Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Similar documents
Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

The purpose of tonight s PIC is to:

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

McKay Road Interchange and Salem / Lockhart Crossing

Public Information Centre

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Elevated Water Storage Facility and Pumping Station Municipal Class EA for Pressure District 7: PIC # 1 Summary

Commissioners Road West Realignment Environmental Assessment

TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK

Mavis Road Class Environmental Assessment

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Portage Parkway Environmental Assessment Public Information Centre No. 1

Commissioners Road West Realignment Environmental Assessment

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

Public Information Centre. Welcome

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In

Welcome to the Public Information Update for

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

APPENDIX K WINDSOR OFFICIAL PLAN

3-2 Environmental Systems

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

TABLE OF CONTENTS Page

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Central Lake Ontario Conservation Conservation Lands Master Plan

ONLINE PUBLIC INFORMATION CENTRE

Township of Adjala-Tosorontio Official Plan Review. Natural Heritage

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Wellington County Badley Bridge Replacement/Rehabilitation Environmental Assessment (EA)Study Welcome

The Gore Road Queen Street East to Castlemore Road

Public Information Centre No.2. Bram West Parkway. From Financial Drive to Heritage Road. and. Financial Drive

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 10, 2013

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

St. Clair Avenue West Area Transportation Master Plan

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Public Information Centre #1

TRCA Field Staking Protocol December 2016

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Ashbridges Bay Erosion and Sediment Control Project

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF DECEMBER 10, 2013

Red Hill Valley Project More Than A Road October 16, 2006

Rapid Transit Implementation Working Group September 14, 2017

WELCOME TO OPEN HOUSE TWO November 28, 2018

Notice of Study Commencement Vaughan Bowstring Arch Bridges Class Environmental Assessment Studies

City Of Owen Sound. 10th Street Bridge Evaluation - Schedule 'C' Environmental Study Report. Version 2 (Phase 3) GMBP File: June 26, 2018

Dundas Street (Regional Road 5) Improvements Class Environmental Assessment Study

GTA West Transportation Corridor EA Study Stage 2. Introductory Community Workshop

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

APPENDIX I Presentations

THE GREENBELT ACT AND PLAN

Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

City of Toronto. Emery Village Transportation Master Plan

Master Environmental Servicing Plan & Secondary Plan

OFFICIAL PLAN FOR THE TOWN OF NEW TECUMSETH

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

An Introduction to the Far North Land Use Strategy

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011

PDS June 1, 2016 Page 1. Planning and Development Committee. MEETING DATE: Wednesday, June 01, 2016

Albion Hills Conservation Area Master Plan: Project Summary

Richmond Hill Official Plan PART II SECONDARY PLANS

APPENDIX F: EXTERNAL APPROVALS

Mehemed Delibasic, P.Eng Project Manager Transportation Planning and Traffic Engineering AECOM CANADA Ltd.

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Scarborough Waterfront Project

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities.

HAZARD MITIGATION GOALS AND OBJECTIVES

Services Department B September 10, 2007

APPENDIX 1. Long Range Planning and the Vision for the Future of the Town

GTA West Corridor Planning and Environmental Assessment Study Public Information Centre #5 ADDITIONAL ANALYSIS IN THE HALTON AREA Backgrounder

One River Environmental Assessment. Welcome!

Environmental Study Report

13. VANDORF-PRESTON LAKE SECONDARY PLAN 13.1 INTRODUCTION

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

Elfrida Growth Area Study

APPENDIX L3. Table of Contents. SWP EA Information Sheets

TRCA Roles and Responsibilities in Planning and Development

BACKGROUND INFORMATION DOCUMENT

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

Transcription:

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan Date: April 7, 2016 Location: Al Palladini Community Centre, Meeting Room #1 Time: 7:00 pm 9:00 pm (Drop-in Session)

Project Overview Background The King-Vaughan Road Bridge is an arch bridge constructed in 1920, and carries one lane of vehicular traffic across the East Humber River in one continuous span. Structural inspection of King-Vaughan Road Bridge completed in May 2012 identified that immediate attention is required with major components of the structure. The deterioration of the structure has triggered the need for a Schedule C Municipal Class Environmental Assessment (Class EA) Study to assess the appropriate rehabilitation/ replacement strategy. King-Vaughan Road is a minor arterial road under the City of Vaughan Official Plan (2010). Key Plan King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 2 of 19

