Operation and Maintenance Manual Sondex All-Welded Heat Exchangers (SAW)

Similar documents
Instruction and Maintenance Manual. Spiral Heat Exchanger

Plate Type Heat Exchangers. Operation and Maintenance Manual

Operation of heat exchangers

Aston Technology-Sondex A/S PHE - Design & Datalist V10A34 Aston Thomas McLaughlin 05/03/ ATESHEX S1 Item: 1

PLATE HEAT EXCHANGER

PLATE HEAT EXCHANGERS. Operation and Maintenance Manual

Description. Main components. Lifting eyes To used for lifting and transport securing. Carrying bar Carries the cassettes and the pressure plate.

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

HRS Heat Exchangers Instruction Manual

Rycroft Supapac Plate Heat Exchangers

Installation, Operation and Maintenance Instructions ThermaFlex Gasketed Plate Heat Exchanger OM010

AIC Brazed Plate Heat Exchanger Operating and Instruction Manual

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

Titanium Plate Heat Exchanger. Installation & Operating Manual

LONGONI ENGINEERING SRL

Channel plates Heat is transferred from one medium to the other through the thin channel plates.

Instruction Manual Plate Condenser. AlfaCond 400/600/800. Part number

Instruction Manual, Toftejorg Rotary Spray Heads Toftejorg MultiMidget, Toftejorg MultiMagnum

Operating Guide. Termix Compact 28 VX-FI / HWP / HWS. 1.0 Table of Contents. 1.0 Table of Contents

UniAir UniBraz UniCompact UniGasket UniSystem UniTwist UniWeld

Instruction Manual. Pharma-line ESE02198-EN Original manual

Brazed Plate Heat Exchanger Operations Manual

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

COPYRIGHT Alfa Laval Lund AB, 2012 How to contact Alfa Laval Contact details for all countries are continually updated on our website.

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents

General Maintenance and Operating Instructions for Heat Exchangers

TITAN FLOW CONTROL, INC.

Medical Refrigerator

Installation of Glass Lined Equipment

M3 M6 M10 TS6 T2 T5 TL3 TL6

Instruction Manual - Plate Heat Exchangers

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

HW 22 District heating substation for indirect heating and domestic hot water systems

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

CRU-S Series Stainless Steel Condensate Recovery Unit

Instruction manual ISO-MIX Skid Mounted Pump Unit

ULTRA LOW TEMPERATURE FREEZER. User Manual

Akva Lux VX District heating substation for indirect heating and domestic hot water systems

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

Installation Guide. Termix Distribution unit. 1.0 Table of Contents. 1.0 Table of Contents

Inverted Bucket Steam Traps

INSTRUCTION MANUAL HETO CBN 8 / 18 / C Cooling Baths ID: IM.doc Revision 1

WesPlate. Operation, Maintenance & Installation Manual. Heat Exchanger. Models WP & WPDW

1200 EVERYDAY PRESSURE WASHER. Instruction Manual. Model: PW If you have any questions or comments, please call our toll free

Indholdsfortegnelse. Danvent Air Handling Units SERVICE MANUAL

MARUYASU INDUSTRIES CO.,LTD.

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

Akva Vita TDP District heating flat station for direct heating and domestic hot water systems

MJC Cartridge Filter Unit Operation & Maintenance

Circulation heaters for ATEX/IECEx hazardous areas or in non-atex version

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Decentralised ventilation units

Steam Condensing Heat Exchanger SR-3 / SR-8

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death.

Operating Manual. Model: 1400 Model: 1400-N RIFOmat Float-Controlled Condensate Traps, PN Safety instructions. 2 General description and use

HKF 8180 Operating instructions

Akva Vita Instantaneous water heater

HOT WASHER MODEL NO: KING150

HELMUT KÄMPKEN GMBH OPERATING MANUAL

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

Medical Refrigerator DW-25H SERIES

M07. Wunda Premium Manifold. Before you start: Check the contents THE BRAND YOU CAN TRUST

