Wetlands Creation, Habitat Restoration Extreme Habitat Makeover: Bronx & Staten Island!

Similar documents
Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Restoring Water Ecosystems in NYC Parks

Fresh Kills Park in Regional Context

6Natural. Environment Development Permit Guidelines

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

New Development Stormwater Guidelines

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Use of Best Management Practices

Chapter 3 Site Planning and Low Impact Development

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

PrairieWalk Pond Lisle, IL

5.0 Storm Water Landscape Guidance Introduction

Appendix I. Checklists

Ashbridges Bay Erosion and Sediment Control Project

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Draft Rhode Island Stormwater Design and Installation Standards Manual

The Napa River Flood Protection Project

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION

Design Around Waterways and Wetlands

Information for File # ARC

Erosion & Sediment Control Plan Application Form & Checklist

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Rule D Wetland and Creek Buffers

STREAM BUFFERS

The South Carolina Stormwater Ponds Research and Management Collaborative

ARTICLE VI: SITE PLAN REVIEW

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Severn River Sub-Watershed: BMP 09-Retrofit

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

FRI-A05: INFRASTRUCTURE, RESILIENCE, and PUBLIC SPACE. E450B, Level 4 Friday, November 6, am-10am

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Article 6 Tree Protection

4. Contractor (and subcontractors if applicable) certification statement(s)

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

Principles for Ecological Landscape Design in Brownfield Business Parks

Lesson 2: Stormwater Best Management Practices (BMPs)

MCCOYS CREEK RESTORATION 30% DESIGN

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Research Projects on Governors Island

Lake and Stream Restoration Project

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Why a new Food & Farm Ordinance?

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Homeowners Guide to Stormwater BMP Maintenance

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Biodiversity Conservation

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Applied Ecological Services, Inc. Sustainable Solutions for Over 30 Years.

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

City of Shady Cove Riparian Ordinance Ordinance XXX

Inventory and Assessment of Stormwater Infrastructure

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Information for File # JTF

Alternatives Analysis Summary Memorandum

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Coffee Creek Park Development Low Impact Development (LID)

2.1.4 Roof Downspout Rain Gardens

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Volunteer Guide to Freshkills Park

HICKORY NUT FOREST DESIGN GUIDELINES

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

What is the EDPA? The EDPA has three objectives: 1. Protect biodiversity. 2. Mitigate damage during development. 3. Restore degraded ecosystems

Green Infrastructure Recommendations For Parks and Public Spaces

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

Chapter 4 - Preparation of Stormwater Site Plans

Zoning Ordinance Article 3

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

North Carolina Coastal Federation

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

TOWN OF BURLINGTON Conservation Commission

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE

SECTION 6. Routine Maintenance Activity Details

STATE OF NORTH CAROLINA DECLARATION OF

Surrey Ecosystem Management Study

Information for File MMJ Main Stem Bassett Creek Restoration Project

4.6. Low Impact and Retentive Grading

Vegetated Filter Strips and Buffers

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

I. INTRODUCTION SITE DESCRIPTION

Weston s Wetlands, Stormwater, & Open Space

Template for Restoration in a Lake Superior Area of Concern. Template for Restoration in a Lake Superior Area of Concern

Protocol for Sustainable Roadsides

STORMWATER MANAGEMENT CRITERIA APPENDIX D: STORMWATER MANAGEMENT POND DESIGN GUIDANCE D. i APPENDIX D 1 STORMWATER MANAGEMENT POND PLANTING GUIDELINES

Reclamation Success Best Management Practices. Pinedale Field Office. Joseph Debebe PhD. Natural Resource Specialist PFO 04/30/2014

SECTION 11.07: WETLAND BUFFER ORDINANCE

Landscaping for Biodiversity

Stream Restoration: Working with Nature?

