SCHNEIDER-KESSEL BERLIN

Similar documents
SCHNEIDER-KESSEL BERLIN

INTEC Engineering GmbH Energy systems

Erhitzer_engl_3:Wärmeträger :43 Uhr Seite 1. INTEC Engineering GmbH Thermal oil heaters

CHAPTER 3 BASIC STEAM CYCLE

INTEC Engineering GmbH Energy systems


Thin Film. Optimizing Temperature Control 2. Preventing Excessive Vacuum 3. Minimizing Air Drawback 4

Image_engl_08:Image-engl-RZ :55 Uhr Seite 1. INTEC Engineering GmbH Energy systems

Boiler Basics. Design and operation

Boiler. Fire tube Boiler:

Product overview. the optimum components for every application

SIOUX HYBRID WATER HEATER

THW-I NTE. Description THW-I NTE. Industrial Hot Water Boiler THW-I NTE for Oil or Gasfiring. Industrial Hot Water Boiler

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

COMPACT FLAME CONTROLLER CFC 100

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

Tray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com

AIM OF THE EXPERIMENT:- Study of boilers (fire tube, water tube) APPARATUS REQUIRED: - SL.NO NAME OF THE APPARATUS SPECIFICATION QUANTITY 01 Fire tube

Savile Plus. Steam Boiler. Suitable for Pressure Jet burners Oil, gas or dual fuel firing. Outputs kg/h

Bryan Flexible Water Tube. Ultra-High Efficiency Condensing Hot Water Boilers. 3,000,000 BTUH Natural Gas Fired

Basic information about quick steam generators/boilers System GEKA Heat Technology Gottfried Kneifel

Ashirwad Carbonics (India) Private Limited

GESTRA. Product Overview. The optimum components for every application

MX RANGE PACKAGED STEAM BOILERS

ENTROPIE boiler TT300

Presentation On Industrial Boiler Operation And Maintenance

Document code: 1 (10) Issuing date: Status:

FUEL-FIRED VERTICAL TUBELESS BOILERS

DH-Direct Fired Poultry Farm Diesel Heater

Installation & Operating Manual ZM kW Universal Oil Heater. ZMH Ltd t/a Z M Heaters T (0)

Bosch Commercial and Industrial Heating High efficiency steam boilers (175kg/h to 55,000kg/h)

Document Code: 1 (15) Issuing date: Status:

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

Heating and Air-Conditioning Testing II. Climatic Test Bench

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

BORSIG WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS PROCESS HEAT EXCHANGER. A Member of KNM Group Berhad

Product Overview. Ordering Information DM-LK-D10 DM-LK-D10-C. Dust & Opacity Meter Complete Set Controller Unit. Sender Receiver SDS-V5 SDR-V4 HPB-82S

Rental Boiler Specifications (Nebraska Boiler)

SECTION Boiler Controls & Waste Heat Recovery

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Boiler Basics: Design & Application Differences. Presented by Steve Connor July 30, 2014

WATER TUBE SOLID FUEL SERIES YOSHIMINE CO., LTD

Submittal Data GA Line AYF Series Commercial and Specialty Chiller-Heaters 2 or 4 pipe Gas Fired Absorption Chiller-Heater Cooling and Heating

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

CHAPTER 6. HEATING PRODUCTION EQUIPMENT AND SYSTEMS

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

Williams & Davis Boilers

Efficient technology for major tasks Hot water boilers

FLUIDIZED BED BOILERS

Biomass Energy Systems

Fuel-Fired Vertical Tubeless Boilers

BuildingName The Description of the Project P DOCUMENTS

Biomass Drum Dryer LMK 2000 Model

BUDERUS. Superior Equipment by Design. Comfortable. Efficient. Intelligent Heating. BUDERUS. G Cast Iron Commercial Boilers

9. Cooling Water System

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

Math & Physics. Complete combustion requires an Air-FuelRatio of 14.7 to 1 for combustion.

FEEDWATER TANK WITH DEAERATOR DATASHEET. Capacity 1000 to lt Operating Pressure 0,5 bar

VIESMANN. VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW.

