Similar documents
SITE SECURITY THE SMARTER WAY TO PROTECT REMOTE AND TEMPORARY SITES, 24 HOURS A DAY.

Cygnus Wireless Alarm System

HFR100. HFR Alarm Range HFR100. Fire Alarm. HFR600 Wireless Fire/First Aid Alert System. Fire Call Points. Fire Alarm. Features & benefits

Introduction. Perry Osberg Doug Corbett Adam Parker. President General Manager. Director Business Development. Director Technical Development


EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

Fire protection documentation. CFPA-E Guideline No 13:2015 F

5 Key Stages to Risk Assessment

H&S Forum. Fire Safety Policy Glascote Academy

Wellsprings Primary School. Fire Emergency Evacuation Plan

SITE SECURITY THE SMARTER WAY TO PROTECT REMOTE AND TEMPORARY SITES, 24 HOURS A DAY.

Howler Go-Link Evacuation Alarm

Guideline No 11:2005. European guideline. Recommended Numbers of Fire Protection Trained Staff

Fire Risk Assessment Safety Checklist

Fire Safety Protocol

- CONSTRUCTION FIRE SAFETY STANDARDS

inet Now Live Monitoring

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

GREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017

Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x

HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School

DEF Fire Evacuation and Emergency Planning Criteria

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE

- CONSTRUCTION FIRE SAFETY STANDARDS

CFPA-E No 1:2014 F. Fire protection management system CFPA-E -GUIDELINES

FIRE PRECAUTIONS AND EMERGENCY EVACUATION PROCEDURES

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Millfield Schools Fire Risk Prevention Policy

THE FIRE SAFETY GUIDE FOR BUSINESS OWNERS

FIRE PROCEDURES 1. APPOINTMENTS

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.

St Edward s Oxford FIRE SAFETY POLICY

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT

Fire Safety Policy. (The Regulatory Reform (Fire Safety) Order 2005) Last Reviewed: January Next Review: January 2019

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Securing your safety

The Social Accountability International (SAI) Fire Safety Checklist

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

(Fire) Emergency Evacuation Plan

Element C3.5 Means of Escape

Purpose of Emergency Response Program Emergency Response Team / Leader Evacuation Procedures Building Life Safety System Virtual Evacuation Building

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

ChurchSafety InfoSheet: Fire Risk Assessment

INITIAL FIRE ASSESSMENT REPORT (FAR)

Fire Safety. A TUC guide for trade union activists

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

SCALES NW EMERGENCY ACTION PLAN

Fire Policy. Fire Safety Order (2005) Dangerous Substances and Explosive Atmospheres Regulations (2002)

Health and Safety Documents in connection with offshore oil and gas operations

USER MANUAL COMBINED FIRE & EXTINGUISHING CONTROL PANEL COMPLIES WITH BS EN PART 1 & EN54 PARTS 2 & 4

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

FIRE SAFETY PLAN PART 1 BUILDING INFORMATION SECTION. Type of Construction: Combustible Non-Combustible

Smart Hub. Connecting people, connected care. What is it? Who is it for? How does it work?

Fire Precautions, Evacuation and Emergency Control Procedure Denmead Scouts HQ

Slight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk

Sandwell Valley School and Sandwell Community Care Trust Training. 150 Birmingham Road, West Bromwich, B70 6QT

Charlotte Building, 17 Gresse Street, London W1T 1QL

A PRACTICAL FIRE SAFETY GUIDE FOR SMALL SELF-CATERING PREMISES

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

Fire. This policy applies to all members of our school community, including those within the EYFS setting.

