FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST

Similar documents
The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

PQS Independent type-testing protocol

Performance Rating of Commercial and Industrial Unitary Air-Conditioning Condensing Units

INDOOR POOL DEHUMIDIFIERS CERTIFICATION PROGRAM

WATER-SOURCE HEAT PUMPS CERTIFICATION PROGRAM For 50 Hz Products

PQS Quality Assurance protocol. TITLE: Cold Room/Freezer Room:

UL Test Methods for Determining the Combustibility Characteristics of Plastics Used in Semiconductor Tool Construction. General Information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SECURITY TESTING AND COMMISSIONING

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

TEST REPORT #14. System Drop-In Test of Refrigerant Blend ARM-42a in an Air-Cooled Screw Chiller

Supplier Handbook. InSinkErator st Street Racine, WI

PQS Independent type-testing protocol

9. ENERGY PERFORMANCE ASSESSMENT OF HVAC SYSTEMS

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

AHRI Standard 1250P (I-P) 2009 Standard for Performance Rating of Walk-In Coolers and Freezers

Surface Temperature Tests on an LST Fan Convector

ANSI/AHRI Standard 911 (SI) 2014 Standard for Performance Rating of Indoor Pool Dehumidifiers

TESTING, ADJUSTING AND BALANCING

Sound Performance Rating of Outdoor Unitary Equipment

Instruction Manual for HX-DX and HX-DXHP Heat Exchangers 3 / 2017

WARRES No Page 1 of 27. Fire Resistance Test Generally In Accordance With BS 476: Part 22: 1987, Clause 5, on an Insulated Fabric Barrier

City of Duluth Festival Center 04/25

Supplier Handbook. InSinkErator st Street Racine, WI

Performance Rating of Active Chilled Beams

Digital EPIC 2 Safety manual

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency

Proforma for Surveillance of Recognized Environmental Laboratory under the Environment (Protection) Act, 1986

60Hz. R134a HXWC SERIES. 205 to 560 Tons. Products That Perform...By People Who Care WATER-COOLED SEMI-HERMETIC SCREW COMPRESSOR WATER CHILLERS

Performance Rating of Variable Refrigerant Flow (VRF) Multi-split Air-conditioning and Heat Pump Equipment

SECTION ELECTRICAL SYSTEMS COMMISSIONING

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Ultrasonic Clamp-On Flow Meter Testing

ME 410 MECHANICAL ENGINEERING SYSTEMS LABORATORY MASS & ENERGY BALANCES IN PSYCHROMETRIC PROCESSES EXPERIMENT 3

HVAC Water chiller selection and optimisation of operation

Refrigerating Appliance DOE Test Report

ANSI/AHRI Standard 620 (I-P) 2014 Standard for Performance Rating of Self-contained Humidifiers for Residential Applications

Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS

ON THE BUTTON A reference guide to environmental ratings used for push button enclosures

SECTION Free/Available Chlorine Analysis System

2016 Annual Conference

SECTION ULTRASONIC TRANSIT TIME CLAMP-ON FLOW MEASURING SYSTEM

Flow Capacity Rating of Suction Line Filters and Suction Line Filter Driers

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CONTENTS AUTOMATIC TRANSFER SWITCHES

Electric radiator test

Under Section 608 of the CAA, EPA has established regulations (40 CFR Part 82, Subpart F) that:

PIP PCTPA001 Testing of Process Analyzer Systems

URS-1 SERVICE AND PARTS MANUAL SERIAL NUMBERS: UP TO

MicroTech Series 200 Centrifugal Chiller

Simple, digital wireless reporting.

