Guideline No.: C-02(201510) C-02 FIRE DOORS. Issued date: October 20,2015. China Classification Society

Similar documents
C-01 FIRE DECKS AND BULKHEADS

L-08 LIFEBOAT RELEASE MECHANISM

Guideline No.: S-02(201510) S-02 Navigation Light and Signal Light Controllers. Issued date: October 20,2015. China Classification Society

M-20 Oil Mist Concentration Detection and Alarm Device

Benefiting Government, Industry and the Public Through Innovative Science and Technology. Barry L. Badders, Jr. P.E.

E-16 Main Engine Remote Control System

E-17 Flammable Gas Detection and Alarm System

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

IMO UNIFIED INTERPRETATIONS TO SOLAS CHAPTER II-2 AND RELATED FIRE TEST PROCEDURES

PROCEDURES FOR APPROVAL OF LIFE-SAVING APPLIANCES AND FIRE SAFETY SYSTEMS, EQUIPMENT AND PRODUCTS

International Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A.

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

CERTIFICATE OF FIRE APPROVAL

F-03 FIXED FIRE DETECTION AND FIRE ALARM SYSTEM

MSC Guidelines for Automatic Sprinkler Systems

IMO COMPREHENSIVE REVIEW OF THE FIRE TEST PROCEDURES CODE

E-20 COMPARTMENT FLOODING WATER LEVEL DETECTORS (INCLUDING SENSORS)

IACS RESOLUTION CHANGES (GMO ) BEKİR SITKI TÜRKMEN

SOUND RECEPTION SYSTEM

IMO FP 53 Report. Lloyd s Register report on the 53 rd session of IMO Fire Protection Sub-Committee. 16 th March, 2009

CERTIFICATE OF FIRE APPROVAL

GROUNDING AVOIDANCE SYSTEM (GAS)

DNVGL-CP-0398 Edition December 2015

Global Requirements for the Fire Protection of Ships. Dr Janet Murrell Warrington Certification Ltd

AMENDMENTS NO. 3/2012 to

DNVGL-CP-0399 Edition March 2016

Part 6 Additional class notations Chapter 6 Additional fire protection for passenger vessels

RESOLUTION MSC.101(73) (adopted on 5 December 2000) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR APPLICATION OF FIRE TEST PROCEDURES

DNVGL-CP-0401 Edition February 2016

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91)

DNVGL-CP-0402 Edition February 2016

MSC Guidelines for Foam Fire Suppression Systems

RESOLUTION MSC.265(84) (adopted on 9 May 2008) AMENDMENTS TO THE REVISED GUIDELINES FOR APPROVAL OF SPRINKLER SYSTEMS EQUIVALENT TO THAT REFERRED TO

26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

ISO INTERNATIONAL STANDARD. Ships and marine technology Lowlocation lighting on passenger ships Arrangement

ASTM F25 SEMINAR Fire Testing for SOLAS and Navy Vessels New Test Procedures and Materials Approval Process

MOBILE OFFSHORE DRILLING UNITS 2012

DNVGL-CP-0407 Edition February 2016

gb# DG UV Test EC-Type Examination (Module B) Certificate Certificate No A.1/3.34 Fire resisting divisions for high speed craft

***** 2. Rev.1 is to be uniformly implemented by IACS Members from 1 July 2004.

FirePro ANNEX 1 MARINE MANUAL. Version 1,

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

DEPARTMENT OF CONSUMER AND INDUSTRY SERVICES DIVISION OF ADULT FOSTER CARE LICENSING ADULT FOSTER CARE FACILITIES

MGN 453 (M) Maritime and Coastguard Agency Logo MARINE GUIDANCE NOTE

STANDARD FOR FIRE RATED ROLLING DOOR ASSEMBLIES

UNIFIED INTERPRETATION OF PROVISIONS OF IMO SAFETY, SECURITY, AND ENVIRONMENT-RELATED CONVENTIONS

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

CERTIFICATE OF FIRE APPROVAL

Main changes in BV Rules for Steel Ships

Dear Customer. Please find attached the January 2017 amendments to C/AS4 Acceptable Solution for Buildings with. Innovation and Employment.

RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

ISO INTERNATIONAL STANDARD. Fire-resistance tests Elements of building construction Part 1: General requirements

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch

gb# DG UV Test EC-Type Examination (Module B) Certificate Certificate No A.1/3.34 Fire resisting divisions for high speed craft

Annex to the Accreditation Certificate D PL according to DIN EN ISO/IEC 17025:2005

ACCOMMODATION BARGES GUIDE FOR BUILDING AND CLASSING JANUARY 2014

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

4 June This circular supersedes MSC/Circ.914. *** I:\CIRC\MSC\01\1272.doc

UNIFIED INTERPRETATIONS OF SOLAS CHAPTER II-2, THE FSS CODE, THE FTP CODE AND RELATED FIRE TEST PROCEDURES ***

Lloyd s Register Type Approval System Test Specification Number 3

Australian Standard. Water mist fire protection systems System design, installation and commissioning AS

Ch. 569 FIRE AND SAFETY SERVICES 28 CHAPTER 569. FIRE AND SAFETY SERVICES GENERAL PROVISIONS INTERNAL DISASTER PLAN EVACUATION DRILLS

MSC Guidelines for General Emergency Alarm & Public Address Systems

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Shipboard incinerators with capacities up to 4000 kw

Applicable international instruments for construction, performance and testing requirements 1

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

V DG UV Test. EC-Type Examination (Module B) Certificate. Certificate No A.1/3.34 Fire resisting divisions for high speed craft

Requirements for ships carrying hydrogen and compressed natural gas vehicles

INTERNATIONAL STANDARD

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS

IMO MSC 94 Summary Report on Polar Code

IMO Resolution MSC 61(67): Annex 1: Part 2

MSC Guidelines for Watermist Fire Suppression Systems Procedure Number: E1-03 Revision Date: 02/16/2017

Public Comment No. 2-NFPA [ Section No ]

Classification for burning behavior of building materials and products

BUILDING AND CLASSING FACILITIES ON OFFSHORE INSTALLATIONS

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

EC-Type Examination (Module B) Certificate. A.1/3.11 b "B" dass divisions, fire integrity

Test Report: ICL/H18/9039 Rev 1

ei DG UV Test EC-Type Examination (Module B) Certificate

ei DG UV Test EC-Type Examination (Module B) Certificate A.1/3.27 a Penetrations through "B" Class divisions (electric cable transits)

GUIDE TO APPROVAL OF RETROFIT BALLAST WATER MANAGEMENT SYSTEM INSTALLATIONS

Notified Body No.: 0575 G U A D N L. SJq

RULES FOR THE CLASSIFICATION AND CONSTRUCTION OF NAVAL SHIPS

Developing a Healthcare Facility Fire Door Inspection Program

FACILITIES ON OFFSHORE INSTALLATIONS 2018

AQ Translated English of Chinese Standard: AQ WORK SAFETY INDUSTRY STANDARD

EC TYPE EXAMINATION CERTIFICATE

Notice No. 7. Rules and Regulations for the Classification of Ships, July Issue date: March Working together for a safer world

ISO INTERNATIONAL STANDARD. Determination of the resistance to jet fires of passive fire protection materials Part 1: General requirements

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Report on Public Input June 2014 NFPA 101

Australian/New Zealand Standard

ed DG UV Test Prüf- und Zertifizierungsstelle BG Verkehr Dienststelle Schiffssicherheit

c. Oko-Tex (European environmental health standard)

Transcription:

Guideline No.: C-02(201510) C-02 FIRE DOORS Issued date: October 20,2015 China Classification Society

Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and testing criteria related to classification and statutory survey of marine products. This Guide is published and updated by CCS and can be found through http://www.ccs.org.cn. Comments or suggestions can be sent by email to ps@ccs.org.cn. Historical versions and release date : Main changes and effective date:

CONTENTS 1 Application... 4 2 Normative references... 4 3 Plans and technical documents... 4 4 Materials and components... 5 5 Design and technical requirements... 5 6 Type test... 6 7 Unit/batch inspection... 8 3 / 8

