OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

Similar documents
OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

OPERATING INSTRUCTIONS MANUAL FLE-60 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE)

THC- 355DF (Dual Fuel)

THC-175DF INDUSTRIAL / COMMERCIAL SPACE HEATER. Certified to / Certifié à CGA 2.14 M2011 Conforms to / Conforme à ANSI std Z83.

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-400T DUAL FUEL CONSTRUCTION HEATER

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-1500T DUAL FUEL CONSTRUCTION HEATER

THC 85N / 175N INDUSTRIAL / COMMERCIAL SPACE HEATER

THC 85 / 175 INDUSTRIAL / COMMERCIAL SPACE HEATER

THC 85N / 175N INDUSTRIAL / COMMERCIAL SPACE HEATER

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) F-1000T DUAL FUEL CONSTRUCTION HEATER

THC 85 INDUSTRIAL / COMMERCIAL SPACE HEATER

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

VF/VG700 Jumbo. Construction Heater. Installation and Maintenance Manual

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

1. GENERAL SAFETY RULES

P4000 Construction Heater

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference)

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Construction Heater. Installation and Maintenance Manual

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

DIESEL/PARAFFIN HEATERS

S150 S300 CONSTRUCTION HEATERS. Rev: August 15, 2008 SERVICE AND MAINTENANCE MANUAL No PLEASE RETAIN FOR FUTURE REFERENCE PRODUCTS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) For FVO-400TRLT INDIRECT FIRED HEATER TRAILER

PARAFFIN/DIESEL HEATER

W Model 1RKU2 w/optional Wall mount. Unit Model Weight (Lbs) Kilowatts Volts- Phase Amps Fan Output Heat Output

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) For FVO-1000TR INDIRECT FIRED HEATER TRAILER

Installation and Maintenance Manual Please retain this manual for future reference.

DF400/DF600. Construction Heaters. Installation and Maintenance Manual

Installation and Maintenance Manual Please retain this manual for future reference.

CYLINDER NOT INCLUDED

1800(L) Construction Heater

IMPORTANT INSTRUCTIONS READ & SAVE

INSTALLATION AND OPERATION INSTRUCTIONS FOR SAFETY INFORMATION WARNING

IMPORTANT INSTRUCTIONS READ & SAVE

OPERATING INSTRUCTIONS AND OWNER S MANUAL

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

INSTALLATION AND OPERATION INSTRUCTIONS FOR BI-DEEP UNITS

Installation and Maintenance Manual Please retain this manual for future reference.

INSTALLATION AND OPERATION INSTRUCTIONS FOR WALL-MOUNT AND BUILT-IN UNITS

KEROSENE FORCED AIR HEATER

IMPORTANT INSTRUCTIONS READ & SAVE

Chromalox. Installation, Operation. Portable Industrial Unit Blower Air Heater Types SDRA and SDRA-RG RENEWAL PARTS IDENTIFICATION

ML180UH SERIES GAS FURNACE WARNING WARNING

INSTALLATION AND OPERATION INSTRUCTIONS FOR WALL-MOUNT AND BUILT-IN UNITS

INSTALLATION AND OPERATION INSTRUCTIONS FOR

USER'S MANUAL PGE Single Package Rooftop

PUREPOWER SERIES CENTRAL VACUUM POWER UNITS PP500, PP600 & PP650

PROPANE CONSTRUCTION HEATER

OPERATING INSTRUCTIONS AND OWNER S MANUAL

INSTALLATION & OPERATING INSTRUCTIONS FOR CEILING MOUNT AIR HANDLERS AC SERIES

OPERATING INSTRUCTIONS AND OWNER S MANUAL

PROPANE CONSTRUCTION HEATER

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

Panel Fan Series Operators Manual (Galvanized and Polymer)

positions, side by side, end to end and Tee configurations. and utility pedestals

Quest Power Electric Heat EHS 31 Pro

OPERATING INSTRUCTIONS AND OWNER S MANUAL

Installation & Maintenance Instructions

Motion Sensor Oscillating Heater with Digital Control

INSTALLATION AND OPERATION INSTRUCTIONS FOR ZERO CLEARANCE AND INSERT UNITS

WARNING FIRE OR EXPLOSION HAZARD.