Attention is drawn to the following places, which may be of interest for search:

Thermal Fluid Heaters

ROTARY DRYER CONSTRUCTION

Energy recovery from exhaust gases using Heat Pipe technology

FLOATING PRODUCTION SYSTEMS

Bryan Water-Pak Indirect Systems 360,000 BTU to 4,500,000 BTU Inputs 199 to 3,533 Gallons Storage Capacity

NFPA 85 COMPLIANCES OF BMS: A CASE STUDY OF BOILER CONTROL AT SBM OFFSHORE MALAYSIA COMPANY 1. AHMED ABOUELRISH 2 Universiti Teknologi Petronas

FCX FUEL OIL CONDENSING BOILER RANGE

Originators of the Flexible Water Tube design

Originators of the Flexible Water Tube design

Gas-fired water heaters, volume III, storage water heaters with input ratings above 75,000 Btu per hour, circulating and instantaneous

Originators of the Flexible Water Tube design

Ball Float Controlled. Thermo Dynamic(TD) Trap Safety Valve Condensate Pump Flash Vessel Moisture Separators Deaerator Head Steam Injector Sight Glass

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set.

Light oil / kerosene burner

CEMENT KILN GAS/OIL BURNER

Solution builder. in energy management.

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

GASEOUS HYDROGEN SYSTEMS

Fuel-Fired Vertical Tubeless Boilers. Classic, Edge, Tribute and VMP Models From 4 to 150 BHP (138-5,021 lbs/hr)

Diocese of Cleveland Facilities Services Corporation

FLX FLEXTUBE. The Widest Range of Hydronic and Steam Watertube Boiler Systems 1,500 to 25,000 MBTU/HR (35-600HP)

DELTA-TE III. Nozzle-mix line burner

Madhu Honap HONEYWELL THERMAL SOLUTIONS INTRODUCTION

Williams & Davis Boilers

Typical damages to Boilers & Economizers

Solution of I Mid Term Steam Engineering 6ME5A

mith Mills 3500A Smith Mills 3500A 3500A-3 OIL, GAS OR COMBINATION GAS/LIGHT OIL COMMERCIAL BOILER/BURNER CAST IRON

ENERGY RECOVERY SOLUTIONS. Recover wasted energy to increase efficiency and save money immediately.

ORO tank heating system

Points to be Considered when Purchasing a Steam Jet Vacuum Pump

JENROLL EXPG the gas-heated, self-contained ironer

GESTRA. Product Overview. The optimum components for every application

Control Products & Systems OEM

Water Fuel + Air for combustion Blowdown

BSS Examination Record Form: Non-private Boats (2002 ECP Parts 2 to Part 10)

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

COMMERCIAL CONDENSING GAS WATER HEATER GALLONS, 55,000 BTU/HR 94% THERMAL EFFICIENCY

SPECIFICATIONS MODEL E859C MINI DEHYDRATOR

Transcription:

SCHNEIDER-KESSEL BERLIN STEAM BOILER and HOT WATER BOILER HIGH PRESSURE STEAM GENERATOR - Series inook

GENERAL The inook is a high pressure steam generator especially designed for closed steam-condensate circuits. The boiler supplies high pressure steam for process engineering plants where special safety regulations are enforced especially in productions where leakages shall not contaminate the product. This requirement can only be met with water of treated quality but not when using thermal oil for heat transfer. The main application of the inook is the entire food industry especially focussed on deodoration of edible oil and fat. distillation, fractioning and esterification of various raw materials. The inook is installed directly below the steam consumer (the condenser), connected to it and not capable of being shut off. The generated high pressure steam transports the heat into the condenser where the heat energy is transferred into a product in a thermal process by condensing. The high pressure steam generator inook and the condenser are operated in an absolute closed circuit driven by natural circulation. The inook installed in a closed circuit, allows an operation without the regular boiler equipment such as water level control and feed water pumps. To avoid water leakages, all connections of supply and return lines and connections with the equipment are welded. For safety valves the connetion is sealed by means of an rupture disc and the spaces in between the disc an the safety value is monitored by leakage control. A D VA N TA G E S Safe and reliable operation due to tube-wall-tube design, no risk of surface overheating by obstruction of circulation due to tube reductions at collector inlets. High plant efficiency by optimized and efficient heat transfer avoiding flue gas leakages between the 3 passes. Minimized furnace volume load and heating surface load by thoroughly adjusted boiler design. High flexibility, of fuel range. 72 hrs supervision free operation by state-of-the-art electronic boiler control system. No hazardous substances such as thermal oils used for heat transfer. No risk of corrosion in the steam and condensate system due to welded connections instead of flanged. Possibility of further increasing the plant efficiency by utilizing the flue gas heat i.e. with waste heat recovery systems such as combustion air preheater. Preassembled boiler system including control box, electrical wiring etc. minimizing the installation time on site.

