MEDIA CENTER September 30, 2010

Similar documents
COSMETOLOGY September 30, 2010

ENVIRONMENTAL HORTICULTURE: AGRISCIENCE AND BIOTECHNOLOGY September 30, 2010

FOOD SERVICE May 6, 2016

CULINARY OPERATIONS September 30, 2010

FOOD SERVICE May 6, 2016

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Library stacks and records storage 150 LB/SF live load

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

SPACE TYPE: JUDICIAL CHAMBER

Number of persons with a disability that live with a disability in your community?

the assemblies catalog

Bethlehem University 2008 Projects Summary

Some Basics of School Library Design

EQUIPMENT GUIDE LIST - CHAPTER

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

SPACE TYPES & REQUIREMENTS

bold/italic items are revisions to the previous program notes

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

HORIZON PARK BUSINESS CENTER, Phase 2

SCHEDULE OF FINISHES AND OUTLINE SPECIFICATIONS

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes

room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Visual Resources Collection: Description of Facilities and Collections

H.L. COSHATT COMPANY, INC. School Fixtures and Furniture. Design Specialist. Installation

GARCIA GALUSKA DESOUSA Consulting Engineers

Electrical Inspection Special Electrical

SPACE TYPE: CHILD CARE

Chapter 6: Plumbing Elements and Facilities. 603 Toilet and Bathing Rooms Wheelchair Accessible Compartment

Calmeca Academy of Fine Arts and Dual Language

Electrical Inspection Special Electrical

Aging-In-Place Remodeling Checklist

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

Instrument Cabinets. Stainless Steel IC Series. Dimensions: Features:

Washington Irving Elementary School

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Residential Accessibility Checklist - for Unit Types A and B With Connecticut Amendments Type A Units Accessibility Requirements rev.

University of Delaware

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

Charles W Earle Elementary School

room data sheet GASTOWN HOTEL 110 WATER STREET, VANCOUVER, BC 1/11 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Edward Jenner Elementary Academy of the Arts

Furniture Solutions for All Types of Industrial Labs

Oscar DePriest Elementary School

sjvhomes.com Kitchen Features

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

2014 Bond Project Guide

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Agustin Lara Elementary Academy

Special Features 3638 Quail View Road Charlotte, NC ,076 SF Heated Living Area Acre Lot July 14, 2009

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

room data sheet MARBLE ARCH HOTEL 518 RICHARDS STREET, VANCOUVER, BC 1/14 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Real Doors & Windows. D3 SmartParts v3.0

Josefa Ortiz De Dominguez Elementary School

CDLC Rehab. Karen E. Conway Conway Creations. As inspired by your logo, hues of blues and yellows enliven durable commercial flooring and hardworking

FEATURES. Space-saving, full-size front-loading two piece energy efficient stacking washer and dryer In-suite security system

Science Tables TABLE CODE

PORTFOLIO SARAH NG

Briar Crest Elementary

Move-Out Condition Form

Beaufort County Community College. Maintenance and House Keeping Plan

APEX. FAMILY of HOMES. from Redman Homes

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

Master Facility Planning Update School Board Meeting May 26, 2016

DIVISION 13 SPECIAL CONSTRUCTION

Stainless Steel Storage Cabinets

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Proudly made in. Canada. to Canadian Standards. The CJ Series. 20 Wide Homes

Maplewood Memorial Library Building Program

room data sheet ORANGE HALL 341 GORE AVENUE, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

A heritage of excellence. Lifestyle. Choice. For you. For life.

S4C Furniture Schedule


Florence High School / Middle School Page 1 of 3 Florence, WI

Health & Safety. Quarterly Audit

Wood Manor. Developer. 24/28/32 Series. Developer. Your Local Wood Manor Dealer is: Some Items Shown May Be Optional

New High School Concept

John Palmer Elementary School

PROCTOR TERRACE ELEMENTARY SCHOOL

BRUNSWICK HOUSE WELCOME TO. UP TO 100Mbps WIFI LARGE BEDS ALL UTILITY BILLS INCLUDED WALK TO UNIVERSITY EN-SUITE ROOMS 24 HOUR CCTV

A. Layout. B. Furniture

DIVISION 10 SPECIALITIES

Coquille Indian Housing Authority Maintenance Report February 2017

room data sheet MARR HOTEL 401 POWELL STREET, VANCOUVER, BC 1/9 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

UNIVERSITY OF OKLAHOMA INSTITUTIONAL FURNITURE CONTRACT #R PRICING SCHEDULE July 1, June 30, 2018

Richard Henry Lee Elementary School

24'-0" RAILING W/H CUBBIES 6' PORCH OPT. BOOK CASE. BUNK BEDS 33x74 OPT. REFER 3608 WDWS. TWO. QUEEN BED 60x80 HITCH LOCATION SHELF RAILING

