Slope Stability Management Framework

Similar documents
edmonton.ca/ribbonofgreen #ribbonofgreen

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS

Describing the Integrated Land Management Approach

Objectives and Strategies for the Integration of Recreation, Parks and Open Space in Regional Plans

Toronto Complete Streets Guidelines

Stormwater in a Liveable City Towards an Evidence Based Policy Framework. Associate Professor Phillip Johnstone

CITY COUNCIL AGENDA REPORT

APPENDIX F: EXTERNAL APPROVALS

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Taché Promenade Tuesday, October 17, 2017

Park Board Strategic Framework. (Mission, Vision, Directions, Goals and Objectives) June 27, 2012

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

implementation r expression in landscape

Land Use Regional Planning in Alberta Collaborating with Stakeholders

Best Practices Appendix: Waterfront Communities

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

Town of Vershire Road Erosion Inventory Report

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Summary of Heritage Input

Green Infrastructure Recommendations For Parks and Public Spaces

CHAPTER 2: PLANNING PRINCIPLES

Branch Fire Rescue Services

HISTORICAL AND ARCHAEOLOGICAL RESOURCES POLICIES

HALIFAX GREEN NETWORK PLAN

APPENDIX L3. Table of Contents. SWP EA Information Sheets

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Green Infrastructure. by Karen Engel, NYS DEC. NYS Department of Environmental Conservation

Biodiversity Action Plan Background Information for discussion purposes

City of Hermosa Beach Administrative Policy #

Nothing lasts forever planning for successful mine closure

WARM SPRINGS PARK MASTER PLAN

CITY VIEW OBJECTIVES

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

The West Vaughan Employment Area Secondary Plan Policies

c. DTAH Toronto Complete Streets Guidelines

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

Upper Smith Creek Comprehensive Development Plan (File: CDP 14-01) TERMS OF REFERENCE

HAZARD MITIGATION GOALS AND OBJECTIVES

OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE

Planning Considerations for Wildlife Passage in Urban Environments. (Prepared by Tony Clevenger, PhD)

AILA CPD TREE OF KNOWLEDGE DESIGNING AND CONSTRUCTING

Scarborough Waterfront Project

Commissioners Road West Realignment Environmental Assessment

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

The following principles guide the development of goals and strategies to protect and promote these amenities:

SECTION E. Realizing the Plan

APPENDIX C: HILLSIDE DEVELOPMENT REGULATIONS (prev. Ordinance #2008-1)

Policy Manual. Municipality of North Cowichan DEVELOPMENT SERVICES

Spencer Environmental 3.0 METHODS

Executive Summary. Parks and Recreation Plan. Executive Summary

QUARRY REHABILITATION PLANS Specifications (version 1.3)

A Joined-up Regional Landscape: A Roadmap to connect the parts

Implementing sustainable water strategy through development industry engagement

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

HAMLET OF KINGMAN AREA STRUCTURE PLAN

This page intentionally blank.

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

CITY OF LANGLEY OFFICIAL COMMUNITY PLAN BYLAW, 2005, NO APPENDIX II - REGIONAL CONTEXT MAP

THE REGIONAL MUNICIPALITY OF YORK BYLAW NO A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York

GUIDELINES FOR ECOLOGICAL PERFORMANCE

DRAFT MAP AMENDMENT FLU 04-4

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

Redevelopment Plan for the Former South Gifford Road Landfill

A New Plan For The Calgary Region June calgary.ca call 3-1-1

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Transportation Systems and Utility Infrastructure

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

6. RECREATION AND OPEN SPACE ELEMENT

River Corridor Overlay Zone (RCOZ) Article 5

POLICY SRT/D4 STORMWATER MANAGEMENT

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Green Infrastructure Project Guidance

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Appendix A. Planning Processes. Introduction

CANADIAN GUIDE FOR GREENER ROADS AND SUSTAINABILITY CONSIDERATIONS FOR BRIDGES GUIDE 2016 CANADIAN CONSULTING ENGINEERING AWARDS

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Evaluation Criteria. Detailed Evaluation Criteria

2017 Canadian Consulting Engineering Awards

6Natural. Environment Development Permit Guidelines

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Complete Neighbourhood Guidelines Review Tool

3 Urban Design and the State Highway Network

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

CALGARY: City of Animals Edited by Jim Ellis

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Rapid Transit Implementation Working Group September 14, 2017

BETTER URBAN PLANNING

Central Lake Ontario Conservation Conservation Lands Master Plan

Sustainable Road Design And Multimodal Roads. Presented by: Sheina Hughes

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

Transcription:

Slope Stability Management Framework For the assessment, evaluation, prioritization and mitigation of slope stability concerns. 2013/06/19 The Slope Stability Management Framework provides guidance to City administration to assess slope stability risks to public safety, City owned land and City owned infrastructure; and determine the most appropriate course of action in accordance with the Slope Stability Management Policy. p. 1

Table of Contents BACKGROUND... 3 PURPOSE... 3 SCOPE... 3 DEFINITIONS... 3 PART I. SLOPE STABILITY CONCERNS ON CITY LAND... 4 The City s actions... 4 Project stages... 4 Project Funding... 6 PART II. SLOPE STABILITY CONCERNS ON PRIVATE LAND... 7 The City s Actions... 7 Investigation... 7 Private Property Owner s Responsibilities... 8 Preventive Strategies by Private Land Owners... 8 SCHEDULE A - POTENTIAL MITIGATION MEASURES AND TBL CONSIDERATIONS... 9 SUPPORTING POLICIES AND DOCUMENTS... 10 p. 2

BACKGROUND The Slope Stability Management Framework (the Framework) provides guidance to City Administration to assess slope stability risks to public safety, City infrastructure, City owned land (City land) or adjacent private land and determine the most appropriate course of action in accordance with the Slope Stability Management Policy (the Policy). The Framework also includes a list of strategies for private land owners as a guide to help reduce the effect of slope stability concerns on their land. The Framework is available at calgary.ca or by contacting 3-1-1. PURPOSE The Framework is intended to: support the implementation of the Policy by guiding the assessment, prioritization, evaluation, and mitigation of slope stability concerns address slope stability concerns in a consistent, cost-effective and timely manner in accordance with the Slope Stability Policy and other City policies and practices inform citizens of the risks of instability on natural slopes and adjacent lands, and inform them of their responsibilities on their lands related to slope stability SCOPE The Framework applies to City land where slope stability may pose a risk to public safety, City infrastructure or City land; and to privately owned land where slope stability may pose a risk to public safety. DEFINITIONS For the purposes of the Framework: City infrastructure means to manmade assets owned and maintained by The City including but not limited to utilities, roads, sidewalks, pathways, bridges, and sport fields. Factor of Safety or FOS means a calculated ratio commonly used to indicate the stability of a slope. The FOS is the ratio by which the strength of the soil exceeds the strength required to prevent a failure. A FOS greater than one indicates that the soil strength is greater than that required to prevent failure. A FOS less than one indicates the slope is unstable. mitigation measure(s) means any actions taken in order to lessen or eliminate identified slope stability risks to public safety, City infrastructure, City land or adjacent private land. risks to public safety means a safety concern arising from slope instability within City land or private land. slope stability concern means shallow or deep seated slope failures, tension cracks, localized slumping, slope surface erosion, river bank erosion or scour, and other concerns typically associated with slope stability. p. 3

PART I. SLOPE STABILITY CONCERNS ON CITY LAND The City s actions The City will: Conduct an initial assessment of reported slope stability concerns and seek to mitigate public safety concerns as a first priority. Conduct the appropriate level of technical review of slope stability concerns that have the potential to affect public safety, City land or infrastructure. Use the Triple Bottom Line (TBL) approach to evaluate a range of potential options and determine the most appropriate course of action, considering slope stabilization may not be appropriate. Consider allowing slope movements to occur naturally and reassess the slope as conditions change where risks to public safety can be mitigated. Seek to mitigate slope stability risks and prevent damage to City land and infrastructure focusing on public safety and City infrastructure essential for day-to day operations. Project stages When slope stability concerns arise on City land, The City will conduct an initial site assessment to determine potential next steps. Not all identified concerns will become slope stability projects. The typical stages of large projects are described below. Figure 1: Slope stability project stages 1. Identify Concerns Slope stability concerns may be identified by the City or by the public. The public can report non-emergency slope stability concerns by calling 3-1-1. Emergency situations should be reported to 9-1-1. Once a concern is identified, The City will determine if the reported concern is related to slope stability, threatens public safety and requires an initial site assessment. Outcome: Concerns requiring assessment will move on to the next stage based on their priority. 2. Initial Site Assessment Public safety is the primary concern at this stage. The City will conduct an initial site assessment, which may include a high-level review of the following: p. 4