VERSAFLOW VORTEX Supplementary instructions

Installation and Maintenance "L" and "LS" Series

SERVICE PROCEDURES. Mattress 2 Pipe Overlay or Replacement

Daikin Water Cooling, Heating, and High Capacity Booster Coils

B 353 COFFEE BREWING MACHINES MACHINES A CAFE KAFFEEBRUEHMASCHINEN KOFFIEZETAPPARATEN

FSW300 Series Flow Switch

ACT Cartridge Dust Collector

Manual Barrel-Dosing Pump BDP

Rev Installation Guide. Sondex Industrial and Marine Pumps

EasiHeat Mechanical Installation and Commissioning Instructions

Installation, Operation and Maintenance Instructions for ThermaFlex Brazed Plate Heat Exchangers

PJ130S High Pressure Cleaner

Inta City Concealed Shower Mixing Valve CT80010CP

Model: 1413 Model: 1418 Float-Controlled Condensate Trap, PN 100

XC-18. NOTE: *Machine shown without Lift-Up Safety Guard. This guard is included with machine. Machine should not be operated without this guard.

GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

55-Gallon Dispenser Package

BoilerSupplies.Com. America's Choice For Boiler Room Supplies. Installation, Operation, & Maintenance Instructions For Shell & Tube Heat Exchangers

PC 640 GB. Built-in cooking tables 60 Instructions for installation and use

Akva Vita TDP-F District heating flat station for direct heating and domestic hot water systems

Where the tap has a removable aerator on the spout exit it can be removed and cleaned periodically to maintain optimum flow performance.

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference TEMPERATURE CONTROL STEAM TRAP LEX3N-TZ LEX3N-TZ.

OWNERS GUIDE TO INSTALLATION AND OPERATION

RSIF power venter USA CAN READ AND SAVE THESE INSTRUCTIONS! Installation and operation manual. Product information Chapters 1 + 2

Installation and Operation Instructions Domestic hot water module FriwaMini with circulation - DN 15

THERMODYNAMIC STEAM TRAP

INSTRUCTION MANUAL (English version) Water still

This manual provides many important safety points. Please read it carefully and follow the instruction rules.

Empty unit Cover Water Total weight 15 kg 8 kg 10 kg 33 kg

Flash Condensing De-aerator Heads Installation and Maintenance Instructions

Operating Instructions. Accessory Units Melitta Cafina XT Series. Melitta Professional Coffee Solutions

Friwa Compact. Operating instructions EN

FOF INDUSTRIAL SATURATED STEAM STERILIZERS

Transcription:

Operation and Maintenance Manual Sondex All-Welded Heat Exchangers (SAW)

The contents of this publication are based on the latest information available and the materials that are used at the time of printing. However, because of rapid developments in this field we cannot be held liable for changes in specifications affecting the contents of this publication. COPYRIGHT Copyright SONDEX HOLDING A/S. All rights reserved. No part of this publication may be reproduced or distributed without prior written permission of SONDEX HOLDING A/S. 2

CONTENTS 1 FOREWORD.... 4 2 INTRODUCTION.... 4 3 SAFETY ALERT NOTICES... 4 4 GENERAL... 5 4.1 Identification of the heat exchanger.... 5 4.2 Correct operation.... 6 4.3 Precautions.... 6 4.4 Thermal design... 7 5 INSTALLATION... 8 5.1 Requirements to the installation area.... 8 5.2 Transport, lifting, storage.... 8 5.3 Installing the pipe connections.... 9 6 COMMISSIONING / OPERATION.... 10 6.1 Commissioning and pre-checks... 10 6.2 Operation... 10 6.3 Shut-down for a short period... 11 6.4 Shut-down for a long period... 11 7 MAINTENANCE... 12 7.1 Clean in place (CIP)... 12 7.2 Some cleaning detergents... 12 7.4 Maintenance of the heat exchanger... 12 8 PROBLEM SOLVING... 13 3