IMPORTANT INSTRUCTIONS READ & SAVE

CRV Clean Room Vacuum

INFRARED ZONE HEATING SYSTEM

Quest Power Electric Heat EHS 62 Pro

SLP98UH SERIES VARIABLE CAPACITY GAS FURNACE WARNING WARNING

User s Manual & Operating Instructions Model Number MH-150NGT-GFA-A

WIDE AREA VACUUM MODEL PF2030 WARNING: OPERATOR MUST READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE OPERATING THIS EQUIPMENT.

40E ELECTRIC FAN HEATER

DIGITAL QUARTZ INFRARED HEATER. Model No.: SPP1500SBH

P.O. Box , Dallas, TX USER'S INFORMATION MANUAL Single-Stage Warm Air Gas Furnaces

ZG Shown READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

IMPORTANT INSTRUCTIONS READ & SAVE

WARNING. PROPANE FORCED AIR HEATER User s Manual & Operating Instructions. Safety Information

EL195UHE SERIES GAS FURNACE WARNING WARNING

HX150 OPERATOR S MANUAL. 150 kw HEATER

HX18 Heater. Read all instructions before using the heater. Contents

Installation & Maintenance Instructions

USERS INFORMATION MANUAL

Serial #4277 and Beyond

OPERATING INSTRUCTIONS AND OWNERS MANUAL GAS-FIRED INFRA-RED TANK TOP HEATER

INSTALLATION AND OPERATION INSTRUCTIONS

BK17 Heater. Read all instructions before using the heater. Contents

Owner s Manual Phoenix FireBird

User s Information Manual

WARNING FIRE OR EXPLOSION HAZARD.

Electric Fireplace Insert with Heater OWNER S MANUAL Model No. FP404R-Q

MANUAL WARNING FIRE OR EXPLOSION HAZARD. SL280UHNV SERIES WHAT TO DO IF YOU SMELL GAS:

User s Manual & Operating Instructions Model Number MH-375T-GFA-A

Gallery Electric Fireplaces

238 Series. Industrial/Commercial Electric Unit Heater. Owner s Manual

FSA-Series Heavy-Duty Flat panel Emitter Architectural Electric Overhead Infrared Heaters

Model PF 2030 Wide Area Vacuum Cleaner

USER S INFORMATION MANUAL

OPERATING INSTRUCTIONS FORCED AIR PROPANE CONSTRUCTION HEATERS

CWA2 Chilled Water Fan Coil With or Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000-60,000 BTUH

DR-180 Through the Wall Exhaust Fan PRODUCT MANUAL & INSTALLATION GUIDE

Transcription:

OPERATING INSTRUCTIONS MANUAL FLE-150 INDUSTRIAL / COMMERCIAL ELECTRIC HEATER (OPERATOR MUST RETAIN FOR FUTURE REFERENCE) Suitable for indoor or outdoor installation / Unvented / Unattended Type 26 Benfield Drive, St.Catharines, Ontario Canada L2S 3V5 (P) 905-685-4243 - (F) 905-685-0113