potential public safety concerns magnitude of the concern potential effects on City land and City infrastructure potential effects on adjacent land owners potential cause(s) site history existing and past concerns other relevant information Outcomes: The City will address safety concerns immediately and seek to prevent further damage to City land and infrastructure. The City will determine if a formal investigation or another action is required. Timing of the investigation will depend on project priority and funding availability. Safety concerns which may vary from tripping hazards to loss of life can be addressed through erosion mitigation, amenity or infrastructure closures, detours, evacuations, emergency repairs or other appropriate measures. 3. Formal Investigation Formal investigations or technical reviews are intended to evaluate potential risks from a geotechnical perspective, identify potential public safety concerns, assess the risk of slope failure, identify potential effects on City land and infrastructure, determine potential causes of the slope instability, and provide recommendations for potential mitigation measures. Structural, hydro-geological, archaeological, environmental and biophysical studies may also be required by municipal, provincial and federal policies and legislation depending on the type and location of the concern. Investigations will be typically conducted by qualified external consultants, such as a civil or geotechnical engineering firms registered with the Association of Professional Engineers and Geoscientists of Alberta (APEGA). Consultants will work closely with City business units who own or operate affected lands or assets throughout the project. Decision on potential mitigation measures and next steps will take into account the TBL considerations listed in Schedule A. Outcomes: Communication with municipal, provincial and federal regulatory agencies, and the public as required. Selection of potential mitigation measures that fit with existing policies and regulatory requirements o The project may move to conceptual design based on project priority and funding availability, if required. o When engineering design is not required, the project may move directly to implementation based on project priority and funding availability p. 5

o When the selected measure is to allow the slope movement to occur naturally and reassess the slope as conditions change, The City will communicate the decision to affected stakeholders 4. Conceptual Design Qualified consultants will prepare conceptual designs potential measures under consideration. The City will evaluate each potential measure taking into account the TBL considerations listed in Schedule A. Outcomes: Evaluation of potential measures and selection of best mitigation measure(s) The project may move to detail design based on project priority and funding availability 5. Detailed Design Qualified consultants to create a detailed design of the selected mitigation measure(s). The design will serve as the basis on which to conduct a more detailed review of economic, social, environmental and other considerations, which may alter the course of the City s actions or the design of the final mitigation measure and its priority. Outcome: Move to implementation of the mitigation measure(s) based on project priority and funding availability 6. Implementation Mitigation measures will be implemented on a priority basis as budget allows, in compliance with municipal, provincial and federal legislation, guidelines, policies and best practices. Projects will typically be implemented by a qualified contractor after a tendering process in accordance with City policies. The City may implement a project in stages to manage the available budget. Project Funding Costs to mitigate slope stability concerns may include geotechnical borehole drilling, scientific analysis, geotechnical investigations, engineering design and construction. Costs vary depending on the type, location, cause, site accessibility, and other factors. Slope stability projects on City land are mainly funded through Capital Program 129-45: Hillslides which is currently allocated $500,000 per year. The current budget level is sufficient for preliminary geotechnical investigation however; it is insufficient for the average project work required. High priority projects requiring additional budget are brought to Council on a case by case basis. Slope instability resulting in damage to City infrastructure as a direct result of an extreme weather may be totally or partially funded by Disaster Recovery Program (DRP) provincial p. 6

funding subject to the eligibility criteria and project guidelines set forth by the Government of Alberta. Each eligible project is reviewed by the provincial government on a case-bycase basis. PART II. SLOPE STABILITY CONCERNS ON PRIVATE LAND There are natural risks associated with stability of slopes and adjacent land. The City strives to mitigate the risks associated with slope instability by restricting development to areas with a FOS of at least 1.5. However, the slope instability risks cannot be completely eliminated. There is a desire by the public to own land adjacent to natural slopes due to the land s aesthetic value. This section provides information on the Policy as it applies to private property, and includes additional information for property owners. The City s Actions The City will: Restrict new development to areas with an FOS of at least 1.5 to ensure urban development is reasonably safe from slope instability. Inform citizens of inherent risks of instability surrounding natural slopes and their responsibilities on their land related to slope stability through The City s website and other communication tools. Conduct the appropriate level of technical review and seek to mitigate slope stability concerns on private property where public safety or public infrastructure are at risk. The City may: Consider mitigating slope stability concerns where a City action, City land or infrastructure are the suspected cause of the concerns, if appropriate, having regard to all of the circumstances. Recognizing each situation is unique, conduct the appropriate level of investigation or technical review and collaborate with private land owners in order to mitigate slope stability concerns on private land on a case-by-case basis. Investigation In cases where as a result of investigation on City land, The City becomes aware of a potential safety concern on private property, The City may: share the results of existing investigations with the affected landowners and adjacent residents; advise the affected landowners and adjacent residents of inherent risks and their obligations; and assist land owners in their efforts to minimize damage to their lands by providing copies of historical geotechnical reports, site history, sharing other available relevant information, providing access to City lands and facilitate coordination of concurrent investigations on private property and City land. p. 7

