Study Group WAGON USERS. Proposed amendments to GCU Appendices 9 and 11: No. 3

Similar documents
PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

T.Y.C. BROTHER IND. CO., LTD.

Knorr-Bremse Group. Presentation of EDT101. Working Group on Derailment Detection Rome, October 13 th 15 th, Knorr-Bremse Group

GASTEC QA. Approval Requirements 31-1

RAILWAY SAFETY SICODE. Derailment detector DTR. Bearing temperature detector.

Official Journal of the European Union C 97/11

Guidelines Cooperation between authorities under Articles 17 and 23 of Regulation (EU) No 909/2014

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

GASTEC QA. Approval Requirements 31-2

On , CCMC received a proposal from DIN for the creation of a new Technical Committee in the area of Food Authenticity (see Annex 1).

Oklahoma. 265: Incorporated national codes and standards The following national codes and standards are incorporated by reference:

Electrical Safety Policy and Management System

ELECTRICAL SERVICE TECHNICIAN EXAMINATION 12 September 2015 QUESTION AND ANSWER BOOKLET

Council of the European Union Brussels, 21 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

COMMISSION DELEGATED REGULATION (EU) No /.. of

Procedure for the Approval of New Fire Detection and Alarm Technologies

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012

GASTEC QA. Evaluation Guideline KE 191. Amendment A1 Excess flow valves. KE A1 March 2012

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

COMMISSION DELEGATED REGULATION (EU) /... of

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Drexel Heights Fire District 2012 International Fire Code Amendments

Installation instructions. For the heating engineer. Installation instructions. timeswitch VTS 160 GB, IE

COMMISSION DELEGATED REGULATION (EU) /... of

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Co-ordination of the Group of Notified Bodies for the Construction Products /Regulation 305/2011/EU

Hot Axle Box Detectors - Siting

Shipboard incinerators with capacities up to 4000 kw

Narrative Reports As Regulated by 780 CMR, Section 903.0

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

Dear Customer. Section Old F8 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM. Standards Training SANS 369 ORIGINATOR

SAFETY MANUAL. PointWatch Eclipse Infrared Hydrocarbon Gas Detector Safety Certified Model PIRECL

Council Directive 93/68/EEC of 22 July 1993 amending Directives

Table of correspondence between ISO :2003, ISO :2003, ISO :2007 and the new ISO 12100:2010. Date of document

Certificate of Conformity Certificate num. Registration date Version Valid until

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

E/ECE/324/Rev.1/Add.27/Amend.5 E/ECE/TRANS/505/Rev.1/Add.27/Amend.5

DIRECTIVES. DIRECTIVE 2009/142/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 30 November 2009 relating to appliances burning gaseous fuels

ISO Submissions on Revised Working Draft (N 348)

Immersion heating type FL65.. PTB 97 ATEX 1027 X. March thuba Ltd. CH-4015 Basle Telefon Telefax

FIRE CONTAINMENT AND CONTROL SYSTEMS

GROUNDING AVOIDANCE SYSTEM (GAS)

Revision process of EN 45545

GUIDELINES FOR THE CLASSIFICATION OF USED ELECTRICAL AND ELECTRONIC EQUIPMENT IN MALAYSIA

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

Compilation of regulatory approaches used in various countries. Information received by the Secretariat through a survey in 2009

COMMISSION DELEGATED REGULATION (EU) /... of

Immersion heating type IN 16.. PTB 99 ATEX 1009 U. May thuba Ltd. CH-4015 Basle Telefon Telefax

Regulation (EC) 1272/2008 on Classification, labelling and packaging. (CLP Regulation) DG Environment

ARTICLE 25. FUEL GAS CODE

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

Requirements for ships carrying hydrogen and compressed natural gas vehicles

Part 1 Scope. Part 2 Definitions

GASTEC QA. Approval Requirements 6

ASSOCIATION POUR LA CERTIFICATION DES MATERIAUX ISOLANTS

EUROPUMP ATEX Guideline Part II

STANDARDS UPDATE NOTICE (SUN) ISSUED: March 19, 2018

Report on the activities of the ATEX consultant. Xavier Lefebvre. Contract : CENELEC/NA Consultant/2013-1

