Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering

Similar documents
SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Northwestern University Scope of BAS Contractor

Virginia Tech Standards for Building Automation System

Integrated Automation

A Career that will take you to heights you never imagined!

Feature Summary. I. System

Cultivator & Hybrid Cultivator

DACC - NMDA BUILDINGS

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( )

AGENDA 282 BUILDING AUTOMATION SYSTEMS GOALS. BAS Systems. HVAC Systems. System Overview Benefits of BAS Future Trends

ADDENDUM NO.1. March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL

Continuous Commissioning: A Valuable Partner to Retrofit Projects

PLC / HMI Modbus (Slave) Addressing

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

SCC Inc. Master Panel. Specifications. Document No. TS 2010 February 11, Product Description. Sample Specification

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

VPR Series VPRE Series VPRC/P Series VPRX Series. IOM-C Software Version 4 Part Number

SPLIT SYSTEMS SELECTION & OPTIMIZATION GUIDE

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

INTEGRATED AUTOMATION FACILITY CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Power and Energy Management Solutions

CONTENTS. Installation Guide. VT7200 Series

Control Panel Checklist

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Control Sequence Number

MAXIMIZING HYDRONIC SYSTEM DESIGN PART III

Building Automation System

Technical Assignment 3 11/15/04. Executive Summary

LightSweep. Lighting Control System

Accuracy by Design Products for the HVAC Professional

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Integrated Automation Instrumentation & Terminal Devices

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Features and Advantages

I/O ZONE 560/583 USERS GUIDE

Reference Guide for Microprocessor Controller

Multiview Monitor / Controller

EC-BOS-602/616 AX Security

TEC3000 Series Wireless, Stand-Alone, and Field-Selectable BACnet MS/TP or N2 Networked Thermostat Controllers Catalog Page

Instruction, Operation, and Maintenance: Controls Software Versions: R37+

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

An HVAC Audit of the Canberra Institute of Technology

SE7200 Series Installation Guide

VCM-X Controller Technical Guide

WaterFurnace FX10 Application Guide Reversible Chiller

Digital Precise Air Control - DPAC

InfinityPro. Control System for Rapid Engineering, LLC Air Handlers. User, Operation & Troubleshooting Manual

DIVISION 26 ELECTRICAL SECTION LIGHTING CONTROL SYSTEM

Honeywell SLATE ICM Platform

Hubbell NX500 High Efficiency Gas Condensing Water Heater

Dryer Master DM510 Commissioning Guide

Introduction. What is the W2W Open controller?

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Application Sheet Chilled/heated ceiling (4 pipe) with 6-way valve on analog output

Master devices. Type X-AIR-ZMAS. Zone master module for up to 25 zone modules, with integral webserver and interfaces to higher-level systems

Added password for IP setup page : Password must be in IP format!

Project Name: Location: Engineer: Contractor: I. GENERAL

TB7200 Series Communicating Zone Thermostats

Honeywell Total Connect Remote Services

June Copyright Climatec

HVAC System Consideration$ 05/14/2012 SAVING MONEY IN HVAC SYSTEMS

SCC Inc. TS Series. Technical Instructions. Document No. TS 1000 June 25, TS Touchscreen Kits. Description. Touchscreen

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

Automation and Energy Efficiency of Industrial Refrigeration Systems

ASHRAE Guideline 36 Advanced HVAC Control Sequences

- Schedule with up to 3 ON periods per day to suit the comfort needs. - Hot water Boost function for temporary override

Sensor and Thermostat Selection Fundamentals

Strategies for Building Energy Efficiency

HLR 1000E Technical Specifications

Energy Savings with Direct Digital Control

ESL-IC Smart Room Control

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

1.0 Digital Controller

Application Manual LT-6617 Rev. 1 July 2017

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include:

SmartVFD HVAC and BYPASS

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

Installation & Operation Manual

CONTROLLED CHILLED BEAM PUMP MODULE

Building Automation System (BAS) Design Criteria

Welsh Commissioning Group, Inc.

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

Water-Cooled Modular Chillers. Product Data Catalog. Standard and Total Access Modules MS010X, MS015X, MS020X, MS030X, MS040X, MS050X, MS070X, MS085X

AIRFLOW MEASUREMENT AND CONTROL PRODUCT CATALOG. Phone: 877-4GNTROL ( ) - Internet: GreenTrol.com. r1f

Help. Help Software Tutorial. Building a Load Sizing Project with an NH-EL Humidifier and CSD Distributor.

