Protection Coordination Workshop. Robert W. Cummings Director of System Analysis and Reliability Initiatives

Similar documents
Reliability Fundamentals of System Protection

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

PRC (I) August 9, Authored by

Standard Development Roadmap

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

PRC-005. Tips and Updates. February 25th, Jonathan Hayes

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Transmission Relay Loadability

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard Development Timeline

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

Appendix B. FRCC regional application of the term transmission Protection Systems

Sudden Pressure Relays and Other Devices that Respond to Non-Electrical Quantities

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

NERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

TECHNICAL REPORT IEC/TR Fibre optic communication system design guides Part 11: Multimode launch conditions. Edition 1.

Working with Partners to Manage Recreation Sites. Dave Samson California Department of Water Resources

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

Classifying Forced Outages Transmission Maintenance Procedure No. 5

Standards and Safety Update

CFLRP 5-Year Ecological Indicator Progress Reporting EXPERT PANEL GUIDANCE

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

Agenda Summary December 11, 2017

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Relay Performance Index for a Sustainable Relay Replacement Program

Protection System Maintenance

Standard PRC Disturbance Monitoring Equipment Installation and Data Reporting

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Information and Project Plan Proposal for Home Depot Renovation Library

Research for the Development of Safety Standards

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

Engineering Design & Testing Corp./EDT Engineers, P.C.

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

The North American Electric Reliability Corporation ( NERC ) hereby submits

South of Eastern Strategic Direction Status Update

Resume For JOHN V. MARTIN

NFPA 1616 Standard on Mass Evacuation, Sheltering, and Re-entry Programs 2017 Edition. Dean Larson, Chair NFPA 1616

A Review of EU Legislation on EP&R

SolarPower Europe O&M Task Force

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance The Objective and Status of Part B

This is a preview - click here to buy the full publication

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

INTERNATIONAL STANDARD


INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

API RP 1175 PIPELINE LEAK DETECTION- PROGRAM MANAGEMENT WORKSHOP APRIL 26 TH AND 27 TH, 2017

Pathway to 2020 Protected Areas Workshop for New Brunswick

Research Needs for the Fire Safety Engineering Profession: The SFPE Roadmap CHRIS JELENEWICZ, P.E., FSFPE SFPE TECHNICAL DIRECTOR

IRO Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities

Sound Practice No.10. Achieving Fire Safety in the City of Makati

FIREFIGHTING RESOURCES OF CALIFORNIA ORGANIZED FOR POTENTIAL EMERGENCIES

Dennis Mullen System Operations Manager

National Grid Requirements for Interconnection of Parallel Generation

Presentation Title. Subtitle (optional) Wastewater Treatment Operations. O&M Contract Procurement. Vancouver City Council Workshop/Public Hearing

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Prince William County Rural Preservation Study

CANADIAN SOCIETY OF LANDSCAPE ARCHITECTS DRAFT STRATEGIC PLAN 2018_20. Approved by the CSLA Members at the date AGM

Aldershot GO Draft Mobility Hub Concepts. East Plains United Church September 13, :30 8:30 pm

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, JANUARY 11, 2017 AT 7:00 P.M. CITY HALL MEETING ROOM C MINUTES

TECHNICAL REPORT IEC/TR High-voltage direct current (HVDC) systems Application of active filters. Edition

STATE OF FLORIDA OFFICE OF THE GOVERNOR EXECUTIVE ORDER

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Supplementary Reference and FAQ

Preliminary Operations and Maintenance Plan Baron Winds Project

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Supplementary Reference & FAQ. Draft

2010 Plan of Conservation and Development

LANDSCAPE SCALE PLANNING AND SITING FOR SHALE DEVELOPMENT

AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION. Communications & Signals Functional Group PROCEEDINGS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Category for Proposal: Partner Forums

The Amazing Secret World of ISA Standards

TOP R4 Unknown Operating State

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Supplementary Reference and FAQ - Draft

DEFENSE LOGISTICS AGENCY HEADQUARTERS 8725 JOHN J. KINGMAN ROAD FORT BELVOIR, VIRGINIA

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

In November and December, SACOG staff conducted the following Blueprint Implementation land use activities:

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

INTERNATIONAL STANDARD

FACILITY CONNECTION STANDARD

THAT staff be authorized to proceed with the permanent road closure of Park Lane, within Hazelwood Cemetery.

