WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP

Similar documents
WD7664 / WD7663 Maxon Burner. Ellis Whisper Dryer Installation & Start UP

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

HEATEC TEC-NOTE. Operation and maintenance Heatec thermal fl uid heaters industrial series IMPOPRTANT NOTICE! CONTENTS. Publication No.

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

Revitalize Building Mechanical Systems (4619)

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Q - Series Boiler. Troubleshooting Manual

READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

Installation & Service Instructions for Jackson & Church Flexaire Packaged Furnaces SDF-125 thru SDF-400 Gas Firing

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Home Stack Washer/Dryers

Home Stack Washer/Dryers

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

HHA Lyerly Apartments 75 Lyerly Houston, Texas J. Allen Management Managing Agent

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent

INSTALLATION INSTRUCTIONS # BURNER ASSEMBLY REPLACEMENT

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Indirect gas-fired air heater

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

DBF 4XL Dryer Booster Fans

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

APX. Nozzle-mix line burner

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)

ACT Cartridge Dust Collector

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler

HX Field Replacement Kit

Fire Bowls and Fire Bowl Inserts (Automated Operation) Operating and Maintenance Instructions

Field Start-Up Sheet Direct Fired Gas Equipment

MAKING YOURSELF AT HOME

The Danger signal indicates an immediately hazardous situation which, if not avoided, will result in death or serious injury.

BK5 Bug Killer. Read all instructions before using the bug killer. Contents

Eclipse Self-Check UV Scanner

Home Stacked Washer/Dryer

INSTALLATION AND OPERATION MANUAL GAS SKILLETS MODELS: GTS-30 GTS-40

User s Information Manual

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

OHM N PREPARATIONS & SUPPORT FOR A WATERTUBE BOILER Fax: P.O. Box 96. Russell, IL

V-VTP Maintenance Manual

SAFETY AND INSTALLATION MANUAL MODEL 8100

Homestyle Stack Washer/Dryers

EZ TANKLESS EZ 101 & 202 OPERATION & INSTALLATION MANUAL

TECHNICAL INSTRUCTIONS

OWNER S MANUAL Manufactured Home Downflow Gas Furnace: MGD-B Series

SECTION GAS-FIRED RADIANT HEATERS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

25M01A-100 to 25M01A-199 HSI Single Stage Combination Gas Valve

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Ultra Low NOx PowerVent with Honeywell Electronic Control California Only

BK17 Heater. Read all instructions before using the heater. Contents

9. Check condensate piping for sagging and/or leakage. Repair any sags or leaks before restoring power to the appliance.

DIRECTIVE NO: D-B

Power Flame Incorporated

AIR ONE PROFILER TOP and SIDE DRYER INSTALLATION MANUAL Part # DRYRPROFLRXXXXXX (ALL COLORS)

Please read this manual completely before attempting to install, operate or service this equipment.

AXIAL HEATER TROUBLE SHOOTING GUIDE. Models: AX24 N/PV, AX24 N/PV LT, AX24 LP AX26 N/PV, AX26 N/PV LT, AX26 LP AX28 N/PV, AX28 N/PV NT, AX28 LP

! WARNING. Replacement Head Mechanism INSTRUCTION MANUAL MM-413F

INDITHERM. Low temperature gas burners

Preventative Maintenance Tables

USER S INFORMATION MANUAL

iq1001, Gen II Submittal Data

Bid Date: Date: Project Name: Project #: City/St/ZIP: Fuel Type: Natural Gas Propane. Engineer: Factory Option: Contractor: Key Features.