Project Overview Study Purpose To confirm the structural condition, along with the hydraulic and safety concerns related to the existing single-lane bridge and to determine the appropriate structural rehabilitation/ replacement strategy that will address the concerns and accommodate forecasted traffic demands. Study Objectives To consider, evaluate, and document improvement alternatives for King-Vaughan Road, taking into account natural environment, technical and socio-economic factors. Consulting with stakeholders to identify and resolve or mitigate issues of concern. To meet the requirements of the Municipal Class Environmental Assessment process to permit the City of Vaughan to proceed with detail design and implementation. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 3 of 19

Project Overview Municipal Class EA Process This project will be conducted in compliance with Schedule C of the Municipal Engineers Association "Municipal Class Environmental Assessment (2011). Phase 1 Identify and Describe the Problem(s) Phase 2 Alternative Planning Solutions Phase 3 Alternative Design Concepts For the Preferred Solution Phase 4 Environmental Study Report Phase 5 Implementation We Are Here Identify reasonable alternative planning solutions. Evaluate the alternative solutions, taking into consideration environmental and technical factors. Identify a preferred solution to the problem(s). Identify alternative designs to implement the preferred solution. Inventory natural, social/cultural and economic environments. Identify the impact of the alternative designs after mitigation. Evaluate alternative designs. Compile an Environmental Study Report (ESR). Place ESR on public record for review for 30 days. Notify the public and government agencies of completion of the ESR and of the Part II Order provision in the EA Act. Proceed to construction of the project. Monitor environmental provisions and commitments. Agency and Stakeholder Consultation Identify a preferred design. Agency and Stakeholder Consultation Problem Statement Preferred Solution ESR Preferred Design King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 4 of 19

Background Studies Completed Existing Land Use The Study Area is located within Natural Areas of the City s Official Plan with agricultural and rural residential land uses in the surrounding area. It is within the City s Core Natural Heritage System as well as the Greenbelt Plan Area. East Humber River The East Humber River is a permanent watercourse within the Humber River Watershed, originating at Lake Wilcox and flowing westward for approximately 18 km, where it passes under King-Vaughan Road. The river flows southward from King-Vaughan Road for approximately 15 km, where it converges with the Main Humber River. The Humber River watershed spans 903 km 2, from the headwaters on the Niagara Escarpment and Oak Ridges Moraine down through the fertile clay plains to the marshes and river mouth on Lake Ontario (TRCA, 2008). TRCA, 2008 King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 5 of 19

Background Studies Completed Structural Investigation Existing King-Vaughan Road bridge is a single span arch structure carrying one lane of vehicle traffic across the East Humber River tributary. A visual inspection and detailed structural evaluation was completed for the bridge. The bridge has reached the end of its service life and is required to be replaced. Due to structural deterioration, the bridge was closed in Fall 2015. A temporary bridge was constructed overtop of the existing structure, to allow reopening of traffic to King-Vaughan Road, until a preferred design is determined. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 6 of 19

Background Studies Completed Natural Environment Designated Natural Heritage Features: The East Humber River Valleylands Environmentally Sensitive Area (ESA) lies south of the bridge, with forested habitat beginning approximately 100 m south of the bridge structure. No Provincially Significant Wetlands or Areas of Natural and Scientific Interest (ANSIs) are present within, or in proximity to, the Study Area. The Study Area is within a locally significant natural site, that provides crucial linkage of habitat along the City s main valley land corridor for the migration of birds and animals. Ecological Land Classification: Three natural vegetation community types were identified in the Study Area, with five distinct Ecological Landscape Classification (ELC) community types recorded. The Study Area consisted predominantly of Dry-Moist Old Field Cultural Meadow (CUM1-1). Trees present along the banks of the East Humber River tributary include Manitoba Maple and Hawthorn. Mammals: Evidence of three mammal species was recorded (Coyote, Raccoon and White-tailed Deer) during the field investigations, East Humber River north of King- Vaughan Road Bridge crossing facing east which are common in urban and riparian habitats. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 7 of 19

