BANDON FLOOD RELIEF SCHEME

Similar documents
2 BACKGROUND TO THE PROPOSED SCHEME 2.1 SITE LOCATION. in association with

Cost 24.1m Benefit Cost Ratio: Potential Measures. A2 - Verdant Place Steps and Crèche. A5 - Star Rovers to Athlunkard Boat Club

Barvills Solar Farm Environmental Statement Non-Technical Summary

Application Guide. Should you have any questions on the Outline Application please contact:

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

The Place Solar Farm

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

Draft Municipal District Local Area Plans. Map Browser. VOLUME THREE Map Browser th November 2016

GREEN WEDGE MANAGEMENT PLAN

Ashbridges Bay Erosion and Sediment Control Project

Report on the Screening Process for the Proposed Woodstock Local Area Plan

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

WELCOME. Welcome and thank you for visiting today.

Welcome to our public exhibition

Linden Homes Proposals for land off Ringwood Road, Verwood

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Actions for local government

High Speed Rail (London- West Midlands)

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

HARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Reconnecting rivers in urban areas; challenges and considerations

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: Fluvial non-tidal Fluvial tidal Coastal

Overview Report. Proposed Development

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Site Assessment Technical Document Appendix A: Glossary

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

APPENDIX F: EXTERNAL APPROVALS

National Monuments in State Care: Ownership & Guardianship. Meath

Agincourt Mall Planning Framework Review Public Open House #2 Consultation Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Assessing the impact of smallscale wind energy proposals on the natural heritage

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES

WELCOME TO THE NEW WILTON PARK

Upper Smith Creek Comprehensive Development Plan (File: CDP 14-01) TERMS OF REFERENCE

... on the draft Arden Vision & Framework

Dorenell Wind Farm 132 kv Grid Connection

FOR SALE RESIDENTIAL DEVELOPMENT OPPORTUNITY BLAIRTUMMOCK EASTERHOUSE

Special Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary.

Response by the Wiltshire Archaeological and Natural History Society

The Local Government Perspective. John Mulholland, Kilkenny County Council.

Land at Rampton Road. Cottenham

BASIC ASSESSMENT PROCESS

Mavis Road Class Environmental Assessment

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

KELLS DEVELOPMENT PLAN

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

National Monuments in State Care: Ownership & Guardianship. Cork

RÓISÍN BURKE ADOPT A MONUMENT IRELAND

Appendix C. Members Pre-Consultation Briefing. Local Plan - Gypsy and Traveller Sites. January 2018

National Monuments in State Care: Ownership & Guardianship. Laois

Environmental Impact Assessment

Ballincollig Carrigaline Municipal District

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Welcome to our exhibition

Christine Toner, Consultation Leader

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Rannoch 132 / 33 kv Substation Extension

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Elevated Water Storage Facility and Pumping Station Municipal Class EA for Pressure District 7: PIC # 1 Summary

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

National Monuments in State Care: Ownership & Guardianship. Tipperary North

LAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development

Implementing sustainable water strategy through development industry engagement

QUARRY REHABILITATION PLANS Specifications (version 1.3)

Rapid Transit Implementation Working Group September 14, 2017

Scarborough Waterfront Project

Comprehensive Development Guide

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

City of Toronto. Emery Village Transportation Master Plan

The Moors at Arne Project, Managing Coastal Change

Landscape Architecture (LARC)

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

We are very pleased to welcome you to this event today.

Fluvial non-tidal Fluvial tidal Coastal. PFRA database comments (in italics): OPW comments Minor flooding of residents on golf links road

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

One River Environmental Assessment. Welcome!

Historic England Advice Report 26 August 2016

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

Victoria Street Pedestrian Bridge

ARLESEY CONSULTATION QUESTIONNAIRE

NON-TECHNICAL SUMMARY

Examination of South Cambridgeshire Local Plan

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

The Hadean-Creation studio.

SUSTAINABLE MANAGEMENT

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

PART 5 - NATURAL AND PHYSICAL ENVIRONMENT

Transcription:

WHAT HAPPENS NEXT? All comments received in response to this Public Information Event will be considered by the OPW and will be taken into account in the preparation of the first stage in the Bandon Flood Relief Scheme Environmental Impact Assessment and the Engineering Study. The Environmental Impact Assessment and Engineering Study for the Bandon Flood Relief Scheme will be delivered in the following Stages: Environmental Impact Assessment Stage I Part 1 Constraints Study (this stage) Part 2 Screening for Appropriate Assessment Stage II Part 1 Environmental Assessment of Viable Options Part 2 Appropriate Assessment Stage III Environmental Impact Statement Stage IV Public Exhibition Engineering Study Hydrology Study & Hydraulic Modelling Site Investigations Flood Risk Assessments Flood Risk Management Options Cost Benefit Analysis Selection of Preferred Option Flood Risk Management Plan Interference Notices Public Exhibition YOUR OPPORTUNITY TO TAKE PART The Office of Public Works wishes to consider all viewpoints in relation to the Study Area being examined. This is your opportunity to take part at the early stages of the planning of the Bandon Flood Relief Scheme. Time spent communicating your views to the Office of Public Works is appreciated. The general public and all interested parties are invited to give their opinions on the Study Area. Please examine the Study Area shown overleaf and let your views be known by either completing the enclosed questionnaire or writing to the address below, giving your comments. Your opinion will be appreciated and given full consideration. Completed questionnaires may be handed in at the exhibition or posted to the address below using the stamped and addressed envelope provided, by Friday 28 th January 2011. FURTHER INFORMATION All queries, questionnaires and comments in relation to this project can be addressed to: Contact Name: Contact Title: Corina Colleran Project Manager McCarthy Keville O Sullivan Ltd. Tel: +353 (091) 735611 Planning & Environmental Consultants Fax: +353 (091) 771279 Block 1, G.F.S.C., Moneenageisha Road, Email: ccolleran@mccarthykos.ie Galway BANDON FLOOD RELIEF SCHEME PUBLIC CONSULTATION JANUARY 2011

Ryan Hanley in association with McCarthy Keville O Sullivan has been appointed by the Office of Public Works to carry out an Environmental Assessment of the proposed Bandon Flood Relief Scheme. This is the first public consultation and its objective is to seek initial views from the public in relation to the key issues that the study should address, and highlight points of local importance that may constrain the design of potential flood alleviation measures. N PURPOSE OF THE PROJECT The purpose of the Bandon Flood Relief Scheme is to identify the most appropriate flood relief scheme to alleviate flooding in Bandon Town. CURRENT POSITION The first phase of the scheme is the identification of a study area and the preparation of a Constraints Study as part of the Environmental Impact Assessment for the scheme. The Study Area is shown in red on the map above. LEGEND Study Area Designated Sites WHAT IS A CONSTRAINTS STUDY? ENGINEERING STUDY A Constraints study identifies the key environmental issues in a study area which may be impacted upon by possible flood alleviation measures and/ or which may impose constraints on the viability and/ or design of these measures. An Engineering Study is being advanced in parallel with the Environmental Assessment of the Flood Relief Scheme. The range of engineering measures typically considered for possible flood alleviation schemes in an Engineering Study include, but are not limited to those listed in the box to the right. It is not possible at this stage to define the number of scheme options that will require study, although a typical Engineering Study of this nature will identify between three and five viable options. POTENTIAL FLOOD ALLEVIATION MEASURES a) b) c) d) e) f) g) h) i) j) k) Do Nothing (i.e., implement no new flood alleviation measures) Non-Structural Measures (e.g. flood warning system or individual property protection) Relocation of Properties and/or infrastructure Reconstruction of Properties and/or infrastructure to a higher level Flow Diversion (e.g. river diversion or flood flow bypass channel) Flow Reduction (e.g. upstream catchment management or flood storage) Flood Containment through Construction of Flood Defences Increase Conveyance of Channel (upstream and/or through and/or downstream of the town) Sediment Deposition and Possible Sediment Traps Pump storm waters from behind flood defences Measures Specific to the Study Location

Recorded Archaeological Sites within the Study Area: Monument Type Ringfort (Rath) Castle Mound Designed Landscape/Ornamental Tower Metalworking Site Castle - Tower House Country House Country House Graveyard Mill - Bleaching House - 18th/19 th Century Market-House Graveyard Historic Town Country House Enclosure Inscribed Stone House - 18th/19 th Century Mill - Corn Historic Town Town gate Brewery Graveyard Graveyard Graveyard possible Town Gate Barracks Town Defences Earthwork Shambles Standing Stone Brewery Gasworks Fulacht Fiadh Burial Ground Country House Country House Mill - Cotton Mill - Corn Mill - Corn Market Cross Mill Prison Market-House Mill Market-House Souterrain Cliff-Edge Fort Castle Castle - Tower House Townland Rockfort Kilbeg South Kilbeg South Ardnaclug Kilpatrick Skevanish Ardnaclug Ardnaclug Laherfineen Laherfineen Laherfineen Laherfineen Coolmoreen Ardnaclug Ardnaclug Kilpatrick Laherfineen Knocknagarrane,, gully Cloghmacsimon Knockbrogan Cloghmacsimon Knockbrogan Knockbrogan Knockbrogan Cloghmacsimon Ballylangley Knocknagarrane Knocknagarrane Knocknagarrane Roundhill Roundhill Roundhill, gully Cloghmacsimon, Roundhill Dromkeen Knockroe Ship-pool Proposed Natural Heritage Area BANDON VALLEY WEST OF BANDON Study Area Proposed Natural Heritage Areas Archaeological Features Proposed Natural Heritage Area BANDON VALLEY ABOVE INISHANNON Proposed Natural Heritage Area BANDON VALLEY BELOW INISHANNON