Installation Instructions 30 French Door Built-in Wall Ovens

M2 Series Startup Form

PBG PACKAGED GAS BURNER

COMMERCIAL 24 VOLT FLUE DAMPER

INSTRUCTION MANUAL FOR OIL BURNER MODELS

Combustion Safety. RESNET Conference San Antonio, TX February 27, Presented by Rich Moore Lightly Treading Energy & Design Denver, CO

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

Locally Controlled Bug Killers. Read all instructions before using the bug killer. Contents

SECTION WATER-TUBE BOILERS

Page 1 of 6. Machine Serial No. Model Pump Size PRELIMINARY INSPECTION. Service and Connections

ZG Shown READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

Econo-Coat RCM 8000 Powder Spray Booth Installation Guide

Dexter Commercial Vended Stack Washer Dryer. Dryer Troubleshooting, Fault Codes, And Schematics. Starting serial number (12/13)

INSTRUCTION MANUAL FOR OIL BURNER MODELS

8670 & 8651 series No/Bill Acceptor 8671 & 8652 Series with Bill Acceptors. Product Information. Important Safety Instructions Product Dimensions

iq251, Gen II Submittal Data

Specifications of V-Line burners

Installation Instructions Part No , Part No Part No

Condensing Models. On-Demand Water Heater Service Handbook

GPC PASTA PRO INSTALLATION & USER OPERATION MANUAL

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

SPX SERIES PACKAGED AIR CONDITIONING/HEAT PUMP UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Bug Killers. Read all instructions before using the bug killer. Contents

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

Custom Control Systems Inc. Ellis Dryer Control Configuration and Operation Manual

User s Information Manual

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00

To dismantle and reassemble domestic Gas Geyser i.e. Gas Water Heater

BAXI LUNA 310 Fi TECHNICAL INFORMATION

2 PREPARE THE OPENING

Exhaust Duct Design Page 1 of (C)

Revision B Printed Fall Elston Manufacturing HC Heater Owners Manual

WHEN TROUBLESHOOTING, PERFORM THE STEPS IN ORDER.

INSTALLATION INSTRUCTIONS & USE & CARE GUIDE Euro-style Range Hood ESH5200

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

Transcription:

WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP Receiving Do a quick visual inspection on the truck for any major damage prior to signing the paperwork. Damage should be noted on the driver s paperwork and the Ellis Customer Support Team should be contacted ASAP at 630-250-9222. Once unloaded, remove all shipping protective plastic wrap. Inspect the machine for shipping damages and the Ellis Customer Support Team should be contacted immediately at 630-250-9222. If there is no damage proceed with the next steps. In most cases the lint filter will be shipped prior to the dryer and will arrive in a crate similar to the one pictured here. Page 1 Revised 12/2/2016

Preparation for Leveling Move the machine into its final position. Remove the large sheet metal cover under the front door. Mark it FRONT on the back side. The covers are all custom fit at the factory. Remove the same cover from the rear of the machine. The last cover to remove is the upper cover on the basket drive end of the machine (the one with the grease fitting labels). Remove the RED SHIPPING CLAMPS bolted to the four basket support pedestals. Remove the SHIPPING BEAM CLAMPS that hold the burner tower flange to the basket box flange. Page 2 Revised 12/2/2016

Phase One Leveling Be very precise with all leveling steps. Look at the air gap between the burner tower flange and the basket box flange. You need to have at least a ¼ inch air gap here. If you find that the two flanges have no air gap you must raise all four corners of the basket box a sufficient amount to provide this gap. Now you are going to level the basket support structure. This consists of the double box tubes in the front and rear of the machine as well as the drive shaft. Jacking Bolt Plate We recommend cutting the shipping braces in half to use has jacking bolt support plates, this will insure the jacking bolt doesn t penetrate the concrete after having the machine operating for a while. Page 3 Revised 12/2/2016

Front or Rear double box beams. Phase 1 Leveling Step 1 Level the front by placing your level on the bottom side of the double box beam. Utilize the jacking bolts located at each of the front corners of the basket box. Shim as required Page 4

Basket drive shaft Phase 1 Leveling Step 2 Level the basket drive end by placing your level on the drive shaft. Shim as required. Utilize the jacking bolts located at each of the drive end corners of the basket box. Shim as required. Phase 1 Leveling Step 3 Level the rear by placing your level on the bottom side of the double box beams. Utilize the jacking bolts located at each of the rear corners of the basket box. Shim as required. Phase 1 leveling Step 4 Now check the flange air gap again to be sure you still have at least a ¼ inch gap. Double check all the above. Do not anchor or grout before performing phase two leveling. Page 5

