SPRINKLER SYSTEM DRY WET

Similar documents
System Test Report CLEAN AGENT

FIVE YEAR AUTOMATIC FIRE EXTINGUISHING SYSTEMS CERTIFICATION REPORT

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Annual Water-Based Fire Protection Systems Inspection

Residential Fire Sprinkler Inspection

Report of Inspection/Test

New Construction Fire Inspection Process

Chapter 4: Fire Protection Systems

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

Skilled Healthcare Documentation Requirements Life Safety and Fire Protection

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 8 Annual Sprinkler System Inspection Revised

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Inspection Report Nursing Home Life Safety Code Section 4 - Annual Fire Alarm Testing and Maintenance. For

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

SUMMARY. Building receiving sprinkler credit: SPRINKLERED. Grade: 68. Percent of Building Sprinklered: 100% Sprinkler Demand Met: 91%

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

Sprinkler Inspection Certificate

Self Inspection Program

AUTOMATIC FIRE SPRINKLER SYSTEMS

GUILFORD COUNTY SCHOOLS

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

Inspection and Testing of Water-Based Systems

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Osceola County Department of Fire Rescue and Emergency Medical Services

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

Environmental Health & Safety

GENERAL AREAS OF INSPECTION

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

Backflow Prevention for Fire Sprinkler Systems. State of Illinois Plumbing Code

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

Building Life Safety Systems Testing

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

ARKANSAS FIRE PROTECTION LICENSING BOARD RULES & REGULATIONS. Applicable to FIRE PROTECTION SPRINKLER SYSTEMS Effective May 9, 2000

A Comprehensive Community Risk Reduction Initiative A COMPREHENSIVE COMMUNITY RISK REDUCTION INITIATIVE

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Prefunctional Checklist

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

*** Inspection *** Please identify yourself as a Cintas representative when arriving onsite.

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

PLAN REVIEW CHECKLIST

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

DISTRICT OF SECHELT. Inspection and Testing of Fire Protection Equipment Bylaw No. 397, 2002

9/15/ Cantara Lane Vista, CA (760)

Plan Review Check List Fire Alarm System

Deluge/Preaction Systems Annotated Instructor s Guide

Deluge/Preaction Systems Annotated Instructor s Guide

Resource, Support, Development, Inc. FIRE EVACUATION DRILL REPORT

Fire & Life Safety Requirements For Fire Department Access and Water Supplies

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

West Chester Fire Dept. Fire Code Maintenance Handbook. Fire Prevention Saves Lives and Property

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

FIRE INSPECTION CHECKLIST

Winnipeg Fire Department Fire Prevention Branch

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

Fire Safety Plan (Single-Stage Fire Alarm System) (Small Establishment):

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

USAutomatic Sprinkler Corporation

2. Welding Materials and Procedures shall conform to the ASME Code.

Fire Department Fire Prevention Inspection Services. HIGH RISE STRUCTURE Fire Inspection Program

Manufacturing safety solutions

Checklist For Life Safety

ICC CODE CORNER 2012 IFC Code & Commentary

NON-CYCLING REFRIGERATED AIR/GAS DRYERS QPNC 75 to QPNC 250 OPERATOR S MANUAL

To expedite the plan review and inspection processes, please refer to the information below.

APPLICATION FOR INSTALLATION OF SPRINKLER SYSTEM.,. :" ROCHESTER, NH FIRE DEPARTMENT FIRE PREVENTION DIVISION

Chapter 2: Identification, water and access

B. Section Identification for Fire Suppression Piping and Equipment.

Department of Public Safety

BERMAD Fire Protection

Evaluating Your Property and Work for Safety Hazards

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

City of Vista Fire Department

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

Established /10/2015. Doran Pruisner Dan Wood

Fire Sprinkler Plan Submittal Form

Common Fire Code Violation Checklist. Listed are some of the most commonly found fire code violations and should not be considered as all inclusive.