1 FOREWORD This manual is a guide for installation, commissioning and maintenance of SAW plate type heat exchangers supplied by SONDEX. It is meant for those who are responsible for the installation, the use and maintenance of the heat exchangers. We recommend that you read this manual carefully before commencing any work. 2 INTRODUCTION This manual is applicable for all SAW heat exchangers produced and supplied by SONDEX. SONDEX can not be held responsible or liable for damage as a result of incorrect installation, use and / or maintenance of SONDEX plate type heat exchanger as well as not complying with the instructions in this manual. Please note that our heat exchangers are specially designed and built for the operating conditions (pressures, temperatures, capacities and type of fluids) provided by the customer. Sudden pressure peaks beyond the normal operating pressure (or pressure surges) which can occur during starting up or stopping of the system can severely damage the heat exchanger and should be prevented. SONDEX can not be held responsible for any damage as a result of any operation deviating from the original design conditions. If you wish to alter the design conditions, please contact us. You may only commission the heat exchanger under the modified conditions after inspection and written approval by SONDEX. Also the name plate on the heat exchanger will be adapted. 3 SAFETY ALERT NOTICES Safety Alert Notice Following MUST be respected by installing/running/servicing plate heat exchangers: Keeping current local safety regulations. Before any work begins ensure that the exchangers are pressureless and cooled till under 40ºC. Use gloves for preventing any injury. In all cases ensure that all laws and regulations are strictly kept concerning human/ environment protection. YELLOW TRIANGLE Refer to applicable SAFETY ALERT notices within the manual! All SAFETY ALERT notices are applicable to personal injury and identified by the following symbol. 4

4 GENERAL 4.1 Identification of the heat exchanger All plate type heat exchangers supplied by SONDEX are provided with a name plate. On this plate the following details are specified: type of heat exchanger year of manufacture manufacturing number nominal capacity in kw transmission area in m2 max. working pressure in bar test pressure in bar max. working temperature in C Find your local service partner at www.sondex.net SAW Type Serial No. Heat Surface Nominel Capasity Flow Max. Differential Pressure kw Ltr/h Product Side Media Side Working Temperature Min. C Max. C Max. Working Pressure bar bar Volume Ltr. Ltr. m 2 bar Year EXAMPLE Important: 1. The starting of the SAW must be done without shocks and against colsed valves. 2. Max. working pressure may not be exceeded at any time. FIG 1 5

4.2 Correct operation This user manual provides information and instructions for correct and safe operation of the unit. Many accidents are caused by incorrect use! It is essential that you study the instructions carefully, and above all, ensure the availability to those who install, maintain and operate the heat exchanger on a daily basis. This manual is of no value if it is not available at the time when your staff needs it. If a problem occurs with your SONDEX Heat Exchanger which is beyond the scope of this manual, do not hesitate to contact us. The installation should not be put into operation before all indistinctnesses have been solved! To avoid injuries and damages, follow the instructions and local applicable safety regulations. Also take the necessary protective measures, depending on the nature of your process or circumstances related to it, at your plant. Please note that our plate type heat exchangers are especially designed and built for the operating conditions (pressures, temperatures, capacities and type of fluids) provided by the customer. Sudden pressure peaks beyond the normal operating pressure (or pressure surges) which can occur during starting up or stopping of the system can severely damage the heat exchanger and should be prevented. SONDEX can not be held responsible for any damage as a result of any operation deviating from the original design conditions. If you wish to alter the design conditions, please contact us. You may only commission the heat exchanger under the modified conditions after inspection and written approval by SONDEX. Also the name plate on the heat exchanger will be adapted. 4.3 Precautions All potential personal injury hazards are identified by safety alert symbol. Bodily harm can be caused by: burning as a result of touching the heat exchanger or other parts of the installation; the uncontrolled release of pressurized media with which the danger of burning and other injuries is present; contact with chemicals; touching sharp edges of the installation. Damage to equipment can be caused by: external forces; corrosion; chemical action; erosion; material exhaustion; water hammer; thermal and / or mechanical shock freezing; wrong transport / lifting. 6

Even after stopping the installation some parts of it can still be hot! The heat exchanger may only be used with the fluids specified on the datasheet. The hot medium may not flow through the exchanger without the cold medium flowing through. This is to prevent damage to the exchanger. In case the cold medium is present but does not flow while the hot medium is flowing through, the cold medium will start boiling and the exchanger will be damaged. Sudden pressure and temperature changes should be prevented. When a heat exchanger (filled with water or a water mixture) which is not in operation is exposed to temperatures below zero, the plates can become deformed. If a danger of frost occurs, the heat exchanger should be drained completely. If the heat exchanger is being used with temperatures above 60 C or with aggressive fluids, we advise you cover the heat exchanger with a screen plate to prevent the risk of touching. If welding activities have to be carried out near the heat exchanger, never use the heat exchanger for earthing the construction work. If you have to weld, dismantle the connecting flanges and isolate the heat exchanger from the system. 4.4 Thermal Design Sondex heat exchangers are designed and calculated according to the newest technology. If performance test has to be carried out, the exchanger must be totally clean. In the Sondex data sheet the nominal capacity and pressure losses are mentioned. 7

