RISK ENGINEERING GUIDELINE.

Similar documents
RISK ENGINEERING GUIDELINE

Management Practices: Fire Protection Impairments November 2015

Risk Management Services

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

RISK ENGINEERING GUIDELINE

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

Builders Risk - Fire Prevention Inspection Checklist

FIRE IMPAIRMENT NOTICE

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Date Issued: December 14, 2017 Revision: 2.1

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Fixed fire protection solutions

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Fire Prevention Plan

Fire System Impairment Policy

Managing Fire Protection System Impairment

Impairments to Fire Protection Equipment

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

HOT WORK PERMIT PROCEDURES

HKIE CPD Training Course (II) 23, 25 June and 7, 9 July 2009

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

Fire protection for buildings

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

VdS Guidelines CONTENTS

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

Manufactured Home Community Self-Inspection Checklist

Conditions for the provision of services Valid from 1 November only for the Jablotron Alarms series of alarms

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM

The New EMC Directive 2004/108/EC

Branch Solution Wood based panel plants. Fire protection solutions for wood based panel plants

Fire Prevention Plan

Safe Operating Procedure

FIRE SAFETY AND PREVENTION POLICY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

HOT WORK SAFETY PROGRAM:

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

2010 FIRE CODE OF NEW YORK STATE

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

Safety & Security Services Services de Sûreté et Sécurité. Hot Work Protocol

Marine Fire safety for the ship industry

UNIVERSITY. Facilities Management

Contractor Safety. Workplace Safety & Environmental Division

OPERATIONAL PERMIT STORAGE MAGAZINE PERMIT APPLICATION

Compliance Guidance for non-technical managers

NOTTINGHAM CITY HOMES

The New EMC Directive 2004/108/EC

Your specialist partner for total electrical compliance. Electrical Testing

Evacuation Fire Safety Program

CO 2 Fire Extinguishing Systems

Property Insurance Risk Management

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNIVERSITY OF OXFORD FIRE RISK ASSESSMENT

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

Technologies Gas extinguishing systems. MX 200 Fire Extinguishing Systems Fighting Fire using HFC-227ea

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

Loss Prevention Standards

Technologies Gas extinguishing systems. MX 1230 Fire Extinguishing Systems Fighting Fire using 3M Novec 1230

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

EtherCAT Box Modules (EPxxxx-xxxx)

Offshore. Optimum fire safety for oil & gas installations

This policy is applicable to all DMS-owned, -leased and -managed facilities.

Approval of water mist systems in buildings

- CONSTRUCTION FIRE SAFETY STANDARDS

F.R.A.M.E. EVENT NETWORKS used in "FRAME".

Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)

Fire Prevention Plan Program

BUSINESS PLAN CEN/TC 191 FIXED FIREFIGHTING SYSTEMS EXECUTIVE SUMMARY

INTEGRATED LIFE SAFETY COMPLIANCE TESTING AND ITS PROCEDURES

Maintenance of Fire Systems

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Report on First Revision June 2014 NFPA 5000

OUTLINE FOR FIRE PREVENTION ACTIVITY

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

Fire Prevention Plan for

Procedure DESCRIPTION/OVERVIEW

NY Fire Safety Institute Coordinator of Fire Safety & Alarm Systems F-80

- CONSTRUCTION FIRE SAFETY STANDARDS

9 Standards, Regulations and Authorities

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

BUSHFIRE RESPONSE PLAN

Tail-end valve stations

Fire protection in information technology facilitie. CFPA-E Guideline No 14:2007 F

ICC CODE CORNER 2015 International Fire Code

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

BURN NOTICE: KEEP THE HEAT AWAY!

OXNARD FIRE DEPARTMENT Fire Watch Guidelines

Water mist fire suppression systems. Minifog ProCon Low-pressure water mist system

Chapter 18 Welding Table of Contents

NATIONAL COMPETENCY STANDARD

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

Unit 2 Fire Safety (Zone 2)

THE FIRE SAFETY GUIDE FOR BUSINESS OWNERS

Sprinkler systems. A presentation for fire brigade staff

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Transcription:

RISK ENGINEERING GUIDELINE. IMPAIRMENT OF FIRE PROTECTION SYSTEMS HDI Risk Consulting Property www.hdi.global