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

SOP SF SOP for LN2 Freezers

100 & 120 Series Pressure and Temperature Switches Safety Manual

MS200/300/400 Magnetic Stirrer. Instruction Manual

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold

SIL Safety Guide Series MS Single-Acting Spring-Return Hydraulic Linear Actuators

CAREL CONTROLLER. Programming Instructions HOW TO CHANGE LEVEL 1 CONTROL SETTINGS HOW TO CHANGE LEVEL 2 CONTROL SETTINGS

Performance Rating of Commercial and Industrial Humidifiers

AHRI Certification Program Scopes - COOLING

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DROP-IN EVALUATION OF REFRIGERANT 1234YF IN A RESIDENTIAL INTEGRAL HEAT PUMP WATER HEATER

Performance Rating of Refrigerant Pressure Regulating Valves

SECTION INTEGRATED AUTOMATION COMMISSIONING

Procedure for the Approval of New Fire Detection and Alarm Technologies

Please read this manual before switching the unit on. Important safety information inside. Dry - Well Temperature Calibrator.

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

ME 410 MECHA ICAL E GI EERI G SYSTEMS LABORATORY

TEST REPORT #4. Travis Crawford Dutch Uselton. Lennox Industries Inc Metrocrest Drive Carrollton, TX 75006

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

REFRIGERATION AND AIR CONDITIONING RÉFRIGÉRATION ET CLIMATISATION POST-SECONDARY NIVEAU POSTSECONDAIRE

Title: Fire resistance test utilising the general principles of BS 476: Part 20: 1987 on four specimens of Uninsulated Air Valves.

AHRI Standard 751 (SI) 2016 Standard for Performance Rating of Thermostatic Refrigerant Expansion Valves

HOW IT RELATES TO PERFORMANCE IN REFRIGERATED COMPRESSED AIR DRYERS

TEST REPORT #47. System Drop-in Test of R-32 and Refrigerant Blends ARM-71a, HPR2A, L-41-2 and DR-5A in a Five-Ton R-410A Rooftop Packaged Unit

University of Houston Master Construction Specifications Insert Project Name

Digital Refrigerant System Analyzer. MAXMIN Psi kpa Bar MPa C F R TIME P T UNITS

Method to test HVAC equipment at part load conditions

RESIDENTIAL WATER HEATER CERTIFICATION PROGRAM

REI-M-4B - Installation Manual Rev 1 October SOLID BOSS Installation Manual Deck Drainage Applications

Refrigeration Cycle And Compressor Performance For Various Low GWP Refrigerants

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

SECTION INDUCTIVE CONDUCTIVITY ANALYZERS

Development of a Transient Simulation Model of a Freezer Part II: Comparison of Experimental Data with Model

Drop-in Testing of Next-Generation R134a Alternates in a Commercial Bottle Cooler/Freezer

Shell-and-Tube Heat Exchanger (Four Passes) - Optional

SYSTEM DESIGN REQUIREMENTS

Lesson 25 Analysis Of Complete Vapour Compression Refrigeration Systems

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Automatic Humidity Controller. Model 512 (Revision C) Operating Manual

SECTION METERS AND GAGES FOR HVAC PIPING

NOVALYNX CORPORATION MODEL A & A SLING PSYCHROMETER INSTRUCTION MANUAL

for Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Approval Standard for Electric Equipment for use in Hazardous (Classified) Locations General Requirements

Transcription:

FORM ACCL-PC1 ACCL WITNESS TEST PROCEDURE AND CHECKLIST AHRI CERTIFICATION PROGRAM FOR AIR-COOLED WATER-CHILLING PACKAGES USING THE VAPOR COMPRESSION CYCLE ACCL Participant: Date of Test: Witness Test Number: Test Results: Instructions to Laboratory Representatives: The following Witness Test Procedure and Checklist is to be used by the Representative Contracted by AHRI (Representative) to document all steps required to conduct witness tests for the Air- Cooled Water Chilling Packages Certification Program (ACCL). This Witness Test Procedure and Checklist is to be used in conjunction with the AHRI General Operations Manual (OM) for AHRI Certification Programs, the ACCL OM and the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI) (Standard). Where the AHRI General OM, the ACCL OM and this Witness Test Procedure and Checklist differ, the other documents shall prevail. The completed checklist shall be submitted to AHRI upon the completion of the witness test. Select the Standard to be used to perform this test (select only one): AHRI Standard 550/590 (I-P) AHRI Standard 551/591 (SI) If the Participant s test facility (Facility) fails to comply with the conditions listed below: Notify AHRI Notify Participant REPRESENTATIVE Pre-Visit When setting up for a trip to Witness Test an Air-Cooled chiller for AHRI Certification Programs, several information items are required. Verify the following information as received from AHRI: 1. Letter of Authorization (AHRI Selection Letter, refer to Section 3.5 of the ACCL OM) from AHRI for the Third-Party Laboratory contracted by AHRI (Laboratory) to witness the Certification Test 2. Copy of the latest AHRI Test Standard Inspection Approval Report 3. Test Site Location 4. Participant s Contact(s) with Phone and Fax Numbers and email 5. Chiller Model Number 6. Model Performance Ratings 7. Unit rated voltage, amperage and frequency 8. Selection Data Sheet, including Fouling Factor Calculations and Water Side Surface Area for the evaporator 9. Random Operating Point (5 th Point) Page 1 of 16

Pre-Visit (contin.) Minimum Laboratory instrumentation required: Verify the following information as received from the Participant: 1. Verification of Power Input instrumentation requirements 2. Mutually agreed upon test date of when to arrive at the Participant s specified Test Stand 3. Directions to the Participant s specified Test Stand 4. Estimate of when testing will be completed Inform the Participant that the unit can be set-up as per the latest edition of the ACCL OM when the Representative arrives Be sure that all Laboratory instrumentation has current calibration stickers. Conduct a quick test to verify that the maximum deviation of the temperature probes from the highest to the lowest readings is within 0.10 F [0.055 C]. This can be done by placing the probes through a wooden board or 1-inch rubber insulation and setting it on a bucket of near-ambient water. Stir the water while checking the temperature readings from each probe. Document the temperature probe readings and recalibrate if necessary. Extreme care must be exercised when handling the temperature probes. Leave the rubber protective sleeves on the probes until you are ready to insert them into the thermo-wells or into the water streams. Temperature probes including measurement device 1. Two (2) for measuring water temperatures 2. Additional probes, equal to the number of aspirating psychrometers Differential pressure gauge including measurement device Power meter including current transformers and voltage sensing leads Barometer Page 2 of 16

Day of Test Upon arrival, request a brief meeting of the involved parties to review the following information: 1. Safety rules at the test site 2. Instrumentation List Calibration Summary Sheet (to be placed in the project file) 3. Confirm test conditions and unit voltage 4. Comparison of Fouling Factor allowance calculations 5. Test set-up; location of Laboratory instrumentation Representative shall unpack and visually inspect all Laboratory instrumentation Representative shall install all Laboratory instrumentation Representative shall visually inspect and confirm the test sample chiller nameplate against the AHRI Selection Letter to confirm identity of the chiller under test. For water pressure drop, the Zero measurements shall be recorded and shall be zero, within a tolerance of ± 1.0% of the full scale value of the calibration range of the measurement system. This verification can be completed before or after the test has been conducted. For water flow, the Zero measurements shall be recorded and shall be zero, within a tolerance of ± 1.0% of the full scale value of the calibration range of the measurement system. This verification can be completed before or after the test has been conducted. Representative shall verify the type of data reported: 1. Five (5) minute average point (continuous) or 2. Instantaneous data point Representative shall authorize starting the test sample chiller Page 3 of 16

