ACS.CCLP1 PD SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC LPG PERMANENT DWELLINGS

Similar documents
ACS.CoCDN1 SAFETY ASSESSMENT CRITERIA CHANGEOVER NON-DOMESTIC TO DOMESTIC NATURAL GAS

ACS.CCLP1 EPC SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT. DOMESTIC.LPG EXTERNAL PIPEWORK CONNECTIONS

ACS.SMB.004.AC.TABLE 2.CESP1.CMA1.CMA2 LS. INITIAL & RE-ASSESSMENT

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers

Standards of Training in Safe Gas Work Domestic Natural Gas Training Specification

Annex 5a Solid fuel (Domestic) Annex 5a Common Minimum Technical Competency Requirements for Solid fuel burning appliance installation (domestic)

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers

QUALIFICATIONS AND CREDIT FRAMEWORK (QCF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION

REGULATED QUALIFICATIONS FRAMEWORK (RQF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION

Technical Bulletin 005(B) Developed with Building Standards Scotland

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

5.5.1 General CD/30 (Oil Condensing Boiler Installation Assessment Form) General Technician Stationary...

Flueing and ventilation for gas appliances of rated input not exceeding 70 kw net (1st, 2nd and 3rd family gases)

TABLE OF CONTENTS. Part I Administrative

Condensation. Some causes, some advice. GGF Condensation Brochure_web.indd 1

Causes and Advice on Condensation

TABLE OF CONTENTS. Part I Administrative... 1

Overview EUSDSG3.11. Maintain gas fired ducted air heaters and appliances

TABLE OF CONTENTS. Part I Administrative... 1

A6VS VENTILATION STANDARDS

Domestic Gas Cookers & Ranges

Twin Wall Installation Instructions And Maintenance Guide

Course introduction 2. 1 Appliances and fuels 3. 2 Combustion Legislation Air supply Flues and chimneys Commissioning 83

CHAPTER 5 - STRUCTURAL FIRE PRECAUTIONS

Part J of the Building Regulations: Changes for 2010 Tuesday 28 th September 2010 Presenter: David Bleicher

GASEOUS HYDROGEN SYSTEMS

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

Annex 4a Common Minimum Technical Competency Requirements for Oil Appliance Installation Work (Domestic)

Eastside Installation Guidelines and Operating Instructions January 2018

Introduction. General. Other regulations. British Standards and European Technical Specifications

2015 MECHANICAL CODE REQUIREMENTS

IFGC-2012 AMENDED IFGC-2015 IFGC-2018 CHAPTER 1 SCOPE AND

Gas Emergency Response

CRAFTSMAN EXAMINATION, NOVEMBER 2009 GASFITTING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

WOLVERTON STOVES U S E R M A N U A L S h A N d o N / A R d L E i g h

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

MULTIPOINT FF Room Sealed Fan-Assisted Water Heater

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No

Compact. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

COMMERCIAL GAS AND ELECTRIC STACKED WASHER/ DRYER INSTALLATION INSTRUCTIONS

Installation and Servicing Instructions. Alpha CB50

INSTALLATION INSTRUCTIONS FOR THROUGH-THE-WALL VENTING COMPONENTS

Product Guide Gas-fired and solar thermal. heating and hot water solutions NEW. Greenstar Comfort controls

Compact HE. High efficiency combi boiler. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

Keep your home free from damp and mould

REGISTRATION EXAMINATION, JUNE 2012 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Non-domestic gas installations (Edition 2)

Alpha CD13R,18R and 24R

HOUSING (STANDARDS FOR RENTED HOUSES) REGULATIONS 2017

Purge Ventilation Unit. Product Manual. ventilation systems TP625

The Greenstar Camray oil-fired regular and system condensing boiler series

AN INTRODUCTION TO BUILDING SERVICES

Understand and apply domestic central heating system installation and maintenance techniques

GENERAL RULES. Ensure that the installation of your product conforms to all the indications given below. English CHIMNEY STACK

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

Installation and Servicing Instructions. Alpha CD50

Preventative Maintenance Tables

IF IN DOUBT, INSTALLATION SHOULD BE MADE BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH CURRENT WIRING REGULATIONS.