Safety Manual: Emergency Response

Fire and Evacuation Guide

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

MOIEZ AHMED Chief Fire Warden Director Training - Usha Armour Pvt. Ltd., Bangalore. Fire Drill (Fire Evacuation Drill Procedure)

Fire Safety, Procedures and Risk Assessment Policy

Fire Risk Assessment. A safety guide for users of the hall

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

EAST DEAN & FRISTON VILLAGE HALL FIRE RISK ASSESSMENT

FIRE POLICY STATEMENT

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Fire Risk Assessment

Control Panel User Guide

FIRE & EVACUATION PLAN PARADISE LOST

FIRE RISK ASSESSMENT Self Assessment

Interim Life Safety Measures. Healthcare Construction Certificate - Level 1

FIRE SAFETY POLICY & EMERGENCY EVACUATION POLICY

Fire Safety Policy and Procedures

FIRE SAFETY AND PREVENTION POLICY

If there are more than ten people working other than on the ground floor,

Allfire Site No. a division of Allsaved Ltd. Fire Safety Log Book. Premises Address: Responsible Person:

LYHA Fire Safety Policy

Conventional Fire System. BiWire Flexi Fire Panel EFBW8ZONE-FLEXI / EFBW4ZONE-FLEXI / EFBW2ZONEFLEXI User Manual

Unit 2 Fire Safety (Zone 2)

FIRE SAFETY FOR PRE-SCHOOLS AND CHILDCARE FACILITIES GENERAL GUIDANCE COUNTY COMMITTEE LIMERICK CHILDCARE

2012 SunTrust Center ERT Annual Review. 919 East Main St. Richmond, VA

Fire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment

Property Name & Address [ Property Name ] - [ Property Address ]

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

FIRE AND EVACUATION PLAN

SmartLINK Module Ei3000MRF for Mains Powered Multi-Sensor Fire / Smoke / Heat / CO Alarms - Ei3000 Series

GENERAL - Regulatory. Fire Policy, Risk Assessment and Prevention (ISI 12a) Fire Procedures (ISI 12b)

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

PREMISES FIRE SAFETY LOGBOOK

Technical reference Reference & design

Sync. Smart Home Alarm

Use this guide to assist you when completing the Evacuation scheme application form.

Transcription:

VPS FIREALERT WES+ IS AN INNOVATIVE FIRE SAFETY AND EVACUATION SYSTEM THAT HELPS PROTECT PEOPLE, PROPERTY AND ASSETS IN BUILDING AND CONSTRUCTION SITES. This proven FireAlert system is mobile and wireless, with long battery life delivering a cost-efficient, effective and practical solution. Quickly and easily deployed at any location, VPS FireAlert Wes+ is EN54 compliant, has a CE mark and meets all important fire safety guidelines and legislation. 0800 294 2828 www.vps-sitesecurity.co.uk

ON-SITE FIRE DETECTION Construction and renovation sites are always high-risk safety areas. However due to the increased volume of combustible materials on-site during this time the chance of fire is significantly increased. Every year there are many fires on construction sites and in buildings undergoing refurbishment which have resulted in people being killed or injured, as well as the loss of property and assets. This not only involves the risk to people but a significant financial loss, as well as project delays and negative publicity. The alarm and evacuation conditions on construction sites are often very poor due to both the extremely high noise levels and constant changes of the escape routes. During the construction process the permanent fire alarm systems are usually not commissioned and there is potentially no or limited fire water supply. The aim of VPS FireAlert Wes+ system is to give the workforce the earliest possible warning of fire, allowing the maximum time to escape and to call the fire and emergency services if required. This early alert can reduce the risk of injury as well as providing more time to restrain fire spread, minimising damage and financial loss.

THE VPS FIREALERT WES+ PRODUCT RANGE FIRE POINT The Fire Point is the primary alert unit in the VPS FireAlert Wes+. The unit incorporates fire alarm sounder, optional strobe alert, and a manual call point for activating the alarm. RADIO REPEATER LINK The Link unit is the simple, cost-effective way to extend the range of your VPS FireAlert Wes+ temporary fire alarm system on very large-scale sites. Connect to your existing VPS FireAlert Wes+ units, set up on site and the unit will act as a relay to link geographically separated sections of site. WIRELESS SMOKE & HEAT DETECTORS Detection units connect directly to the VPS FireAlert Wes+ system, automatically raising the alarm in the event of fire. For maximum performance in dusty construction environments, we offer a dustproof smoke detector. VPS FIREALERT WES+ APP The VPS FireAlert Wes+ app for Android tablets delivers full wireless fire alarm system reporting as well as flexible system configuration. Health and safety reporting made easy export your system logs and weekly silent test logs to pdf, csv or email. Download from the Google Play store. VPS FIREALERT WES+ INTERFACE The VPS FireAlert Wes+ interface enables the connection of other devices to the VPS FireAlert Wes+ network, therefore in the event of fire other safety devices can be triggered i.e. lifts, turnstiles, access control systems and auto diallers etc. BASE STATION The VPS FireAlert Wes+ Base Station delivers extensive system reporting and system configuration. If an alarm is activated, the base station allows you to identify quickly which unit has been triggered. Records activations and warnings, so you can monitor the activity and health of your whole VPS FireAlert Wes+ system.