1. Which national directives/laws control the placing on the market of equipment for explosive atmospheres?

Operating instructions

A Notification under Article 12 of Regulation (EU) No 1025/2012 1

TECHNICAL BULLETIN No: 0040

26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

ST. VINCENT AND THE GRENADINES

ECE/TRANS/180/Add.5/Amend.1

Australian Standard. Degrees of protection provided by enclosures (IP Code) AS IEC Ed 2.1:2001 AS 60529

NEC ROP/ROC Code Making Panel Meetings

IMO COMPREHENSIVE REVIEW OF THE FIRE TEST PROCEDURES CODE

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS

Council of the European Union Brussels, 5 September 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

PART 3 REQUIREMENTS FOR SPRINKLER SYSTEMS and SPRINKLER INSTALLERS

Rules for Classification and Construction Additional Rules and Guidelines

(recast) (Text with EEA relevance) out the conformity assessment procedure. Conformity 20 February 2014.

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

NZQA unit standard version 1 Page 1 of 6. Install, maintain and repair of telecommunications optical fibre network infrastructure

EUROPEAN UNION. Brussels, 13 February 2014 (OR. en) 2011/0357 (COD) PE-CONS 54/13 ENT 190 MI 550 CONSOM 128 COMPET 470 CODEC 1481

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

Verification & Testing for Conformity Assessment / EC Verification. NB-Rail (ERTMS Group)

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment

Regulation 574_2014: Annex III CPR. and. Regulation 568_2014: Annex V CPR

GASTEC QA. Approval Requirements 136

Australian Standard. Automatic fire detection and alarm systems System design, installation, and commissioning AS

Loss Prevention Standard

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland

SAFETY MANUAL. Multispectrum IR Flame Detector X3301

Survey of electrical equipment installed in hazardous areas on tankers

CE marking of fire-resistant doors the right way!

Assessment of plans. DI Thomas Knoll Knoll Planung & Beratung Vienna, Austria

ISO INTERNATIONAL STANDARD. Fire-resistance tests Elements of building construction Part 1: General requirements

The new Gas Appliances Regulation (EU) 2016/426

ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993

CERTIFICATE OF FIRE APPROVAL

Transcription:

Proposed amendments to GCU Appendices 9 and 11: No. 3 Record of amendments Amended by Date Paragraph Amendment Jean-Marc Blondé 4 February Entry Jean-Marc Blondé 19 February Modifications following to WG TI held in Paris on 05/ WG TI Decision 19 February - Following to the minutes of WG TI held on 5/ Title: Proposed amendment made by: RU / keeper / other body Proposed amendment concerns: Proposer: Entry of a new fault code for derailment detectors, codes 3.3.1.2 to 3.3.1.4 SBB Cargo annexe 9 annexe 11 Jean-Marc Blondé Service technique des Wagons Location, date: Basle, 25/3/ Concise description: New code 3.3.6 derailment detector 1. Starting-point (current situation): 1.1. Introduction It is necessary to report to the keeper any anomalies affecting the status of the derailment detector in order to reduce the potential risk of derailment.

1.2. Mode of operation - 1.3. Anomaly / description of problem Appendix 9 does not currently have a damage code incriminating the position of the derailment detector. 1.4. Does this concern a recognised code of practice* (e.g. DIN, EN)? No Yes (state which): UIC Code 541-8, edition 06/2007 * Code of practice: a written set of rules that, when correctly applied, can be used to control one or more specific hazards." (source: Regulation EC 352/2009, Article 3) "Technical provisions laid down in writing or conveyed verbally and pertaining to procedures, equipment and modes of operation which are generally agreed by the populations concerned (specialists, users, consumer and public authorities) to be suitable for achieving the objective prescribed by law, and which have either proven their worth in practice or, it is generally agreed, are likely to within a reasonable period of time" (translation/source: BMJ Handbuch der Rechtsförmlichkeit German Ministry of Justice) 2. Target situation 2.1. Elimination of anomaly/problem (goal) Introduction of damage code 3.3.6 Derailment detector on the basis of UIC Code 541-08, edition dated June 2007. It must be inserted in Section 3.3, because this Section applies to both the pneumatic element (brake pipe) and the pneumatic surveillance system