PREPARED FOR: (Name of Client) CONCERNING: (Address of Property) BY: P Home. YOUR HOME CHECK 1305 FM 359, Suite G F

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

Esse B MODEL Roomheater with boiler WOOD BURNING ONLY MODEL

Inspection Checklist Mechanical Rough in

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

2012 INTERNATIONAL FUEL GAS CODE VENTS

Assessment Schedule - TS.6

IGEM/G/5 Edition 2 Communication 1762 Gas in multi-occupancy buildings

ARCHIVED. Compliance Document for New Zealand Building Code Clause G4 Ventilation Second Edition. Prepared by the Department of Building and Housing

Dovre 250 Cast Iron Gas Stove

Code of Practice - Ventilation- Mechanical Extract Ventilation (MEV) + Mechanical Ventilation with Heat Recovery (MHVR)

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

INSTALLATION & COMMISSIONING INSTRUCTIONS Model: 990 CH

APPENDIX 12 FIRE SAFETY REQUIREMENTS FOR LIQUEFIED PETROLEUM GAS (LPG) CYLINDER INSTALLATIONS

GENERAL BASIC INSTALLATION INSTRUCTIONS INDIRECT GAS FIRED WATER HEATERS PARKER BOILER CO.

Contents The IET Regulations, BS 7671, and this Guide 1.1 The need for this Electrician s Guide 1.2 The IET Regulations BS 7671

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

REGISTRATION EXAMINATION, NOVEMBER 2016 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Condensation Control in New Homes. Important information for owners and occupiers

Commissioning of Heat Producing Appliances Burning Solid Fuel

Installation and Servicing Instructions

- CONSTRUCTION FIRE SAFETY STANDARDS

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS.

Safety Best Practices Manual

Installation and Maintenance

Fire resistance. Appendix E. E.1 Fire resistance. Appendix. (A copy of this Appendix is available on /)

Chapter FUEL GAS CODE*

INSTALLATION AND SERVICING INSTRUCTIONS

LEIHDC70SC - LEIHDC70BB LEIHDC70BC. Instructions Manual.

BRANDON DRY & DHW OIL MODELS

Installation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers

ONLINE VERSION ONLINE VERSION

BUILDING STANDARDS SUPPORTING GUIDANCE DOMESTIC VENTILATION

SABRE. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

Installation and Servicing Instructions. Alpha CD25X/28X

Table of Contents for the REGULATION (EU) 2017/745 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2017

Trimbox Mixed Flow Fans. Product Manual. ventilation systems TP220T TP221T TP222T TP223T

Building Regulations Approved Document F1 Means of Ventilation April 2006

Alpha InTec 26C, 30C, 34C and 24X, 28X

Installation and Servicing Instructions. Alpha CD25C/28C/35C

ZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008

Transcription:

ACS.CCLP1 PD SAFETY ASSESSMENT CRITERIA INITIAL & RE-ASSESSMENT DOMESTIC LPG PERMANENT DWELLINGS Issue 7 ACS.SMB 1

CCLP1 PD INITIAL & RE-ASSESSMENT Introduction Tests gas safety competence in core domestic LPG competencies for permanent dwellings. CCLP1 PD can only be awarded when the Candidate holds CCLP1. Comprises: 3(b). LPG supply pressures - operation and positioning of emergency isolation, flow controls and valves for bulk gas storage vessels 3(c). LPG cylinder and vessel location and safety 4. Ventilation 5. Installation of pipework and fittings 12. Chimney Standards 13. Chimney inspection and testing 14. Installation of open, balanced and fan-assisted chimneys. CBs and ACs may adopt Competence and Criteria numbering different to that used in this document. CB and AC documentation may adopt wording for criteria different to that used in this document, provided the meaning is unaffected. Range All fittings in permanent dwellings. Pre-requisites Initial CCLP1. Re-assessment CCLP1 + CCLP1 PD. References and normative documents MIs. All relevant documents as listed in the Legislative, Normative & Informative Document List (LINDL), inc.: HSL56 GIUSP. ACS.SMB.003.ACRND identifies Normative Documents that should be held by ACs. Abbreviations AC. Assessment Centre CB. Certification Body I. Initial IP. Intermediate pressure LP. Low pressure MIs. Manufacturer s/manufacturers instructions PD. Permanent dwelling R. Re-assessment Ref. Reference Issue 7 ACS.SMB 2