An impairment of fire protection systems increases the risk. In order to reduce the risk of fire during the impairment of fire protection systems, additional fire prevention measures must be taken. General. Fire protection systems, replace as for with such as automatic fire extinguishing systems and automatic fire alarm systems, are essential components of fire protection concepts. They also provide a high success rate in extinguishing and/or detecting fires. Multiple examples of losses show that companies without adequate fixed fire protection in place often suffer a total fire loss with high property damage and business interruption claims. The efficiency and reliability of fixed fire protection is thus an essential factor to reduce potential fire damage and to maintain the business continuity of a company. In order to guarantee this to a maximum extent, repair works, periodic servicing and corrective maintenance to the fire protection systems cannot be avoided. Important: During an impairment, the risk of having a loss increases mainly because of two reasons: Firstly, the fire protection systems that are relevant for the safety are not in operation. Secondly, repair works include activities that increase the risk of starting a fire. Proactive planning of the impairment plays an important role to ensure that servicing, maintenance and repair works are carried out properly as well to restore the fire protection system immediately after the works have been completed. This guarantees that the work can be carried out as smoothly as possible and that the fire protection system is again operational as quickly as possible.

Risk Engineering Guideline: Impairment of fire protection systems 3 For this reason, it makes sense to subdivide the measures for the impairment of fire protection systems as follows: Measures before the impairment. Measures during the impairment. Measures after the impairment/restoration of the fire protection system. 1 Risk situation. Based on experience, the majority of losses happen outside of the normal operations. Why is the risk for a company increased specifically during repair, service and maintenance works? The reason is given by the fact that the adequate protection level is not provided and that activities can therefore be carried out outside everyday operations. Additionally, repair and service works often involve activities with an increased accident risk or ignition potential, such as welding, separating and cutting. In order to reduce the risk of fire during the impairment of fire protection systems, additional fire prevention measures must be taken. 2 Measures before the impairment. Servicing, repair and maintenance works should be carried out by a HDI Risk Consulting recognised contractor; preferably by the company that originally installed the fire protection system. The servicing company must be certified for the systems concerned. Basically, the planned impairment should be reported to HDI Risk Consulting (possibly via the insurance broker) at least 14 days before the start and any compensation measures required are to be clarified. (Attached form Impairment notification ). Unplanned interruptions (disruptions) are to be reported without any delay. If an unplanned impairment should occur during the night, HDI Risk Consulting (possibly via the insurance broker) is to be informed on the following day. This obligation to inform does not apply if it concerns the impairment of e. g. a single automatic fire detector under the condition that monitoring of the area involved is not compromised. The impairment can only be instructed by an employee familiar with the areas and their associated risks and hazards. This should be closely coordinated with the fire safety officer. The instruction should be given in written form and after the impairment, the document is to be kept on file for at least half a year. The wide variety of varying fire protection systems makes it difficult to be very detailed with respect to all measures to be taken during an impairment. This is why the following list of items does not pretend to be complete and should be adopted or extended to the respective fire protection system when required. Furthermore, reference is made to the relevant sections in the various internationally recognised guidelines to ensure the operational readiness, preventive measures and standard operating procedures are adhered to if a system is not fully operational.

4 The following should be considered before the impairment: Optimal preparation and organisation of the activities, in order to keep the impairment as short as possible. This includes, among others: the setting up of a time schedule, the provision of all required materials (e. g. replacement parts, seals etc.), the coordination of required specialised staff, the avoidance of work interruptions, e. g. of repair works during night-time periods, week ends or public holidays. Definition of the areas to be impaired: restriction to small sections if possible, no general impairment of the entire system. If work is being carried out on the pipework of an extinguishing system, only the respectively affected section should be shut off. If the zone protected by one section covers several rooms, appropriate measures should be taken, e. g. by insertion of blind flanges, protective caps, etc., to isolate the pipework only in the rooms where the work is being carried out. When work is being carried out on the water supply of (e. g. a sprinkler system), one source of water should be kept operational (compressed air water tank or pump) whenever possible or an alternative feed should be established. When the only water supply for an extinguishing system is shut down or fails, an alternative water supply should be provided. If the system is equipped with a fire department connection, a hose connection should be set up between this connection and the next hydrant, integrating a booster pump if necessary. If on a site with multiple users a common fire protection system is operated, all the users must be informed about the impairment of the system and joint compensation measures should be taken. Notification of the responsible public fire brigade and the works fire brigade. Notification of the employees, the plant management and the internal security/safety management. Any work that involves a fire hazard, e. g. welding, cutting and burning operations, may not be carried out in the areas affected by the impairment or may only be carried out with strict adherence for the applicable safety regulations for operations involving fire hazards (see HDI Risk Consulting Guideline Hot works and Hot work permit ). In order to be able to respond at short notice in case of an unforeseen impairment of fire protection systems, detailed procedures should be elaborated in advance. These are then immediately available whenever required. If fire alarm and extinguishing systems are a safety-relevant element of the building permit and the occupancy permit, this permit for use could be restricted in principle by this impairment. Additional protective measures defined by the responsible authority (e. g. fire protection service department) may have to be taken into account. Provision of suitable substitute systems (e. g. mobile fire alarm systems). Provision of suitable manual fire extinguishing equipment (fire extinguishers, installation of fire hoses ready for use, etc.) combined with a fire watch, or at least an increased number of patrols, e. g. by guards. Before a system is partially or completely impaired, all parts of the company site should be inspected in order to ensure that there are no hazards or signs of a fire.