5 INSTALLATION 5.1 Requirements to the installation area It is very important that enough space around the heat exchanger is kept free for servicing of the unit. Min. 5.2 Transport, lifting and storage SAW23 WARNING: To prevent personal injury always use appropriate hoisting equipment. If you are to lift the heat exchanger itself, straps should be used. They should be placed as shown on the picture. 8

Never lift the heat exchanger by using the connections or studs around them! Attention: ALWAYS: NEVER: Use the lifting eyes (if fitted) Attach the straps to the clamping bolts Lift using the connections Storage: Should it be necessary to store the heat exchanger for a longer period (1 month or more), certain precautions should be taken in order to prevent unnecessary damage to the equipment. Preferably the heat exchanger should be stored inside in a room with a temperature around 15 to 20 C and a humidity of max. 70%. If this is not possible, place the heat exchanger in a wooden box which is provided with a lining on the inside against penetration of moisture. 5.3 Installing the pipe connections Depending on the type the SONDEX plate type heat exchanger will be provided with flanges, couplings, threaded pipes, etc. When connecting the pipe system to the heat exchanger make sure that no stress or strain is imposed, by the pipe system, on to the heat exchanger! We advise you of the following: Heavy pipe work needs to be supported. This will prevent heavy forces on the heat exchanger. Always install flexible connections to prevent vibrations on the heat exchanger. These flexible connections also prevent expansion of the pipe work, caused by temperature influence, onto the heat exchanger. These flexible connections need to be fitted in a longitudinal direction to the plate package. The pipe work needs to be thoroughly cleaned and flushed before connecting up to the heat exchanger. Always install vents on both sides of the heat exchanger. Note: For proper venting the vents should be fitted on the highest point in the direction of the flow of the medium (preferably on an air vessel). To enable the heat exchanger to be opened when necessary shut off valves should be provided in all connections! Make sure that the pipe work, connected to the heat exchanger, is secured against pressure peaks / surges and temperature shocks! 9

6 COMMISSIONING / OPERATION 6.1 Commissioning and pre-checks Commissioning may only be done by staff specially trained for the job or by SONDEX commissioning engineers. Control, maintenance and repair of the installation may only be done by authorized, trained and properly instructed staff. Maintenance and cleaning may only be done with a heat exchanger cooled to under 40 C and shut down! Check if all connections are fitted correctly (see also 5.3). Check the pressures and temperatures of the media and make sure that these are not more than the values specified on the name plate. Cause of the many pressure holding weldings, it is important to heat up the heat exchanger slowly. The heating up time may not exceed 10 C / 15 minutes, when the heat exchanger has exceeded 50 C. Working pressure is to be achieved gradually max. 1 bar/min. It is essential that the heat exchanger is not subjected to thermal or mechanical shock as this could lead to premature gasket failure 6.2 Operation Start cold circuit first, then the hot circuit. Fully vent the system; Close shut off valve fitted between pump and exchanger; Fully open valve fitted into return line from the exchanger; Start the circulation pump normally placed by the inlet; Gradually open closed shut off valve between pump and exchanger; Vent system again if necessary. Repeat the above for the secondary circuit. 10

When using steam as one of the media: Use slow acting steam control valves and open slowly shut off valves! Before start up: Ensure that the steam control valve is fully closed Ensure that the heat exchanger is fully drained of condensate Start cold circuit first, then the steam side Open steam control valve slowly this prevents water hammer of any condensate in the steam line and reduces the pressure / thermal shock to the exchanger Ensure that the steam trap is correctly sized to allow full condensate discharge this prevents water clogging inside the exchanger Check for proper operation: Check for pressure pulses in the system caused by the pumps or control valves. If found, stop operation and rectify. Continuous pressure pulses will result in fatigue failure of the heat exchanger. Visually check the unit for leakages. Check that all vents are closed to prevent air being sucked into the system. When in operation, the conditions should not be changed. The max. conditions specified on the name plate should not be exceeded. 6.3 Shut-down for a short period If the heat exchanger has to be shut down for a short period, please follow this procedure: Slowly close the control valve in the hot circuit whilst maintaining the full flow in the cold circuit; Switch off the hot circuit pump; Cool down the heat exchanger to under 40 C; Slowly close the control valve in the cold circuit; Switch off the cold circuit pump; Close all remaining shut off valves. 6.4 Shut-down for a long period If the unit is to be taken off line for an extended period of time then the following procedure should be followed: Point 6.3 must be followed, then: Allow unit to cool down Drain all circuits Please also see chapter 5.2 - Storage 11

