For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

Similar documents
For the compliance with the resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime Authority.

TYPE APPROVAL CERTIFICATE

EU RO MUTUAL RECOGNITION TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS

Issued to DISTRIBUIDORA INTERNACIONAL CARMEN, S.A -DICSA- Zaragoza Zaragoza, Spain

is found to comply with DNV GL rules for classification Ships, offshore units, and high speed and light craft

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

BWTS Installation DNV GL Experience

Commandant United States Coast Guard

TYPE APPROVAL CERTIFICATE

Shipboard incinerators with capacities up to 4000 kw

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

Commandant United States Coast Guard

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

DNVGL-CP-0398 Edition December 2015

DET NORSKE VERITAS TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE

Notified Body No.: 0575

TYPE APPROVAL CERTIFICATE

EC-TYPE EXAMINATION CERTIFICATE (MODULE B)

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Notified Body No.: 0575

DNVGL-CP-0402 Edition February 2016

HYUNDAI HEAVY INDUSTRIES CO., LTD.

DNVGL-CP-0407 Edition February 2016

Glass fibre rovings - Non-metallic materials

Notified Body No.: 0575 G U A D N L. SJq

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

Terminal lugs for LV power cables with aluminum conductors

DNVGL-CP-0399 Edition March 2016

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

Notified Body No.: 0098

GROUNDING AVOIDANCE SYSTEM (GAS)

DNVGL-CP-0401 Edition February 2016

Coatings for protection of FRP structures with heavy rain erosion loads

WÄRTS1LÄ. EC-Declaration of Conformitv. In accordance with the Marine Equipment Directive 2014/90/EU

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

INFORMATION BULLETIN No. 150

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch

BWTS installation and beyond UK Chamber of Shipping BWM implementation forum

EC-TYPE EXAMINATION CERTIFICATE (MODULE B)

IMO LIST OF DOCUMENTS ISSUED IN CONNECTION WITH THE FORTY-SEVENTH SESSION OF THE SUB-COMMITTEE ON FIRE PROTECTION AGENDA FOR THE FORTY-SEVENTH SESSION

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

SOUND RECEPTION SYSTEM

MOL Group TECHNICAL SPECIFICATION INSTRUMENTATION. List of booklets MGS-M-REF-I-LI. Rev

EC Type Examination Certificate

Australian Standard. Functional safety Safety instrumented systems for the process industry sector

DASPOS A/S Gammel Klausdalsbrovej Herlev Denmark Tel.: website: DASPOS USA, Inc NE 116th Street, PMB

***** 2. Rev.1 is to be uniformly implemented by IACS Members from 1 July 2004.

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels

Valve Manufacturers Association of America

ISO INTERNATIONAL STANDARD. Fire protection Automatic sprinkler system Part 9: Requirements and test methods for water mist nozzles

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

Report No. ECL01I Page 1 of 5. Test Report. Centre Testing International Pinbiao(Shanghai) Co., Ltd. Maritime Industry Division

Presentation to the Ballast Water Collaborative Duluth, Minnesota August 2 & 3, Prepared by:

Tasman Sea Control System

DIRECTIVE NO: D-B

C e r t i f i c a t e

SOUTH AFRICAN NATIONAL STANDARD

USCG-EU MRA EC TYPE EXAMINATION (MODULE B) CERTIFICATE

EC TYPE EXAMINATION (MODULE B) CERTIFICATE (EC-US MRA)

MED 96/98/EC QUALITY SYSTEM MODULE D CERTIFICATE

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Oil Mist Detection and Alarm Equipment

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

API MANUAL OF PETROLEUM MEASUREMENT STANDARDS

TYPE TESTING PROCEDURE FOR CRANKCASE EXPLOSION RELIEF VALVES JULY 2016

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

M-20 Oil Mist Concentration Detection and Alarm Device

Guideline No.: S-02(201510) S-02 Navigation Light and Signal Light Controllers. Issued date: October 20,2015. China Classification Society

Part 2-55: Medical electrical equipment. Particular requirements for the basic safety and essential performance of respiratory gas monitors

User s Manual. YTA110, YTA310, YTA320, and YTA710 Temperature Transmitters. Manual Change No

