October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM

Similar documents
A. General Information

Boston Water and Sewer Commission

Commonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office

WASHINGTON COUNTY OREGON

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

2017 Downtown Waterfront District Municipal Harbor Plan & Public Realm Activation Plan Supplement - February 16, 2018

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Appendix I. Checklists

RIVERSIDE, Newton MA June 9, 2011

PUBLIC SERVICES ELEMENT GOALS / POLICIES / MEASURES

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

DRAFT MAP AMENDMENT FLU 04-4

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Ashbridges Bay Erosion and Sediment Control Project

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

City of Sun Prairie Wetland Buffer Reduction Request

Venice Pumping Plant Dual Force Main Project Draft EIR

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

4. UTILITIES ELEMENT.


City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Chesapeake Bay Critical Area Conservation Plan

Chelsea Creek Municipal Harbor Plan

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

SUBMITTAL REQUIREMENTS

The West Vaughan Employment Area Secondary Plan Policies

ORDINANCE NO IT IS HEREBY ENACTED AND ORDAINED by the Borough Council of the Borough

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Advance Engineering & Surveying PLLC

Note: Staff reports can be accessed at Zone: I-3. Tier:

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

City of Surrey PLANNING & DEVELOPMENT REPORT File:

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

MONTGOMERY COUNTY PLANNING DEPARTMENT

Humber Bay Shores Precinct Plan Final Report

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Public Information Centre #1

R E S O L U T I O N. Designation: Section 2, Block 17, Lot 20.G-1 ( ) R-2A (1-Family, 2-acre Minimum Lot Size) 46 North Greenwich Road

TOWN OF EASTON. MASSACHUSETTS CJffiCE Of the fjown c4dminiit'tato't

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

The Residences at Alewife Station

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

USF System Campus Master Plan Updates Goals, Objectives and Policies

WETLANDS PROTECTION ACT REFERENCE MANUAL

When planning stormwater management facilities, the following principles shall be applied where possible.

Highlands Region Stormwater Management Program Guidance

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

Westport Master Plan. Town of Westport. Master Plan Master Plan Update Committee. Westport, Massachusetts

Department of Planning & Development Planning Unit

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

A Guide to Open Space Design Development in Halifax Regional Municipality

Draft Rhode Island Stormwater Design and Installation Standards Manual

ITS Concept Development Activity Descriptions

EROSION AND SEDIMENT CONTROL FOR STORMWATER MANAGEMENT

Draft Downtown Waterfront Municipal Harbor Plan

Proposed Kenmount Hill CDS Amendment. Public Hearing October 25 th, 2018

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size)

HAZARD MITIGATION GOALS AND OBJECTIVES

Weston s Wetlands, Stormwater, & Open Space

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

CAPE COD COMMISSION MAIN STREET P.O. BOX226 BARNSTABLE, MA (508) FAX (508)

Request Modification of Proffers Approved by City Council on May 8, 2012 Modification of Conditions (Mini- Warehouse) Staff Recommendation Approval

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Procedures IV. V. Rural Road Design Option

ESD # 122 UNION RIDGE MODULAR CLASSROOM

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014


November 9, Lew Jones, Director of Facilities Berkeley Unified School District 1720 Oregon Street Berkeley, CA 94703

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

PROJECT SUMMARY. University of California, Irvine Humanities Building. Project No FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION

Letter of Notification For East Lima Station Expansion Project

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

LIMITED ENVIRONMENTAL REVIEW

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

Transcription:

