HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

Similar documents
ASHTABULA COUNTY COASTAL MANAGEMENT PLAN

PORT CLINTON DOWNTOWN REVITALIZATION PLAN

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

PUBLIC SPACE/AMENITY PROJECTS

Port of Camas-Washougal Waterfront Trail Master Plan

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

VIRGINIA KEY CONSENSUS MASTER PLAN

Naomi Weiss, Executive Director, DBPA Jason Jeffries, Project Manager, City of Daytona Beach

Village of Fair Haven Goals & Objectives

Ashbridges Bay Erosion and Sediment Control Project

Town of Peru Comprehensive Plan Executive Summary

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Preliminary Sketch Plan for Fort Hunter Park

Lakefront Downtown Action Plan Phase I June 2008

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Community Conversation. Thursday, March 30, James St N 7:00 pm 9:15 pm

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

Preliminary Regulatory and Engineering

Village of Pentwater Street Improvements. David Bluhm, PE Don DeVries, PE

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

City of Meriden Harbor Brook Flood Control Project Overview

PARTF Scoring System for Grants

Highest & Best Use Study Marina Park Lands

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

Planning for Waterfront Communities

Capital Projects Update March 2017

LPC Goals and Strategies. Transportation and Connectivity Employment Opportunities Food Access Waterfront Access Livable Communities

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan

Council Agenda Report

MS4 PROGRAM COST SAVINGS THROUGH COMMUNITY PARTNERSHIPS

Fall 2017 Construction Update

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Ann Arbor Intermodal Station Environmental Review

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Keyport. Vision for Keyport

The Benefits and Challenges Associated with Green Infrastructure Practices

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

ENVISION. Planning and Policy Initiatives Maintenance and Operations Initiatives Programming Initiatives

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Please read the entire document

Riverfront Development Plan

PRELIMINARY DESIGN + DEVELOPMENT PLAN

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

CAMA LAND USE PLAN TOWN OF KITTY HAWK IMPLEMENTATION STATUS REPORT 2013

preliminary master plan Cover Slide executive summary public presentation

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

PORT ST. JOE WATERFRONT PARTNERSHIP WATERFRONT STRATEGIC PLAN. Land Design Innovations, Inc.

jmt.com MARINE Part of a diversified family of solutions

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

A L F O N S O A R C H I T E C T S

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

RRC WATERFRONT PLANNING TOOLKIT AND GUIDELINES

New York City, 19 th c.

Creating a Main Street Strategy A Roadmap to a Community s Future

Goat Island Masterplan

SUNY Green Infrastructure Summit. April 17, 2014

Lake and Stream Restoration Project

Best Practices Appendix: Waterfront Communities

Chapter 9: Economic Development

Olde Towne Vision Plan

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Durango Parks & Recreation Department. Strategic Plan

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

2016 WORKSHOP LVR Field Trip

CONSTRUCTION DOCUMENTS CHECKLIST

LIMITED ENVIRONMENTAL REVIEW

HERNANDEZ & SWIFT ASSOCIATES, INC. Engineering & Environmental Services Balihai Court Gulf Breeze, Florida (850)

Southeast Michigan Council of Governments

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

2007 Blaine Wharf District Master Plan ii

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

PROCEEDINGS OF THE ST. CLOUD PLANNING COMMISSION. A meeting of the St. Cloud Planning Commission was held on June 12, 2012, at 6:00 p.m.

The Process. Phase 1: Detailed Assessment, Design Framework Phase 2: Conceptual Design. Phase 3: Master Plan Document

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

Project Overview. Get Involved. Public Information Meeting. Contact Information

S E C T I O N 8 THE GOALS AND OBJECTIVES: KEY ELEMENTS 8.1 ENHANCEMENT OF THE ROSE GARDEN

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Advance Engineering & Surveying PLLC

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

Shoreline Master Program Town of La Conner, Washington

HUDSON RIVER WATERFRONT. Hudson River Waterfront Walkway

City of Heath. Town Center Concept

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

2.1 Location and Size

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

LANDSCAPE ARCHITECTURE - NEW JERSEY

GOALS AND OBJECTIVES. This section includes Goals and Objectives for the communities of:

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

CITY OF BOCA RATON GOVERNMENTAL CAMPUS Master Plan Progress August 22, 2017

Transcription:

AWARD WINNING PROJECT Location Huron, Ohio Architectural, Engineering, Site, Landscaping, Planning, Survey, Grant Administration, Construction Administration Cost $285,000 Amphitheater $300,000 Marina Building $2,433,155 Boat Ramp and Parking Lot $39,000 Waterfront Walkway Project Funding $3.142 Million Grant ODNR Boat Ramp Schedule Professional Services 2004 Construction: 2004-2009 HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER Project Team Emil Diener, RLA, Landscape Architect Daniel Knott, P.E., Site Power/Lighting Poggemeyer Design Group provided assistance to obtain funding and planning and design services for the development of the Huron Boat Basin in Huron, Ohio, just off Lake Erie. The project includes the construction of a live performing arts facility including stage, seating tiers, lighting, landscape development, electric service, and walkway access. Project Relevance Municipal Rental Recreation A second phase included construction of a marina building adjacent to the amphitheater and boat basin area. The facility provides ADA accessible restrooms with showers, lounge, storage, retail space and a registration and administrative office area The City of Huron utilizes the area for a variety of community events and festivals including the concert series Boppin at the Basin, Arts at the Amphitheater and Movies by the River. DESIGN Huron River Amphitheater PDG designed and managed the construction of an amphitheater facing the marina in downtown more... Reference Mr. Andrew White City of Huron 417 Main Street, P.O. Box 468 Huron, Ohio 44839 419.433.5000

Huron Waterfront Development and Amphitheater Huron. The amphitheater was designed to capitalize on the topography of the site, the vistas created by the Lake and River, the business activity of the downtown, and the pedestrian and boating activities of the marina. Numerous very successful concerts are held there every year. Planning Developed a plan for a waterfront walkway along the Huron River and Lake Erie. PDG, with the assistance of JJR, Inc., worked with a Waterfront Walkway Committee to develop goals and objectives for the project to define: The location of the walkway throughout the Target Area; Identification of property control issues; Historical, ecological, and environmental data into the walkway design; Selection of a walkway theme and image; Design elements such as furniture, street lighting, signage and landscaping; Acquiring citizen input and consensus; Tying in major community focal points such as the boat basin, the amphitheater, the proposed marina building, beaches, the lighthouse and pier, the downtown, etc.; Addressing both vehicular and pedestrian traffic patterns throughout the area; Development of preliminary probable construction costs; Potential phasing of construction elements; and Identification of potential funding sources for various elements of the project. PDG incorporated an innovative visioning technique to acquire citizen input. In addition to public forums, a Trip-Tic was prepared. This Trip-Tic included an overall color map of the proposed walkway, as well as a section devoted to each key area along the walkway (about 18 in all). Historic information, along with proposed features of the walkway at each section were presented and questions were asked. Participants could take the Trip-Tic tour at their convenience, answer the questions, and return the booklet to the City for analysis. This visioning technique was considered very successful by the City and all participants.

2010 National Award as Best Large Boating Access Facility States Organization for Boating Access (SOBA) 2010 Quality Asphalt Paving Awards Flexible Pavements of Ohio Huron Waterfront Development and Amphitheater Marina Building PDG designed a unique structure to serve as a marina building for transient boaters, as well as public event participants in downtown Huron. The Marina Building faces the Huron River and Lake Erie and is adjacent to the marina and the amphitheater in the downtown. Restrooms, showers, lounge areas, offices (for the City s parks staff), a small retail shop, and decks provide transient boaters and residents with an attractive public space for River and Lake events. PDG also acquired State grants to assist with the financing of this project. ODNR Boat Launch Award Winning PDG provided engineering services for new public boating access facilities in the Huron River with access to Lake Erie. The facility was designed for typical Lake Erie private watercraft and includes a four-lane boat launch and associated sheet piling and dock abutments, floating boarding docks and courtesy docks, access drives, 135 car/trailer parking spaces, lighting, make-ready and tie-down areas, and a public restroom facility with water service, grinder pump sanitary sewer and other appurtenances. The project involved the demolition of existing industrial structures and the concrete and masonry from one of the demolished was crushed and utilized on-site as granular backfill material and the existing asphalt parking and aggregate base was crushed and used as new pavement base. Stormwater runoff is treated by a linear stormwater quality pond which also minimized the required storm sewers thereby reducing project cost and energy inputs. Site lighting is provided by LED area lights which greatly reduce power requirements while minimizing light pollution. PDG prepared the City s application for grant funds, which resulted in an award of $3,142,000 (Engineers Estimate) through the Ohio Department of Natural Resource s Cooperating Public Boating Facility Project program. Project cost was $2,433,155. 2010 National Award as Best Large Boating Access Facility States Organization for Boating Access (SOBA) 2010 Quality Asphalt Paving Awards-Flexible Pavements of Ohio PROJECT FINANCING Huron NatureWorks Grant Huron CDBG-ED Grant Huron Boat Basin Grant Program Transportation Enhancement Program STAG Grant (Federal) Application