BENEFITS OF VPS FIREALERT WES+ INTERCONNECTED SYSTEM When a VPS FireAlert Wes+ unit is triggered, the entire zone will be alerted (according to the rescue plan) to evacuate people The source of fire is easy to identify Optional GSM version: up to 6 users can be set to receive configurable SMS notifications for alarm activations and system alerts. FLEXIBLE, PRACTICAL AND RELIABLE 3 years battery life, reducing lifetime costs and the need for constant replacement while also improving compliance with waste regulations Extensive wireless range offers complete site coverage Possibility of unlimited number of units in any combination on one site; adding and removing units is quick and easy as the build progresses; VPS FireAlert Wes+ units can be re-used on future projects Real-time system monitoring: each unit monitors itself (battery, signal, etc.) Anti-tamper controls to ensure system integrity and compliance Transit mode to allow safe removal & storage without risking activation Silence test function which eliminates the need of a construction site evacuation during a test, therefore there is no disruption on the site and / or nearby residential areas TIME AND COST-EFFECTIVE No wiring is required Easy to install and maintain, without specialists Reusable on next building projects The existing costly fire protection procedures are easy to downsize (e.g. less fire wardens are required) In case of an incident, the problem can immediately be located and identified preventing delays in the construction project and decreasing the possibility of further damages and injuries to employees MOBILE AND VERSATILE APPLICATION POSSIBILITIES: To protect sites and workers during new constructions, renovation and during conversion works In hazardous locations (hot works) In temporary buildings such as containers and site offices Bridging of delivery time, until the installation of a permanent fire system At locations where wiring is undesirable At locations with no electrical supply Anywhere that requires wide area coverage and there are large groups of people (e.g. events) Reporting function in Excel file or PDF file

DEPLOYING VPS FIREALERT WES+ ON CONSTRUCTION SITES VPS FireAlert Wes+ units can be deployed as soon as the cabins are on site and the build is out of the ground. Setup is quick and easy it takes just a few minutes for your units to be on active duty protecting your site and workers. Fire Points are placed in accordance with your fire plan usually at each stairwell or lift shaft and can be added as the build progresses. Units can be numbered according to your fire plan for easy identification in the event of any issues. Heat, smoke or dust-proof smoke detectors provide active fire protection in enclosed areas and in temporary accommodation units. All your VPS FireAlert Wes+ units connect to form a network, so if a fire breaks out any unit can trigger a sitewide alarm, whether actively in the case of the detection units or manually via the Fire Points. The Base Station will tell you where the triggering unit is so you can pinpoint the fire. You can also set up text alerts to help you provide an immediate response, and if you have the VPS FireAlert Wes+ app you can export reports of your silent test results and any activations to PDF or spreadsheet for full reporting and tracking. Once the project is complete, you can easily re-use your VPS FireAlert Wes+ units on the next one.