- - Mil7 ROMNEY GOVERNOR KERRY HEALEY LIEUTENANT GOVERNOR Tel. (617) 626-1000 Fax. (617) 626-1 181 http://www.mass.govlenvir ROBERT W. GOLLEDGE, JR. SECRETARY October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM PROJECT NAME : Replacement Parking at UMASS Boston PROJECT MUNICIPALITY : Boston (Dorchester) PROJECT WATERSHED : Boston Harbor EOEA NUMBER : 13880 PROJECT PROPONENT : UMASS Boston DATE NOTICED IN MONITOR : September 26,2006 Pursuant to the Massachusetts Environmental Policy Act (G. L. c. 30, ss. 61-62H) and Section 11.03 of the MEPA regulations (301 CMR 1 1.00), I hereby determine that this project does not require the preparation of an Environmental Impact Report (EIR). In a separate Decision issued on October 25,2006, I have proposed to grant a Waiver from the requirement to prepare a mandatory Environmental Impact Report (EIR) for the project. This Certificate sets forth the issues that must be addressed by the proponent during permitting and discusses recommendations that were submitted on the project during the MEPA comment period. Proiect Description As described in the Environmental Notification Form (ENF), the project consists of the creation of approximately 850 replacement parking spaces on 7.48 acres in four locations within the UMASS Boston (the University) campus. Each parking area, referred to as Areas B, C, D, and E, will be paved with binder coarse, and lighting, stormwater management structures and pedestrian access routes will be constructed. This project is being proposed under the Emergency Action provisions of the MEPA Regulations (30 1 CMR 1 1.13) subsequent to the closure of the existing structured parking facility due to public safety concerns. The proposed project seeks to provide temporary paved surface parking facilities to alleviate shortages due to the garage closure while the University embarks on its recently initiated Institutional Master t3pr~nted on Recycled Stock 20% Post Consumer Waste -. --, -. - -- -- 4 - -- ----A

ENF Certificate October 26,2006 Planning (IMP) process. As indicated at the site consultation meeting, the proponent intends to construct Area D in Fall 2006, and complete paving and upgrades to Areas B,C, and E during UMASS Boston's winter break. The project site is located within the northern portion of the UMASS Boston campus, near the terminus of Mount Vernon Street and the privately maintained one-way road within the UMASS Boston campus. In accordance with the Emergency Action provisions of the MEPA Regulations, parking Areas B,C, and a portion of Area E are presently in use by students and staff. Areas B and C were constructed of gravel and temporary lighting was in place at the commencement of the Fall 2006 semester. A portion of Area E is presently used for parking within an existing paved lot; temporary lighting was installed to facilitate use of the area for student and staff parking. The remainder of Area E is used by the Boston Water and Sewer Commission (BWSC) for a storage facility located adjacent to the Calf Pasture Pumping Station. It is anticipated that in the future the BWSC will no longer use this facility; UMASS Boston has secured the rights to use this property for parking or other campus-related purposes once the BWSC vacates. Area D is presently a large open field maintained by the University, located adjacent to Dorchester Bay and the Harborwalk. The Harborwalk will not be altered and existing vegetation proximate to the coastline will be maintained in association with this project. The project site is located within areas identified as filled tidelands, and contains substantial areas identified under the Wetlands Protection Act (WPA) as "Area Subject to Coastal Storm Flow" and other wetland resource areas protected under the WPA. The project site has also been identified within the most recent Atlas published by the Natural Heritage and Endangered Species Program (NHESP) as containing Priority Habitat for the Vesper Sparrow (Pooecetes grarnineus) and is therefore subject to review under the Massachusetts Endangered Species Act (MESA). Jurisdiction This project is subject to the preparation of a mandatory EIR pursuant to Section 11.03(3)(a)(1)(5) because the project will require a Chapter 91 License, and consists of a new non-water dependent use that will occupy one or more acres of waterways or tidelands. The project will also result in the creation of five or more acres of impervious area (Section 1 1.03(l)(b)(2)), and the creation of construction of 300 or more New parking spaces at a single location (Section 1 1.03(6)(b)(l5)), both of which are ENF thresholds under the MEPA regulations. The project requires a Chapter 91 Waterways License from the Massachusetts Department of Environmental Protection (MassDEP). It is my understanding that the project proponent intends to file for a Chapter 91 Waterways License under the Emergency Action provisions of the Waterways Regulations (3 10 CMR 9.20). Based upon information shared at the site consultation meeting, the project proponent has concluded the public hearing process with the Boston Conservation Commission for an Order of Conditions under the Wetlands Protection Act, and has received approval under the Category 2 Programmatic General Permit from the U.S. Army Corps of Engineers. By way of the comment letter received on the ENF from the Division of Fisheries and Wildlife - NHESP, the project has been authorized to proceed pursuant to the MESA emergency provisions (321 CMR 10.15). This comment letter also

