Small LP Gas Jurisdictional Systems. Kim Lapierre Technical Training Manager John Minchew Area Safety Manager West

Similar documents
Petroleum Gas Systems - 1 -

Iowa Propane Gas Association 2018 Training Descriptions

Iowa Propane Gas Association 2011 Training Descriptions

2018 Propane Training

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Amended for Application within the State of Iowa

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Changes for the New Edition. Senior Engineer, NFPA NFPA

PROPANE EXCHANGE. Thanks to Southern States Cooperative, Tarantin Industries & Thompson Gas for advertising in this issue.

Compliance Guidance for non-technical managers

Suburban Propane Notice of Public Awareness. Additional Information for Customer s Buried Piping

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

First Revision No. 20-NFPA [ Section No ]

5.07 Air Replenishment Systems

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

1.0 Basic Principles and Practices of Propane Performance-Based Skills Assessment 2016

Fire Safety Inspection Update

ARTICLE 25. FUEL GAS CODE

GAS PIPELINE OPERATIONS

GASEOUS HYDROGEN SYSTEMS

Vendor Company Name Tempaco (904) Tempaco (904) Robert H. Peterson Company. Meagher Corp.

SOUTH CAROLINA LIQUEFIED PETROLEUM GAS PROGRAM (LP-GAS)

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

Department of Public Safety

Pipeline Personnel Qualification. ASME B31Q Update. Presented by: Mike Gruenberg Southwest Gas Corporation

Suggested Specifications Prestige Excellence 110

LGB Gas fired boiler

IFGC-2012 AMENDED IFGC-2015 IFGC-2018 CHAPTER 1 SCOPE AND

Compliance Inspections -Attachment 11 - DOT Compliance Quality Assurance Auditing Procedure

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

2012 Edition. Tech Topics: Standards & Codes. Note 4, Issue 1. Points of Interest: Introduction. Background. Changes to Definitions in Article 100

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

VeriSafe Absence of Voltage Tester The safe way to verify the absence of voltage

The safe way to verify the absence of voltage.

ASHRAE 2016 Boiler and Pressure Vessel Program Overview February 22, 2016

Firefighter/ Emergency Medical Technician MASON VALLEY FIRE PROTECTION DISTRICT

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

Medical Gas Inspections and Maintenance Programs. HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

Presented at 6 th Pipeline Technology Conference Hannover, Germany April 4-5, 2011

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

PG&E Gas Control Training and Qualification Program

Mobile Food Units. A definition of mobile food unit added in OFC Rule 2 is as follows:

Temporary LPG Heat for Construction Sites Information Packet

7.0 Applying Basic Electricity Principles to Service Propane Appliances Skill Evaluation Packet (Updated 11/2012)

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

FIREFIGHTER II: FIRE DEPARTMENT COMMUNICATIONS COMMUNICATIONS: SKILL SHEET #2 Define and Demonstrate Fire Department Radio Procedure

Kansas Propane Education and Research Council Annual Report 2017


LGB. Control Supplement. Gas fired boiler. Universal Control System. Series 2 Propane gas. Contents

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Orange County EMERGENCY POWER PLAN (EPP) CRITERIA FOR ASSISTED LIVING FACILITIES & NURSING HOMES

GAS APPLIANCE LISTING PROGRAM

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus


Electrical Safety Program.

Australian/New Zealand Standard

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

First Revision No. 1-NFPA 30A-2015 [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Completed Projects / Projets terminés

CARBON DIOXIDE SYSTEMS FOR BEVERAGE DISPENSING PERMIT REQUIREMENTS

NATURAL GAS SYSTEM OPERATOR SAFETY PLAN

The Gas Company Public Awareness Information Pipeline Installation & Maintenance-Southern California Gas Company (SoCalGas)

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

NFPA 70E Elevates Safety. with Heightened Risk Awareness

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Fire Suppression Installation (R-102) for AVI Hoods & XLT Ovens

MOBILE FOOD VENDING Food Trucks & Trailers

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

MNEC NFPA 72 WHITE PAPER

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

Canadian Fire Alarm Association. Fire Alarm System Activation. Fire Alarm with malfunction history

NFPA Fire Inspector I Study Guide

Tri-Tech Medical Inc.