Risk Engineering Guideline: Impairment of fire protection systems 5 3 Measures during the impairment. The following should be considered during the impairment of fire protection systems: Affixing of warning notices in protected areas and on components of the system, clearly indicating that the fire protection system is under impairment. Fire protection barriers, such as fireproof doors and fireproof dampers, should be closed during the impairment. Hazardous or critical processes representing a fire risk should be discontinued to the maximum extent possible. Smoking and open flames are strictly prohibited in the affected areas (avoidance of unnecessary ignition sources). An increased number of control rounds must be carried out by trained and informed guards. The use of third party companies within the affected area should be avoided. If the use of third party companies is unavoidable, they must be properly informed and trained in accordance with the situation. If possible, the electrical power supply to the affected areas should be switched off. A fire watch should be provided, if possible by the fire brigade or a specialist fire protection company with appropriate communication equipment (radio links, mobile phones), in order to ensure that any fire alarm can be reported without any delay. If longer interruptions of the work are unavoidable, patrols should be carried out at intervals of maximum one hour. These patrols should be documented. The design concentration of an oxygen reduction system may not be exceeded during the impairment of the system. Otherwise, the emergency concept agreed with the departments responsible for fire protection and personal safety security must be implemented (e. g. external supply with inert gas from a tanker). Impairment notification Restoration notification To be sent to the insurer/where applicable through your broker Company name:... Responsible person:... Street:... Postal code, City:... Policy number:... Herewith we declare that the Sprinkler system Water spray extinguishing system Automatic fire detection system Foam extinguishing system Spark extinguishing system Water-mist extinguishing system Local application extinguishing system, type:... Powder extinguishing system Gas extinguishing system, gas type:... Oxygen reduction system... will be under impairment on...201... for the estimated duration of... hours/days. is under impairment since...201... The restoration of the system will probably follow within... hours/days. is restored on... 201... at... h. The target value of... % rest O 2 of the oxygen reduction system is/will be reached on... 201... at... h. Reason for the impairment: Extension/Change Repair works Maintenance Damage Other... The following area is affected (please mention alarm valve, group, number of sprinklers, area, etc.):...... Precautions for the impairment: Production processes with an increased fire risk are suspended The area under impairment is kept as small as possible A ban on cutting and welding is valid for the duration of the Fire doors and fire dampers are closed impairment Appropriate alternative systems are put in place (e. g. mobile fire Closed valves are marked detection system) A person is posted at the control valve/pump for fast reaction in A fire watch is arranged case of a fire Pressurised fire hoses are ready for use A smoking ban is valid in the area concerned An emergency concept (e. g. external supply of N₂ for oxygen The public fire brigade is informed reduction systems, drains of the sprinkler system connected The works fire brigade is informed via a fire hose with a hydrant) Stops, blind flanges or similar spare parts are available on the spot Ordered works are done without interruption Other:... Remark:... Date, Signature:... Precautions for the restoration: All armatures, switches on (automatic) operational readiness are All parties involved in the process are informed (employees, safety checked and possibly padlocked in open position organisation, public and private fire brigade, insurer/broker, etc.) The pipes are all flushed after the works, a flush test was The alarm system was reset and the alarm receiving station performed informed Pressure testing was done The full operational readiness of the system is confirmed in Warning signs indicating the impairment, as e. g. the marking of written by the company doing the activities needed during the closed valves, are removed impairment The activities were recorded in the service manual Other... 403-HRC249GB 201603 Remark:... Date, Signature:... Further explanations and examples of protection measures are listed in the Risk Engineering Guideline Impairment of fire protection systems published by HDI Risk Consulting. HDI Risk Consulting GmbH π HDI-Platz 1 π 30659 Hannover π www.hdi.global