The City will not investigate slope stability concerns on private property if the instability is a result of natural processes or the actions of private landowners including but not limited to: alterations to overland drainage due to erosion of the landscape, excessive irrigation, non-functional eaves troughs, and misdirected downspouts landscaping, improper lot drainage, or improper lot maintenance lot grading or construction without appropriate permits failure to comply with any applicable laws or regulation. One exception to this rule is when a failing slope has created a safety concern, in which case The City may issue orders against the owner to ensure that the properties are secured and returned to a safe condition. Private Property Owner s Responsibilities Land owners are responsible for addressing slope stability concerns on their own land and taking appropriate measures to mitigate or eliminate risks to persons and land. The City will not make recommendations or design solutions for issues on private land. Land owners should seek the advice of qualified professionals for recommendations or designs. Responsibilities of private land owners applicable to slope stability concerns include but are not limited to the following: maintain and remediate for drainage and erosion control on their lots investigate slope stability concerns mitigate risks and limit their damages comply with any and all applicable laws including but not limited to the Land Use Bylaw 1P2007, Drainage Bylaw 37M2005, Occupiers Liability Act, Building Code and Fire Code, including any orders issued thereunder to take remedial actions comply with any and all geotechnical covenants, setback requirements and other restrictions registered on their land title do not alter or deviate from approved grading or drainage plans. Preventive Strategies by Private Land Owners Land owners should be aware of how their actions may affect slope stability. The following list is offered as a guide to help reduce the effects of slope stability concerns but is not definitive: obey all infrastructure closures and detours for your own safety avoid infiltration of overland water onto slopes avoid unauthorized irrigation, landscaping, grading, excavation or other alteration of natural land and vegetation seek professional advice for lot grading, landscaping, construction and alteration of retaining walls and any other alteration of slopes; and p. 8

avoid placement of loads including loose soil and debris over the side of, and atop slopes Private land owners who are unsure how to maintain their site and prevent slope stability concerns over the long term, should seek the advice of qualified professionals. SCHEDULE A - POTENTIAL MITIGATION MEASURES AND TBL CONSIDERATIONS The City will consider a range of potential mitigation measures for each specific concern. The City may consider mitigation measures such as: Allowing slope movements to occur naturally and reassess the slope as conditions change where risks to public safety can be mitigated. bio-engineering erosion mitigation infrastructure repair, relocation, temporary or permanent closures, and decommissioning formal or informal slope monitoring; and slope stabilization Potential measures will be evaluated using a TBL approach. Examples of TBL considerations applicable to slope stability are listed below. Economic Considerations Life-cycle cost of existing and proposed infrastructure, including maintenance, replacement, relocation and decommissioning costs Efficient use of existing infrastructure and services Type and value of infrastructure affected such as utilities, roads, pathways, trails, and retaining structures Importance of infrastructure on delivering services to Calgarians Savings in energy, infrastructure, maintenance costs, land values, and reduction in demand for air and water pollution control measures associated with retaining natural areas and wetlands Social Considerations Risks to public safety Safety and reliability of City infrastructure Access to natural areas and recreational amenities such as open areas, sports fields, trails and pathways Preservation of the river valley and ravine system as a significant visual and natural amenity feature, and recreational opportunity for Calgarians Value of affected City land and infrastructure to the community s quality of life and healthy lifestyle Effect of slope stability on adjacent residents, area users and general public. p. 9

Aesthetics Stakeholder input Environmental Considerations Effect of slope stability on the natural environment Effect of potential mitigation measures on the natural environment Conservation of biodiversity, quality of life, communities and ecosystems Environmental protection of scenic landscapes, river valley park system, waterways and wetlands, natural tree stands and prominent escarpments Conservation, protection and enhancement water quality and quantity Efficient use of resources to reduce Calgary s ecological footprint Public access management for protection of natural areas Regulatory requirements for environmental protection Additional Considerations Compliance with Council approved policies and regulatory requirements Technical considerations such as site accessibility and construction methodology Current and future land use Current and planned area projects Land and easement requirements Site s history of slope instability Other site and context specific considerations SUPPORTING POLICIES AND DOCUMENTS 2020 Sustainability Direction. 2010 Calgary Natural Area Management Plan. 1994 Calgary Open Space Plan. 2002 Calgary Transportation Plan. 2009 Engage! Policy. 2003 Environmental Development Review Policy. 2006 Environmental Policy. 2007 Integrated Risk Management Policy. 2004 Municipal Development Plan. 2009 Municipal Government Act. Triple Bottom Line Policy Framework. 2011 Wetland Conservation Plan Policy. 2004 Slope Adaptive Development Guidelines Policy and Conservation Planning and Design Policy, 2009 p. 10