ENF Certificate October 26,2006 outlined specific actions and mitigation that must be undertaken by the proponent, in consultation with NHESP, in association with the project. The project will be financed by the Massachusetts Board of Higher Education and the Division of Capital Asset Management. Therefore, MEPA jurisdiction for this project is broad and shall extend to all aspects of the project that are likely, directly or indirectly, to cause Damage to the Environment. Land Alteration I Drainage The project will result in the creation of 5.48 new acres of impervious area and 6.60 acres of new land alteration. A large portion of the property is located on filled tidelands, and historically the area was used for landfill purposes. Limited grading will be required to establish the parking areas, further necessitated by a desire to not disturb existing soils in the area. According to the ENF and the site consultation session, the project is designed to meet MassDEP's Stormwater Management Policy through the use of deep sump catch basins, VortechnicsTM stormwater management structures, grease traps, and infiltration trenches. Under current conditions, drainage from this portion of the campus connects to a pipe that discharges directly into Dorchester Bay. The proponent has indicated that post-development runoff rates will be less than pre-development conditions and that the introduction of water quality structures should serve to maintain water quality discharges. The proponent should confirm with MassDEP and the Division of Marine Fisheries that the project is consistent with the MassDEP Stormwater Management Policy. The proponent should incorporate snow plowing and storage provisions into its stormwater pollution and prevention plans as part of the NPDES permitting process. It is imperative that given the limited parking availability, that snow removal be managed in accordance with MassDEP Snow Disposal Guidelines. The NPDES stormwater pollution and prevention plan should also outline operations and maintenance procedures for the proposed stormwater management structures in post-construction conditions. Wetlands, Waterways and Tidelands The project will alter approximately 14,650 square feet of Land Subject to Coastal Storm Flow. Additionally, the project will consist of 6.60 acres of new non-water dependent use of tidelands or waterways. Based upon information shared at the site consultation meeting, existing drainage from Parking Area D connects to a drainage outfall pipe that ultimately discharges to Dorchester Bay. While studies have not confirmed drainage patterns in Areas B,C, and E, it is possible that some portion of existing drainage also connects to this same drainage pipe. The proponent has designed a stormwater management system consistent with the MassDEP Stormwater Management Policy in an attempt to mitigate the potential impact of stormwater runoff on adjacent wetlands and tidelands. Parking Areas C,D, and E are located within historically filled tidelands regulated by M.G.L. Ch. 91 and the Waterways Regulations at 3 10 CMR 9.00. Area B is located on tidelands

ENF Certificate October 26,2006 that are considered "landlocked" and thus is exempt from the aforementioned regulations. The Waterways Regulation Program, via its ENF comment letter, has recommended that the temporary parking facilities be allowed to proceed through permitting given that the IMP process has commenced. Parking Area D is likely to have the greatest potential visual impact to public access along the nearby Harborwalk. The temporary parking facilities do not appear to directly impact the Harborwalk through alteration, and the proponent has agreed through the Notice of Intent process with the Boston Conservation Commission to plant a landscape buffer to delineate and shield, to the extent practicable, portions of the parking areas. Temporary parking facilities should provide not only safe pedestrian access to the UMASS Boston Campus, but should also maintain access to the Harborwalk and public recreation opportunities. We encourage the proponent to explore the possibility of upgrading the Harborwalk in the project vicinity to meet Harborwalk design standards during the Chapter 91 permitting review process. The UMASS Boston campus is located near designated shellfish growing areas and supporting marine resources. According to the Division of Marine Fisheries (DMF), intertidal areas near the project site are presently closed to shellfishing, however improvements in water quality have been seen in the region. The proponent states that it has designed a stormwater management system in accordance with the MassDEP Stormwater Management Policy that will reduce total suspended solids (TSS) and reduce stormwater runoff rates in comparison to existing conditions. Traffic / Parking The project will result in the creation of more than 300 parking spaces in a single location. The primary impetus for this project is to create temporary parking areas to offset lost parking spaces in the closed parking structure. The objective of the new parking spaces is to create temporary, safe, parking areas to accommodate commuting students (UMASS Boston has no on-campus accommodations), while the University undertakes its IMP process. It is clear from discussions with University representatives that a primary focus of the IMP will be to find areas to accommodate parking for faculty and staff in an integrated fashion to the overall campus environment. It is possible that the temporary parking areas proposed within this ENF will become permanent parking areas or structures under the IMP. As a condition of a Draft Record of Decision (DROD) issued on October 25,2006, I have required UMASS Boston to submit an NPC, no later than November 8,2008, that specifically addresses the long-term use of these temporary parking areas. I strongly encourage the University to thoroughly evaluate a comprehensive parking plan during the IMP process that specifically addresses conversion of these temporary parking areas back to open space. If these temporary parking areas will eventually become permanently altered, the IMP should consider the requirements for environmental mitigation in the larger campus plan to meet future permitting requirements. The project will not create added parking capacity nor generate additional vehicle trips beyond those that existed prior to the closure of the on-site parking garage. Overflow parking during times of peak demand has been accommodated by sharing a parking area at the Bayside Exposition Center; although no formal agreement is in place between the operator of the Bayside Exposition Center and UMASS Boston. Since UMASS Boston is a commuter school, the University is actively involved in promoting use of public transportation and provides shuttle