UPSO. Under-pressure safety cut-off. 3. Products and characteristics of combustion 1. Awareness of regional differences in Building Regulations regarding CO detection when installing new or replacement fixed combustion appliances. GSR ISU 037 3(b) LPG Supply pressures - operation and positioning of emergency isolation, flow controls and valves for bulk gas storage vessels 1. recognition of supply pressures from gas storage vessels: MP stage 2. operation and positioning of vapour service shut off valve 3. operation and positioning of first and second stage regulators 4. 5. 6. 7. identification of causes of under-pressure conditions 8. operation, positioning and visible indicators of UPSOs 9. re-setting UPSOs 10. operation and positioning of limited relief valve 11. advice to consumer on re-setting UPSO 12. 13. recognition of supply pressures to individual flats in multi-storey buildings 14. recognition of additional final stage regulator for LP supplies in multi-storey buildings 15. labelling IP and LP supplies in multi-storey buildings 3(c) Cylinder and vessel location and safety 1. location and safety of cylinders: (i) installation, location and protection (ii) construction, inc. ventilation of compartments, lockers and internal housings (iii) safety precautions for storage and use 2. location and safety for vessels: (i) installation (ii) marking of common vessels commercially available for single supply (iii) location 4. Ventilation 1. calculate free area of selection of air vents 2. identify correct and incorrect types of air vents and grilles e.g. fly screens 3. identify installation of inadequate ventilation KNOWLEDGE AND UNDERSTANDING (these criteria are PC for re-assessment) REF I R 1. requirements for ventilation 2. installation of ventilation grilles and vents 3. types of grilles and vents 4. additional ventilation e.g. extractor fans, cooker hoods, dryers etc. 5. labels and notices 6. siting of ventilation (wall, window, floor, ceiling and ducted) direct to outside air, or via series air vents 7. calculating ventilation for combustion of open flue appliances 8. calculating ventilation for enclosed spaces - cupboards, compartments for open, balanced and fan assisted flue appliances 9. calculating combustion ventilation for multi-appliance installations, multiple open flue and flueless appliances within the same room/space 10. ventilator location for single and multiple DFE space heaters inc. flued and flueless 11. requirements for flueless appliances inc. cooking, water heating and space heating 12. restrictions for use of screens, and louvers or grilles to prevent entry of vermin 13. positioning of ducted ventilation into a space containing a gas appliance(s) Issue 7 ACS.SMB 3

14. effects of oil or solid fuel appliances on ventilation for DFEs 15. effects of double glazing, cavity insulation draught proofing on ventilation provision 16. identification and installation of in tumescent air vents 17. operation of passive stack ventilation 18. ventilation for internal kitchens 19. Installation of appliances in cellars 5. Installation of pipework and fittings. Range of pipe sizes: 6 mm to 28 mm 1. join copper pipe using appropriate capillary fittings, methods and agents 2. disconnect LPG cylinder from pipework, observing all safety precautions 3. attach temporary earth bonding equipment correctly 4. fabricate copper capillary fitting using appropriate methods and agents 5. reconnect LPG cylinder 6. check work carried out is gas tight 7. purge installation of air 1. galvanised steel pipe and fittings standards suitability and use 2. jointing and cleaning agents for stainless and galvanised steel pipework 3. restrictions on use of union, compression and capillary fittings 4. safety requirements for pipework: (i) installed between joists in floors or roof spaces (ii) installed across joists in ceiling or roof spaces (iii) buried in concrete (iv) passing through cavity walls (v) installed behind dry lined walls (vi) installed within timber construction walls 5. ventilation for pipework installed within ducts 6. fire stopping in buildings containing flats or maisonettes 7. pipework inside a protected shaft or other fire escape route 8. ventilation for protected shafts 9. minimum depth of pipework buried below ground 10. locations where pipework is not to be installed 11. min. spacing from electrical supplies, meters and fuse boxes 12. min. cross sectional area of equipotential bonding conductor 12. Chimney Standards 1. existing solid fuel chimneys: (i) suitability checks required (ii) min. size of unlined chimney used for gas fire before terminal is required (iii) min. size of side openings for slabbed over chimneys (iv) min. cross sectional area of new chimney installations gas fires (v) operation of dampers and restrictor plates (vi) effects of other fuels on chimneys and need for cleaning (vii) min. void dimensions below appliance connections (viii) catchment spaces and standard dimensions/volumes (ix) types of flue liners during construction (salt glazed clay etc.), poured/pumped concrete flue liners, flexible flue liners (x) restrictions to use of poured concrete liners (xi) sealing and support of flexible flue liners in chimneys (xii) inspection of chimneys through loft spaces (xiii) chimney heights/appliance types where liners are required (xiv) sealing chimney voids (xv) fitting bird guards to chimneys (xvi) suitable and unsuitable terminals for space heaters inc. radiant, inset and DFE 2. pre-cast flue systems: (i) pre-cast flue design, standards, operation, routing, connection and termination (ii) min. cross sectional area of new gas flue block (iii) min. requirement of vertical flue blocks before off-sets (iv) jointing material for pre-cast flue blocks (v) min. flue size/diameter to connect pre-cast transfer blocks to termination point Issue 7 ACS.SMB 4