100% Full Load Test All verifications shall be conducted at 100% load steady state conditions as the first load test point. Representative shall confirm and record that the Laboratory instrumentation is in agreement with the Test Stand s. If these criteria are not met, interchange the Laboratory instrumentation to confirm they are correct. Note: The RTD thermowell may be a cause of a temperature difference; not deep enough into the water stream or location. If calibration facilities are available on site, the Participant may wish to recalibrate his equipment and then compare with the Laboratory instrumentation. Should any of these criteria not be met, steps should be taken to ensure that the discrepancy is resolved. In cases where the discrepancy cannot be resolved and no damage is apparent, the Laboratory instrumentation data for that parameter shall be used. 1.1. The water temperature difference across the evaporator as determined by the Test Stand s instrumentation is within 0.2ºF [0.11 C] from the Laboratory instrumentation 1.2. The Test Stand and Laboratory temperatures values for entering Evaporator temperature are no more than 0.2ºF [0.11 C] different 1.3. The Test Stand and Laboratory temperatures values for leaving Evaporator temperature are no more than 0.2ºF [0.11 C] different 1.4. The Facility and Laboratory temperatures at each aspirating psychrometer are no more than 0.3ºF [0.17 C] different 1.5. The Power Input as determined by the Test Stand s instrumentation is within 2% of the Laboratory s values 1.6. The Water Pressure Drop reading determined by the Test Stand s instrumentation is within 2% of the Laboratory s values 1.7. Verify air distribution in accordance with the ACCL Air Distribution Checklist 1.8. The Test Stand and Laboratory barometric pressure values differ by no more than 0.02 psi [0.14 kpa] After the proper refrigerant charge has been established, the refrigerant charging line shall be disconnected and remain off from the test sample during the testing Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period. Page 4 of 16

100% Full Load Test (contin.) The Representative shall confirm all of the following data collected at each test point are in accordance with the Standard: Instrument Set #2 (next two steps) 2.1 Data collected in accordance with Section C6.2.1 of the Standard. 2.2 Entering Evaporator water temperature measurements for each set of 2.3 Leaving Evaporator water temperature measurements for each set of 2.4 Evaporator water flow measurements for each set of 2.5 Power input measurements for each set of 2.6 Evaporator water flow as compared to Target 2.7 Leaving Evaporator water temperature as compared to Target 2.8 Evaporator water flow as compared to Target 2.9 Leaving Evaporator water temperature as compared to Target 2.10 Mean Entering Condenser dry-bulb air temperature as compared to Target 2.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 2.12 Voltage (average of all phases) as compared to Target 2.13 Frequency as compared to Target The Representative shall confirm all of the following at the conclusion of the test are in accordance with the Standard 3.1 Calculated Capacity (adjusted for Barometric Pressure) is within tolerance 3.2 Calculated Efficiency (adjusted for Barometric Pressure) is within tolerance 3.3 Calculated Evaporator water pressure drop For continuous unloading units, verify that the actual capacity (adjusted for Barometric Pressure) at 100% Full Load is not greater than 105% of the rated performance Page 5 of 16

75% Part-Load Test Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period. The Representative shall confirm all of the following data collected at each test point are in accordance with the Standard Instrument Set #2 (next two steps) 1.1 Data collected in accordance with Section C6.2.1 of the Standard. 1.2 Entering Evaporator water temperature measurements for each set of 1.3 Leaving Evaporator water temperature measurements for each set of 1.4 Evaporator water flow measurements for each set of 1.5 Power input measurements for each set of 1.6 Evaporator water flow as compared to Target 1.7 Leaving Evaporator water temperature as compared to Target 1.8 Evaporator water flow as compared to Target 1.9 Leaving Evaporator water temperature as compared to Target 1.10 Mean Entering Condenser dry-bulb air-temperature as compared to Target 1.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 1.12 Voltage (average of all phases) as compared to Target 1.13 Frequency as compared to Target Page 6 of 16

75% Part-Load Test (Contin.) The Representative shall confirm the calculated IPLV is within tolerance at the conclusion of the test are in accordance with the Standard For continuous unloading units during part-load tests, verify the measured capacities (adjusted for Barometric Pressure) are within tolerance (± 2% of the full load rated capacity). For discrete capacity step units, part-load test points shall be taken as close as practical to the specified part-load rating points as per Table 3 of the Standard. For discrete unloading units, verify that the mean entering condenser dry-bulb air temperature is based on the measured capacity (adjusted for Barometric Pressure) for the test as per Table 3 of the Standard. Page 7 of 16