A Canadian Initiative to advance Conservation, Connections, Collaboration and Leadership for Parks and Protected Areas

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

INTERNATIONAL STANDARD

Microgrid Fault Protection Based on Symmetrical and Differential Current Components

BOARD OF ADVISORS Biographies

i n S o u t h e r n M a i n e

ICLEI Webinar Sustainability in the Master Plan and Zoning Code

Transcription:

Protection Coordination Workshop Robert W. Cummings Director of System Analysis and Reliability Initiatives February 17-18, 2010

2 System Protection and Control Performance Improvement Initiative

The Initiative System Protection and Control Performance Improvement Initiative aka SPI Launched April 24, 2009 NERC Board recognition of the importance of system protection to reliability Goal: Improve BES reliability Purpose: Improve the performance of power system Protection Systems through fostering technical excellence in protection and control system design, coordination, and practices. 3

The Initiative Elevate System Protection and Control Task Force to Subcommittee status Increased emphasis on the importance of protection Collaborative efforts with: IEEE Power & Energy Society IEEE Power System Relay Committee Bridge between IEEE standards and NERC system performance requirements (in NERC standards) Coordinate Protection Standards Philosophies and Standards Work Technical basis for all protection standards changes Reduce discrepancies 4

SPI Targeted Areas 5 PRC Standards Technical Support SPCS to provide technical SME support to Standards process Relay Loadability Standard PRC-023 Relay Loadability passed by NERC Board February 2008, awaiting FERC approval Protection System Reliability (redundancy) SPCS Technical Reference Document & SAR Generator Frequency and Voltage Protective Relay Coordination Standards Project 2007-09 Generator Verification Drafting of Standard PRC-024-1 Generator Frequency and Voltage Protective Relay Settings

SPI Targeted Areas 6 Transmission and Generation Protection System Misoperations Technical review of PRC-004 -- Analysis and Mitigation of Transmission and Generation Protection System Misoperations Includes NERC-wide definition of protection misoperations for NERC reporting and system performance metrics Protection System Maintenance SPCTF 2007 Technical Reference Document on Protection System Maintenance Project 2007-17 Transmission and Generation Protection System Maintenance and Testing, PRC-005 in re-drafting phase

SPI Targeted Areas 7 Protection System Coordination Transmission Protection Coordination Support for revisions to PRC-001 Trans & Gen Protection Coordination IEEE PSRC collaboration SPCS Technical Reference Power Plant and Transmission System Protection Coordination support for revisions to PRC-001 BES System Performance & Protection Coordination with Generator Controls Improved modeling of governors and other generator controls New control models need to be applied Model validation to actual system performance essential

SPI Targeted Areas BES System Performance & Protection Coordination with Turbine/Boiler Controls Next thrust of the SPI Response to a leading trend in system disturbances Largely uncharted area for modeling by planners Discussions with industry experts and turbine control manufacturers on appropriate level of modeling (detailed modeling not appropriate) 8

9 Power Plant and Transmission System Protection Coordination

Background 10 Generation Transmission protection miscoordination accounted for 20 percent of the protection misoperations that were causal or contributory to significant disturbances (2005-2009) Technical Reference Document published in December 2009 Technical bridging document between IEEE Standards and Guides and NERC Standards Series of workshops and webinars

Technical Reference Document Team 11 Joe Uchiyama US Bureau of Reclamation Jon Gardell Quanta Technology Tom Wiedman Wiedman Power System Consulting Ltd., Corp. Murty Yalla Beckwith Electric Co. Inc. Jon Sykes PG&E (formerly with SRP) Hank Miller AEP Phil Winston Southern Company John Ciufo Hydro One (SPCS Chair) Phil Tatro NERC (formerly with National Grid) Bob Cummings NERC