(vi) effects of temperature on installation of pre-cast flues 3. open gas flue systems: Natural draught: (i) termination positions for chimney outlets (ii) ridge terminal positions (iii) effects of adjacent structures, basement areas, light wells and retaining walls on terminal positions (iv) methods of dealing with downdraught on steeply pitched roofs (v) restrictions to siting and lengths of chimney run to avoid condensation (vi) min. up-stand for chimneys passing through tiled or slated roofs (vii) special requirements for chimneys passing adjacent to combustible material or through other dwellings (viii) pre-fabricated metal starter box for space heaters (xiv) passive stack ventilation systems in houses, where open flue natural draught appliances are fitted 4. fan draught chimneys for open flue appliances: (i) requirements prior to installing fans in secondary flues (ii) additional safety requirements when fans are installed in secondary flues (iii) fan dilution and shared open flue fanned draught systems in domestic dwellings 5. shared open flue chimneys for natural draught appliances: (i) when two or more appliances are connected to same flue (ii) appliances with a common flue in same room (iii) appliances on shared flues installed on different floors labelling 6. room sealed natural draught chimney configurations for appliances: (i) balanced flue construction (ii) restrictions for outlet positions horizontal to an opening relating to appliance net input (iii) restrictions for outlet positions below an opening relating to appliance net input (iv) restrictions for outlet positions above an opening relating to appliance net input (v) restrictions for outlet positions below gutters, soil pipes, drain pipes and eaves (vi) restrictions for outlet positions in car ports (vii) balanced flue terminal guards 7. room sealed fanned draught chimney configurations: (i) restrictions on lengths, bends etc. for fanned draught room sealed flues (ii) restrictions for outlet positions inc. horizontal and vertical configurations (iii) enclosing chimneys (iv) proximity of flue duct outlets to boundaries (v) identifying unsafe situation of a room sealed flue system installed within an enclosure without sufficient means of inspection 8. balanced compartments for open flue appliances: (i) ducted air positioning (ii) cross sectional areas of air inlet ducts (iii) compartment construction 9. condensing flues: (i) condensate disposal position and termination for appliances of less than 4 kw (ii ) plume management kits (iii) where air inlet duct and terminal positions differ (iv) terminal guard for pluming kit air inlets 10. chimneys for vertex appliances: (i) construction and operation of vertex chimneys (ii) min. height of appliance draught break above roof insulation 11. exchange of information and planning for flues: (i) requirements of designer, builder, provider or installer when installing gas flues (ii) chimney certificates 13. Chimney testing 1. visually inspect flue and check: (i) starter block is correctly sized and positioned (ii) catchment space is correct (iii) flexible flue/liner is correctly sealed at base and terminal position 1. chimney testing with passive stack ventilation systems, extract fans, radon extract fans, circulating fans, ceiling paddle fans etc. Issue 7 ACS.SMB 5

14. Chimney/flue assemblies for appliances open flue chimney installation - identify correct and incorrect installations: 1. cement based and/or metallic rigid: (i) flueing into a pre-lined chimney (clay lined) (ii) flue pipe adaptors (ridge tile adaptor boot) 2. flexible liners: (i) joining at base and at terminal position using appropriate adapters (ii) clamping at terminal position (iii) sealing of annular space with chimney 3. flexible metallic flues inc. room sealed or closed flue alternatives: (i) flue pipe jointing 4. fan draught chimneys: (i) number of bends within flue length is to MIs (ii) calculate ventilation for a vertex flue 1. condensing appliance flues 2. effects and hazards of inadequately sealed flue liners 3. incorrect applications of flue liners 4. identify difference between vertex flues and vertical balanced flues Issue 7 ACS.SMB 6