50% Part-Load Test Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period per Table 12 of the Standard. The Representative shall confirm all following data collected during the test are in accordance with the Standard 1.1 Data collected in accordance with Section C6.2.1 of the Standard. 1.2 Entering Evaporator water temperature measurements for each set of 1.3 Leaving Evaporator water temperature measurements for each set of 1.4 Evaporator water flow measurements for each set of 1.5 Power input measurements for each set of 1.6 Evaporator water flow as compared to Target 1.7 Leaving Evaporator water temperature as compared to Target 1.8 Evaporator water flow as compared to Target 1.9 Leaving Evaporator water temperature as compared to Target 1.10 Mean Entering Condenser dry-bulb air-temperature as compared to Target 1.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 1.12 Voltage (average of all phases) as compared to Target 1.13 Frequency as compared to Target Page 8 of 16

50% Part-Load Test (Contin.) The Representative shall confirm the calculated IPLV is within tolerance at the conclusion of the test in accordance with the Standard For continuous unloading units during part-load tests, verify the measured capacities (adjusted for Barometric Pressure) are within tolerance (± 2% of the full load rated capacity). For discrete capacity step units, part-load test points shall be taken as close as practical to the specified part-load rating points as per Table 3 of the Standard. For discrete unloading units, verify that the mean entering condenser dry-bulb air temperature is based on the measured capacity (adjusted for Barometric Pressure) for the test as per Table 3 of the Standard. Page 9 of 16

25% Part-Load Test Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period per Table 12 of the Standard. The Representative shall confirm all following data collected during the test are in accordance with the Standard 1.1 Data collected in accordance with Section C6.2.1 of the Standard. 1.2 Entering Evaporator water temperature measurements for each set of 1.3 Leaving Evaporator water temperature measurements for each set of 1.4 Evaporator water flow measurements for each set of 1.5 Power input measurements for each set of 1.6 Evaporator water flow as compared to Target 1.7 Leaving Evaporator water temperature as compared to Target 1.8 Evaporator water flow as compared to Target 1.9 Leaving Evaporator water temperature as compared to Target 1.10 Mean Entering Condenser dry-bulb air-temperature as compared to Target 1.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 1.12 Voltage (average of all phases) as compared to Target 1.13 Frequency as compared to Target Page 10 of 16

25% Part-Load Test (Contin.) The Representative shall confirm the calculated IPLV is within tolerance at the conclusion of the test in accordance with the Standard For continuous unloading units during part-load tests, verify the measured capacities (adjusted for Barometric Pressure) are within tolerance (± 2% of the full load rated capacity). For discrete capacity step units, part-load test points shall be taken as close as practical to the specified part-load rating points as per Table 3 of the Standard. For discrete unloading units, verify that the mean entering condenser dry-bulb air temperature is based on the measured capacity (adjusted for Barometric Pressure) for the test as per Table 3 of the Standard. Page 11 of 16

Extra Point (Required for instances when previous points cannot be determined due to discrete step machines that are unloaded at different loads) Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period per Table 12 of the Standard. The Representative shall confirm all following data collected during the test are in accordance with the Standard 1.1 Data collected in accordance with Section C6.2.1 of the Standard. 1.2 Entering Evaporator water temperature measurements for each set of 1.3 Leaving Evaporator water temperature measurements for each set of 1.4 Evaporator water flow measurements for each set of 1.5 Power input measurements for each set of 1.6 Evaporator water flow as compared to Target 1.7 Leaving Evaporator water temperature as compared to Target 1.8 Evaporator water flow as compared to Target 1.9 Leaving Evaporator water temperature as compared to Target 1.10 Mean Entering Condenser dry-bulb air-temperature as compared to Target 1.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 1.12 Voltage (average of all phases) as compared to Target 1.13 Frequency as compared to Target Page 12 of 16