Background Studies Completed Natural Environment Birds: Bird inventories in June and July 2015 recorded 34 species, all of which are considered common breeders in Ontario and are representative of urban and riparian areas. Species At Risk (SAR): Two avian SAR observed outside of the Study Area (Bobolink and Eastern Wood Pewee). Evidence of potential Bank Swallow or Northern Rough-Winged Swallow nest burrows were observed north of the Study Area. Bobolink and/or Eastern Meadowlark could potentially occur in the Study Area due to suitable habitat west of the bridge. Bank Swallow Eastern Wood-Pewee Eastern Wood-Pewee could potentially occur in the Study Area due to the presence of forest edges. Bank with inactive nest burrows identified to the north, outside of the Study Area Barn Swallows may nest under the bridge; however no nest was observed at the time of surveys. Bank Swallows could occur in the area; however, the river banks within the Study Area are low and not typical of those used by the species. Barn Swallow nest King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 8 of 19

Background Studies Completed Natural Environment Fish Community: The East Humber River is considered occupied habitat for Redside Dace. 16 species of fish were recorded within the reach approximately 100 m south of King-Vaughan Road, and are indicative of a warm to cool water fish community in the summer. Rainbow trout, which is an introduced species, represented the only migratory salmonid species reported. Other species reported include American Brook Lamprey, Redside Dace Blacknose Dace, Common Shiner, Fantail Darter, Rainbow Darter, and Rock Bass. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 9 of 19

Background Studies Completed Hydraulic Assessment Hydrologic and hydraulic models have been obtained from the TRCA. Under existing conditions, the bridge only has the capacity to pass the 1:10 year event without overtopping. Under temporary conditions, there will be a nominal increase in flood elevation at the bridge, which rapidly dissipates upstream, without impacting any structures, and for which the City has approval from all of the impacted landowners. Subject to confirmation from the City, a Regional floodline showing existing and temporary flow increase during temporary works rural arterial road is required to pass a 25 year event and a minimum freeboard requirement of 0.5m in accordance with the current MTO criteria. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 10 of 19

Background Studies Completed Fluvial Geomorphic Assessment Fluvial geomorphic characterization was undertaken for the East Humber River to identify existing and recent historic channel conditions, erosion threshold indicators. The results of rapid assessment confirm generally good quality channel performance in terms of both stability and habitat. Scoring is relatively similar for both sides of the crossing. In areas where rooting reinforcement does not spread below the channel invert, the river bed has been subject to incision. Some channel widening is currently seen in undercuts where the upper banks are slightly cantilevered or rolled over the lower bank. The proposed opening width to satisfy geomorphic requirements is 16.4m. The proposed bankfull cross-section under the crossing is 9.4m wide. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 11 of 19

Background Studies Completed Archaeology A Stage 1 Archaeological Assessment was completed for the Study Area (approx. 4.56 ha). It was concluded that approx. 33.8% of the Study Area has low to no archaeological potential. The remainder of the Study Area (66.2%) exhibits archaeological potential, where a Stage 2 Archaeological Assessment is required prior to any form of land alteration. Built Heritage and Cultural Heritage Southeast of bridge crossing Area identified with archaeological potential. Assessment There were no heritage designated properties within one kilometre of the Study Area. The King-Vaughan Road Bridge is contextually associated with the Humber River and the Toronto Carrying-Place Trail, an important early historic trail connecting Lake Ontario with Holland River where dozens of pre-contact Aboriginal sites have been Northwest of the bridge crossing Area identified with archaeological potential. identified along its length. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 12 of 19

Background Studies Completed Transportation and Traffic Study A Transportation and Traffic study was undertaken to examine the implications of keeping or removing the bridge. The study examined existing (2015) and forecast (2021) traffic conditions for King-Vaughan Road and Highway 27 with and without the crossing. The study noted a potential alignment for the GTA West Transportation Corridor crossing King- Vaughan Road and the Study Area. There were no reported collisions at the King- Vaughan Road Bridge. Forecast Year 2021 Very little traffic is forecast to use King-Vaughan Road in the year 2021 due to the alignment and discontinuity of the roadway. Should King-Vaughan Road Bridge be removed, it would adversely impact the operation of the Highway 27 and Kirby Road intersection, but improve conditions at the Highway 27 and King- Vaughan-Road intersection, assuming current roadway configurations and all traffic projected to use the crossing diverts to Kirby Road via Kipling Avenue and Highway 27. Planned future improvements to widen Highway 27 and expand the intersections would address these concerns. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 13 of 19