Transcription:

Page 1 of 6 Wetlands Creation, Habitat Restoration Extreme Habitat Makeover: Bronx & Staten Island! (printer friendly version uses Acrobat Reader) An Electronic Newsletter of EEA's Environmental Consulting Activities Fall 2005 EEA, Inc. 55 Hilton Avenue, Garden City, New York (516) 746-4400, (212) 227-3200 (800) 459-5533 additional New York offices: Stony Brook (631) 751-4600 Altamont (518) 861-8586 Asheville, NC (828) 253-0982 e-mail addresses: General: mailto:eea@eeaconsultants.com Individual: First initial and last name @eeaconsultants.com EEA services include Phase I ESAs, Haz-Mat Testing and Remediation, Wetlands Delineation and Creation, Natural Resources Inventories, Marine Ecology Studies, Air Quality and Noise studies, and Environmental Management System (ISO 14000) implementation. In its 1992 report, Restoration of Aquatic Ecosystems, the NRC (National Research Council ) defined restoration as the "return of an ecosystem to a close approximation of its condition prior to disturbance." Further in the report, regarding wetland restoration, it states: "The term restoration means the reestablishment of predisturbance aquatic functions and related physical, chemical and biological characteristics. Restoration is... a holistic process not achieved through the isolated manipulation of individual elements. Within the restoration model, there are branches that modify this definition. Creation and enhancement are two such branches that still restore habitat, but through different processes. Each Before habitat requires a custom made design to ensure a successful restoration. The Before may be very different habitats and functions than the After, but a successful restoration can still be achieved. Our ecologists here at EEA want to let you know about two of these projects that are currently in progress. One is located within The Bronx Zoo and the other project lies within Fresh Kills Landfill in Staten Island (Richmond County). The Bronx Zoo The Wildlife Conservation Society (WCS) is designing a Center for Global Conservation at the Bronx Zoo scheduled for opening Spring 2007. Led by FX Fowle Architects, a NYC-based architectural, interior design and planning firm, the design for the WCS world headquarters was recently completed for the 40,000 square-foot office building and the surrounding landscape. The EEA ecology team was called in by HM White Site Architects, an award winning landscape architectural and urban design firm on the team, to assist in the design of the wetland creation phase. Visit our web site at http://www.eeaconsultants.com/

Page 2 of 6 For information or quotes, contact: Phase I ESAs Richard Fasciani Phase II/III Haz-Mat Testing and Remediation Nicholas Recchia, VP, CPG Dredge Management Testing Jeffrey Shelkey EAS/EIS Studies Janet Collura, CWS Wetlands Studies and Design Laura Schwanof, RLA Marine Ecology Teresa Rotunno Terrestrial Ecology Denise Harrington, AICP Air Quality and Noise Victor Fahrer, P.E. Upland community in the restoration area The goals for the wetland creation were multiple; to design a palustrine emergent wetland system to provide stormwater detention and water quality improvement, habitat enhancement and site beautification. This wetland system will be a prominent entry feature for the Global Conservation Hall and a well-traveled wildlife viewing area for visitors. Currently, the existing footprint for the wetlands creation is a successional old field habitat with a mix of ornamentals and nonnatives. Mowed lawn, hilly slopes rock outcrops and sparse trees characterize the project site classified as an Oak Tulip Forest by Reschke, 1990. Environmental Management Systms (ISO 14000) Robert Clifford Director of Strategic Planning James McAleer EEA, Inc. Founded in 1979 Principals Leland M. Hairr, Ph.D. President Allen Serper, M.S., P.E. Vice President Roy R. Stoecker, Ph.D. Vice President Existing channel sections in restoration zone Meandering through this habitat is an existing stream channel that is redirected underground at isolated points with storm water control structures. Flamingo Pond, located in the southern section of the design footprint, lies at the mouth of this aquatic system. EEA worked with the project team to create a design that would restore and enhance this aquatic habitat. A wet meadow with emergent wetland plants will be created along with three deep

Page 3 of 6 pools within the new wetlands, situated strategically to be seen from the Exhibit Hall, terraces and walkways. Native plantings were carefully chosen to attract local wildlife by providing food and shelter to be compatible with the surrounding landscape, and to enhance the educational component of the wetland creation for park visitors. Waterfowl can be found easily in the Zoo! Flamingo Pond Inventory It! Members of EEA s Ecological Division began by investigating the existing hydrological conditions, wetland and upland communities, soil properties, and storm water system. The analysis of existing conditions is a key step that must be completed first in any design. After this data was analyzed, preliminary designs were formulated for the type and size of both aquatic and upland communities to be created or enhanced. Once HM White s design incorporated our data, EEA reviewed and modified all design details and specifications including plantings, soil amendments, hydrology, flood control measures, soil erosion, substrate stabilization, storm water collection & disposal, micro-habitat analysis and herbivory controls. What s Next Waterfowl make use of the adjacent uplands Once plans are finalized, it will be time to address the monitoring plan for the restoration. A Monitoring and Maintenance Plan is critical to both the short- and long-term success of any wetland restoration. Created wetlands may be more challenging to sustain during the early