Bid Response: Formal Sealed Bid

The Ultimate Home Value with Quality, Durability & Flexibility in Design

3 St Helens Drive Seaham Co. Durham SR7 7PU. Company: Castledene Sales & Lettings Inspected by: Stuart Hutchinson

MANAGEMENT WORKPLACE SPECIFIC INSPECTION CHECKLIST Department: Burwash Dining Hall/Ned s Cafe

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

INTERLINKS - TLC CREATIVE SOLUTIONS

planning guide Client Name Client # Client Phone/Cell Client Address Please supply best phone number to be reached at for consultation

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Transcription:

MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements listed below: 1 Reading Room 1 Technical Processing Room 1 Audio Visual (AV) Storage Room 1 CCTV Room (Studio & Control Booth) 1 Staff Toilet Room II. PROGRAM FURNITURE AND EQUIPMENT Refer to the Furniture and Equipment List for Owner-provided furniture and equipment. III. SPECIAL CONSIDERATIONS 1. Heating/Ventilation/Air Conditioning Provide additional supply air in the CCTV Studio and Control Booth to compensate for the heat generated by the TV production equipment and lighting. 2. Acoustical Standard, in accordance with the General Design Requirements section. 3. Floor Provide carpet in the Reading Room. Standard elsewhere, in accordance with the General Design Requirements section. 4. Walls The CCTV Room is to be divided into two areas: the Control Booth and the Studio. The two areas are to have a minimum 10 long common wall with an observation window. The Control Booth is to be a minimum of 10 deep from the observation window to the back wall. The CCTV Studio (all walls) is to be painted smooth, non-glossy "chroma key" blue, with no baseboard or electrical outlets. 5. Ceiling Provide a 12 high ceiling in the Reading Room and in the CCTV Studio. 6. Lighting The Reading Room lighting should be divided so that six (6) areas can be separately controlled. Provide an adequate number of fixtures around the perimeter of the Reading Room to insure that the shelves are propertly lighted. Media1

6. Lighting (continued) Provide stumble light switches at the main entrance into the Reading Room. Provide all other switches for the Reading Room lighting in a panel near the circulation desk. The AV Storage Room lighting is to be controlled by switches located at each door. Provide a suspended pipe grid system with six (6) stage-type lighting fixtures in the CCTV Studio. Insure that aisles between shelves are adequately lighted. 7. Windows Provide full-height windows in one area of the Reading Room, located as directed. Wherever possible elsewhere, provide windows above the shelving, sill height to be a minimum of 4 above the top of the library shelving units. Provide an observation window, the entire length of the wall, from the Technical Processing Room into the Reading Room, sill height to be 36" above the floor. Minimize the number of mullions provided. Provide an observation window, the entire length of the wall (minimum 10 ), from the CCTV Control Booth into the CCTV Studio area, sill height to be 30" above the floor. 8. Doors All interior doors are to be half-glass except for the AV Storage Room doors. Provide halfglass doors with double glazing and sound seal at the door into the CCTV Studio. All doors are to be keyed alike except for the exterior AV Storage Room door and the CCTV Room door(s). Provide a peephole in the exterior AV Storage Room door. No hardware is to be provided on the outside of this door. The main entrance into the Reading Room must accommodate the book detection equipment. These main entry doors are to be full glass, double doors. All other exits from the Reading Room to the exterior are to be equipped with a local electric alarm, to sound whenever the door is opened. All interior doors are to be hinged so as not to project into the Reading Room when opened. 9. Water Provide one (1) toilet and one (1) wall-mounted lavatory with cold water in the Staff Toilet Room. Provide one (1) sink with cold water in the Technical Processing Room. Provide two (2) electric water coolers, located near the main entrance into the Reading Room. 10. Communications Clock and Intercom Provide a clock, speaker(s) and intercom handset in the Reading Room, Technical Processing Room, and CCTV Control Booth. Provide a volume control and cut-off switch in the CCTV Control Booth for control of the speakers. Provide one (1) master intercom station, to be located near the CCTV head end equipment. In addition to the intercom system above, provide a local 2-way intercom system from the CCTV Control Booth to the CCTV Studio. Media2