INTERNATIONAL STANDARD

MGN 453 (M) Maritime and Coastguard Agency Logo MARINE GUIDANCE NOTE

SECTION Free/Available Chlorine Analysis System

CCTV Camera Systems and Project Engineering

Design & Use of Ground Based Pumps Guidance Document

APRIL 2010 ELECTRICAL EQUIPMENT STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No

INTERNATIONAL STANDARD

Advanced Integrated Ecological monitoring solutions & Process analysis for Marine Industry & Port Authorities

Size and rating wise typical Third Party Inspection certificates for the models of Valves

PROCEDURES FOR APPROVAL OF LIFE-SAVING APPLIANCES AND FIRE SAFETY SYSTEMS, EQUIPMENT AND PRODUCTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Sequence of operation

PQS Independent type-testing protocol

Part 6 Additional class notations Chapter 2 Propulsion, power generation and auxiliary systems

Reference F-IAB-012 Page Page 1 of 6 Revision 2. Please complete all sections and submit electronically to

SX65 and SX75. Electronic process controllers

Sergey Gribanov Head of Technical Service, Germany

FINAL ATEX REPORT ON EQUIPMENT FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES FOR GOLDEN PROMISE EQUIPMENT INC. FLOW MONITOR, GPE3000 SERIES,

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

Transcription:

Certificate No: TP00000ZS Revision No: 1 This is to certify: That the Ballast Water Management System with type designation(s) Ecochlor Ballast Water Management System Issued to Ecochlor, Inc. Maynard M, United States is found to comply with Resolution MEPC.174(58) Resolution MEPC.169(57) DNV GL class programme DNVGL-CP-0209 Type approval Ballast water management systems DNV GL rules for classification Ships pplication : This is to certify that the Ballast Water Management System listed above has been examined and tested in accordance with the requirements of the specifications contained in Guidelines contained in Resolution MEPC.174(58) and DNV GL Rules stated above. This Certificate is valid only for the Ballast Water Management System referred to above. For compliance with Resolution MEPC.174(58), the Certificate is issued on behalf of the Norwegian Maritime uthority. Product(s) approved by this certificate is/are accepted for installation on all vessels classed by DNV GL, unless otherwise instructed by the relevant Maritime dministration. Issued at Høvik on 2017-10-27 This Certificate is valid until 2022-10-23. DNV GL local station: New York pproval Engineer: Ingrid Sigvaldsen for DNV GL Dag Sæle-Nilsen Head of Section This Certificate is subject to terms and conditions overleaf. ny significant change in design or construction may render this Certificate invalid. The validity date relates to the Type pproval Certificate and not to the approval of equipment/systems installed. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 1 of 7 DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL S.

Ballast water management system supplier Ecochlor Inc. Type and model designation Ecochlor BWMS Series 75, Ecochlor BWMS Series 100, Ecochlor BWMS Series 150, Ecochlor BWMS Series 200, Ecochlor BWMS Series 250, Ecochlor BWMS Series 300. Place of production: ProFlow Inc. 303 State St., North Haven, CT 06473, US and FluidTech Environmental & Equipment Technology Co., Ltd., 1st Floor, Block 2, Henglu Modern Industrial Park, 166 Min Dong Road, Pudong New rea, 201209 Shanghai, P.R. China. Equipment assembly drawings The Ballast Water Management System (BWMS) shall be installed in accordance with the relevant piping and instrumentation s listed below. Description Title Drawing No. Rev. Wiring Wiring Wiring Wiring Treatment System P&ID Two Filter (Shared) Two Filter (Each) Single Filter (Each) Single Filter Zone 0 Two Filter (Shared) ES04075H01 ES04100H01 ES04150H01 ES04200H01 ES04250H01 ES04300H01 ES04075H02 to ES04300H02 ES04075H12 to ES04300H12 ES04075H22 to ES04300H22 ES04075H32 to ES04300H32 ET04075H42 to ET04300H42 Motive Water Filter P&ID ES04800H05 Filtration System Electrical Details Treatment System Electrical Details ft Peak System Electrical Details Zone 0 Main Filtration System Electrical Details ES05400H02-H22 ES05400H32-H61 ES05400H63-H77 ET05400H01-H55 H G G H G H J C C B Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 2 of 7