4.6 Advanced Propane Appliance Service and Troubleshooting Performance-Based Skills Assessment 2019

June 2018 Safety Meeting Fire Extinguishers Part I

Robin Clark Health & Safety Coordinator

Above Ground Fuel Tank Requirements

Design & Construction Standards, Revised January

TANKLESS WATER HEATING

The 2012 Fire Suppression Rating Schedule (FSRS)

Gas Piping Facts. Information for properly sizing gas lines for use with tankless water heaters and other gas appliances TANKLESS WATER HEATING

NFPA 54 UPDATE. Paul Cabot American Gas Association

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION


5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

CAMDEN COUNTY FIRE COORDINATOR

LIST OF OISD STANDARDS (April 2016)

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Navigating the Safety Certification Process for LED Lighting Products Todd Straka, Director Lighting Services

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Transcription:

Small LP Gas Jurisdictional Systems Kim Lapierre Technical Training Manager John Minchew Area Safety Manager West

NFPA 58, the Liquefied Petroleum Gas Code standard has been the guidance in the LP Gas/Propane industry since 1932 All LP Gas installations are already required to meet the current design, construction, and material requirements as prescribed by NFPA 58

NFPA 58 is an evolving standard that is updated every three years By maintaining this update cycle, the standard will reflect and address the following Historical safety issues in the industry Emergency responder and firefighting concerns Propane industry Best Practices Latest industry technology Current edition is 2017

Typical Natural Gas Pipeline Operating pressure of 200 to 1,200 psig Typical Small LP Gas Pipeline Operating pressure of 10 psig or less

Natural Gas Systems Complex systems Miles of pipelines Compressor Stations Regulator Stations Metering Stations Delivery Stations Transmission lines Distribution lines Service lines Small LP Gas Jurisdictional System Less complex Feet of pipeline Storage Tank(s) 1 st stage regulator 2 nd stage regulator(s) Service lines

Small Jurisdictional System Small Commercial and Residential System

Jurisdictional System Material: ASME 500 Tank 1 st Stage Regulator UL144 (2) Second Stage Regulators UL144 (2) Meters Pipe and Fittings Material Cost: $1343.00 Labor for Install: 480.00 $1823.00 Prices based on average material cost Non Jurisdictional System Material: (1) ASME 500 Tank (1)1 st Stage Regulator UL144 (1) 2 nd Stage Regulator UL144 (1) ASME 50 gal Tank (1) Integral two Stage Regulator UL144 Pipe and Fittings Material Cost: $1538.00 Labor for Install: 480.00 $2018.00 Prices based on average material cost

Jurisdictional System Installation documentation of pressure, leak and operating test maintained. System components listed. System installed meeting NFPA 58 requirements. Jurisdictional site specific binder created following procedures as outlined in Operations and Maintenance Manual. System mapped. Documentation of MOP & MAOP established. Establish Site Specific Emergency Response Plan Ensure mailing of Public Awareness Message to new user(s) and every 6 months following initial notification. Non-Jurisdictional System Installation documentation of pressure, leak and operating test maintained. Materials listed and approved for LP gas use with pressure rating for the segment of the system installed. Materials and design meeting NFPA 58 requirements. Tank(s), regulators and piping visible are inspected at each delivery. Employees trained in Emergency Response. New user receives LP gas Safety Information.

Jurisdictional System (cont d) Register site with One-Call Provider Create site specific Distribution Integrity Management Plan for system. Average Labor Cost to set up one small Jurisdictional System s required documentation to meet 49 CFR 192 requirements for small LP systems: *Approximately $750 Non Jurisdictional System Installations with large amounts of underground piping and possible exposure to excavation would be registered with One- Call. *Assumes operator has current O & M Plan, Operator Qualification Plan, and DIMP

Jurisdictional System In addition to Training meeting NFPA 58 requirements. Training meeting 49 CFR 192 Subpart N Ensure task specific training for technician performing: installation, testing, patrols, repairs or inspections. Currently 19 task specific training modules. Each Task specific training is identified in the Operator Qualification Plan to include training, written exam and skill evaluations. 3 year recurring certification on most covered tasks. 1 year recurring certification on Joining of PE pipe. Average Cost for initial training of 1 technician on the additional 19 tasks. $8,000 Non Jurisdictional System Training meeting NFPA 58: Technicians installing, repairing, and maintaining systems are trained. CETP certification or equivalent and Licensed per individual state requirement. Delivery Drivers are trained in product transfer. CETP certification or equivalent and meet individual state training requirements. CETP requires training, written exam and skill evaluation for each certification type. 3 year recurring certification and state specific required continuing certification.