EOEA# 13880 ENF Certificate October 26,2006 buses from the nearby JFKRJMASS station on the Red Line and Commuter Rail. In response to the closure of the parking garage, shuttle service has been intensified and expanded. Additionally, the University also provides preferred parking rates for motorcycles, provides resources for carpools, and is subject to MassDEP's Rideshare Regulations. In accordance with the Rideshare Regulations, the University conducts regular surveys to understand commuting patterns, demand and assist with implementing mitigation measures to reduce vehicle trips. I expect that the University will continue to use these data to better understand the effectiveness of the proposed temporary parking facilities and to assist in the IMP process. Rare Species A portion of the project site is mapped as Priority Habitat of Rare Species (PH 974) within the Massachusetts Natural Heritage Atlas, 12Ih Edition (effective October 1,2006). The site is mapped habitat for the Vesper Sparrow (Pooecetes gramineus), a species that is listed as "Threatened" pursuant to MESA. The project has been granted permission to proceed under the emergency provisions of the MESA Regulations (321 CMR 10.15) and the proponent must consult with NHESP to review actions requested within the NHESP ENF comment letter prior to commencement of any additional construction efforts. I agree with NHESP's request to consider alternatives to restore habitat within Area D during the IMP and long-term parking planning process. Furthermore, I remind the proponent that they should evaluate the impact to habitat and outline appropriate mitigation measures if alternatives cannot be implemented to return Area D to open space once the action items from the IMP are initiated. A future Conservation and Management Permit may be required from MESA in the future should parking become permanent or other development be proposed within Priority Habitat Areas. Hazardous Waste The MassDEP has identified that a portion of the project site is regulated under the Massachusetts Contingency Plan, Release Tracking Number 3-0004071. Additionally, the proponent indicated at the site consultation meeting that the property was historically used as a landfill, and therefore groundwater monitoring has been ongoing for a period of time. The proponent is reminded that any proposed work must be performed in compliance with applicable regulations under Massachusetts General Laws c.2 1 El2 1 C and the Occupational Safety and Health Administration (OSHA).

EOEA# 13880 ENF Certificate October 26,2006 Conclusion Based on a review of the information provided by the proponent and after consultation with the relevant public agencies, and given the temporary nature of the parking areas, I find that the potential impacts of this specific project (temporary emergency parking facilities) do not currently warrant further MEPA review. Outstanding issues may be addressed during the permitting process. October 26,2006 Date Comments received: 10/04/2006 Paul Nutting (2 letters) 1011612006 Massachusetts Department of Environmental Protection - NERO 1011612006 Massachusetts Department of Environmental Protection - Waterways Regulation Program 10/16/2006 Division of Fisheries and Wildlife - Natural Heritage and Endangered Species Program 1011612006 Division of Marine Fisheries