Lift Station Level Controller

Transcription:

Case Study: New York Marriott Marquis BAS & Commissioning Bill Michell, RPA, FMA, CEOE Director of Engineering

Retro-Commissioning ( 05-06) NYSERDA co-funded study Re-Commissioning of all major mechanical, AHU & VAV systems Re-Commissioning and re-engineering of Steam systems Electricity reduction of 3% and Steam reduction of 15% Lighting Retrofit ( 06 ROI Project) BOH Lighting conversion to T-8 lamps & electronic ballasts/led Exit signs Escalator lamps converted to Cold Cathode lamps 2 year ROI; 793,300 KWH annual reduction Lighting Retrofit ( 07 ROI Project) Replacement of Atrium rail guest corridor lighting with T-8 fixtures 2 year ROI; 625,464 KWH

Building Automation System ( 08 ROI Project) - Installation of Tridium BAS - Convergence Johnson Controls 9100 BAS & original Honeywell BAS - Installation of VFD s - Integration of Chiller Plant, Hot Water System & Lighting Controls - Chiller Plant Optimization - 2.5 year ROI, annual reduction of 2,887,337 KWH

BAS Commissioning Features - Graphics; Easy operator interface - System operations easily verified - Open protocol; convergence & integration of controls - Trending - Scheduling Tools - Allows for ongoing Continuous Commissioning

The Home Page Weather Buttons for quick access to floors Buttons for specific building systems Move up and down building for hot link to floors

The Floor Plan Press Floor 8

The Floor Plan Custom Graphics Shades AC 9-2 shades area unit serves. this area Click AC 9-2 AHU summary for floor Each group is listed with space names

Press the schedule icon Schedules

Schedules Drag time is up and down as required Multiple times and temperature settings Special Event Schedules Rooms grouped by area and space names

Schedules Press the Home Hot Link Button

The Home Page Press Chiller Plant

Cooling Towers Chiller Plant Tab Navigation for Subtopics Isolation valve status Right click allows for commanding certain objects Color shifts denote override or status conditions

Typical Air Handler Access to Setpoints, Schedules, Trends Return Air Conditions Supply Air Conditions Fan Summary

Typical VAV Space Conditions Hydronic Reheat Temperature Setpoint Control Flow Setpoint Control

Domestic Hot Water Typical for Zone 2 and 3 Recirc. Pump 1 Building Load SS ST Diaphragm Tank Primary Pump 1 Heater 1 P New Motorized Mixing Valve V-1 M SS ST Recirc. Pump 2 DCWS Existing Pneumatic Valve P Primary Pump 2 SS ST Heater 2 Existing Pneumatic Steam Valve New Motorized Mixing Valve V-2 M Hot Water Supply to Zone P Steam Condensate Supply Steam Condensate Return SS ST Existing Pneumatic Steam Valve JACE 2 IO-34 1 13* AO 5* 14* 2 DO 1 3 DO 2 4 5 6 AO 1 7 AO 2 8 AO 4** AO 3 16** 15** DO 3 9 DO 4 10 11 12

TITLE Domestic Hot Water Zone Primary Pump 2 Zone Primary Pump 1 Zone Recirc Pump 1 Zone Recirc Pump 2 Zone Heater 2 Steam Valve Zone Heater 1 Steam Valve Zone Steam Cond. Valve* Zone Mixing Valve 1 Zone Mixing Valve 2** Internet 24vac (-) 24vac (+) RIB RIB RIB RIB + - + - + - + - EP EP Transducer Transducer + - + - EP Transducer + - + - M + - M C C C C C 0V 0V 0V 0V C C C C C 0V 0V 0V 0V DO DO DO DO DO DO DO DO DO DO AO AO AO AO AO AO AO AO 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 DO DO DO DO DO DO DO DO DO DO AO AO AO AO AO AO AO AO 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 Tridium JACE-201 201 # IO-34 ZONE 2 IO-34 ZONE 3 (Same as Zone 2) LAN2 LAN1 CAT5 232 COM1 WPM 24V 485 COM2 s + - 24VAC UI UI UI UI UI UI UI UI UI UI UI UI UI UI UI UI H N 1 G 2 3 G 4 5 G 6 7 G 8 9 G 1011 G 1213 G 1415 G 16 (+) (-) UI UI UI UI UI UI UI UI 1 G 2 3 G 4 5 G 6 7 G 8 24VAC UI UI UI UI UI UI UI UI H N 9 G 1011 G 1213 G 1415 G 16 (+) (-) CAT5 Hotel Ethernet Switch CAT5 Reliable Controls Local LCD Interface * Denotes Optional device ** Denotes option for 2 dedicated valves vs. single common control valve Intranet-connected PC with Internet Explorer 22/2 BACnet MS/TP RIBXF split core current switch 120/24vac RIB RIBU1C SPDT relay EP Transducer M UCP522 EP transducer to control existing pneumatic steam valves 3-way 24vac spring return modulating mixing valve (VGF31EM30/KAS-175-M) 10K Type III thermistor with immersion well Domestic CWS Temp Zone Preheated CWS Temp Zone Prim. Pump 2 Status Zone Prim. Pump 1 Status Zone Heater 2 HWS In Temp Zone Heater 1 HWS In Temp Zone Heater 2 HWS Out Temp Zone Heater 1 HWS Out Temp Zone Recirc. Pump 1 Status Zone Recirc. Pump 2 Status Zone HWR Temp Zone HWS Temp Steam Condensate Suppy Temp* Steam Condensate Return Temp* Zone Valve 1 HWS Temp** Zone Valve 2 HWS Temp** H N Intercon Systems, Inc. 1060 Holland Drive Suite 3D Boca Raton, FL 33487 9th Floor Marriott Marquis Hot Water Controller Layout FILENAME DRAWN BY DATE marriott marquis hot water.vsd Karl Zimmerman 9/12/06

Domestic Hot Water Heater Temperature Mixing Valve Temperature Zone Supply Temperature

Trends Temperature Legend Trend shows Tower Fan power loss Time