Phase Two Leveling & Anchoring The phase two leveling and anchoring will require the connection of air and electric to the machine. Come back to this section after completing those two sections of this procedure. Tilt to load and deploy the RED SAFETY BRACES built into or shipped with the machine. Drill and install the floor anchors on the two front corners of the basket box. Tighten the anchors and return to horizontal. Tilt to unload (some machine may not have this option) and deploy the RED SAFETY BRACES built into or shipped with the machine. Drill and install the floor anchors on the two rear corners of the basket box. Tighten the anchors and return to horizontal. Use the control to tilt to load. Note if the basket housing dips slightly just before it actually tilts. If it dips you have an air gap at the cup and rest pin in the corner that dipped. Use the jacking bolt to raise the frame in that corner just enough to eliminate the dip. Use the control to tilt to unload. Note if the basket housing dips slightly just before it actually tilts. If it dips you have an air gap at the cup and rest pin in the corner that dipped. Use the jacking bolt to raise the frame in that corner just enough to eliminate the dip. Double check phase one leveling points. Now the air gap between the flanges can be set. Utilize the jacking bolts on the burner end of the machine. Your goal is to close the gap between the flanges as much as possible while still allowing the basket box to tilt in both directions with no rub. Shim as required Drill and anchor the two corners of the burner tower. The Anchors needed are ¾ x 8.5, you will need 6 of those. Page 6

When the Phase Two leveling and anchoring is complete grout all 6 anchoring pads as required. Page 7

Duct work and Lint Filter Connections The lint filter is supplied with all required plumbing and electrical connection parts. The air piping for the lint filter blowdown and water piping for the lint filter sprinkler need to be piped and run at time of install. The fittings needed are provided with the machine. Air Inlet and Exhaust Duct should be 24 inches round or equivalent with a minimum of turns. Fewer turns will equate to higher efficiency. - A properly installed exhaust duct will have less than 1 inch WC of back pressure while running a formula. - A properly installed inlet and exhaust duct will be supported properly so the weight is not fully supported by the inlet flange of the blower or the lint filter. Page 8

Burner Blower motor Installation Install the combustion air 3 phase motor / blower housing on the Maxon burner package. The gasket and hardware are supplied with the machine. Electrical Connection Top entry of the control cabinet is not advised. Do not power up the machine until all machine electrical connections are made (burner blower motor, lint filter coil, and front and rear beacons and sirens). THIS MAY CAUSE SEVERE DAMAGE AND OR ELECTRICAL SHOCK! NOTE: the Softrol Dryer(s) will require a ground rod installed by the machine and connected directly to the ground lugs. Talk to the customer and/or the contractor. Verify the three phase power being brought to the machine is of the proper voltage and current rating. A ground cable of equal size to the three phase cables must be installed. Page 9

Use on ohm meter to be sure the machine disconnect is open before bringing power to the machine. Identify and remove the control transformer secondary fuse, Close the customers three phase disconnect providing electrical power to the top of the machine disconnect. Use your meter to verify the voltage you have matches the machine data plate and the stickers on the control cabinet. Check the voltage on each phase to the ground to be sure you have all three. NOTE: If one of the phases shows 0 volt to ground you may have a B phase grounded service pleased contact us immediately for further guidance after verifying that it is not a blown fuse or faulty breaker. Close the machine 3 phase disconnect. Repeat the above electrical test with your meter at the bottom of the disconnect Take special note for 230 volt systems with a high voltage phase. The high phase must not be left on the primary of the control transformer. Long term control damage will result. Check the voltage at the secondary of the control transformer. If the transformer is tapped properly you should read about 120 VAC. If this is OK turn off the machine disconnect. Verify all three phases are opened and then replace the secondary fuse. Turn on the machine disconnect. Turn on the control power switch and push the green control power button. If the green light stays on you are done with this task. Bump for Rotation The wiring for rotation of the basket and main blower was done at the factory during testing. You will be using the main blower motor to test rotation. If this one tested okay the basket will be okay as well. The main blower motor should turn counter clock wise looking at the cooling fan as noted on the blower door. If it turns the wrong way, swap two of the customer s three phases. Use your meter to be sure the power is turned off Verify the combustion blower motor rotation. Page 10