Extra Point (Required for instances when previous points cannot be determined due to discrete step machines that are unloaded at different loads) The Representative shall confirm the calculated IPLV is within tolerance at the conclusion of the test in accordance with the Standard For continuous unloading units during part-load tests, verify the measured capacities (adjusted for Barometric Pressure) are within tolerance (± 2% of the full load rated capacity). For discrete capacity step units, part-load test points shall be taken as close as practical to the specified part-load rating points as per Table 3 in the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI). For discrete unloading units, verify that the mean entering condenser dry-bulb air temperature is based on the measured capacity (adjusted for Barometric Pressure) for the test as per Table 3 in the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI). For discrete unloading units that cannot be unloaded below 25%, 50%, or 75% capacity points, then the unit shall be run at the minimum step of unloading at the condenser entering water or air temperature based on Table 3 for 25%, 50% or 75% capacity points as per Table 3 in the latest edition of AHRI Standard 550/590 (I-P) or AHRI Standard 551/591 (SI). Page 13 of 16

Random Operating Point (5 th Point) (Contin.) Verify air distribution in accordance with the ACCL Air Distribution Checklist The Test Stand operator is to inform the Representative when they are ready to initiate the test so the Representative can record test data simultaneously. The Representative shall verify that the Test Stand test conditions remain within the allowable tolerances for the duration of the test period. The Representative shall confirm all following data collected during the test are in accordance with the Standard 1.1 Data collected in accordance with Section C6.2.1 of the Standard. 1.2 Entering Evaporator water temperature measurements for each set of 1.3 Leaving Evaporator water temperature measurements for each set of 1.4 Evaporator water flow measurements for each set of 1.5 Power input measurements for each set of 1.6 Evaporator water flow as compared to Target 1.7 Leaving Evaporator water temperature as compared to Target 1.8 Evaporator water flow as compared to Target 1.9 Leaving Evaporator water temperature as compared to Target 1.10 Mean Entering Condenser dry-bulb air-temperature as compared to Target 1.11 Variation of Mean Entering Condenser dry-bulb air temperature as compared to Target 1.12 Voltage (average of all phases) as compared to Target 1.13 Frequency as compared to Target Page 14 of 16

Random Operating Point (5 th Point) (Contin.) The Representative shall confirm the following are within tolerance at the conclusion of the test in accordance with the Standard 1. Calculated Capacity (adjusted for Barometric Pressure) is within tolerance 2. Calculated IPLV (adjusted for Barometric Pressure) is within tolerance 3. Calculated Evaporator water pressure drop For continuous unloading units, verify that the actual capacity (adjusted for Barometric Pressure) at 100% Full Load is not greater than 102% of the rated performance Page 15 of 16

Day of Test (contin.) After the test is completed, calculate the unobtainable points as per the latest edition of the Standard, if applicable. Calculate the IPLV using the appropriate efficiency values. The results are then calculated by the Laboratory (using the Participant data) to compare with the Participant s calculated results as well as a separate Laboratory calculation. Any instrumentation discrepancies shall be included in the final test report. The Participant shall be informed of the final test results, and if the sample met the ACCL Certification Program criteria. If the sample fails, the Participant decides the next course of action as per the ACCL Operations Manual, Section 3.11 Test Failures. If discrepancies were observed between the program participants and the Laboratory instrumentation, they should be so noted in the Laboratory test report along with any required follow-up. During the next visit to the program Participant s Test Stand, the Representative shall verify that the corrective action was performed. The Laboratory test report, along with the raw data obtained from both the Test Stand and the Laboratory instrumentation, shall be issued to AHRI. The Laboratory shall invoice AHRI and the Participant in accordance with the AHRI/Laboratory Testing Services Agreement. This checklist & all supporting documents have been reviewed & approved by: PRINTED NAME OF REPRESENTATIVE SIGNATURE OF REPRESENTATIVE DATE Page 16 of 16