Constraints Study A Constraints Study is currently being undertaken by the project Environmental Consultants. The purpose of the Constraints Study is to determine and document the constraints that may inform the selection and design of the proposed Flood Alleviation Measures. Primary Constraints A range of constraints are being considered under the following categories: Flora and Fauna Fisheries Habitats Water Quality Archaeological, Architectural and Cultural Heritage Landscape and Visual Amenity Angling, Tourism and Recreational Use Flood Related Socio-Economic and Social Issues

Public Involvement Consultation will be undertaken throughout the process to ensure that the views of the public and other stakeholders are taken into account. The purpose of this initial Information Gathering Day is to: Provide information about the Objectives of the Scheme Outline the Design and Statutory Process Provide an Opportunity for Comment at a preliminary stage Gather information about Environmental Constraints Obtain other information relevant to the Scheme Following this initial public consultation, there will be further opportunities for involvement through attendance at future information days, when updates on the scheme progress will be presented. A questionnaire is available for you to complete and return with your own comments. Members of the project teams are present today to answer any questions you have, or take note of any relevant information.

Scheme Objectives & Overview The purpose of the Bandon Flood Relief Scheme Project is to identify a preferred flood relief scheme to reduce the frequency or impact of flooding of the Bandon River and to develop the scheme to outline design. The process of identifying the preferred scheme includes an assessment of the range of measures and scheme options available, to determine their technical, economic and environmental viability. The Project Team includes a Design Team made up of consulting engineers, the OPW and Cork County Council in addition to the Environmental Team. A broad study area has been identified and the initial stages of the project have commenced, including Constraints Study and Preliminary Design Surveys.

Formal Public Exhibition Process Proposed Statutory Process under Arterial Drainage Act Held over a four week period Launch by Minister of State to elected Councillors Full drawings/maps on display for full period and also available at local Town Council offices Up to four Open days when representatives of the Project Team will attend to address queries from the public Copies of EIS to be available for sale to the public All written observations to OPW will be considered and responded to Exhibition Report, including all observations, to be sent to Minister for Finance before formal approval of the Scheme.

Constraints Study A Constraints Study is currently being undertaken by the project Environmental Consultants. The purpose of the Constraints Study is to determine and document the constraints that may inform the selection and design of the proposed Flood Relief Measures. Primary Constraints A range of constraints under the following categories are being considered: Flora and Fauna Fisheries Habitats Water Quality Archaeological, Architectural and Cultural Heritage Landscape and Visual Amenity Angling, Tourism and Recreational Use Flood Related Socio-Economic and Social Issues

Public Involvement Consultation will be undertaken throughout the process to ensure that the views of the public and other stakeholders are taken into account. The purpose of this initial Information Gathering Day is to: Provide information about the Objectives of the Scheme Outline the Design and Statutory Process Provide an Opportunity for Comment at a preliminary stage Gather information about Environmental Constraints Obtain other relevant information relevant to the Scheme Following this initial public consultation, there will be further opportunities for involvement through attendance at future information days, when updates on the scheme progress will be presented. A questionnaire is available for you to complete and return with your own comments. Members of the environmental and design teams are present today to answer any questions you have, or take note of any relevant information.

Scheme Objectives & Overview The purpose of the Bandon Flood Relief Scheme Project is to identify a preferred flood relief scheme to reduce the frequency or impact of flooding of the Bandon River and to develop the scheme to outline design. The process of identifying the preferred scheme includes an assessment of the range of measures and scheme options available, to determine their technical, economic and environmental viability. The Project Team includes a Design Team made up of consulting engineers, the OPW and Cork County Council in addition to the Environmental Team. A broad study area has been identified and the initial stages of the project have commenced, including Constraints Study and Preliminary Design Surveys.

Formal Public Exhibition Process Proposed Statutory Process under Arterial Drainage Act Held over a four week period Launch by Minister of State to elected Councillors Full drawings/maps on display for full period and also available at local Town and Council offices Up to four Open days when representatives of the Consultants will attend to address queries from the public Copies of EIS to be available for sale to the public All written observations to OPW will be considered and responded to Exhibition Report, including all observations, to be sent to Minister for Finance before formal approval of the Scheme.