A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Similar documents
A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Town of Essex Small Site Erosion Control Guide

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

2.1.4 Roof Downspout Rain Gardens

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Wisconsin Contractors Institute Continuing Education

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

The following general requirements will be met for all planter box installations:

EROSION & SEDIMENT CONTROL

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

5.0 Storm Water Landscape Guidance Introduction

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

2008 SWMM, 2010 Revision City of Tacoma

Table 4.7.1: Swales Potential Application and Storm Water Regulation

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Tree Pits Construction Guide

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

SECTION 6. Routine Maintenance Activity Details

WQ-07 INFILTRATION TRENCH

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Case Study Bioretention Installation and Maintenance

Subsurface Infiltration Bed

4.6. Low Impact and Retentive Grading

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

BIORETENTION FACILITY

Eric Konzelmann, CPESC, CPSWQ Assistant District Manager. Montgomery County Conservation District

SECTION 900 TURF ESTABLISHMENT

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Image: Montana NRCS USDA

Analyzing the Bioretention Construction Sequence

Appendix G. Detailed Design

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

6.1 Bioretention Areas

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Soil Erosion and Sediment Control

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Huntington Stormwater Utility

Plan Review Checklist

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

Guidance on Preparation of Construction and Maintenance Costs

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Use of Best Management Practices

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?

Please make the following changes in your copy of the bid proposal for the captioned project:

Preventing Storm Water Pollution: What We Can Do

Stormwater Control Plan: Small (Tier 1) Land Development Project

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

EROSION & SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

Bioretention cell schematic key

Rule D Wetland and Creek Buffers

SOIL EROSION AND SEDIMENT CONTROL

SECTION AMENDED TOPSOIL

Lesson 2: Stormwater Best Management Practices (BMPs)

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Structural Storm Water Best Management Practices (BMPs)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

Protocol for Sustainable Roadsides

C-10. Disconnected Impervious Surface

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Appendix D - Technical Design Criteria for BMPs

All materials in this presentation are taken from materials produced by:

4. CONCEPT PLAN DEVELOPMENT

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Structural Stormwater Best Management Practices

Tips for Maintaining and Enhancing Stormwater Management Areas

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Kittson Parkway / Watershed Park Parking Lot

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

PLAN SUBMITTER'S CHECKLIST

SITE TOPSOIL & FINISH GRADING

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

The Low Risk Site Handbook

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Section 3 Non-Structural BMPs

City of South Portland Stormwater Manual

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Transcription:

The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language will require modification and additional detail to fit the physical conditions of the site and the final design of the BMP. TEMPORARY EROSION CONTROL A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. B. Install storm drain inlet protection to prevent clogging of the stormsewer and increases in sediment loads to downstream stormwater facilities or waterbodies. C. If the vegetated swale area is used for runoff conveyance during construction, it must be constructed per the specifications following construction and stabilization of the project site. D. Inspect erosion control measures at least once a week and after each rainfall event. Make any required repairs immediately. E. Silt fence fabric that collapses, tears, decomposes or otherwise becomes ineffective should be replaced within 24 hours of discovery. F. Remove silt fence deposits once they reach 30 percent of the height of the silt fence or silt curtain. Care should be taken to avoid undermining of the fence during cleanout. G. Erosion control devices shall be maintained until the site is stabilized, as determined by the Engineer. VEGETATED SWALE EXCAVATION, BACKFILL AND GRADING A. Delineate the limits of the swale grading prior to commencement of excavation. Upon approval of delineation, stakes and temporary construction fencing shall be set to maintain limits of excavation as directed by Engineer. B. I. If the vegetated swale is used for runoff conveyance during construction, initial grading of the swale shall be performed in conjunction with rough grading of the site. Once construction in the 1

contributing drainage area has been completed and the site is stabilized, re-grade and restore the swale to ensure functionality. II. If an alternative temporary sediment basin facility is being provided before discharge to the swale, grading and construction of the vegetated swale may not begin before the contributing drainage area has been completed and stabilized. C. Grading of the vegetated swale shall be accomplished using low-impact earth-moving equipment to prevent compaction of the underlying soils. Wide tracked vehicles such as back hoes, small dozers and bobcats are recommended. Excavating equipment should operate from the side of the swale to the extent feasible. If excavation leads to substantial compaction of the subgrade, the first several feet shall be removed and replaced with a blend of topsoil and sand to promote infiltration and plant growth. D. If an underdrain is required per the construction documents excavate the underdrain to the specified depth (elevation). All sub material below the specified elevation shall be left undisturbed, unless otherwise directed by the Engineer. E. In the event that sediment is introduced into the BMP during or immediately following excavation, the sediment will need to be removed from the vegetated swale or underdrain prior to initiating the next step in the construction process. F. Material excavated from the vegetated swale shall be disposed of on-site at locations (temporary stockpile areas) designated by the Engineer. G. Amended soil shall be placed in the vegetated swale to the specified depth (elevation) and shall consist of a well blended mixture of 40% semicoarse washed sand; 30% MnDOT Grade 2 compost and 30% native topsoil by volume. H. Clean, washed 1 to 3-inch gravel shall be placed in the bottom of the underdrain to the depth specified in the construction documents. Gravel should be placed in lifts and lightly compacted with plate compactors. The gravel shall conform to the following requirements: Sieve Size Percent Passing 2.0 100 1.5 85-100 1.0 30-60 0.5 0-10 2