Problem Statement The following problem statement has been developed for this EA: Based on initial investigation and consultations, the following deficiencies and opportunities have been identified: Significant deteriorated structural condition; Sub-standard (single lane) width; Substandard hydraulics; and Opportunity to improve structure opening to enhance geomorphology. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 14 of 19

Planning Alternatives The following planning alternatives have been identified for consideration in addressing the problems and opportunities discussed above: Planning Alternative 1: Do Nothing: Leave the King-Vaughan Road Bridge over the East Humber River Tributary in its current state, recognizing that the existing bridge has been temporarily replaced through construction of a single lane temporary bridge over top of the existing structure. This alternative will result in continuing deterioration of the structure. Planning Alternative 2: Rehabilitation of the Structure: Complete rehabilitation of the existing structure as required to maintain vehicular access with minimal disruption to traffic. Planning Alternative 3: Replacement of the Structure: New two lane vehicle bridge using existing or alternative bridge alignment. Planning Alternative 4: Remove Bridge Structure: This would interrupt continuous access of King-Vaughan Road from Hwy 27 to Pine Valley Drive. No new structure would be constructed and vehicular traffic will be diverted to north to King Road or south to Kirby Road. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 15 of 19

Planning Alternatives Assessment Component Evaluation Criteria Planning Alternative 1: Do Nothing Planning Alternative 2: Rehabilitation of the Structure Planning Alternative 3: Replacement of the Structure Planning Alternative 4: Remove Bridge Structure Terrestrial/Vegetation Wildlife Habitat Species at Risk Natural Environment Groundwater/ Surface Water/Drainage Fisheries and Water Quality Flooding Social, Cultural & Economic Environnent Land Use Archaeology and Cultural Heritage Resources Utilities Construction Disruption Safety Traffic Structural Integrity Technical Expected Service Life Maintenance and Future Inspection Requirements Hydraulic Capacity Property Impacts Costs Capital Cost Area Plans & Policies Compatibility with Regional, City and Conservation Authority Area Plans and Policies PREFERRED King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 16 of 19

Preferred Planning Alternative Based on the results provided the Planning Alternative Assessment table and the assessment of Alternatives, Planning Alternative 3: Replacement of the Structure: New two lane vehicle bridge using existing or alternative bridge alignment is recommended to be carried forward as the preferred planning alternative for assessment of design alternatives and preliminary design. Associated Benefits Planning Alternative 3: Replacement of the Structure Provide new bridge that meets current design standards Provide 2 lanes of Traffic Improves Hydraulic Capacity Provides opportunity to enhance geomorphology With proper environmental constraint avoidance and mitigation planning, the benefits of Planning Alternative 3 outweigh its potential impacts to the natural and cultural environment. Further studies and impact assessment to the natural and cultural environment will be conducted during the detail design phase to minimize, mitigate, and compensate, as appropriate, for associated impacts. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 17 of 19

Next Steps Receive public comments by April 29, 2016; Review and confirm preferred planning alternative and assessment in light of comments received from the public and agencies to date, and confirm or modify alternative; Develop alternative design concepts; Complete detailed impact analysis; Develop proposal for mitigation of negative effects; Technical advisory meeting No. 2; PIC No. 2, and Prepare and submit the Environmental Study Report. King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 18 of 19

We Would Like To Hear From You Please complete the comment sheet and place in the Comment Box or send your comments by email/fax/letter to either of the following project team members by April 29, 2016. You can view tonight s information boards again on our website: https://www.vaughan.ca/projects/engineering_projects/king_vaughan_road_bridge/pages/ default.aspx Mr. Pat Marcantonio, C.E.T. Project Manager City of Vaughan Infrastructure Delivery 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Phone: 905-832-8585 Ext. 8468 Fax: 905-832-6145 Email: Pat.Marcantonio@Vaughan.ca Mr. David Sinke, P. Eng. Consultant Project Manager Amec Foster Wheeler Environment & Infrastructure 3215 North Service Road, Box 220 Burlington, ON L7R 3Y2 Phone: 905-335-2353 Toll Free: 1-866-751-2353 Fax: 905-335-1414 Email: David.Sinke@AmecFW.com Thank you for your participation King-Vaughan Road Bridge Replacement Class Environmental Assessment Slide 19 of 19