FIRE DOORS 1 Application 1.1 This Guideline applies to the doors fitted in compartments and passages of ships and offshore installations according to the requirements for A, B and H class fire divisions. 1.2 The types of fire doors are as follows: single leaf fire doors, double leaf fire doors, sliding fire doors (i.e. fire sliding doors), lift fire doors, shutter fire doors, etc. 2 Normative references 2.1 The approval and inspection of fire doors are to be based on the following documents and their subsequent amendments: (1) Regulations 3 and 9, Chapter II-2 of International Convention for the Safety of Life at Sea, 1974 and the amendments thereof;(2) IMO Resolution MSC.307(88)-the International Code for Application of Fire Test Procedures, 2010 (IMO 2010 FTP Code); (3) Chapter 1, PART SEVEN of CCS Rules for the Construction and Classification of Mobile Offshore Units; (4) ISO/TR 834-3:1994 Fire-resisting Tests Elements of Building Construction Part 3: Commentary on Test Method and Test Data Application ; (5) Regulations 3~12, Chapter II-1 of International Convention for the Safety of Life at Sea, 1974 and the amendments; (6) IMO MSC.337(91) The Code on Noise Levels on Board Ships; (7) Chapter 4 Part 3 CCS Guidelines for Noise Control and Testing for Ships and Products. 3 Plans and technical documents 3.1 To apply for the type approval of fire doors, the following drawings and technical documents are to be submitted in triplicate to CCS for approval or information: (1) General arrangement of fire door; (2) Drawing of door leaves (including vent, escape hatch grating or hose opening, as appropriate); 4 / 8

(3) Drawing of door frame; (4) Fire test arrangement (including thermocouples); (5) Technical specifications of fire doors (for information); (6) Type test program; (7) List of qualified suppliers of major raw materials/components and parts; (8) Product installation specifications; (9) Nameplate. 4 Materials and components 4.1 Materials and components are to comply with relevant requirements of CCS Rules. 4.2 The door leaves and frame are to be made of steel or other equivalent materials, and CCS approved core materials (i.e. insulation materials, e.g. non-combustible materials such as rock wool, ceramic fiber and calcium silicate boards), and relevant approval certificates are to be provided. Door locks, automatic closing devices (if necessary) are to be approved by CCS. 5 Design and technical requirements 5.1 A and B class fire doors are to comply with the relevant requirements in 2.1(1) and (2) of this Guideline in terms of structural design, integrity and insulation. 5.2 H class fire doors are to comply with the relevant requirements in 2.1(2), (3) and (4) of this Guideline in terms of structural design, integrity and insulation. 5.3 Major raw materials of fire doors are to comply with the following requirements: (1) Insulation materials (non-combustible materials such as ceramic fiber,rock wool and calcium silicate boards): the non-combustibility is to comply with Part 1 of IMO 2010 FTP Code. (2) Adhesives: the low flame spread characteristics are to comply with Part 5 of IMO 2010 FTP Code. (3) Non-metallic materials used in fire doors are to be free of asbestos. 5 / 8

6 Type test 6.1 Selection of typical samples: The standard fire test may be carried out to the largest fire door (with the largest opening size) constructed on the basis of approved drawings. Other tests may be carried out at the manufacturer. 6.2 The type test items are given in Table 6.2. The type test items Table 6.2 No. Test item Type test Routine test 1 Review of material quality certificates 2 Size examination 3 Surface quality examination 4 Strength test 5 Opening and closing test 6 Standard fire test 7 acoustic noise index test for air sound insulation 6.3 Test methods and requirements (1) Review of material quality certificates: Main raw materials of fire doors are to be furnished with: the manufacturer s quality certificate for steel plates, CCS products/approval certificates for insulation materials, CCS products/approval certificates for fire door locks and automatic closing devices (if necessary). (2) Size examination: External size and gap measurements are to comply with the approved drawings. (3) Surface quality examination: The surface of samples is to be smooth and free from burrs and cuts, and the paint is to be applied evenly without drainage, wrinkling, and breakdown (if painted). (4) Strength test (except shutter doors, sliding doors and lift fire doors): The door is to be dropped freely for three times with door leaf being opened to an angle of 60, and the tested door leaf and frame are to be structurally intact and undamaged. 6 / 8

