Start Up the Evap System

Similar documents
Additional Cooling Stage (FT174-43) Adds the location points and plumbing for a fourth heat exchanger.

TMCI Padovan Evaporators

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler

Brown Hills College of Engineering & Technology

MicroTech Series 200 Centrifugal Chiller

Daikin Direct Expansion (DX) Cooling Coils

Open Protocol Data Communications

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC

Switching on the pump. Measuring of PH. Aspiration of PH Down or PH up. Injection of the product. PH adjusted

BEFORE OPERATING THE MACHINE: WARNING

J120 STEAM BOOSTER INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER. J120 Steam Booster Manual D

McQuay. Screw Chiller Water Cooled. WHS Vintage A. Last Manufactured: Replacement Parts List No New 07/2012

DISPENSE TROUBLESHOOTING INDEX. Hot Tank Descaling Instructions are included in this Troubleshooting section.

TECHNICAL INSTRUCTIONS

REFRIGERATION AND AIR CONDITIONING RÉFRIGÉRATION ET CLIMATISATION POST-SECONDARY NIVEAU POSTSECONDAIRE

TEMPERATURE CONTROLLERS

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

Method Statement. Supervisor/Cleaning operative Cleaning operative

The Condensate Water Systems

PDF Created with deskpdf PDF Writer - Trial ::

Chapter 2.3: Steam System

FEEDWATER TANK WITH DEAERATOR DATASHEET. Capacity 1000 to lt Operating Pressure 0,5 bar

Standard Operation Procedures - Inferno 4500 Daily Startup

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

Operation and Maintenance Haskris LX-Series, R-Series, WW-Series, OPC-Series

Niles Steel Tank Hot Water Generator Installation and Operation Manual

EXTREME 1 Reverse Osmosis System

EXTREME HP-1 Reverse Osmosis System

INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold

All alerts are still logged as alarms and also show up in the current alarm list.

Tasman Sea Control System

Evaporation studied on a duplicated vessel, pilot scale evaporator equipped with a heat pump

Water-Cooled Scroll Compressor Chillers

347002K/177002K/34900

EXTREME 2 Reverse Osmosis System

PLYWOOD INDUSTRY JOB EVALUATION PROGRAM JOB DESCRIPTION. Points: 242 Grade: 18

CAREL IR33+ CONTROLLER

Refrigerant Recovery Unit, Model RRU134

EXTRACTOR Operation & Maintenance Manual

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Owners Manual for the AV18AX

PDS 2010 Parylene Coater SOP

Series 300 VTB. Installation Instructions

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

Installation & Operation Manual Models:

EXTREME HC-8 Reverse Osmosis System

EXTREME HC-4 Reverse Osmosis System Leader Evaporator Co., Inc. 49 Jonergin Drive Swanton, VT Tel:

Vertical Dryer Owner s Manual

OPERATION & MAINTENANCE MANUAL AC860

INTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

Printer Startup and Demo Build The purpose of this section is to execute the following:

THE ALLIANCE FOR BANGLADESH WORKER SAFETY BOILER SAFETY

DOUBLE O-RING GEO-PRIME TANK Non-Pressurized Flow Center System INSTALLATION INSTRUCTIONS. Model: DORGPT-1 NOTE:

Tray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com

INSTALLATION MANUAL CONDITIONING ENERGY RECOVERY VENTILATOR (CERV) MODEL CERV-001-PARTA, CERV-001-PARTB

INFINITY FLUIDS CORPORATION

Vacuum Oil Purifier (VOP) (5 Pages. June 2017)

EXTREME HC-2 Reverse Osmosis System

This guide is meant to be a starting example that should be customized by your organization. This guide should support your Safety VSP.

Mobile Air-Con Service Solution. AC7000 Operation Manual

DISPENSING TROUBLESHOOTING INDEX

EXTREME 4 Reverse Osmosis System

Brazed Plate Heat Exchanger

TCPSeries Installation Operation & Maintenance

ph COOLING TOWER CONTROLLER

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

ADVANCED EXTERIOR FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

Information Job Sheet 4. Closed-Loop Drainback Systems. Drainback tanks

Kube Engineering. Industry Guide. Power Industry

Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS

Math & Physics. Complete combustion requires an Air-FuelRatio of 14.7 to 1 for combustion.

In order to be useful, many substances must be available in pure form.

BMC OPERATION AUTOMATIC & MANUAL SYSTEMS

MicroTech Series-200 Flooded Screw Chiller

RB10 - RB30 Steam Generator Series:

MAXIMUM SERIES. Maximum Series portable chillers can be used on a variety of process applications that require 20 F to 70 F chilled water.