7 MAINTENANCE 7.1 Clean in place (CIP) CIP cleaning (clean in place by circulating cleaning detergents) To use CIP cleaning, it is a condition that the scaling on the plates is soluble. All materials in the whole circulation system of course have to be resistant to the cleaning detergent. We advise you to ask for a confirmation from the supplier of the cleaning detergent that it will not damage the materials in the heat exchanger. If the solution requires recirculation, select a flow that is as high as possible, and certainly no less than the service or product flows. Follow the instructions as given by the detergent supplier / cleaning specialist. We suggest that for recirculated cleaning detergent methods, the fluid should be pumped through the exchanger for no less than 30 minutes, but this is only an estimate, the cleaning time depends on the type of fouling. Rinsing After using any type of cleaning agent, always rinse thoroughly with fresh water. If cleaning in place then circulate fresh water for at least 10 minutes. 7.2 Some Cleaning Detergents Oil and grease can be removed with a water emulsifying oil solvent i.e. BP system. Organic and grease cover can be removed with sodium hydroxide (NaOH) maximum concentration 1,5% - max. temp. 85 C. Mixture for 1,5% concentration = 5 ltr. 30% NaOH per 100 ltr. water. Stone and limestone can be removed with nitric acid (HNO3) - max. concentration 1,5 % - max. temp. 65 C. Mixture for 1,5% concentration = 2.4 ltr. HNO3 62% per 100 ltr. water. Nitric acid also has an affective build up effect on the passivation film of stainless steel! CAUTION: Nitric acid and Sodium Hydroxide may cause injury to exposed skin, eyes, and mucous membranes. Use of protective eyewear and gloves is strongly recommended. 7.3 Maintenance of the heat exchanger Time interval once a year as a minimum Check temperatures and flows against commissioning data. Check general condition and look for any signs of leakage. Wipe clean all painted parts and check surfaces for signs of damage touch up if necessary. Check bolts and bars for rust and clean. Lightly coat threaded parts with molybdenum grease or a corrosion inhibitor (ensure that no grease, etc. falls onto the plate gaskets. 12

8 PROBLEM SOLVING If you have problems with your heat exchanger, in most cases these can be solved by your own personnel. Please find below a summary of possible problems as well as possible causes and solutions. A condition for the continuous proper functioning of your heat exchanger is in strict compliance with the permissible values for pressure and temperature mentioned on the name plate. Exceeding these values, even as short-lasting pressure peaks will cause damage to the unit and be the cause of problems. To avoid costly repairs, we advise you to have the installation work and maintenance carried out by properly trained personnel. You can also contact relevant SONDEX Sales Office. Problem Possible Cause Possible Solution Leakage At the connections Check the flange gasket (if fitted) Check the O-ring Fit the pipes tension-free Insufficient capacity Too high pressure drop Mixing of primary and secondary circuit Air in the system The operating conditions deviate from the specification The heat exchanger is dirty The connections have been interchanged Flow larger the the design flow Channels in plate(s) blocked Incorrect measurements Medium deviating from the design Air in the system Please contact Sondex De-aerate the pipe system Check the pipe work for possible air traps Adjust the operating conditions Clean the heat exchanger Redo the pipe work Adjust the flow Flush /clean Check the pressure indicator Addition of for instance anti-freeze will increase the pressure drop De-aerate the pipe system Check the pipe work for possible air traps 13

Sondex A/S - Head Office Jernet 9 DK-6000 Kolding Denmark Tel.: +45 76 306 100 Fax (1) +45 75 538 968 Fax (2) +45 75 505 019 info@sondex.dk www.sondex.net