I. Filter fabric encasing the underdrain shall have a minimum transmissivity rate of 100 gallons per minute. J. The perforated pipe (underdrain) shall be laid directly on the gravel bed. Grade and alignment shall not vary from the prescribed grade by more than 0.03 feet (9 mm) at any point. The joints between sections of pipe shall be connected in a fashion acceptable to Engineer. Once the pipe is in place, it shall be covered immediately with granular material as specified in the construction documents. The granular material shall be of uniform depth on either side of the pipe. Special inlets and special devices at the outlet end of the pipe shall be constructed as shown in the plans. K. Maximum spacing between check dams should be such that the toe of the upstream dam is at the same elevation as the toe of the downstream dam. The maximum height of the dam should not exceed 3 feet. Hand or mechanical placement required to achieve complete coverage of swale and to ensure that center of dam is lower than edges. NATIVE SEEDING Seeding native grasses and forbs (wildflowers) can be accomplished using a number of different methods. However, due to the complexity of seed sizes, textures and densities, a great deal of care needs to be taken to ensure that the site is well prepared and that seed is placed properly. For more information on native seeding methods and specifications see the following source: http://www.dot.state.mn.us/environment/seeding_manual/seedingmanual2003.pdf NATIVE PLANTS, PLANTING AND TRANSPLANTING A. Native planting shall not commence until planting areas have been properly amended and prepared per the specifications. B. Native planting shall not commence until the native seeding has been completed and any required erosion control blanket has been installed. The planting shall be completed within 72 hours of native seeding. C. The site shall be free from all weeds and invasive plant species. If weeds and invasive plant species exist onsite, they shall be removed and disposed of properly. 3

D. Plant material shall be spaced in accordance with recommended dimensions. Adjust spacing as necessary to evenly fill planting bed with indicated quantity. E. All plant material shall be thoroughly watered within 8 hours of planting. CONSTRUCTION SEQUENCE SCHEDULING An implementation schedule should be included as part of the erosion control plan to identify the order of operations for construction activities. This is particularly important when constructing stormwater BMPs that are designed to infiltrate stormwater runoff. There are many construction activities which may contribute to the failure of a stormwater BMP if they are not planned for accordingly. The following items should be considered in developing an implementation schedule for a project: 1. Perform continuous inspection of temporary construction access to ensure that it is providing adequate erosion and sedimentation control for the construction site. 2. Install silt fence along the perimeter of the site to prevent sediment from leaving the site during the construction process. Silt fence should be installed at a uniform elevation and constructed so that flow cannot bypass the ends. Install heavy duty silt fence along the perimeter of downstream waterbodies to prevent sediment pollution. Install heavy duty silt fence along the perimeter of grading-prohibited areas and all stormwater BMPs to eliminate traffic in these areas during the construction process. 3. All down gradient perimeter sediment-control BMPs (e.g. temporary outlet controls) must be in place before any up gradient land-disturbing activity begins. 4. Remove topsoil from the site and place in temporary stockpile location. Seed stockpile with temporary seed mix and mulch with weed-free straw if the stockpile is to remain in place for more than three days. 5. Install underground utilities (water, sanitary sewer, electric, telephone, etc.) taking the location and function of stormwater BMPs into consideration. 6. Rough grade the site leaving the vegetated swale area undisturbed until the contributing drainage area has been completed and the site is stabilized. 7. Seed and mulch disturbed areas on site. 4

8. Construct the roads in a manner that minimizes adverse impacts to the location and function of the stormwater BMPs. For example, ensure that construction access or equipment staging areas do not conflict with the final location of the vegetated swale. 9. Perform all other site improvements in a manner that minimizes adverse impacts to the location and function of the stormwater BMPs. 10. Final grade the site. Grading of the vegetated swale shall be accomplished using low-impact earth-moving equipment to prevent compaction of the underlying soils. Wide-tracked vehicles such as backhoes, small dozers and bobcats are recommended. Excavating equipment should operate from the side of the swale to the extent feasible. If excavation leads to substantial compaction of the subgrade, the first several feet shall be removed and replaced with a blend of topsoil and sand to promote infiltration and plant growth. 11. Construct check dams if specified. 12. Stabilize the site by implementing the native seeding portion of the landscaping plan. 13. Install any required erosion control blanket, ditch checks, and other semipermanent and permanent erosion control measures. 14. Remove the temporary erosion and sediment controls after the vegetated swale is stabilized per the Engineer s approval. It is important for the swale to be stabilized before receiving stormwater flow. CONSTRUCTION OBSERVATION It is strongly recommended that the design engineer be onsite during various stages of the construction process to ensure the following: 1. Construction documents are being adhered to. 2. Physical conditions of the site meet assumptions made during the design process. 3. Erosion control measures have been installed correctly and are being maintained during the entire construction process. 5