Jurisdictional System Establish schedule and perform annual: Leak survey Atmospheric corrosion inspection Regulator inspection Relief Valve inspection Key Valve inspection Cathodic Protection testing Establish schedule and perform quarterly: Patrolling Odorization Estimated cost for quarterly and annual testing and inspections of small system: $1700.00 Non Jurisdictional System Establish schedule and perform: Cathodic Protection testing per NFPA 58, at initial installation, within first 18 months and every 3 years after. Odorization testing is completed during each product transfer. From the refinery to transport or railcar to the bulk storage tanks, from the storage tanks to the bobtail, from the bobtail to the system tank. Inspection of the tank and system is completed during each delivery. System is inspected each time a new occupant moves in. Leak and operating tests are performed.

Additional cost to operate one small LP gas pipeline system meeting the definition of a Jurisdictional System that complies with the requirements of 49 CFR Part 192. Documentation $ 750 *Training (1 tech) $ 8,000 Qtrly/Annual Test and inspections $ 1,700 $10,450 *CETP and State Specific Licensing requirement cost is not included in this total.

Single source supplying a privately owned Inn with the supply tank on the same property. Single source supplying a privately owned Inn, 4 rooms with gas fireplaces installed for guest use.

The gas supply line is operating at 10 psig or less to the 2 nd stage regulator reducing line pressure to the boiler to 11 wc. The gas supply line is operating at 10 psig or less to a 2 nd stage regulator reducing line pressure to the boiler and gas fireplace units to 11 wc. The physical components of the portion of the system falling under the pipeline regulation has not changed in either example. The system was installed meeting NFPA 58 requirements.

NFPA 58 System Design Requirements: Tank location and set backs Tank appurtenances Pipe material and location Regulator(s) and location Meter and location Materials used in system must be approved for LP Gas and the pressures the component will be exposed to meeting ANSI,ASME,ASTM,AGA,CSA,UL ratings.

Systems installed to NFPA 58 code requirements meet the same requirements of a pipeline system per 49 CFR 192, which includes: Over pressure protection of the downstream components Components are approved and tested for the pressures in which they will operate. Materials in the system are protected from corrosion Atmospheric Underground (Cathodic) Protection from outside force damage Vehicular Weather related conditions (snow, ice, flooding, etc.) Fire Proper odorization of the supply product

Part 192 allows the operator to reduce to the MAOP on a segment of pipeline that can not be reconditioned or phased out when it is considered to be in unsatisfactory condition. This option applies to the natural gas pipelines that are already operating with higher established MAOPs based on the material SMYS yield strength. The multiple regulating stations between pipeline segments allows the ability to operate with lower MAOPs in identified segments.

The LP gas system s MAOP is determined not only by the rated pressure capacity of the pipe and components, pressure test, and historical data but is also limited by the chemical make up of the product. The rated pressure capacity of the PE pipe most commonly used in these installations is not the limiting factor to establish the MAOP on the high pressure side of the system it is limited by the concern of re-liquification of the LP gas vapor in the pipe at the higher pressures. NFPA 58 limits the pressure in PE piping to 30 psig. Allowable measures to mitigate abnormal operating conditions of natural gas pipelines do not apply to the LP Gas systems.

The proper design and construction of the LP gas installation by trained technicians will provide a safe reliable supply of propane to the end users. The inspection of the tank, visible pipe and regulators at the time of each delivery and meter read will provide time to observe an abnormal operating condition requiring immediate or scheduled repair.

Challenges to meeting 192 compliance Multi state operators are challenged to incorporate the various state regulators interpretation of the language in 49 CFR Part 192. Individual state s have language that states that if that state s regulation conflicts with 49 CFR Part 192, the state s regulation shall prevail. Multi state operators need to operate with multiple state specific O&M Manuals, OQ Plans, and DIMP to satisfy the request for language changes by the regulators. Repeat inspections of the same plans result in requested changes to the same plans previously inspected by the regulators and issuance of a Letter of Concern or in some cases NOPV. This results in repeated revisions to the Plans and distribution of the revised plans a challenge and a significant expense to the operator. PHMSA has not adopted NFPA58 beyond the 2004 edition. This limits the use of newer safer technology approved for use in LP Gas systems in newer additions of NFPA58.

The number of reportable incidents on the Small LP Gas Jurisdictional systems is negligible for incidents resulting from: Operator error Equipment failure Material failure Outside force damage Incidents as a result of third party excavation, which are a: Leading reported cause of incidents to a Small LP Gas Jurisdictional System. Limited risk based on small cubic ft volume of product in the pipeline, tank is accessible and service valve controlling flow can be shut-off quickly, excess flow valves installed in multi-container installation, limited flow rate thru singe tank installation pig tail.