Page 4 of 6 stages of establishment. Monitoring consists of collecting ecological and physical data on the system. Plant health & growth, water level checks, water quality, disease control, wildlife observations and invasive species monitoring are documented. Adjustments are then made to the restoration to ensure continued achievement and successful completion of design performance criteria. The Maintenance Plan will focus on removal of trash and sediment accumulation, particularly around storm water control devices, removal and replacement of dead plant material, long-term site stabilization and repairs/adjustments to all structures as needed. Fresh Kills Landfill Wetlands Creation In 1996, Governor Pataki and then NYC Mayor Giuliani jointly announced the plan to close Fresh Kills Landfill in Staten Island. By March 2001, NYC s last solid waste disposal facility was closed. Thereafter, the Department of Sanitation of New York City (DSNY) issued a Solid Waste Management Plan Modification that, among other things, called for the development of a truck-to-rail-facility for Staten Island waste on a site within the Fresh Kills Landfill. An existing rail line was proposed to be extended to reach the new facility and rail yard. The Staten Island Transfer Station has been constructed and is expected to begin operation once the rail connections have been completed. Spartina planting begins EEA was called in by the Lead Project Engineering Firm, HDR, Inc. to address the tidal wetlands issues in the project area and find solutions. HDR is a world-wide architectural, engineering and consulting firm with a reputation for finding innovative engineering solutions. They continue to work closely with DSNY to address solid waste management solutions. Restoration footprint The area is graded to create tidal habitat zones Elevations are repeatedly taken when crafting tidal wetlands EEA was contracted to conduct an ecological assessment of the affected footprint, design the wetlands, write the specifications for the construction bid, oversee the construction phase, and develop a monitoring and maintenance plan to conform to NYSDEC guidelines. The loss of tidal wetlands resulting from the rail crossing, stormwater outfall apron and erosion control material was mitigated with a wetland creation project adjacent to the site. A 4.5 to 1 ratio was established for the wetlands (for every 1 acre of wetlands lost, 4.5 acres of wetlands are created). The planting phase has begun and will continue in the Spring

Page 5 of 6 of 2006. A little over three acres of tidal wetlands and adjacent uplands will be created. Inventory It! Nearshore tidal plantings, wildfowl exclusion barrier in place Data collection is key to monitoring wetland success before, during and after restoration. EEA performed the ecological assessment first, to gather all baseline data on botany, wildlife and habitat characteristics. Alternative wetland creation sites were also investigated by the ecology team within the vicinity of the proposed project. A wetland delineation was conducted and a wetlands line was flagged for future surveying into the design plans. Once the baseline data was processed and analyzed, EEA ecologists worked with HDR to design the wetland creation habitat. The design was submitted with overall project plans to the NYS Department of Environmental Conservation (NYSDEC) for review and approval. Permitting from all Federal, State and local agencies was obtained to progress toward the construction phase of the project. During the construction phase of the project, EEA s tasks included: Review the ecology-related tasks within the Construction Bid Document Develop the Seeding and Landscaping Plan and Specifications for the wetland excavation area Develop the specifications for the waterfowl exclusion devices Develop the specifications for sediment and erosion control Coordinate with the Resident Engineer on shop drawings Cost analysis for bioengineering and planting tasks On-site inspection of wetland plants/soil erosion materials upon arrival Management of time-sensitive ecological tasks and materials Plant Installation Oversight

Page 6 of 6 Pre- and post-construction monitoring of wetland plantings according to NYSDEC guidelines Continued monitoring of erosion control, waterfowl exclusion Soil testing as needed for planting suitability Transfer Facility Building is complete EEA s HazMat Team was brought in to review existing subsurface data and perform a subsurface profile of the wetland creation footprint. Test pits were developed across the site for this gross characterization of the soil profile. Results were used to support plant selections and engineering tasks. What s Next Transect analysis in planting zone EEA will continue to monitor the planting phase as scheduled. The project s Monitoring and Maintenance Plan will be in place once construction is completed. NYSDEC will assist the project team to ensure a thriving and successful wetlands. For further information, contact Laura Schwanof at the Stony Brook office or lschwanof@eeaconsultants.com 12/01/05