.015 Innisfil Fire Station parking lot and roof Infiltration Gallery & cistern 1.05 0.09 Newmarket Residential Road (Forest Glenn) Bioswale / biofilters / Raingardens 1.16 Whitchurch Permeable asphalt/infiltration 0.11 0.012 Stouffville Community Park & parking lot galleries/raingardens East Municipal office Permeable Pavement/Bioswale 1.11 1.21 Gwillimbury sidewalk/entrance area Newmarket Recreation Complex roof & parking Dry Swales / Permeable Pavement/Bioretetion Recreation Complex roof & Permeable pavement, rain 1.98 3.5 Aurora parking gardens Uxbridge Recreation Complex parking Bioswale 1.67 1.7 Barrie Recreation Complex parking Bioswale - Design phase only N/A N/A Barrie School play area and parking Permeable Pavement/Bioswale TBC TBC P reduction (kg/yr) 21

Fire hall Recreation centre Office parking lot Town parking lot Street Street Community centre Play park 22

Demonstrating progress: Focused catchments New monitoring station 23

Demonstrating progress: Focused catchments Pond maintenance Street LID retrofit LID retrofit at recreation Centre (roof and parking lot) School De-Pave Residential Raingardens SWM guidelines driving LID in re-development 24

Recreation Centre: Newmarket - Opportunity and constraints assessment - Partnership with Town LSRCA: Funding through EC & technical support Town: Funding and project management - Treat: Roof (flat section), entrance drive and parking lot - Permeable pavement and bioswale 25

Recreation Centre: Newmarket After Before 26

Street retrofit: Newmarket - Major works (water, sewage, Stormwater) planned for street - Western Creek prone to flooding (flooding challenges well know to elected officials) - Partnership with Town LSRCA: Funding & technical support Town: Funding and project management - Strong community focus - Bioswales and rain gardens 27

Street retrofit - Town of Newmarket After Before 28

Forest Glen Video 29

Town parking lot (Bradford) - Town planning upgrade to Town Parking lot - With LSRCA support able to inlcude LID - Permeable pavement and bioswale 30

Aurora Community Centre 32

Aurora Community Centre Before After 33

Pilot project: Lesson s learned - Financial support needs to align with municipal budget cycles - No set formula for funds needed to incentivize a project - Important to be able to demonstrate multiple benefits of LID - especially financial return - Keep projects relatively simple at first - Contactor training essential - Continuous construction monitoring essential 34

Moving forward - We ve made some great progress - Learned some valuable lessons - Recognize that need to keep adapting and learning if we re going to be successful in restoring urban environment! - Success = move beyond pilot project - widespread and rapid restoration of urban watershed What will that take? 35

Moving beyond pilot projects - Significant sustained funding - Economic justification for investment - Catchment/watershed based decision support tools to guide: where, when, what types of GI/LID - Demonstrate that we are making a difference 36

Thank you 37