INSTRUCTIONS TO COMPLETE INSPECTION FORM:

THE "STRIPPER" BLAST-IT-ALL

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

STORAGE TANK INSTALLATION and OPERATION MANUAL

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

CELLTROL II BIOREACTOR CONTROL SYSTEM OPERATIONS MANUAL

SECTION 50 - CAB CLIMATE CONTROL

SERVICE PROCEDURE FOR RETROFITTED A/C SYSTEMS

Central States Industrial. Operation & Maintenance Manual Pilot Plant Direct Steam Injection Vacuum Cool System

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

REFRIGERANT SYSTEM SERVICE WARNINGS

DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

CAS. Product Specifications. COMMERCIAL SPLIT SYSTEMS CONDENSING UNITS R 410A, 6 to 12.5 TONS BUILT TO LAST, EASY TO INSTALL AND SERVICE

Geothermal ORC Systems Using Large Screw Expanders

Operating Manual "Mark II" Solid-State Digital Automatic Controlled Sterilizers

OPERATION & MAINTENANCE MANUAL RHS680

ENVIRONMENTAL HEALTH AND SAFETY. Power Washing Guidelines

Series 1140 and 1141 Temperature Regulators

WORKSHEET 4-4 (ON-CAR) HFC-134a Recovery

OPERATION MANUAL KP4041 POLY SCRAP COMPACTOR

To request a quote or locate your nearest dealer, contact Customer Care toll-free in the US at or

Spray Dryer Standard Operating Procedure

Transcription:

Page 1 of 14 Purpose: To start the Evaporator System for normal operation. Required PPE: Safety Glasses Hearing Protection Steel Toed Shoes Nitrile Gloves Potential Hazards: In the automatic mode the equipment may start without warning. Keep hands clear unless the unit is locked out in a safe condition. Fall hazard exists on ladder and the raised platform. Use three-point contact when climbing up to or down from the platform. The vessels, heat exchangers and piping for have hot surfaces which could cause burns. Avoid contact with these hot surfaces. Reference Documents: None Required Equipment & Materials: Startup process log sheet S-2536 ph tester

Page 1 of 14 Line up Cooling Tower Water Note: if the cooling tower is already in operation, proceed to the next section. 1. Turn CONTROL POWER Switch ON at the Main control panel. 2. Verify that Green CONTROL POWER light is lit. 3. Wait for HMIs to boot up. 4. Turn on Disconnect Switch for COOLING TOWER PUMP.

Page 2 of 14 5. Turn on Disconnect Switch for COOLING TOWER FAN. 6. Press the START button on the CT Fan Controller to start the controller. 7. At the Concentrator HMI (Page 2) turn on the cooling tower water: a. Turn on CONDENSER WATER PUMP. b. Turn on COOLING TOWER PUMP. c. Turn on COOLING TOWER (fan). a. c. b.

Page 3 of 14 Start the Seal Water System Note: if the seal water system is already in operation, proceed to the next section. 8. At the Stripper HMI (Page 2) turn on the WATER SEAL PUMP. 9. Verify water seal return flow to tank. Flow should be visible here 10. Inspect stripper system pumps for seal water leaks.

Page 4 of 14 11. Remove and inspect filter screen. 12. Clean screen if any debris or foreign material is found. 13. Open Recovery Water Valve.

Page 5 of 14 14. At the Stripper HMI (Page 1) Start the FEED PUMP. 15. Wait 10 seconds before proceeding. 16. Start the 1 ST EFFECT EXTRACT PUMP. 17. Start the 2 nd EFFECT EXTRACT PUMP.

Page 6 of 14 18. Verify that the vacuum break valve is closed. 19. At the Stripper HMI (Page 2) Start the VACUUM PUMP. 20. Start the ESSENCE VACUUM PUMP.

Page 7 of 14 21. Verify that system is building vacuum. Gauge should read at least 10 inhg. Before continuing to the next step. 22. Start the HOT WATER PUMP at the Evap System HMI. 23. Verify that injection water supply valve is open. 24. Visually inspect heat exchanger for leaks.

Page 8 of 14 25. Set injection spray water valve to 45-degree position as shown. 26. Open spray heater water supply valve. 27. Prime the fluid column to ensure there is a level visible in the sight glass. Sight Glass

Page 9 of 14 28. At the Stripper HMI (Page 1) Start the condensate and extract pumps: a. 1 ST EFFECT COND PUMP b. 2 ND EFFECT COND PUMP c. SPRAY HEATER EXTRACT PUMP d. CONDENSOR EXTRACT PUMP e. ESSENCE COND PUMP a. b. c. d. e. 29. Open steam supply valve to hot set.

Page 10 of 14 30. Open condensate valve to drain water from the system 31. Close valve when only steam is present. 32. Open steam supply valve (Chain Operated).

Page 11 of 14 33. Open condensate valve to drain water from the system 34. Close valve when only steam is present. 35. Adjust STRIPPER STEAM SUPPLY PRESSURE setpoint to 20 PSI: Touch to bring up keypad for entry.

Page 12 of 14 36. Turn STEAM VALVE on. 37. Open the manual inlet valve to balance tank. 38. Adjust flow rate and 1 st stage vacuum to as needed to achieve desired brix.

Page 13 of 14 History of Revisions Revision Revision Date Revised By Reason for Revision