10. Communications (continued) Voice/Data Provide one (1) floor-mounted quadraplex data and adjacent quadraplex power outlet at the circulation desk, in accordance with SDHC standards. Provide wall or floor-mounted quadraplex data outlets with adjacent power outlets in the Reading Room to serve approximately eight (8) owner-provided research and library catalog computers. These computers are to be located so that the monitors are visible to the staff at the circulation desk. Provide data and power outlets in the Reading Room to serve two (2) owner-provided computer labs consisting of 24 computer stations each. Provide one (1) quadraplex data and one (1) quadraplex power outlet on each free-standing structural column in the Reading Room to provide flexibility for future computer needs. Provide three (3) duplex data outlets with adjacent power outlets above the ceiling of the Reading Room, for a future wireless system. Provide one (1) voice/data outlet with adjacent power outlet at each power pole in the Technical Processing Room, located as directed. One (1) of these will support a modem/fax unit. Provide one (1) wall-mounted quadraplex voice/data outlet (1 voice/3 data) with adjacent power outlet in the CCTV Control Booth. Provide data and power outlets for the main school file server(s) in the systems room nearest the Media Center. Closed Circuit TV (CCTV) In the CCTV Control Booth provide two (2) audio/video inputs to routing switcher busses, and one (1) audio/video output from routing switcher buss. In the CCTV Studio provide one (1) audio/video output from CCTV monitor buss of routing switcher, located near the TV jack. Provide a CCTV jack and adjacent power outlet in the Reading Room, located as directed. Provide the CCTV head end equipment in the Technical Processing Room. The CCTV system is to be designed in accordance with SDHC standards. Provide two (2) CCTV input jacks near the head end equipment. Provide two (2) CCTV jacks with adjacent power outlets in the CCTV Studio, located as directed. Provide a 2 diameter conduit from the CCTV head end equipment to the property line, for the future installation of cable TV. Provide two 3 diameter conduits to penetrate the wall between the CCTV Control Booth and the CCTV Studio, with removable gaskets. Provide a floor trench with removable cover from the CCTV Control Booth wall to mid-center Studio (camera location) for cable by Owner. 11. Electrical Reading Room Provide a 20 amp duplex floor outlet at the Owner-provided circulation desk. Provide outlets for the Owner-provided computer equipment, as described above. Provide outlets in the metal base of the perimeter library-type shelving units, approximately 20 apart. Outlets are to be circuited so that no more than four (4) outlets are on any one circuit. Technical Processing Room Provide dedicated duplex outlets spaced 3' apart above the countertop and on the wall below the observation window. Provide three (3) power poles, located as directed. Media3

11. Electrical (continued) CCTV Control Booth and Studio Provide two (2) dedicated duplex outlets spaced 4' apart, located below the observation window on each side of the wall. Provide two (2) duplex outlets above the countertop in the CCTV Control Booth. In addition, provide duplex outlets spaced 4 apart along the back wall (opposite of the observation window) of the CCTV Control Booth. CCTV Control Booth and Studio (continued) Provide additional outlets as required in the CCTV Studio, located as directed, no outlets are to be located on the filming wall. 12. Gas and Air 13. Safety Standard, in accordance with the General Design Requirements section. 14. Fencing 15. Service Drives 16. Parking 17. Contractor-Provided Equipment and Casework Reading Room Provide 134 units of floor-supported library-type shelving along the perimeter walls and create double-faced peninsulas of shelving. Perimeter units are to be single-faced, 36 wide x 12 deep x 90 high with five adjustable shelves, one sloping closed base shelf, and a canopy top. Peninsular units are to be double-faced, and otherwise are to match perimeter units, in accordance with SDHC standards. Provide eight (8) freestanding ranges of library-type shelving, each range to be double-faced consisting of two 42 high x 24 deep x 36 wide double-faced units with two (2) adjustable shelves and one sloping closed base shelf, in accordance with SDHC standards. Each range is to have a one-piece (6 x 2 ) plastic laminate top and plastic laminate end panels. Provide a book detection system complete with railings, located so as to be directly visible from the circulation desk, in accordance with SDHC standards. Media4

17. Contractor-Provided Equipment and Casework (continued) Technical Processing Room Provide nine (9) linear feet of lockable base and wall cabinets, to include the sink and one (1) bank of lockable graduated drawers, countertop to be 36" above the floor. The CCTV head end equipment is to be located adjacent to this base cabinet. Provide twenty eight (28) units of floor-supported library-type shelving along the perimeter walls and create double-faced peninsulas of shelving. Perimeter units are to be single-faced, 36 wide x 12 deep x 90 high with five (5) adjustable shelves, one (1) flat closed base shelf, and a canopy top. Peninsular units are to be double-faced, and otherwise are to match perimeter units, in accordance with SDHC standards. CCTV Control Booth Provide six (6) linear feet of lockable base and wall cabinet, countertop to be 36" above the floor. 18. Contractor-Provided Instructional Aids 19. Other Considerations The location of the Media Center should be central to the facility yet remote to high noise level areas such as Gymnasiums, playcourts and outdoor dining areas. The Computer Lab area of the Reading Room is to consist of four freestanding banks of computers with power poles at each end of each bank. Workstations will be set up back-to-back. A total of 48 computer workstations will be provided for use by two classes. Visiblity from the Technical Processing Room into all areas of the Reading Room is of primary importance. Minimize the size of structural columns and other obstructions. Plan the layout of the AV Storage Room so that storage space for Owner-provided utility shelving and rolling carts is provided. The main elevator should be located near the Media Center, with convenient access from the exterior AV Storage Room door. The circulation desk is to be provided and installed by the Owner. Media5

SPACE RELATIONSHIPS (1) Language Arts Classroom (see Language Arts Section) Reading Room CCTV Control Booth CCTV Studio Technical Processing Room Audio Visual (AV) Storage Room Staff Toilet Room Media6