Air Connection The air supply plumbing should be no smaller than ½ NPT. Adjust the pressure regulator to 95 PSI. Page 11

Sprinkler Water Connection This should be supplied by a 3/4 NPT pipe from an uninterruptable supply of water. In house pump sources are not advised. The isolation valve should be located where it would be difficult to turn off unintentionally. We recommend the following: - A continuous supply of water of 40 PSI. - Flushing the water supply prior to connecting to the inlet point to avoid getting debris in the sprinkler solenoid valve that could cause leakage in the valves. The normal gas supply to the machine is a minimum of 15 inches WC and a maximum of 28 inches WC (1/2 to 1 PSI). Anything outside this parameter contact technical support for advice. Run 1¼ black iron pipe from the gas header to the machine. Have a soap solution on hand to check for leaks in the connections and for later on the gas train piping during the start-up. Refer to local code; Local code typically requires the gas regulators and vent valve to be vented to the outside of the building. The machines are shipped with plugged vent ports. Gas Connections & Vents Page 12

Testing / Check / Verify 1. Turn on the control power. 2. Open the air isolation valve. 3. Open the sprinkler water isolation valve. 4. Open the gas isolation valve. 5. Open and close the front door. 6. Tilt the machine to full load position and then to the unload position from the front control. 7. Rotate the basket in both directions with the front yellow pendant. 8. Open and close the back door from the rear control (if option is available). Tilt to unload and back to level from the back control (if option is available). Rotate the basket in both directions with the rear yellow pendant. 9. Push in the front E stop button. The green lighted button should turn off. Reset the E stop and push the green lighted button. It should come back on. Repeat this test with the rear E stop button (if option is available). 10. Push in the SPRINKLER WATER SHUT OFF, next push in the SPRINKLER TEST button. You should not get any reaction from the water solenoid valves. 11. Reset the shutoff switch. Push the test button again. This time you should see water at the lint filter and in the basket. 12. Check to make sure the Zytron control inside the control cabinet is set at 250 F. 13. Check the blower door safety interlock switch release logic. The green lighted button on the side of the control should allow entry when lit and pressed. 14. Verify that the following is done; Low pressure gas cutoff is set at.4 WC. High pressure gas cutoff is set at 14 inches WC. Inlet and outlet temperature indications on the control are reading ambient temperature. 15. Inspect the basket exhaust flange seal. Adjust the seal to eliminate any visible air gap. Check the adjustment of the two air fan differential switches; Differential Air Pressure Diaphragm Switches Gray Spring Switch = 0.25 to 0.5 inches WC. Combustion Air Blower Red Spring Switch = 0.8 to 1.0 inches WC. Main Blower Formulas Consult with the customer making sure they provide you with a list of formula names and numbers they want assigned to each. Have them tell you which ones are to be conditioned and full dry. Find out enough information about each product to be dried to allow you to decide on the appropriate inlet and outlet temperatures. Use our standard formula format and edit as required. Enter all formulas. Page 13

First Light Off Header and Gas Train meters are part of the Maxon package. The average Gas Train reading while running a formula at 100% firing rate is between 1 and.5 WC. This is what should happen when you start a formula; The main blower starts and its differential switch closes. Combustion air blower starts and its differential switch closes. Both of these switches are inputs to the flame guard. The basket starts to rotate. In 45 seconds the following should happen; o Flame guard switch initiates the ignition spark plug and opens two pilot gas valves. You should have a flame signal. o The modulating gas valve should begin stroking open and you should continue to have a flame signal. o Pilot valves close and you should continue to have a flame signal. With an empty machine select a formula and start the machine. A few flame failures are common at this stage due to air in the new gas pipe. While running check the pilot and main gas plumbing for leaks. Start Drying Loads The first few loads will allow you to make any gas pressure adjustments required as well as formula adjustments to achieve desired results. After a few hours of observation you should be able to reinstall the basket box covers. The balance of the time will be split between tuning the machine and training the customer. Operator Training Cleaning requirements. How to program and edit formulas. Maintenance Personnel Preventative Maintenance. How the machine works. How to program and edit formulas. Review Common questions / problems. Page 14