CONSTRUCTION HEALTH AND SAFETY LEGISLATION VPS FireAlert Wes+ was designed and engineered with the specific aim of creating a fire safety system that s compliant with new increasingly stringent European health and safety practice. COMPLIANCE EUROPEAN GUIDELINES (CFPA E) The European Fire Protection Associations have decided to produce common guidelines in order to achieve similar interpretation in European countries and to give examples of acceptable solutions, concepts and models. The Confederation of Fire Protection Associations in Europe (CFPA E) reflects best practice proposed by the members of CFPA Europe. WIRELESS SMOKE & HEAT DETECTORS EUROPEAN GUIDELINE CFPA21: 2012F FIRE PREVENTION ON CONSTRUCTION SITES Applicable: large construction sites or where predominantly combustible structures (more than 35% of its elements of construction composed of combustible materials, e.g. timber frame) or high rise buildings (where upper storey is beyond the effective reach of the fire brigade) In compliance with the national fire safety legislation the person responsible for the fire safety management system and inspections must ensure that a fire risk assessment is undertaken and is reviewed and updated regularly as construction proceeds. This document is a key element of the site fire safety plan. (4. Site fire safety plan) To carry out weekly test of the site fire detection and alarm devices installed on site (5. The role of the person responsible for fire safety) On all site a means of giving warning of fire must be established. Manual devices may be utilised provided that: They are clearly audible above background noises in all areas They are distinctly different from any other warning devices on site and can be readily identified as being a fire alarm, There are multiple provisions of these to ensure that they can be accessed at all times. (7. Emergency procedures) Automatic fire detection systems must be installed in temporary accommodation and in temporary building when these are: Within 6 metres of a building under construction or refurbishment Used for storage of flammable liquids or compressed gases Used for drying of clothes. Temporary buildings or temporary accommodations where cooking (including the use of toasters) is undertaken should have fire detection installed. (11. Temporary building and temporary accommodation) The plan must detail, as minimum: General site precautions and fire detection and alarm systems (4. Site fire safety plan)

EUROPEAN GUIDELINE CFPA26: 2010 F FIRE PROTECTION ON TEMPORARY BUILDING ON CONSTRUCTION SITES Rooms in temporary building where people are present other than occasionally behind closed doors and which are situated in such a way that it is necessary to pass through a corridor or some other space to reach the escape routes, should be fitted with an alarm that is automatically triggered by a smoke fire detector in the corridor. A rest room should also be fitted with an escape alarm supplemented with a fire alarm function in the room. (4. Fire protection requirements for escape, 4.7 Escape alarm) EU DIRECTIVE 92/57/EEC - SAFETY AND HEALTH REQUIREMENTS AT TEMPORARY OR MOBILE CONSTRUCTIONS SITES Depending of the characteristics of the site, the dimensions and use of the rooms, the on-site equipment, the physical and chemical properties of the substances present and the maximum potential number of people present, an adequate number of appropriate fire-fighting devices and, where required, fire detectors and alarm systems must be provided. (4. Fire detection and firefighting) APPROVALS VPS FireAlert Wes+ meets the highest technology standards. The VPS FireAlert Wes+ product range is externally certified and approved to: THE CONSTRUCTION PRODUCTS REGULATION The Construction Products Regulation as supported by EN54 states that: Fire safety products must be CE marked To obtain a CE mark, a Declaration of Performance must be produced To obtain a Declaration of Performance, fire safety products must be tested by an approved external body That body must be involved in inspection, testing and factory production control EUROPEAN STANDARDS FOR FIRE PRODUCTS EN54 EN54 is the Harmonised Standard laying down design, manufacture and performance standards required for construction fire safety products. Every product in the VPS FireAlert Wes+ range has been externally tested, approved and certified by an official body as complying with EN54. In the event of danger, it must be possible for workers to evacuate all workstations quickly and as safely as possible. (3. Emergency routes and exits) NON-BINDING GUIDE TO GOOD PRACTICE FOR UNDERSTANDING AND IMPLEMENTING DIRECTIVE 92/57/EEC Having fire points with extinguishers at danger points and on circulation routes, and training workers in their use. Emergency arrangements including first aid: there are systems in place for quickly identifying emergencies and communicating with an emergency response team; (4.1.3 Concluding preparations before starting construction work)

0800 294 2828 Enquiries@vps-sitesecurity.co.uk www.vps-sitesecurity.co.uk VPS Site Security, Broadgate House, Broadway Business Park, Oldham, Greater Manchester, OL9 9XA Copyright VPS Ltd 2017. All technical specification are subject to change. The VPS hexagonal logo is a registered trademark of VPS Holdings Limited.