6 Risk Engineering Guideline: Impairment of fire protection systems 4 Measures after the impairment. Ensuring complete automatic operational readiness without delay should include the following: Check of all fittings and switches for (automatic) operational readiness, if necessary securing in open/closed position with a pad-lock. Performing a flushing test at the riser of a sprinkler system. Notification of all departments involved in the process (employees, safety organization, public fire brigade or works fire brigade etc.). Resetting the fire alarm control panel and notification of the alarm receiving station. After the work has been completed, the full operational readiness of the system should be confirmed in writing by the specialist company carrying out the works. Furthermore, the activities should also be recorded in the logbook of the system. Notification of HDI Risk Consulting (possibly via the broker) and if necessary the responsible public fire brigade and/or building permit authority about the restoration of the fire protection system. Removal of the warning notices. If fire protection systems are under impairment, the risk of a major loss is increased, but can be reduced to an acceptable level by adopting the measures described above. 5 Note. This Risk Engineering Guideline is not intended to be complete and does not provide any release from the duty of compliance with statutory or legal regulations. Any liability is excluded.

Risk Engineering Guideline: Impairment of fire protection systems 7 6 References. Local Standards should be complied with. VdS 2091en: Maintenance of operational readiness of water extinguishing systems VdS 2093en: CO₂-fire extinguishing systems, planning and installation VdS 2095en: Automatic fire detection and fire alarm systems, planning and installation VdS 2106en: Spark detection, spark separation and spark extinguishing systems, planning and installation VdS 2380en: Fire extinguishing systems using non-liquefied inert gases, planning and installation VdS 2381en: Fire extinguishing systems using halocarbon gases, planning and installation VdS 2496en: Triggering of fire extinguishing systems, guidelines VdS 2893en: Maintenance of operational readiness of fire extinguishing systems with gaseous extinguishing agents VdS 3527en: Inerting and oxygen reduction systems, planning and installation VdS 2108en: Foam extinguishing systems, planning and installation VdS CEA 4001en: Sprinkler systems, planning and installation VdS 2109en: Water spray systems, planning and installation VdS 2212en: Log book for water extinguishing systems FM Global Fire Protection System Inspection, Testing and datasheet Maintenance and Other 2-81: Fire Loss Prevention Inspections VdS 2240en: Log book for gas and powder extinguishing systems VdS 2304en: Local application protection for electric and electronic equipment, planning and installation NFPA 25: Standard for the inspection, testing, and mainte nance of water-based fire protection systems

8 Risk Engineering Guideline: Impairment of fire protection systems About HDI Risk Consulting GmbH. HDI Risk Consulting GmbH supports mid-size companies, industrial companies and corporations in loss prevention and in establishing risk management systems. HDI Risk Consulting offers customers access to about 180 engineers and experts from a wide range of different disciplines. The goal is to support companies in managing risks and working out individual, risk-based concepts for insurance cover. HDI Risk Consulting operates across the world in the segments of Property, Motor, Engineering and Marine with particular focus on the identification and assessment of risks and the development of appropriate, individual protection concepts. HDI Risk Consulting GmbH is a wholly owned subsidiary of HDI Global SE. 403-HRC/REG149GB 201613 HDI Risk Consulting GmbH HDI-Platz 1 D-30659 Hannover Phone: 49-511-645-3219 Fax: 49-511-645-4542 Internet: www.hdi.global Imprint: In charge of the content: HDI Risk Consulting GmbH Layout: Insignio Kommunikation GmbH Pictures: HDI Risk Consulting GmbH, istockphoto.com: (by_ alactr, by_ bodo23, by_ SB-8NIHAT, by_ gordondix, by_ JimmiLarsen,) reinobjektiv, Although we made every effort possible to ensure the accuracy of the information provided, no liability can be assumed for the currentness, correctness and completeness of the information. We neither intend, nor assume any obligation, to update or revise these statements in light of developments which differ from those anticipated.