3. Additional text (relates only to proposed amendments to GCU Appendix 9): We request for the code 3.3.6 in Annex 1 of Appendix 9 as per the table below: Component Code no. Irregularities/Criteria/Notes Actions to be taken Category Pneumatic part 3.3 3.3.6 DET Annex 8: Handling of wagons 3.3.6.1 Derailment detector tripped Rectify + M, proceed according to Point 4 of Appendix 8 3.3.6.2 Detector not watertight Isolate the detector +M 3.3.6.3 Detector s connection hose not watertight Rectify + M, if impossible: remove 3 3 4 Point 4: equipped with a derailment detector Tracing a tripped detector: When a tripped detector is detected, the wagon (all axles) must be examined in accordance with the check-list in order to determine the cause. If it has proved impossible to identify the cause, reset the display unit of the detector by pressing on the trip indicator. Detector not watertight (air leak) Isolate the detector using the isolation valve and replace it as soon as possible. - Isolation valve handle in a vertical position: DET tripped - Isolation valve handle in a horizontal position: DET not tripped Low pressure in the pipe (air leak): The wagon may not be moved except at the rear of the train and without the brake pipe being connected (the brake pipe and the brake are thus inoperable). Resetting: The detector does not reset itself automatically once the brake pipe is fully drained; this may therefore be refilled. These actions may be carried out using the isolation valve. The trip indicator (red flap) remains visible at all times and must be reset manually. After inspection of the wagon, the trip indicator (red flap) may be reset.

Appendix 9 Examination of the ability to run of wagons equipped with derailment detectors. Reference: Appendix 8, point 4, procedure concerning continuation of the movement following the tripping of a derailment detector Wagon check-list Inspection of wagon after tripping of DET 1. Wheel Check visually for any sign of damage. Check visually for any sign of damage, deformation or cracks on the running surface or on the flange 2. Axles / running gear Check visually for any sign of damage, deformation or cracks on the axles and the axle boxes 3. Bogie Check visually for any sign of damage, deformation or cracks on the bogies 4. Link between bogie and underframe Check visually for any sign of damage, deformation or cracks on the link between bogie and vehicle body. 4. Reason: No error code is currently foreseen for identification of an anomaly in the derailment detector. 5. Assess potential positive/negative impacts E.g. on operations, costs, administration, interoperability, safety, competitiveness, etc., using a scale of 1 (very low) to 5 (very high). Justify observations Positive impacts: Operations, Interoperability, Safety, competitiveness : this permits the code to be attached clearly to the derailment detector and ensures uniform utilisation of this damage code amongst the RUs: (Value:3) Impact on costs & administration is very low:(value:1)

6. Safety appraisal of proposed amendment Description of actual/target system, and scope of change to be made (see points 1 and 2). Safety appraisal done by : SBB Cargo, DB 6.1. Does the change made impact on safety? No Yes Reason: The presence of damage influences the capability of the wagon to operate 6.2. Is the change significant? No Yes Reason: see template. Attach the "significant change?" test template 6.3. Determining and classifying risk: deleted 6.3.1. Effect of change in normal operation: 6.3.2. Effect of change in the event of disruption / deviation from normal operation: 6.3.3. Potential misuse of system: No Yes (describe possible misuse): 6.4. Have safety measures been applied? No Yes For each type of risk, one of the following risk acceptance criteria is to be selected: Code of practice Use of reference system Explicit risk estimate 6.5. Has a risk analysis been submitted to the assessment body? No Yes Assessment body: Attach the verdict reached by the assessment body: [appendix]