Product description The Ecochlor Ballast Water Management System description is given in the Operation, Maintenance & Safety Manual (OMSM), Ecochlor standard vessel (ES) and the Operation, Maintenance & Safety Manual (OMSM) Ecochlor tanker vessel (ET) approved by DNV GL. Treatment sequence Ballast water uptake: Filtration and chemical disinfection. Ballast water discharge: Manual verification of the chlorine dioxide (ClO 2) levels in the ballast water to be discharged. Discharge is allowed when the maximum concentration is 0.20 mg/l. pplication/limitation Model TRC (m 3 /h) ClO 2 concentration (mg/l) during uptake Ecochlor BWMS Series 75 <500 4.25 Ecochlor BWMS Series 100 <1300 4.25 Ecochlor BWMS Series 150 <3500 4.25 Ecochlor BWMS Series 200 <6900 4.25 Ecochlor BWMS Series 250 <12200 4.25 Ecochlor BWMS Series 300 <16200 4.25 Minimum capacity is 50 m 3 /h for all models. Temperature is not a limiting condition for this system. The system is accepted for a salinity above 1 PSU. o For vessels operating in waters subject to IMO regulations, the >1 PSU salinity limitation is related to where treated ballast water may be discharged. Efficacy testing of the Ecochlor BWTS was performed in <1 PSU water (tested for all salinities) and the discharge standard was met. The system can be used to treat ballast water <1 PSU at uptake, but treated water may not be discharged in FW with salinity <1 PSU. The minimum holding time is 24 hours. The holding time is dependent on the time to reach maximum allowable discharge concentration of the chlorine dioxide (ClO 2). The manual in-tank sampling regime defined is depending on the holding time times; 24-48 hrs, 48-72 hrs or >72 hrs. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 3 of 7

Filter The filter type BS-Series manufactured by Filtersafe is a screen filter with a 40 μm wire mesh. The filter(s) shall be installed with a TRC that corresponds to the ballast flow capacity. The filter requires a minimum inlet operational pressure of 1.6 bar. The backwash shall initiate when a differential pressure across the filter is 0.4 bar. Model TRC (m 3 /h) Model TRC (m 3 /h) BS025 50 BS201-T 550 BS031 75 BS300 750 BS050 125 BS300-T 850 BS061 150 BS400 1000 BS061-T 180 BS400 -T 1200 BS070 180 BS603 1500 BS100 250 BS603-T 1650 BS100-T 275 BS804 2000 BS101 250 BS804-T 2250 BS101-T 275 BS1004 2500 BS150 375 BS1004-T 2750 BS150-T 410 BS1204 3000 BS151 375 BS1204-T 3300 BS151-T 410 BS1206 3000 BS200 500 BS1206-T 3300 BS200-T 550 BS1406 3420 BS201 500 BS1406-T 3762 Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 4 of 7

Installation- and operational specifications for the different components Flow meter The type approved system must be installed with a flow meter on filter outlet. If the flow meter is installed on the filter inlet, an additional filter flush flow meter is to be installed. Chemical storage and piping For the safety arrangement of chemical storage and piping, DNV GL rules Pt.6 Ch.7 applies. Further details are given in DNV GL report no 262.1-019159-J-83, rev. 0. Control and monitoring equipment Monitoring equipment to be installed; gas detectors inside ClO 2 generator installation space, flow meters for precursor chemicals, motive water and ClO 2 piping, pressure transmitters monitoring vacuum conditions for mixing chamber and leakage detectors in secondary containments and ClO 2 generator. ny indication of leakage shall trigger an alarm and shutdown. The gas sensors are to be arranged with an independent shutdown functionality. The control and monitoring devices are to be energized and to remain active while the system is switched OFF, in case of leakage during longer voyages. The type approved system includes the following control units and sensors: Name Manufacturer Model Treatment system control panel Main ballast filter control panel Ecochlor Ecochlor CP-1 CP-1ExZ1 CP-2 CP-2EXZ1 CP-2ExZ0 CP-4 Remote HMI panel Ecochlor CP-3 Mixing chamber Nalco 6052111 Metering pump IWKI IX-C060TCF-TF01 ClO 2 Gas detector Dräger 37 ClO 2 sensor Optek F26 Handheld ClO 2 measuring instrument Handheld ClO 2 measuring instrument Palintest Photometer 7500 Palintest ChlordioXense PLC program Ecochlor ES0400 V13_SP1 170401 ll changes in the software are to be recorded as long as the system is in use on board. The records of all changes are to be forwarded to DNV GL for evaluation and approval. Major changes to the software are to be approved before installed in the computer. Based on the modification, a Certification of pplication Functions may be required for the particular vessel. Information regarding the selected components shall be part of the documentation related to the specific installation, either by a reference to valid type approval certificate or technical documentation. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 5 of 7