DESIGN The inook is a vertical high pressure steam generator without a steam drum with the burner installed as roof burner on top of the boiler. The flue gas system of the inook is a three pass boiler type where the furnace is the 1st pass and the 2nd and 3rd pass are formed by the concentrically arranged tube cages of the convection part. The superior advantage of the inook is the execution of the tube cages in absolute flue gas tight tube-wall-tube design. This secures that the vertical evaporator tubes can be welded into the bottom and top ring collectors without reduction. This design feature is the ultimate precondition to ensure unobstructed water steam flow and subsequently thermal overheating even during peak loads and/or sudden load fluctuation will be avoided. This design is adapted from our high-pressure water-tube boilers (ERK-HP) and has proven its technical superiority in compare with other designs. Summarizing the advantages of tube-wall-tube design in brief: Unhindered water and steam flow since no reduction of tube cross section between upper and lower ring collectors No clogging and no overheating occurs Total gas tight tube-wall-tube design secures no leakages between the tube cages hence increasing the boiler efficiency

M A N U F A C T U R I N G A N D E Q U I P M E N T Design and fabrication of the inook is in accordance with the German Technical Regulation for Steam Boiler (TRD) respectively Euronorm EN-12953 in connection with the Pressure Vessel Directive DGRL 97/23/EG as stationary boiler (land based boiler). The fabrication is supervised and monitored by TÜV, the German Steam Boiler Supervision Authority. In addition we are able to deliver in compliance with standards such as ASME, BS, Vincotte, Stoomwezen, APAVE, ISPESL, DOSH, Australia, New Zealand, Japan, etc. Boiler equipment and control systems are certified by the respective classification authorities. Depending on the specific requirements the inook is equipped with the subsequent equipment. Decisive for the selection of the equipment are: required grade of plant efficiency required grade of plant safety and plant availability fuel availability BASIC EQUIPMENT FOR THE inook pressure body including boiler casing and insulation firing system in monobloc design for: gaseous fuels such as natural gas L and H, bio gas, LPG liquid fuels such as LFO, bio diesel control box including the control system such as: pressure control burner control boiler safety chain with emergency push button main power supply connection 1 safety valve with rupture disk and leakage control (pessure switch) 2 low water level limiters 1 pressure limiter 1 pressure transmitter 1 direct reading pressure gauge with gauge isolation valve 1 flame sensor 1 test valve for water level 1 feed and drain valve with check valve 1 exhaust gas temperature limiter OPTIONAL EQUIPMENT FOR THE inook firing system in monobloc design for additional 2 alternative fuels including control system cascade control 2nd safety valve including rupture disk and leakage control boiler water filling pump oxygen control air preheater

TECHNICAL DATA We supply the inook in the capacity range from 150 kw up to 5000 kw. Boilers for higher capacities are available upon request PROCESS FLOW DIAGRAM 1 SV1 safety valve 2 PS+ pressure switch 12 3 PSZ+ pressure limiter 4 PIC pressure transmitter / control 5 PI pressure gauge with valve 11 3 4 5 10 6 LSZ-1 low water level limiter 1 2 7 LSZ-2 low water level limiter 8 TSZ+ temperature limiter 13 6 9 XZA flame monitor 7 9 10 RD rupture disc 11 TIC temperature control 12 AV1 venting valve 13 AV2 test valve low water level 14 AV3 filling and drain valve 15 RV check valve 8 18 16 SV3 safety valve 17 FP filling pump 14 19 15 16 17 18 ST strainer 19 FH flexible hose

SCHNEIDER Engineering GmbH Berlin, Germany Tel.: +49 (0)30 75 44 93 99-0 Fax: +49 (0)30 75 44 93 99-21 info@schneider-kessel.d SCHNEIDER-KESSEL (Asia) Ltd. Bangkok, Thailand Tel.: +66 (0)2 3660-573 Fax: +66 (0)2 3660-574 info@schneider-kessel.com We deliver worldwide Range of Deliveries and Services Steam and Hot Waters Generators water tube boilers three pass boilers waste heat recovery boilers electrically heated steam and hot water generators Engineering Installation and Commissioning After Sales Service Repair Spare Parts www.schneider-kessel.com 04/2013