(5) Opening and closing test(except shutter doors, sliding doors and lift fire doors): The vertically installed door is to be inclined to an angle of 3.5 in the direction opposite to the vertical one and then opened and closed for three times, with the door leaf being opened flexibly without abnormal noise and the bolt being easily inserted into the lock latch when closing the door. (6) The standard fire test is to be carried out in accordance with the requirements in Part 3 of IMO 2010 FTP Codeor ISO/TR 834-3 & Part 3 of IMO 2010 FTP Code. (7) The products which met the requirements Regulations 6.2 Chapter 6 of IMO MSC.337(91) The Code on Noise Levels on Board Ships should be tested for acoustic noise index at the test and inspection institutes approved by CCS.The specific testing methods, please see to Chapter 4 Part 3 CCS Guidelines for Noise Control and Testing for Ships and Products. 1 Integrity requirements: a) A class (including A-60, A-30, A-15, A-0) fire doors are to be subjected to the standard fire test for one hour, at the end of which the doors are to be intact and capable of preventing the passage of smoke and flame; b) B class (including B-15, B-0) fire doors are to be subjected to the standard fire test for half an hour, at the end of which the doors are to be intact and capable of preventing the passage of flame; c) H class (including H-120, H-60, H-30, H-0) fire doors are to be subjected to the standard fire test for two hours, at the end of which the doors are to be intact and capable of preventing the passage of smoke and flame. 2 Insulation requirements: a) A-0, B-0, H-0 class fire doors are to comply with the integrity requirements only; b) A-60, A-30, A-15, H-120, H-60 and H-30 class fire doors are to be fitted with thermocouples on the unexposed surface according to 7.6.3 of Appendix 1 of Part 3 of IMO 2010 FTP Code during the standard fire test, and the average temperature will not rise more than 140 above the initial temperature, nor will the temperature, at any one point, including any joint, rise more than 180 above the initial temperature, whereas for B-15 class fire doors the temperature at any one point will not rise more than 225 above the initial temperature, within the test period corresponding to the appropriate degrees of fire resistance. (8) The connection of the door frame to the bulkhead: in a test, the method of fixing the door frame to the bulkhead is to be as used in practice. If the method of fixing the door frame in a test is made by bolts, welding may also accepted as a method of fixing the door frame without further tests. Where intermittent welding is used, reliable methods are to be used to fill the welding gap with non-combustible materials or appropriate fire-retardant materials (e.g. fire-resisting 7 / 8

sealant). (9) Non-metallic materials used in products are to be free of asbestos and are to provide asbestos free statement or approval certificate. 6.4 Test report (1) The non-combustibility test report for insulation materialsis to comply with the requirements in Part 1 of IMO 2010 FTP Code. The term of validity of non-combustibility test report for insulation materials of A, B and H class fire doors is not to be beyond 24 months before the date of the insulation test, or valid CCS certificates for insulation materials are to be furnished with. (2) The standard fire test report is to comply with Part 3 of IMO 2010 FTP Codeor ISO/TR834-3&Part 3 of IMO 2010 FTP Code. (3) Test reports for application are not to be more than 5 years old. If the approval depends on several test reports with different dates, the date of the oldest report governs. However, a type approval certificate may be renewed without retesting provided that the test report is not more than 15 years old and that no alternation of components or construction has been made to the product. (4) Prior to 1 July 2013, fire tests may still be carried out in accordance with the older edition of FTP Code (1996 FTP Code). The term of validity for test reports is not to exceed 15 years. 7 Unit/batch inspection 7.1 10% of fire doors for each type/specification are to be taken as test samples. 7.2 The unit/batch inspection of fire doors is to be carried out upon type approval. The inspection scope is shown in column Routine test of Table 6.2. 7.3 Products are to comply with the asbestos free requirement and provide asbestos free statement or approval certificate. 8 / 8