South Davis Metro Fire Agency

Full Service Central Station Fire Alarm Listing Evaluation

Fire Drill Requirements Group E Occupancies

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

A. This section includes design and performance information for fire protection and suppression systems.

Transcription:

Seattle Fire Department Confidence Test Report (use one form per sys.) 206-386-1448 Confidence Testing Officer 206-615-1068 (fax) 206-233-7219 Red Tag Hotline SPRINKLER SYSTEM DRY WET Status Given CONFIDENCE TEST REACCEPTANCE TEST RED YELLOW WHITE Occupancy Address: Occupancy Name: Responsible Person First & Last Name: Phone Number: Responsible Person Address, City, State, Zip: Responsible Party E Mail Address Technician s Name (Please Print legibly) SFD Certification No. SCP- Date of Test: Test Frequency: Annual Riser Valve Make: Riser Valve Model: System Identification No. System SFD ID No. (Call 386-1448 for this No.) Central station monitoring? Monitoring Required? Monitoring Company Name DEFICIENCIES FOUND? List items that were not corrected at the time of the confidence test. Use the Deficiencies section or attach itemized sheet REPAIRS: All deficiencies have been corrected Corrected By: SFD Certification Number: SCP System Status changed to White (including the tag on the system) This certifies that this fire and life safety system has been properly inspected for functional operation in accordance with the current Seattle Fire Code (SFC), Administrative Rules, and NFPA Standards adopted by the SFC for this system. The discrepancies found are noted in the report and have been reported to the building Owner/Manager for corrective action. Signature of Technician Phone # Name of Testing Company Building Representative (signature) Date Print Name and Title Direct Phone # Building Rep unavailable Building Rep declined to sign report THIS REPORT WILL BE SENT TO THE SEATTLE FIRE DEPARTMENT BY THE TESTING AGENCY IN ACCORDANCE WITH ADMINISTRATIVE RULE 9.02.09 ALL DEFICIENCIES RECORDED ON THIS REPORT SHALL BE CORRECTED WITHIN 30 DAYS OF THE TEST DATE 9-2013 ver. 1.4 Page 1 of 4

The items on the checklists below shall be inspected and tested. This list may not constitute all of the required inspecting and testing of the fire and life safety system. Refer to the 2009 Seattle Fire Code Sec. 903; SFC Administrative Rules 9.02.09, 9.03.09, and 9.06.07; and 2008 NFPA 25 for inspecting and testing requirements. PRE-TEST CHECKS 1. The Fire Alarm was put into test mode and/or other precautions were taken to avoid preventable alarms. 2. This is the only Sprinkler System of this type (i.e. Dry) at this address. If No What is the unique ID number? (See SFC Ad Rule 9.02.09) N/A N/A 3. All signs, placards, and labels are provided on doors and system controls. SPRINKLER HEADS 4. Number of Sprinkler Heads: <20 >20 but < 100 >100 5. All accessible sprinkler heads have been visually inspected and are free of corrosion, paint, obstructions and/or physical damage. (List the location of defective heads in the Deficiencies section.) 6. The sprinkler coverage is OK. (Note: If the coverage has not been altered after the last acceptance/reacceptance test it is OK.) 7. The standard sprinkler heads are less than 50 years old or within a prescribed testing period. If No have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed intervals thereafter. Due date for sample testing: 8. The Quick Response sprinkler heads are less than 20 years old or within a prescribed testing period. If No have the heads sample tested or replaced per 2008 NFPA 25 and at N/A the prescribed intervals thereafter. 9. Due date for sample testing: 10. The dry type sprinkler heads are less than 10 years old or within a prescribed testing period. If No have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed intervals thereafter. Due date for sample testing: N/A 11. The proper number of spare sprinkler heads is available, with the proper wrenches for each, at the riser or another designated location. HEAT ACTIVATED DEVICES 12. Heat actuation devices function on pre-action and deluge systems. N/A FLOW TESTS 13. The Main Drain is the proper size. If No Size Required size 14. The Main Drain flow test. Static pressure psi Flow pressure psi Return to static pressure min/sec 15. Flow from the inspector s test valve activates the system alarms. ALARMS AND SUPERVISORY DEVICES 16. All Supervisory and alarm devises [i.e. bell(s), flow switches, supervisory switches] function properly. N/A VALVES 17. Pressure regulating valves (PRV) are set properly. N/A 18. All supply valves are secured or supervised. 19. All supply valves have been lubricated (where required) 9-2013 ver. 1.4 Page 2 of 4