Explosion proof version Some parts of the Ecochlor system are not designed for the installation in a hazardous area. The Ecochlor filter Ex model meets the requirements for use in hazardous area Zone 1 and Zone 0 in accordance with DNV GL rules Pt.4 Ch.8 Sec.11. Ex-certification is not covered by this certificate. Installation in a hazardous area are to be approved in each case according to the Rules and Ex-certification / Special Condition for Safe Use, listed in a valid Ex-certificate issued by a notified/recognized Certification Body. Documents approval for each installation The following documentation is to be submitted for approval in each case. Piping: Piping and Instrumentation Diagram (P&ID) of the ballast system including the treatment system installation. Control and instrumentation: Power supply arrangement. Interface description specifying external signals including alarms for failure. Description confirming the arrangement of alarms for bypass of the BWMS system (as part of the Ballast Water Management Plan). List of Ex equipment according to Pt.4 Ch.8 Sec.11 if the system is to be installed in a hazardous zone. Type approval documentation GBF / Test Quality ssurance Plan, Ecochlor BWTS Series 75, Model ES-400S-1.0, 8 pril 2015, Rev.0 GBF / Final Land-based Ballast Water Management Report ccording to USCG Final Rule, Ecochlor BWTS Series 75, Model ES-400S-1.0, 17 March 2017, Rev.0. GBF / Final Shipboard Ballast Water Management Report ccording to USCG Final Rule, Ecochlor BWTS Series 75, Model ES-400S-1.0, 5 October 2016, Rev.0. Operation, Maintenance & Safety Manual (OMSM), Ecochlor standard vessel (ES), 21 June 2017, Rev.B Operation, Maintenance & Safety Manual (OMSM) Ecochlor tanker vessel (ET), 21 June 2017, Rev.B OMSM ES ppendix Package OMSM ET ppendix Package ES Installation Specification, 26 March 2017, Rev. ET Installation Specification, 26 March 2017, Rev.B Retlif / Test Report for Ballast Water Treatment Systems (BWTS), report no. R-15756-1, 17 October 2016 Information for pproval of Scaled Treatment Systems, Series 100 to Series 300, 8 March 2017, Rev.4 Ecochlor Commissioning, 22 June 2017, Rev.C Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 6 of 7

Tests carried out Land-based testing in accordance with Resolution MEPC.174 (58) witnessed by DNV GL Shipboard testing in accordance with Resolution MEPC.174 (58) witnessed by DNV GL Factory cceptance Test of the control and automation system witnessed by DNV GL Environmental testing in accordance with Environmental test specification for instrumentation and automation equipment, DNV GL CG-0339 and Resolution MEPC.174(58) Marking of the product For the traceability of this Type pproval, each treatment system is to be marked with: Manufacturer s name or trade mark Type designation Serial number Periodical assessment DNV GL s surveyor is to be given permission to perform a Periodical ssessment at any time during the validity of this certificate and at least every second year. The arrangement is to be in accordance with procedure described in DNV GL-CP-0338 Section 4. The scope of the periodical assessment includes: Ensuring that the documentation for the type approval is available. Inspection of factory samples, selected at random from the production line (where practicable). Review of production and inspection routines, including test records from product sample tests and control routines Ensuring that systems, software versions, components and/or materials used, comply with type approved documents and/or referenced system, software, component and material specifications. Review of possible changes in the design of systems, software versions, components, materials and/or performance, and make sure that such changes do not affect the type approval given. Ensuring traceability between manufacturer s product type marking and the type approval certificate. Copy of the type approval certificate copy of this type approval certificate should be carried on board a vessel fitted with this ballast water management system at all times. n annex containing the summary reports of the test results of land-based and shipboard tests should be available for inspection on board the vessel. Form code: T 251 Revision: 2016-12 www.dnvgl.com Page 7 of 7