2011 Outstanding Comprehensive Plan Award Winner American Planning Association, Small Town and Rural Division (STaR) Location Luna Pier, Michigan Grantwriting, Architecture, Engineering, Storm Drainage, Construction Administration Size 1,436 population (2010), plus seasonal population Project Funding $490,000 Grant Michigan Natural Resources Trust Fund $100,000 Grant U.S. EPA Great Lakes Restoration Schedule Professional Services: 2011 2013 PDG Project Manager Randy A. Mielnik, AICP, LEED AP LUNA PIER BEACHFRONT IMPROVEMENTS With assistance from PDG, the Luna Pier Master Plan was completed in 2009 and represented the first major planning initiative for this Southeast Michigan community. As part of the Luna Pier Master Plan, the City was awarded a grant for $490,000 from the Michigan Natural Resources Trust Fund to help fund the improvements to the pier and beach area. Enhancements include a new restroom/changing area that will represent a replica of the Turtle Island Lighthouse that once stood in Lake Erie. The project also includes ADA improvements to the beach, a kayak launch, and storm water improvements. This grant was combined with a $100,000 U.S. EPA Great Lakes Restoration Grant that helps to fund an innovative storm water management system. This project demonstrates Green Streets techniques and innovative stormwater management which helps to clean runoff before it is discharged into Lake Erie. Poggemeyer assisted City Leaders in obtaining the grant funds and also provided design services for the new waterfront. Reference Mr. Greg Stewart Former City Administrator; City of Luna Pier 734.847.6791 ext. 7322

2008 National Outstanding Marina and Harbor Award States Organization for Boating Access (SOBA) AWARD WINNING PROJECT Location Toledo, Ohio Site, Mechanical, Electrical and Structural Engineering, Construction Administration Schedule 2006 Professional Services 2007 Construction Cost $5.8 million Project Team Richard Hertzfeld, P.E. Project Manager Daniel L. Knott, P.E., Electrical Engineer James Jordan, Design Technician John Brock, P.E., Structural Engineer TOLEDO SKYWAY MARINA Poggemeyer has played an integral role to-date in the conceptualization and development of the Marina District. As part of this extensive project, PDG completed a detailed design of the $5.8 million Marina and Site Improvements. PDG successfully met the accelerated schedule and the City s very aggressive bid date. This project consists of a 96-slip marina with full utilities, sanitary pump-out facilities, marine fueling facilities, access roads, parking, all public utilities including: water, sanitary sewers, storm sewers, power, gas, telephone and cable. Other major design components include; sheet pile wall and tie-back system in weak soils, a major 96 combined sewer junction chamber with primary screen, guide piles for floating docks, construction methods and sequencing to comply with brownfield clean-up requirements. The electrical design for the floating docks, future development, street lighting and passenger terminal building included drawings and specifications for the utility service connection, power distribution, grounding, shore power connections, and area and parking lot lighting. This project was complicated by the constrained site, coordination with the Toledo Edison Company of relocation of their main 69KV more...

Toledo Skyway Marina before power feeding the entire downtown business district, connection to the existing 35ft deep sanitary sewer and aggressive design schedule. Electrical Elements Underground Manholes Hand Holes and Duct Banks for Power Distribution Telephone and Cable Television System Cabling Calculations of Dock Electrical Loads According to National Electrical Code Requirements Calculations for Electrical Fault Analysis Photometric Analysis for Lighting Systems Construction Cost Estimating

Location Oregon, Ohio Planning, Engineering Cost $250,000 Project Funding ODNR NatureWorks Project Team Phillip A. Whaley, Project Manager WATERFRONT BOARDWALK PDG worked closely with the City of Oregon to move forward with waterfront development initiatives developed as part of the City s Comprehensive Plan. During the comprehensive planning process, the need to more fully capitalize on the Lake Erie waterfront was identified which led to the concept of developing a boardwalk adjacent to a city park and community center. After several attempts to secure funding from different sources, and modifying the original project scope, the City of Oregon and PDG prepared a successful NatureWorks application for the project. The new boardwalk improves and beautifies approximately 600 feet of Lake Erie Shoreline with a pedestrian walkway, access points to the water, decorative lighting, and outdoor furniture. This project stabilizes the shoreline, dissipates wave action with unique rip rap design, and provides various landscape treatments between the shoreline and Bay Shore Road. Project Relevance Waterfront Development Grant Writing Reference Michael Beasley Administrator/Public Safety Director City of Oregon 5330 Seaman Road Oregon, Ohio 43616-2633 419.698.7095