GAUGES 20. The maintenance on the system gauges is up-to-date. Due date for the next comparison test: Note: The system gauges are to be compared with a calibrated gauge every five (5) years. If a gauge is not within +/- 3% of the calibrated gauge it must be replaced or recalibrated. This check should be done for multiple floors at static pressure using one calibrated gauge and hydraulic calculations. This is a Federal Building OBSTRUCTION INVESTIGATION 21. The 5-year obstruction investigation of Fire Department Connection (FDC) piping is up-todate in accordance with 2008 NFPA 25 Chap. 14. (eff. 10/21/2012) Date for next FDC obstruction investigation 22. The 5-year obstruction exam for the FDC(s) included testing and operation of the check valve. 23. The 5-year Obstruction Examination of the sprinkler piping is up-to-date in accordance with 2008 NFPA 25 Chap. 14. (eff. 10/21/2012) Date for next Piping Obstruction Examination FIRE DEPARTMENT CONNECTIONS 24. The Fire Department Connection(s) (FDC) is clear of bushes, guards, or other debris and is visible from the street N/A 25. All FDCs have protective plugs or covers. N/A 26. If a plug or cover was missing from a FDC the piping was inspected for debris. (this is required) N/A 27. All caps and plugs have at least 12 clearance for operating wrenches. N/A 28. All swivels turn freely. N/A RECALLS 29. The inspector did not find recalled devices during the visual inspection. Note: the inspector s inspection is a visual cursory inspection from the floor level in accessible areas Unk ALARM MONITORING 30. A signal was received at the Central Station monitoring company. N/A DRY SPRINKLER SYSTEMS [NEXT 3 ITEMS] 31. The system passed the trip test. System tripped in seconds N/A 32. Air compressor refills system in 30 minutes or less. N/A 33. The system s low points were drained and the system was restored to service. N/A 34. FINAL CHECKS 35. The Fire Alarm was removed from test mode and/or other precautionary measures were removed to restore fire alarm system to normal operation (includes removal of protective coverings). 36. The system was left in service. If No, why 37. The confidence test report was given to the owner and a current status tag was posted. 38. The confidence test report was sent to the fire marshal s office. N/A 9-2013 ver. 1.4 Page 3 of 4

Deficiencies 9-2013 ver. 1.4 Page 4 of 4

BACKFLOW PREVENTION ASSEMBLY TEST REPORT NAME OF PREMISE Commercial Residential SERVICE ADDRESS CUSTOMER PRINTED NAME PHONE FAX LOCATION OF ASSEMBLY TYPE OF HAZARD ISOLATED DCVA RPBA OTHER NEW INSTALLATION EXISTING REPLACEMENT LINE PRESSURE: PSI MAKE OF ASSEMBLY MODEL SERIAL # SIZE AIR GAP INSPECTION: Required minimum air gap separation provided? Yes No PROPER INSTALATION? YES NO INITIAL TEST DCVA / RPBA CHECK VALVE #1 DCVA / RPBA CHECK VALVE #2 RPBA PVBA / SVBA PASSED FAILED CLOSED TIGHT CLOSED TIGHT OPENED AT #1 CHECK AIRGAP OK? AIR INLET OPENED AT DID NOT OPEN NEW PARTS AND REPAIRS TEST AFTER REPAIRS PASSED FAILED CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART CHECK VALVE HELD AT CLEANED REPAIRED CLOSED TIGHT CLOSED TIGHT OPENED AT AIR INLET #1 CHECK CHECK VALVE Detector Meter Reading: LINE PRESSURE PSI CONFINED SPACE? YES NO REMARKS: TESTER S SIGNATURE: CERT #: DATE: TESTER S NAME PRINTED: TESTERS PHONE # REPAIRED BY: LIC. #: DATE: FINAL TEST BY: CERT #: DATE: CUSTOMER S SIGNATURE: DATE: CALIBRATION DATE: GAUGE #: SERVICE RESTORED? YES NO