FLE-150 OPERATING INSTRUCTIONS MANUAL GENERAL HAZARD WARNING: FAILURE TO COMPLY WITH THE PRECAUTIONS AND INSTRUCTIONS PROVIDED WITH THIS HEATER, CAN RESULT IN DEATH, SERIOUS BODILY INJURY AND PROPERTY LOSS OR DAMAGE FROM HAZARDS OF FIRE, EXPLOSION BURN ASPHYXIATION, OR ELECTRICAL SHOCK ONLY PERSONS WHO CAN UNDERSTAND AND FOLLOW THE INSTRUCTIONS SHOULD USE OR SERVICE THIS HEATER. IF YOU NEED ASSISTANCE OR HEATER INFORMATION SUCH AS AN INSTRUCTIONS MANUAL, LABEL, ETC. CONTACT THE MANUFACTURER WARNING: FIRE, BURN, INHALATION AND EXPLOSION HAZARD, KEEP SOLID COMBUSTIBLES, SUCH AS BUILDING MATERIALS, PAPER, OR CARDBOARD, A SAFE DISTANCE AWAY FROM THE HEATER AS RECOMMENDED BY THE INSTRUCTIONS NEVER USE THE HEATER IN SPACES WHICH DO OR MAY CONTAIN VOLATILE OR AIRBORNE COMBUSTIBLES, OR PRODUCTS SUCH AS GASOLINE SOLVENTS, PAINT THINNER, DUST PARTICLES OR UNKNOWN CHEMICALS WARNING: NOT FOR HOME OR RECREATIONAL VEHICLE USE

Introduction You have just received an FLE-150 150kW Electric Construction Heater manufactured by Flagro Industries Use: The FLE-150 Electric Construction Heater is designed for temporary heat only. The heater may be installed indoors or out and used to bring 100% outdoor air, or heat and re-circulate building air. The FLE-150 is designed to heat large spaces, buildings and machines without worrying about on site fuel. Quality: The FLE-150 is built with the highest quality of components, giving our customers the confidence they deserve in a Flagro product. Convenience: The FLE-150 gives our customers the flexibilty of a 60kW/90kW/150kW heat setting. The heater is equipped with a; fan speed inverter control that provides optimum temperature rise by adjusting blower output at each heat setting. Colour coded Cam Lock power connections for easy installation. Remote thermostat option available. Safety Always verify that you have proper voltage supply. (480V) It is important to check the wiring connections inside the heater before plugging in the Cam Locks. Use a meter to measure volt supply to each cam lock. Work on the internal systems should only be attempted by a certified electrician and only when power has been disconnected and can not be reconnected to the heater. Grounding The heater is supplier with a cam lock system with a grounding connection and is indicated with a "G" on the cam lock panel. The heater is also supplied with a grounding nuts found on all panels. It is very important to double check that all grounding connections are properly secure. Clearance from Combustibles The discharge temperature of these units may reach very high temperatures. Maintain minimum distance from combustible materials as follows: Top: 6 Inches Bottom: 6 Inches Sides: 6 Inches Discharge: 15 FT

MAINTENANCE 1 Every heater should be inspected before each use, and at least annually by a qualified service person 2 The appliance must be kept clear and free from combustible materials, gasoline and other flammable vapors and/or liquids 3 The flow of ventilation air must not be obstructed. Be sure to check the fan assembly and ensure the motor and blade are operating properly. 4 Compressed air may be used to keep components free of dust and dirt build up. Pre-Start Checklist 1 Heater must be level and lockable wheels must be in the lock position 2 Make sure blower switch and both heat selection switches are in the "OFF" positions 3 Make sure the air intake is free from any obstruction(s) 4 Make sure the heater oulet is free from any obstruction(s) 5 Make sure the heater is properly grounded 6 Check power supply voltage and ampacity

START UP INSTRUCTIONS 1 Determine power source - 480V (confirm power source is correct) 2 Remove top cover and inspect all wiring (once complete, secure top cover to heater using the same hardware) 3 Connect Flanged Camlocks to female camlocks ( colour coded) Connect camlocks as follows: Red A Black B Blue C Ground G 3 PHASE UNIT CONNECTION 4 Turn on power supply 5 Pull "Master" button to the out position 6 Determine "Manual" or Remote Thermostat (if remote, set desired temperature) 7 Turn Blower on/off switch to the "ON" position (The blower will start and the green air flow light will come on) 8 Turn on heater settings as desired ( 150kW= 60kW & 90kW combined) Failure to have proper air flow will cause unit to overheat and shut down The green light should come on and air should be pushed through the outlet port Check to see that only the green light is on. Caution: Heater body panels will get very hot

Notes: Speed inverter is pre-set for optimum air flow/temperature rise. Based on kw selection, blower will adjust speed. See Chart below HEAT SETTING BTUH CFM TEMP. RISE NOISE RATING 150 kw 512,000 5300 138F 79 DB 90 kw 307,000 4650 101F 76 DB 60kW 205,000 4100 67F 73 DB FAN ONLY 6800 N/A 85 DB 1 Move all heat control setting to the "OFF" position 2 Leave Fan in the "ON" position for 3-5 minutes SHUTDOWN 3 Turn Fan OFF ( blower is preset to run for 30 seconds before coming to a complete stop) 4 Push Master button "IN" 5 Shut off all power source 6 Disconnect all power sources 7 Store heater

TROUBLE SHOOTING PROBLEM PROBABLE CAUSE REMEDY PARTS Heater will not start No power to unit Make sure Master pull button is in the out Controller display does not position. illuminate Check voltage at main power supply and circuit breaker. Blown fuse(s) Check control panel fuses, replace if necessary. Main circuit breaker tripped Reset main circuit breaker. FUSES Blower runs, no heat kw setting is in the off position(s) Move kw swtich to apppropiate kw setting Thermostat option not selected properly If in the remote position, thermostat may not be plugged in properly Check thermostat setting position Check thermostat plug to make sure it is Plugged in securely Remote thermostat set too low Adjust thermostat control Sail switch out of adjustment or defective Check for air flow obstruction. Check belt tension. Replace sail switch if required Defective controller Check controller and replace if needed

26 Benfield Dr. St.Catharines, Ontario Canada L2S 3V5 (O) 905-685-4243 (F) 905-685-0113 HEATER SPECIFICATIONS MODEL Power Requirements MAXIMUM INPUT (KW) BLOWER FLE150 480V/575V 512,000 btu 7 1/2 H.P. TEMPERATURE RISE (above ambient) 60KW 67 F 90KW 101 F 150 KW 138 F AMP DRAW MOTOR 7 AMPS 60KW 90KW 150KW 64 AMPS 97 AMPS 161 AMPS DB (noise level) FAN ONLY 85 60KW 73 90KW 76 150KW 79 INLET SIZE OUTLET SIZE (Designed for 20" Dia. Ducting) 16" Dia. 20" Dia. DIMENSIONS 40 X 58 X 33 H X L X W (IN.) WEIGHT AIR CIRCULATION 560 LBS 6800 CFM

PARTS LIST FOR FLE-150 Part Number FLE-601 FLE-602 FLE-603 FLE-604 FLE-605 FLE-606 FLE-607 FLE-608 FLE-609 FLE-610 FLE611 FLE-612 FLE-613 FLE-614 FLE-615 FLE-616 FLE-617 FLE-618 Part Description 150KW RESISTOR ELEMENT FAN BLADE ASSEMBLY FOR FLE-150 1-1/2 HP MOTOR FOR FLE-150 VARIABLE SPEED DRIVE FOR FLE-150 WIRED CONTROL/OPERATOR PANELS ADJUSTABLE MOTOR BASE 7" FAN PULLEY FOR FLE-150 3.25" MOTOR PULLEY FOR FLE-150 6" LOCKABLE SWIVEL CASTER FOR FLE-150 6" RIGID CASTER FOR FLE-150 BLUE MALE PANEL CAM-LOCK FOR FLE-150 BLACK MALE PANEL CAM-LOCK FOR FLE-150 GREEN MALE PANEL CAM-LOCK FOR FLE-150 RED MALE PANEL CAM-LOCK FOR FLE-150 BLUE FEMALE DETACHABLE CAM-LOCK FOR FLE-150 BLACK FEMALE DETACHABLE CAM-LOCK FOR FLE-150 GREEN FEMALE DETACHABLE CAM-LOCK FOR FLE-150 RED FEMALE DETACHABLE CAM-LOCK FOR FLE-150